About this file

This appears to be a document related to infection control barrier samples. The document provides details on the installation of a Dwyer DigiMag manometer to measure room pressure, with a poly connection to the positive side to provide an accurate reading. The document indicates that a HEPA filter machine should be blowing out of the room. This document does not appear to be directly related to the provided federal contract opportunity, which is for the modernization of an elevator in Building 200.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--578-24-007 CON Modernize Elevator in Building 200, newest first.
File Type Posted
Hines Electrical Distribution - Arc Flash Study 2021.pdf PDF
Wage Determination 05-06-2024.pdf PDF
Bldg. 200 Unit P2..pdf PDF
Quality Control Specification.pdf PDF
EXTERIOR AB Xfrm Drawings.pdf PDF
Pre-Bid RFI Q-A 578-24-007- Final Doc.pdf PDF
Painting Specifications.pdf PDF
36C25224B0007 0001.docx DOCX document
S02 Solicitation 36C25224B0007_1 .pdf PDF
Solicitation 36C25224B0007_1 .pdf PDF
13- Cutting Welding and Other Hot Work.pdf PDF
16- Building 200 Location and Floor Plan.pdf PDF
6- Hines VA Masking and Visitation Policy.pdf PDF
Wage Determination.pdf PDF
578-24-007 Construction SOW.pdf PDF
36C25224B0007_1.docx DOCX document
18- 2022 Elevator Conditions Report.pdf PDF
14- OIT Horizontal Cable Requirements.pdf PDF
5- No Smoking Policy 10-1-19.pdf PDF
1- Hines VA Campus Site Plan.pdf PDF
11- 578-24-007 Infection Control Risk Assessment-ICRA.pdf PDF
10- 578-24-007 Interim Life Safety Measures-ILSM.pdf PDF
9- Pre-Construction Risk Assessment-PCRA.pdf PDF
7- Safety and Health During Construction Activities.pdf PDF
4- Emergency Contact List.pdf PDF
3- Contractor Badging - Fingerprint Request Form.pdf PDF
2- Contractor Parking.pdf PDF
17- Representative Photos of Elevator Equipment.pdf PDF
8- Pre-Construction Checklist.pdf PDF
15-578-24-007 Specification Book.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAHINDoyleL Text Box Entrance

VHAHINDoyleL Text Box Manometer

VHAHINDoyleL Text Box

ICRA

VHAHINDoyleL Text Box

PCRA

VHAHINDoyleL Text Box

ILSM

VHAHINDoyleL Text Box Sign-in

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINSidleB Image

VHAHINSidleB Text Box Dwyer DigiMag Installed on edge guard. Poly is connected to positive side (+) to give accurate reading of room pressure. Hepa filter machine should be blowing out of room.

VHAHINSidleB Image

File details come from the government source that posted it. Updated .