This document is a Pre-Bid Request for Information (RFI) related to a federal contract opportunity to modernize an elevator in Building 200. The key details are:
The federal contract opportunity is Solicitation Number 36C25224B0007 for "Z1DA--578-24-007 CON Modernize Elevator in Building 200", issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 12. The contract is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Contractors must be certified SDVOSBs or have an approved SBA/VA Mentor-Protege partnership to provide bonds or bid guarantees.
The RFI addresses various technical and contractual details of the elevator modernization project, including quality control, lead paint abatement, superintendent qualifications, elevator door frame replacement, fire alarm connections, security requirements, fire stopping, interior finishes, ICRA wall panels, design costs, tax exemption, permitting, drywall patching, painting, and electrical/mechanical/plumbing work. The RFI responses provide clarification on these project requirements.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Date Submitted SUBJECT/COMMENT Responder
1 4/24/2024 Please provide a Quality Control Specification. COR see attached Quality Control PDF
2 4/24/2024 What is expected for the lead paint abatement? Full 100% removal of all designated lead based paint. OR Removal of all COR No lead paint abatement is called for in this project.
3 4/24/2024 Please confirm the role of the Superintendent can be dual hat with the SSHO. COR
You are responsible to all the specifications but Article 1.7 of Section 01 35 26 of the 578- 24-007 Specification Book addresses this issue. "A. The Prime Contractor shall designate a minimum of one SSHO at each project site that will be identified as the SSHO to administer the Contractor's safety program and government-accepted Accident Prevention Plan.", "D.
The SSHO or an equally-qualified Designated Representative/alternate will maintain a presence on the site during construction operations in accordance with FAR Clause 52.236- 6: Therefore; yes, the superintendent can also be the SSHO if qualified.
4 4/24/2024 Please confirm if we are to replace the elevator door frames. COR Yes, reuse existing elevator door frames. See specification 142110.2.40A
5 4/24/2024 Please provide architectural details if the elevator doors frames are to be replace as part of the door replacement item in the SOW. COR The SOW does not include the hoistway door frames as items that need to be replaced.
6 4/24/2024 Please provide elevations for each floor. This information is required to understand if any architectural repair is needed following the replacement of the Corridor Arrival Lantern/Position
COR
Due to to potential of unrecorded interior changes over the years, we don’t have accurate existing interior elevation drawings. Please visit the site and field measure for the concern.
A revit background file can be provided upon request.
7 4/24/2024 Please provide elevator heights to determine cable, hoist ropes, governor rope, and all other items needing to be replace based on the SOW.
COR Please see the newly provided "2022 Southco elevator information PDF" Use this PDF for proposal purposes but all the information needs to be verified upon project execution.
8 4/24/2024 Please confirm if any new Fire Alarm connections and or tie-ins are required. COR All elements of this modernization are to be installed in compliance with manufacturers recommendations and all applicable fire codes and regulations.
9 4/24/2024 Please provide a plan showing where we will need to tie all new data COR Contractor to coordinate with Hines OIT team after site survey to determine suitable location, then provide shop drawings to show proposed pathways and connections.
10 4/24/2024 Please confirm the security scope requirements, if any, within the elevator. COR
Elevator controls should be programmed for restricted access on demand and key card entry. Fire and emergency control features should be in compliance with manufacturers recommendations and applicable codes and regulations
11 4/24/2024 Please confirm if we are to provide new elevator disconnects COR Existing elevator disconnects are to be reused.
12 4/24/2024 Please confirm the fire stopping requirements for this project. COR Follow all applicable codes and regulations regarding fire stopping requirements.
13 4/24/2024 Please confirm the existing interior cab finish is to remain. COR Yes, the interior cab finish is to remain. Please reference item 2.44 pg 177 of the specification Book for details. Among other notes it says to reuse the car interior panels and flooring but it also requires to refinish or replace the entrance panels.
14 4/24/2024 Please confirm if ICRA wall panels are required at each elevator landing floor. COR
See specification "013526.1.12 Infection Control" and "SOW section 3". ICRA wall panels are required on the floors where you access the exposed shaft or the car for demolition or construction purposes. The panels provide a safety barrier and contain fumes, dust and noise. ICRA panels would not be required at entrances that do not open during these times.
ICRA panels would be required for the corridor arrival lantern replacement.
15 4/24/2024 Please confirm if ICRA wall panels are required at each floor, should each floor receive a lockable door. COR
See specification "013526.1.12 Infection Contro" and "SOW section 3". Doors would only be required on the floors that provide necessary access for you to complete the work and maintain safety. Because you have access to the ICRA panel areas from the elevator car, you would not need a panel door at every level.
578-24-007 CON Modernize Elevator in Building 200 Pre-Bid RFIs
S05 - Pre-Bid RFI 578-24-007- Final Copy 1 of 3
16 4/24/2024 Please confirm if the contract is required to carry any design cost associated with this project COR
The contractor is responsible to provide information. See "section 10 of the SOW" and " sections 1.2 and 1.5 of the (Modernize Elevator in Building 200)" and other requirements listed. Costs to produce this information are to be borne by the contractor. Shop drawings, reports and product information are examples of required information.
17 4/24/2024 Please confirm if this project is tax exempt. If so, will the VA provide the documentation to the prime contractor after award? Contracting A Tax Exempt and a Certificate will be provided to the awardee after award.
18 4/24/2024 Please confirm if the contractor is required to carry any additional permit costs for an elevator modernization in the State of Illinois? Contracting If permit costs are required by the State of Illinois for this work, then yes the contractor will be required to carry the costs
19 4/24/2024 Please confirm if any drywall patching is required that a level 4 finish for all finished gypsum board including patches. COR Yes, level four drywall finish is suffecient for required patches.
20 4/24/2024 Please confirm painting unless otherwise noted is to be (3) coats (prime, body, and finish) and will be from "seam to seam" or to a change of materials where walls are patched and refinished.
COR See paint specifications 099100 and yes, your statement meets our expectations.
21 4/24/2024 Please confirm no mechanical work is required for this project? COR No mechanical HVAC work is required for this project.
22 4/24/2024 Please confirm no plumbing work is required for this project? COR No plumbing work is required for this project.
23 4/24/2024 Please confirm no alterations or additions to the existing fire protection service is required? COR Follow all applicable codes and regulations regarding fire protection services.
24 4/24/2024 Please confirm what electrical upgrades are required to accommodate the new elevator equipment COR Existing electrical systems are to be used.
25 4/24/2024 Please provide as built of the existing electrical service and panel locations. This information is required if electrical modifications are required on this contract.
COR See the newly provided electrical information.
26 4/24/2024
Please confirm that this project is a competitive Service-Disabled Veteran-Owned Small Business Set-Aside project and that any bonding provided by a contractor must be through a SDVOSB or SBA/VA APPROVED Mentor-Protege partnership under the SBA/VA Mentor-Protégé program in which the partnership has been approved prior to the bid date.
Contracting This contract is slated for SDVOSB contractors who have met all the of responsibility checks stated in the solicitation. Market research has shown that there are numerous SDVOSBs under the contract NAICS code that can perform the contract requirements
27 4/24/2024
Please confirm that a large business not part of an SBA/VA APPROVED Mentor-Protégé team under the VA Mentor-Protégé program cannot provide a Payment & Performance bond for a
SDVOSB.
Contracting Large businesses will not be considered under this solicitation as stated in the solicitation posted to SAM. Contractors must provide proof that they are certified as a SDVOSB and meet all of the requirements as listed in the solicitation
28 4/24/2024 Please confirm that a large business not part of an SBA/VA APPROVED Mentor-Protégé team under the VA Mentor-Protégé program cannot provide a bid guarantee for a SDVOSB.
Contracting Large businesses will not be considered under this solicitation as stated in the solicitation posted to SAM
29 4/24/2024 Please define off hours, we assume off hours to be second shift work but need confirmation. COR Yes, 2nd shift.
30 4/24/2024 Please confirm this project can be performed during normal working hours. COR See SOW section G.8
31 4/24/2024 Please confirm if Submittal Exchange can be used on this project. COR Yes, Submittal Exchange, Procor, or other electronic submital software are acceptable .
32 4/24/2024 Please confirm the elevator brake pads are non ACM and do not require Asbestos Abatement. COR No asbestos abatement is specified for this project. See OSHA 29 CFR 1910.1001(f)(3)
Standard Interpretations for exceptions to lift brake pads.
S05 - Pre-Bid RFI 578-24-007- Final Copy 2 of 3
33 4/22/2024 Will there be stringent enforcement measures to ensure adherence to subcontracting limits? Additionally, can external entities notify the Contracting Officer in case of any violation?
Contracting
It is our practice to enforce the subcontracting requirements for our contracts here at GLAC. The solicitation spells out those requirements and will be adhered to. We award to primarily SDVOSB companies that meet the responsibility checks and are deemed qualified for award. If you have RFIs for this solicitation, please send them to the appropriate personnel here at GLAC prior to the deadline in the Invitation for Bid and they will be addressed just like all others that are forwarded to us.