This document appears to be Attachment 2 - Building Automation System (BAS) Drawings related to Solicitation Number 36C25224B0006 for the replacement of the Building Automation System (Metasys) at a Department of Veterans Affairs facility. The solicitation is being issued by the Veterans Health Administration, Veterans Integrated Service Network 12. The document contains drawings and schematics related to the existing BAS system that is to be replaced under this contract. It does not provide details on the specific products, services, or requirements for the replacement system. The key information contained in this attachment is the technical details and specifications of the existing BAS infrastructure that will need to be considered in the replacement effort.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
PROJECT TEAM
PROJECT LEADER/ARCHITECT
PENN CONSTRUCTION GROOP
VETERANS AFFAIRS MEDICAL CENTER
500 E VETERANS ST
TOMAH, WI 54660
CAMPUS MAP
SHEET INDEX
IN THE CASE OF CONFLICTS OR DISCREPANCIES
WITHIN OR AMONG THE CONTRACT DRAWINGS, THE
BETTER QUALITY, MORE STRINGENT REQUIREMENTS
OR GREATER QUANTITY OF WORK, AS DETERMINED
BY THE GOVERNMENT, SHALL BE PROVIDED.
MECHANICAL
PENN CONSTRUCTION GROUP
MECHANICAL
M001 MECHANICAL LEGEND, ABBREVIATIONS, AND NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-21-007
Office of
Facilities
Management
100% BID DOCUMENTS
OCT 16, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE BUILDING
AUTOMATION SYSTEM
(METASYS) DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
GI001
KAB
TITLE SHEET
HFB
MD011 MECHANICAL SITE PLAN WEST - DEMOLITION
ST. FRANCIS LOCATION
3770 S. PENNSYLVANIA AVE., UNIT 8
ST. FRANCIS,WI 53235
PHONE: (414) 391-2797
PENN CONSTRUCTION GROUP
ST. FRANCIS LOCATION
3770 S. PENNSYLVANIA AVE., UNIT 8
ST. FRANCIS,WI 53235
PHONE: (414) 391-2797
MD012 MECHANICAL SITE PLAN EAST - DEMOLITION
MD101 B400 MECHANICAL FIRST FLOOR AND PARTIAL BASEMENT DEMOLITION PLANS
MD102 B400 MECHANICAL SECOND FLOOR DEMOLITION PLAN
MD103 B400 MECHANICAL THIRD FLOOR DEMOLITION PLAN
MD104 B400 MECHANICAL FOURTH DEMOLITION FLOOR
MD105 B400 MECHANICAL ATTIC DEMOLITION PLAN
MD106 B401 MECHANICAL FIRST FLOOR AND PARTIAL BASEMENT DEMOLITION PLANS
MD107
MD108
MD109
MD110
MD111
MD112
MD113
MD115
MD116
MD117
MD118
MD119
MD120
MD122
MD123
MD124
MD125
MD126
MD127
MD128
MD129
MD130
MD131
MD132
MD133
MD134
MD135
MD136
MD137
MD114
MD121
SHEET NUMBER SHEET NAME
GENERAL INFORMATION
GI001 TITLE SHEET
ISSUED FOR
35% BD
ISSUED FOR
65% DD
7/10/2023
5/26/2022
X
ISSUED FOR
95% CD
8/07/2023
ISSUED FOR
100% CD
9/22/2023
X
X
X
X
B401 MECHANICAL SECOND FLOOR DEMOLITION PLAN
B401 MECHANICAL THIRD FLOOR DEMOLITION PLAN
B401 MECHANICAL ATTIC DEMOLITION PLAN
B402 MECHANICAL FIRST FLOOR AND PARTIAL BASEMENT DEMOLITION PLANS
B402 MECHANICAL SECOND DEMOLITION PLAN
B402 MECHANICAL THIRD FLOOR DEMOLITION PLAN
B402 MECHANICAL ATTIC DEMOLITION PLAN
B403 MECHANICAL FIRST FLOOR AND PARTIAL BASEMENT DEMOLITION PLANS
B403 MECHANICAL SECOND FLOOR DEMOLITION PLAN
B403 MECHANICAL THIRD FLOOR DEMOLITION PLAN
B403 MECHANICAL ATTIC DEMOLITION PLAN
B404 MECHANICAL FIRST FLOOR AND PARTIAL BASEMENT DEMOLITION PLANS
B404 MECHANICAL SECOND FLOOR DEMOLITION PLAN
B404 MECHANICAL THIRD FLOOR DEMOLITION PLAN
B404 MECHANICAL ATTIC DEMOLITION PLAN
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
B405 MECHANICAL FIRST FLOOR AND SECOND FLOOR DEMOLITION PLANS
B406 MECHANICAL FIRST FLOOR AND PARTIAL BASEMENT DEMOLITION PLANS
B406 MECHANICAL SECOND FLOOR DEMOLITION PLAN
B406 MECHANICAL THIRD FLOOR DEMOLITION PLAN
B406 MECHANICAL ATTIC DEMOLITION PLAN X
B407 MECHANICAL FIRST FLOOR AND PARTIAL BASEMENT DEMOLITION PLANS
B407 MECHANICAL SECOND FLOOR DEMOLITION PLAN
B407 MECHANICAL THIRD FLOOR DEMOLITION PLAN
(NOT USED)
B408 MECHANICAL FIRST FLOOR AND PARTIAL BASEMENT DEMOLITION PLANS
B408 MECHANICAL SECOND FLOOR DEMOLITION PLAN
B408 MECHANICAL THIRD FLOOR DEMOLITION PLAN
B408 MECHANICAL ATTIC DEMOLITION PLAN
X
X
B409 MECHANICAL FIRST FLOOR AND BASEMENT DEMOLITION PLANS
B410 MECHANICAL FIRST FLOOR AND BASEMENT DEMOLITION PLANS X
X
X
B411 MECHANICAL FIRST FLOOR AND ATTIC DEMOLITION PLANS
MD138
MD139
MD140
MD141
MD142
MD143
B412 MECHANICAL FIRST FLOOR AND ATTIC DEMOLITION PLANS
B415 MECHANICAL FIRST FLOOR, MEZZANINE AND UPPER MEZZANINE DEMOLITION PLANS
B416 MECHANICAL FIRST FLOOR AND BASEMENT DEMOLITION PLANS
B32 MECHANICAL FIRST FLOOR AND BASEMENT DEMOLITION PLANS
X
X
X
X
B40 MECHANICAL GROUND DEMOLITION PLAN
B52/B455 MECHANICAL FIRST FLOOR DEMOLITION PLANS
MD144 B452/B424 MECHANICAL FIRST FLOOR AND ATTIC DEMOLITION PLANS
MD145 B425 MECHANICAL DEMOLITION PLAN
X
MH101 B400 MECHANICAL HVAC FIRST FLOOR AND PARTIAL BASEMENT PLANS
MH102 B400 MECHANICAL HVAC SECOND FLOOR PLAN
MH103 B400 MECHANICAL HVAC THIRD FLOOR PLAN
MH104 B400 MECHANICAL HVAC FOURTH FLOOR
MH105 B400 MECHANICAL HVAC ATTIC PLAN
MH106 B401 MECHANICAL HVAC FIRST FLOOR AND PARTIAL BASEMENT PLANS
MH107
MH108
MH109
MH110
MH111
MH112
MH113
MH115
MH116
MH117
MH118
MH119
MH120
MH122
MH123
MH124
MH125
MH126
MH127
MH128
MH129
MH130
MH131
MH132
MH133
MH134
MH135
MH136
MH137
MH114
MH121
B401 MECHANICAL HVAC SECOND FLOOR PLAN
B401 MECHANICAL HVAC THIRD FLOOR PLAN
B401 MECHANICAL HVAC ATTIC PLAN
B402 MECHANICAL HVAC FIRST FLOOR AND PARTIAL BASEMENT PLANS
B402 MECHANICAL HVAC SECOND FLOOR PLAN
B402 MECHANICAL HVAC THIRD FLOOR PLAN
B402 MECHANICAL HVAC ATTIC PLAN
B403 MECHANICAL HVAC FIRST FLOOR AND PARTIAL BASEMENT PLANS
B403 MECHANICAL HVAC SECOND FLOOR PLAN
B403 MECHANICAL HVAC THIRD FLOOR PLAN
B403 MECHANICAL HVAC ATTIC PLAN
B404 MECHANICAL HVAC FIRST FLOOR AND PARTIAL BASEMENT PLANS
B404 MECHANICAL HVAC SECOND FLOOR PLAN
B404 MECHANICAL HVAC THIRD FLOOR PLAN
B404 MECHANICAL HVAC ATTIC PLAN
B405 MECHANICAL HVAC FIRST FLOOR AND SECOND FLOOR PLANS
B406 MECHANICAL HVAC FIRST FLOOR AND PARTIAL BASEMENT PLANS
B406 MECHANICAL HVAC SECOND FLOOR PLAN
B406 MECHANICAL HVAC THIRD FLOOR PLAN
B406 MECHANICAL HVAC ATTIC PLAN
B407 MECHANICAL HVAC FIRST FLOOR AND PARTIAL BASEMENT PLANS
B407 MECHANICAL HVAC SECOND FLOOR PLAN
B407 MECHANICAL HVAC THIRD FLOOR PLAN
(NOT USED)
B408 MECHANICAL HVAC FIRST FLOOR AND PARTIAL BASEMENT PLANS
B408 MECHANICAL HVAC SECOND FLOOR PLAN
B408 MECHANICAL HVAC THIRD FLOOR PLAN
B408 MECHANICAL HVAC ATTIC PLAN
B409 MECHANICAL HVAC FIRST FLOOR AND BASEMENT PLANS
B410 MECHANICAL HVAC FIRST FLOOR AND BASEMENT PLANS
B411 MECHANICAL HVAC FIRST FLOOR AND ATTIC PLANS
MH138
MH139
MH140
MH141
MH142
MH143
B412 MECHANICAL HVAC FIRST FLOOR AND ATTIC PLANS
B415 MECHANICAL HVAC FIRST FLOOR, MEZZANINE, UPPER MEZZANINE PLANS
B416 MECHANICAL HVAC FIRST FLOOR AND BASEMENT PLANS
B32 MECHANICAL HVAC FIRST FLOOR AND BASEMENT PLANS
B40 MECHANICAL HVAC GROUND FLOOR PLAN
B52/B455 MECHANICAL HVAC FIRST FLOOR PLANS
MH144 B452/B424 MECHANICAL HVAC FIRST FLOOR AND ATTIC PLANS
MH145 B425 MECHANICAL HVAC GROUND FLOOR PLAN
PROJECT NO.: 676-21-007
REPLACE BUILDING AUTOMATION SYSTEM (METASYS)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
MD701 MECHANICAL OVERALL BAS NETWORK DIAGRAMS - DEMOLITION
MD702 MECHANICAL BAS NETWORK DIAGRAM BUILDING 400 - DEMOLITION
MD703
MD704
MD705
MD706
MD707
MD709
MD710
MD711
MD712
MD713
MECHANICAL BAS NETWORK DIAGRAM BUILDING 400 - DEMOLITION
MECHANICAL BAS NETWORK DIAGRAM BUILDING 401 - DEMOLITION
MECHANICAL BAS NETWORK DIAGRAM BUILDING 401 - DEMOLITION
MECHANICAL BAS NETWORK DIAGRAM BUILDING 402 - DEMOLITION
MECHANICAL BAS NETWORK DIAGRAM BUILDING 403 - DEMOLITION
MECHANICAL BAS NETWORK DIAGRAM BUILDINGS 406, 407, AND 408 - DEMOLITION
MECHANICAL BAS NETWORK DIAGRAM BUILDINGS 409 AND 410 - DEMOLITION
MECHANICAL BAS NETWORK DIAGRAM BUILDINGS 411 AND 412 - DEMOLITION
MECHANICAL BAS NETWORK DIAGRAM BLDGS 32, 52, 415, 416, 424, 425 - DEMOLITION
MECHANICAL BAS NETWORK DIAGRAM BUILDINGS 452 AND 455 - DEMOLITION
M011 MECHANICAL SITE PLAN WEST - NEW WORK
M012 MECHANICAL SITE PLAN EAST - NEW WORK
MECHANICAL - CONTINUED
SHEET NUMBER SHEET NAME
ISSUED FOR
35% BD
ISUED FOR
65% DD
7/10/2023
5/26/2022
ISUED FOR
95% CD
8/07/2023
ISUED FOR
100% CD
9/22/2023
M701
M702
M703
M704
M705
MECHANICAL OVERALL BAS NETWORK DIAGRAMS - NEW WORK
MECHANICAL BAS NETWORK DIAGRAM BUILDING 400 - NEW WORK
M706
M707
M708
M709
M710
M711
M712 X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
XX
MECHANICAL BAS NETWORK DIAGRAM BUILDING 400 - NEW WORK
MECHANICAL BAS NETWORK DIAGRAM BUILDING 401 - NEW WORK
MECHANICAL BAS NETWORK DIAGRAM BUILDING 402 - NEW WORK
MECHANICAL BAS NETWORK DIAGRAM BUILDING 403 - NEW WORK
MECHANICAL BAS NETWORK DIAGRAM BUILDINGS 404 AND 405 - NEW WORK
MECHANICAL BAS NETWORK DIAGRAM BUILDINGS 406, 407, AND 408 - NEW WORK
MECHANICAL BAS NETWORK DIAGRAM BUILDINGS 409 AND 410 - NEW WORK
MECHANICAL BAS NETWORK DIAGRAM BUILDINGS 411 AND 412 - NEW WORK
MECHANICAL BAS NETWORK DIAGRAM BLDGS 32, 52, 415, 416, 424, 425 - NEW WORK
MECHANICAL BAS NETWORK DIAGRAM BUILDINGS 452 AND 455 - NEW WORK
E001
ELECTRICAL PARTIAL POWER PLANS
ELECTRICAL
EP102
EP103
EP104
EP101
EP105
EP106
ELECTRICAL PARTIAL POWER PLANS
ELECTRICAL PARTIAL POWER PLANS
ELECTRICAL PARTIAL POWER PLANS
ELECTRICAL PARTIAL POWER PLANS
ELECTRICAL PARTIAL POWER PLANS
X
XX
XX
XX
XX
XX
XX
M501 MECHANICAL DETAILS AND DIAGRAMS X
M502 MECHANICAL DETAILS AND DIAGRAMS X
M503 MECHANICAL DETAILS AND DIAGRAMS X
M504 MECHANICAL DETAILS AND DIAGRAMS X
ELECTRICAL SYMBOLS AND ABBREVIATIONS
EP107 ELECTRICAL PARTIAL POWER PLANS XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
XXX
X
XX
X
X
X
X
XX
X
XX
X
X
X
X
XX
HA101
HA102
HA103
HA104
X
X
X
X
X
B402 HAZARDOUS MATERIALS ATTIC PLAN
B403 HAZARDOUS MATERIALS ATTIC PLAN
B404 HAZARDOUS MATERIALS ATTIC PLAN
B408 HAZARDOUS MATERIALS ATTIC PLAN
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
MD708 MECHANICAL BAS NETWORK DIAGRAM BUILDINGS 404 AND 405 - DEMOLITION
X
X
HAZARDOUS MATERIALS
ISSUED FOR
100% BID
10/16/2023
ISUED FOR
100% BID
10/16/2023
GC101 NOTES AND PHASING
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
O
X
Y
G
E
N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-21-007
Office of
Facilities
Management
100% BID DOCUMENTS
OCT 16, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE BUILDING
AUTOMATION SYSTEM
(METASYS) DESIGN
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
GENERAL
NOTES AND PHASING
1/100" = 1'-0"
PARTIAL SITE PLAN
GC101
AutoCAD SHX Text DUE TO THE CONTINUED OCCUPANCY OF ALL FLOORS INVOLVED IN THIS PROJECT, WITH THE EXCEPTION OF THE CRAWL SPACES, BASEMENTS AND ATTICS, HEPA CARTS MAY BE USED ON THE FIRST, SECOND, AND THIRD FLOORS (AND FOURTH FLOOR OF B400) WITH PRIOR APPROVAL BY THE VA. ALL HEPA CARTS MUST FOLLOWING THESE REQUIREMENTS FOR USE: A. WORKING DIMENSIONS: 1. COLLAPSED: 29"W x 74"L x 68"H - FITS THROUGH A 36" WIDE DOOR FRAME. COLLAPSED: 29"W x 74"L x 68"H - FITS THROUGH A 36" WIDE DOOR FRAME. 2. EXTENDED: REACHES UP TO 10'-6" WITH STANDARD ENCLOSURE. EXTENDED: REACHES UP TO 10'-6" WITH STANDARD ENCLOSURE. B. STRUCTURE: 1. FULLY BOXED ALUMINUM FRAME WITH CASTER AND WHEEL ASSEMBLY RATED FOR 900 FULLY BOXED ALUMINUM FRAME WITH CASTER AND WHEEL ASSEMBLY RATED FOR 900 POUNDS EACH. 2. TOTAL CART RATED FOR 1,500 POUNDS. TOTAL CART RATED FOR 1,500 POUNDS. 3. ALL FOUR CASTERS ARE NON-MARRING, SELF BRAKING. SWIVEL LOCKS ON ONE END. ALL FOUR CASTERS ARE NON-MARRING, SELF BRAKING. SWIVEL LOCKS ON ONE END. C. HEPA-FILTERED NEGATIVE AIR MACHINE: 1. LAB-TESTED DESIGN, INDIVIDUALLY TESTED UNITS, WITH CERTIFIED TESTING RESULTS AND LAB-TESTED DESIGN, INDIVIDUALLY TESTED UNITS, WITH CERTIFIED TESTING RESULTS AND DOCUMENTATION 2. MEDICAL GRADE 99.97% AT 0.03 MICRON, MERV 18 PLUS, DOUBLE GASKETED. MEDICAL GRADE 99.97% AT 0.03 MICRON, MERV 18 PLUS, DOUBLE GASKETED. 3. FAN RATED AT 750 CFM. FAN RATED AT 750 CFM. D. ELECTRICAL: 1. THREE-WAY ELECTRICAL WIRED FOR 120V WITH POWER SAFELY CONTROLLED INSIDE AND THREE-WAY ELECTRICAL WIRED FOR 120V WITH POWER SAFELY CONTROLLED INSIDE AND OUTSIDE THE CART FOR BEST IC PRACTICES. 2. INCLUDES 25 FOOT RETRACTABLE EXTENSION CORD, CONVENIENCE OUTLETS, AND LIGHTING. INCLUDES 25 FOOT RETRACTABLE EXTENSION CORD, CONVENIENCE OUTLETS, AND LIGHTING. E. MECHANISM: 1. AUTOMATED RAISE/LOWER AUTOMATED RAISE/LOWER 2. PUSH BUTTONS RAISE AND LOWER THE ENCLOSURE UP TO 10'-6" STANDARD. PUSH BUTTONS RAISE AND LOWER THE ENCLOSURE UP TO 10'-6" STANDARD. 3. TWO ACTUATORS EACH, RATED FOR 200 POUNDS. TWO ACTUATORS EACH, RATED FOR 200 POUNDS. 4. RAISE AND LOWER IN 30 SECONDS OR LESS WITH NO TOOLS. RAISE AND LOWER IN 30 SECONDS OR LESS WITH NO TOOLS. F. ADJUSTABLE ADVANCED ENCLOSURE: 1. ENCLOSURE FABRICATED WITH DURABLE, HEALTHCARE APPROVED, ANTI-MICROBIAL, ENCLOSURE FABRICATED WITH DURABLE, HEALTHCARE APPROVED, ANTI-MICROBIAL, ANTI-STATIC, FIRE RESISTANT, EASY TO CLEAN MATERIAL; TRANSLUCENT. 2. EACH ENCLOSURE HAS TWO PASS-THRU SLIPS, CLEAR ZIPPING CLOSED TOP, AND EACH ENCLOSURE HAS TWO PASS-THRU SLIPS, CLEAR ZIPPING CLOSED TOP, AND SLIDE-OUT/OFFSET TOP-FRAME TO WORK AROUND WALL OBSTACLES. G. END-ENTRY DOOR: 1. LOCKABLE WITH KEY AND KEY SET. LOCKABLE WITH KEY AND KEY SET. 2. WINDOW AND WORK ORDER/PERMIT SLIDE HOLDER. WINDOW AND WORK ORDER/PERMIT SLIDE HOLDER. H. SAFETY FEATURES: 1. NEGATIVE AIR INDICATOR (MANOMETER). NEGATIVE AIR INDICATOR (MANOMETER). 2. WALK-OFF MAT STORAGE COMPARTMENT BELOW DOOR.WALK-OFF MAT STORAGE COMPARTMENT BELOW DOOR.
AutoCAD SHX Text
REQUIRED HEPA CART FOR DAY WORK, 6 AM TO 6 PM:
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1. VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD PRIOR TO SUBMITTING PROPOSAL. VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD PRIOR TO SUBMITTING PROPOSAL. FAILURE TO DO SO SHALL NOT RELIEVE THIS CONTRACTOR FROM PERFORMING THE WORK REQUIRED UNDER THIS CONTRACT. 2. ALL SUB-CONTRACTORS ARE ENCOURAGED TO VISIT AND ATTEND A PRE-BID WALK THRU TO ALL SUB-CONTRACTORS ARE ENCOURAGED TO VISIT AND ATTEND A PRE-BID WALK THRU TO INSPECT THE EXISTING AREA AND THOROUGHLY FAMILIARIZE THEMSELVES WITH THE ACTUAL JOB CONDITIONS BEFORE SUBMITTING BID. 3. WHILE THE SIZE AND LOCATION OF NEW WORK AND EQUIPMENT IN THE EXISTING AREA HAS WHILE THE SIZE AND LOCATION OF NEW WORK AND EQUIPMENT IN THE EXISTING AREA HAS BEEN INDICATED ON THE DRAWINGS AS ACCURATELY AS POSSIBLE, CONTRACTOR SHALL ADJUST HIS WORK AS REQUIRED TO AVOID EXISTING UTILITIES, FIRE ALARM, ROOF DRAINS, ACCESS COVERS, AND OTHER STRUCTURES NOT PARTICULARLY SHOWN ON PLAN AT NO EXTRA COST. BEFORE CONSTRUCTION, INSPECT PREMISES AND MAKE A DETAILED EXAMINATION OF ALL LOCATIONS WHERE NEW WORK IS TO BE INSTALLED. EXAMINE EXISTING PIPING, CONDUITS, STRUCTURAL SUPPORTING BEAMS, AND OTHER CONDITIONS. 4. ACCESS TO ALL BUILDINGS AND PARKING AREAS MUST BE MAINTAINED THROUGHOUT THE ACCESS TO ALL BUILDINGS AND PARKING AREAS MUST BE MAINTAINED THROUGHOUT THE PROJECT. 5. CONTRACTOR IS TO COORDINATE ALL WORK THE THE VA'S CONTRACTING OFFICER'S CONTRACTOR IS TO COORDINATE ALL WORK THE THE VA'S CONTRACTING OFFICER'S REPRESENTATIVE (COR) 6. DO NOT INTERFERE WITH EXISTING BUILDINGS' MECHANICAL, ELECTRICAL, AND SECURITY DO NOT INTERFERE WITH EXISTING BUILDINGS' MECHANICAL, ELECTRICAL, AND SECURITY SYSTEMS OPERATIONS. IF IT IS NECESSARY TO SHUT DOWN FACILITY SYSTEMS AT ANY TIME, CONSULT VA COR TO MAKE ARRANGEMENTS TO DO SO DURING OFF-HOUR WORKING PERIODS AT THE VA'S CONVENIENCE. PRIOR NOTICE SHALL BE GIVEN TO THE VA AND ARCHITECT/ENGINEER (14) DAYS IN ADVANCE OF THE DESIRED SHUT-DOWN TIME. ANY PREMIUM OR OVERTIME COSTS NECESSARY TO ACCOMPLISH THE ABOVE SHALL BE INCLUDED IN THIS BID. FAILURE TO PROCEED WITHOUT PROPER PRIOR NOTIFICATION MAY RESULT IN THE ASSESSMENT OF A CREDIT TO THE CONTRACT. 7. CONTRACTOR SHALL ADHERE STRICTLY TO STATE AND FEDERAL OCCUPATIONAL SAFETY AND CONTRACTOR SHALL ADHERE STRICTLY TO STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS. 8. CONTRACTOR SHALL PARK ONLY IN THE DESIGNATED PARKING AREAS AND ARE NOT TO PARK CONTRACTOR SHALL PARK ONLY IN THE DESIGNATED PARKING AREAS AND ARE NOT TO PARK ON THE LAWN AREAS; THE ONLY EXCEPTION IS TO LOAD AND UNLOAD SUPPLIES OR EQUIPMENT. 9. CONTRACTOR IS RESPONSIBLE FOR THE SAFEGUARDING OF THEIR TOOLS AND EQUIPMENT. ALL CONTRACTOR IS RESPONSIBLE FOR THE SAFEGUARDING OF THEIR TOOLS AND EQUIPMENT. ALL TOOLS AND EQUIPMENT ARE NOT TO BE LEFT UNATTENDED AND ARE TO BE SECURED AT ALL TIMES WHEN THE CONTRACTOR IS NOT PRESENT. 10. CONTRACTOR MUST CONTROL DEMOLITION AND CONSTRUCTION DUST FROM FACILITY BY CONTRACTOR MUST CONTROL DEMOLITION AND CONSTRUCTION DUST FROM FACILITY BY ERECTING A DUST BARRIER AND VENTILATION WITH HEPA FILTERS. IF VENTING TO OUTSIDE, THE CONTRACTOR WILL ENSURE NEGATIVE AIR PRESSURE IS MAINTAINED IN ENCAPSULATED WORK AREA. WHEN TRANSPORTING DEBRIS, WET DOWN SUFFICIENTLY TO PREVENT DUST SPREADING. 11. IF SCAFFOLDING IS USED, IT MUST BE USED IN ACCORDANCE WITH (OSHA) REGULATIONS AND IF SCAFFOLDING IS USED, IT MUST BE USED IN ACCORDANCE WITH (OSHA) REGULATIONS AND IS TO BE ENCLOSED FOR THE FIRST EIGHT FEET ABOVE GROUND AT END OF EACH WORKING DAY, UNTIL DISMANTLED. LADDERS MUST BE REMOVED AND LOCKED UP AT THE END OF EACH WORKING DAY TO PREVENT UNAUTHORIZED PERSONS FROM HAVING ACCESS. 12. PROTECT ALL EXISTING SURFACES FROM DAMAGE. ANY DAMAGED SURFACES SHALL BE PROTECT ALL EXISTING SURFACES FROM DAMAGE. ANY DAMAGED SURFACES SHALL BE REPLACED TO MATCH ORIGINAL ITEM, OR REPAIRED TO MATCH EXISTING OR ADJACENT MATERIAL AT THE END OF PHASE OF WORK OR WITHIN 10 WORKING DAYS, WHICHEVER IS SOONER. AS APPROVED BY THE VA COR. 13. CONTRACTOR IS RESPONSIBLE FOR REPAIRING AND REPLACING ANY DAMAGED LAWN. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING AND REPLACING ANY DAMAGED LAWN. THE RESTORATION WILL BE PERFORMED BY A LANDSCAPE CONTRACTOR THAT REGULARLY DOES SODDING AS PART OF THEIR BUSINESS. ALL DAMAGED LAWN WILL BE OVERCUT BY 6" OR MORE TO ACCOMMODATE FULL WIDTH ROLLS OF SOD. TOPSOIL TO BE TILLED AND GRADED TO A SMOOTH MATCHING GRADE OF UNDAMAGED LAWN. SOD TO BE THOROUGHLY SATURATED WITH WATER UPON PLACEMENT. THE CONTRACTOR IS RESPONSIBLE FOR WATERING NEW SOD UNTIL PROJECT ACCEPTANCE BY THE COR. 14. CLEAN ALL DEBRIS FROM CONSTRUCTION SITE DAILY TO THE SATISFACTION OF THE VA COR. CLEAN ALL DEBRIS FROM CONSTRUCTION SITE DAILY TO THE SATISFACTION OF THE VA COR. 15. WORK HOURS: WORK HOURS: DAYTIME - NORMAL WORK THAT DOES NOT CREATE VIBRATION, LOUD NOISE OR ODORS, OR - NORMAL WORK THAT DOES NOT CREATE VIBRATION, LOUD NOISE OR ODORS, OR REQUIRES LOADING DOCK / TRUCK SPACE. NIGHT (8 PM - 6 AM) - WORK REQUIRING OUTAGES, TRUCK SPACE. SEE EXCEPTION. 8 PM - 6 AM) - WORK REQUIRING OUTAGES, TRUCK SPACE. SEE EXCEPTION. - WORK REQUIRING OUTAGES, TRUCK SPACE. SEE EXCEPTION. WEEKENDS - WORK THAT CREATES LOUD NOISE, VIBRATIONS, ODORS, OUTAGES AND/OR - WORK THAT CREATES LOUD NOISE, VIBRATIONS, ODORS, OUTAGES AND/OR TRUCK SPACE SEE EXCEPTION. EXCEPTION TO NIGHTS AND WEEKENDS: EXCEPTION IN ALL CLC'S HOUSING PATIENTS. GET THE COR, THE CLC'S MANAGING NURSE, AND THE VA TOMAH HEAD OF NURSING APPROVAL. 17. CONTRACTOR TO PROVIDE "SUBMITTAL EXCHANGE" SECURE ONLINE SYSTEM FOR EXCHANGING, REVIEWING AND ARCHIVING SUBMITTALS, RFIS, AND OTHER CONSTRUCTION COMMUNICATIONS ELECTRONICALLY.
AutoCAD SHX Text
PHASING NOTES:
AutoCAD SHX Text REPLACE BUILDING AUTOMATION SYSTEM (METASYS) DESIGN CONSTRUCTION PHASING AND SUGGESTED INSTALLATION SEQUENCE. PHASE 1: B32 SERVER, B40 PC, SIEMENS HEAD END IN B40, RELATED NEW BAS SYSTEM OPERATING PROGRAMMING, NEW WINDOWS 10 INSTALLATION, AND BAS REQUIRED BAS SYSTEM CABLE INSTALLATION: A. WHILE THE EXISTING CAMPUS BAS SYSTEMS ARE STILL OPERATING, PROVIDE THE NEW WHILE THE EXISTING CAMPUS BAS SYSTEMS ARE STILL OPERATING, PROVIDE THE NEW SERVER IN BUILDING 32. SET-UP THE HARDWARE AND PROGRAMMING FOR FUTURE CONNECTIONS AS CAMPUS BUILDING BECOME AVAILABLE IN THE CONSTRUCTION SEQUENCE. B. WHILE THE EXISTING CAMPUS BAS SYSTEMS ARE STILL OPERATING, PROVIDE THE NEW END WHILE THE EXISTING CAMPUS BAS SYSTEMS ARE STILL OPERATING, PROVIDE THE NEW END USER PC IN BUILDING 40. SET-UP THE HARDWARE AND PROGRAMMING FOR FUTURE CONNECTIONS AS CAMPUS BUILDING BECOME AVAILABLE IN THE CONSTRUCTION SEQUENCE. C. ROUTE NEW REQUIRED CABLES TO/FROM THE NEW SERVER IN B32 TO THE END USER PC IN ROUTE NEW REQUIRED CABLES TO/FROM THE NEW SERVER IN B32 TO THE END USER PC IN B40. D. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 1. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 1. PHASE 1A: B32 A. REMOVE PXCC-1 IN B32 BASEMENT. REMOVE PXCC-1 IN B32 BASEMENT. B. REPLACE LIEBERT UNIT CONTROLLERS IN B32 BASEMENT. REPLACE LIEBERT UNIT CONTROLLERS IN B32 BASEMENT. PHASE 1B: B40 A. DEMOLISH SIEMENS META-PC HEAD END. DEMOLISH SIEMENS META-PC HEAD END. PHASE 2: B400 A. REMOVE S1-NIE01-400, NC-1, NC-7, AND ASSOCIATED CABLING TRUNKS. REMOVE S1-NIE01-400, NC-1, NC-7, AND ASSOCIATED CABLING TRUNKS. B. SIMULTANEOUSLY WITH REMOVAL OF S1-NIE01-400, NC-1, NC-7; PROVIDE NEW SIMULTANEOUSLY WITH REMOVAL OF S1-NIE01-400, NC-1, NC-7; PROVIDE NEW S1-NAE02-400, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. C. REMOVE S1-NAE01-400 AND ASSOCIATED CABLING TRUNKS. REMOVE TRUNK 1 AND TRUNK 2 REMOVE S1-NAE01-400 AND ASSOCIATED CABLING TRUNKS. REMOVE TRUNK 1 AND TRUNK 2 FROM S1-NAE01-400. D. SIMULTANEOUSLY WITH REMOVAL OF S1-NIE01-400, NC-1, NC-7; PROVIDE NEW SIMULTANEOUSLY WITH REMOVAL OF S1-NIE01-400, NC-1, NC-7; PROVIDE NEW S1-NAE03-400, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. E. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 2. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 2. PHASE 3: B401 A. REMOVE PXCM-1 AND ASSOCIATED CABLING TRUNKS. REMOVE PXCM-1 AND ASSOCIATED CABLING TRUNKS. B. SIMULTANEOUSLY WITH REMOVAL OF PXCM-1; PROVIDE NEW S1-NAE02-401, ASSOCIATED SIMULTANEOUSLY WITH REMOVAL OF PXCM-1; PROVIDE NEW S1-NAE02-401, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. C. REMOVE PXCM-2 AND ASSOCIATED CABLING TRUNKS. REMOVE PXCM-2 AND ASSOCIATED CABLING TRUNKS. D. SIMULTANEOUSLY WITH REMOVAL OF PXCM-2; PROVIDE NEW S1-NAE02-401, ASSOCIATED SIMULTANEOUSLY WITH REMOVAL OF PXCM-2; PROVIDE NEW S1-NAE02-401, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. E. REMOVE PXCM-3 AND ASSOCIATED CABLING TRUNKS. REMOVE PXCM-3 AND ASSOCIATED CABLING TRUNKS. F. SIMULTANEOUSLY WITH REMOVAL OF PXCM-3; PROVIDE NEW S1-NAE02-401, ASSOCIATED SIMULTANEOUSLY WITH REMOVAL OF PXCM-3; PROVIDE NEW S1-NAE02-401, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. G. REMOVE PXCM-4, S1-NCE25-401, AND S1-NAE03-401; ALL ASSOCIATED CABLING TRUNKS REMOVE PXCM-4, S1-NCE25-401, AND S1-NAE03-401; ALL ASSOCIATED CABLING TRUNKS AND CONTROL DEVICES. H. SIMULTANEOUSLY WITH REMOVAL OF PXCM-4, S1-NCE25-401, AND S1-NAE03-401; SIMULTANEOUSLY WITH REMOVAL OF PXCM-4, S1-NCE25-401, AND S1-NAE03-401; PROVIDE NEW S1-NAE01-401, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. I. INCLUDING THE FOLLOWING: CHILLER CONTROL, LEGIONELLA CONTROL, HOT WATER PUMPS, INCLUDING THE FOLLOWING: CHILLER CONTROL, LEGIONELLA CONTROL, HOT WATER PUMPS, HEAT EXCHANGERS, CHILLED WATER PUMPS, CONDENSATE PUMPS, AND CONDENSER WATER PUMPS. J. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 3. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 3. PHASE 4: B402 A. REMOVE NC-2, NC-3, PXCC-36, PXC16, S1-NAE19-402, AND S1-NCE1-402 CHILLER, REMOVE NC-2, NC-3, PXCC-36, PXC16, S1-NAE19-402, AND S1-NCE1-402 CHILLER, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. B. SIMULTANEOUSLY WITH REMOVAL OF NC-2, NC-3, PXCC-36, PXC16, S1-NAE19-402, AND SIMULTANEOUSLY WITH REMOVAL OF NC-2, NC-3, PXCC-36, PXC16, S1-NAE19-402, AND S1-NCE1-402 CHILLER; PROVIDE NEW S1-NAE01-402 AND ASSOCIATED CABLING TRUNKS. C. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 4. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 4. PHASE 5: B403 AND B404 A. REMOVE PXC-24, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. REMOVE PXC-24, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. B. SIMULTANEOUSLY WITH REMOVAL OF PXC-24; PROVIDE NEW ASSOCIATED CABLING TRUNKS SIMULTANEOUSLY WITH REMOVAL OF PXC-24; PROVIDE NEW ASSOCIATED CABLING TRUNKS AND CONTROL DEVICES B403. C. REMOVE AND REPLACE CABLING AS NOTED ON DRAWINGS FOR B404. REMOVE AND REPLACE CABLING AS NOTED ON DRAWINGS FOR B404. D. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 5. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 5. PHASE 6: B406 A. REMOVE PXC-16, PXC-24, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. REMOVE PXC-16, PXC-24, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. B. SIMULTANEOUSLY WITH REMOVAL OF PXC-16 AND PXC-24; PROVIDE ALL ASSOCIATED SIMULTANEOUSLY WITH REMOVAL OF PXC-16 AND PXC-24; PROVIDE ALL ASSOCIATED CABLING TRUNKS AND CONTROL DEVICES. C. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 6. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 6. PHASE 7: B407 AND B408 A. REMOVE AND REPLACE CABLING AND DEVICES AS NOTED ON DRAWINGS FOR B407. REMOVE AND REPLACE CABLING AND DEVICES AS NOTED ON DRAWINGS FOR B407. B. REMOVE PXC-1 AND ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES; B408. REMOVE PXC-1 AND ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES; B408. C. SIMULTANEOUSLY WITH REMOVAL OF PXC-1; PROVIDE ALL ASSOCIATED CABLING TRUNKS AND SIMULTANEOUSLY WITH REMOVAL OF PXC-1; PROVIDE ALL ASSOCIATED CABLING TRUNKS AND CONTROL DEVICES; B408 D. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 7. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 7. PHASE 8: B409 AND B410 A. B409: REMOVE PXCM-1, DIAKIN AHU CONTROLS, DEVICE 9000, ASSOCIATED CABLING TRUNKS, B409: REMOVE PXCM-1, DIAKIN AHU CONTROLS, DEVICE 9000, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. B. B409: SIMULTANEOUSLY WITH REMOVAL OF PXCM-1, DIAKIN AHU CONTROLS, AND DEVICE B409: SIMULTANEOUSLY WITH REMOVAL OF PXCM-1, DIAKIN AHU CONTROLS, AND DEVICE 9000; PROVIDE ALL ASSOCIATED CABLING TRUNKS AND CONTROL DEVICES. C. B410: REMOVE PXCM-2, DIAKIN AHU CONTROLS, DEVICE 9000, ASSOCIATED CABLING TRUNKS, B410: REMOVE PXCM-2, DIAKIN AHU CONTROLS, DEVICE 9000, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. D. B410: SIMULTANEOUSLY WITH REMOVAL OF PXCM-2, DIAKIN AHU CONTROLS, AND DEVICE B410: SIMULTANEOUSLY WITH REMOVAL OF PXCM-2, DIAKIN AHU CONTROLS, AND DEVICE 9000; PROVIDE ALL ASSOCIATED CABLING TRUNKS AND CONTROL DEVICES. E. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 8. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 8. PHASE 9: B411 AND B412 A. B411: REMOVE DEVICE 9000, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. B411: REMOVE DEVICE 9000, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. B. B411: SIMULTANEOUSLY WITH REMOVAL OF DEVICE 9000; PROVIDE ALL ASSOCIATED CABLING B411: SIMULTANEOUSLY WITH REMOVAL OF DEVICE 9000; PROVIDE ALL ASSOCIATED CABLING TRUNKS AND CONTROL DEVICES. C. B412: REMOVE DEVICE 9000, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. B412: REMOVE DEVICE 9000, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. D. B412: SIMULTANEOUSLY WITH REMOVAL OF DEVICE 9000; PROVIDE ALL ASSOCIATED CABLING B412: SIMULTANEOUSLY WITH REMOVAL OF DEVICE 9000; PROVIDE ALL ASSOCIATED CABLING TRUNKS AND CONTROL DEVICES. E. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 9. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 9. PHASE 10: B416 A. REMOVE PXCC-1, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. REMOVE PXCC-1, ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. B. SIMULTANEOUSLY WITH REMOVAL OF PXCC-1; PROVIDE ALL ASSOCIATED CABLING TRUNKS SIMULTANEOUSLY WITH REMOVAL OF PXCC-1; PROVIDE ALL ASSOCIATED CABLING TRUNKS AND CONTROL DEVICES. C. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 10. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 10. PHASE 11: B424, B425 AND B455 A. REMOVE ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. REMOVE ASSOCIATED CABLING TRUNKS, AND CONTROL DEVICES. B. SIMULTANEOUSLY WITH REMOVAL; PROVIDE ALL ASSOCIATED CABLING TRUNKS AND CONTROL SIMULTANEOUSLY WITH REMOVAL; PROVIDE ALL ASSOCIATED CABLING TRUNKS AND CONTROL DEVICES. C. FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 11.FOLLOW SPECIFICATION SECTIONS, DRAWING DIAGRAMS, AND DRAWING PLANS FOR PHASE 11.
AutoCAD SHX Text
CONCRETE CURB
AutoCAD SHX Text H
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
BLDG 260
AutoCAD SHX Text
BLDG T290
AutoCAD SHX Text
BLDG 402
AutoCAD SHX Text
BLDG 416
AutoCAD SHX Text
BLDG 403
AutoCAD SHX Text
BLDG 410
AutoCAD SHX Text
BLDG 411
AutoCAD SHX Text
BLDG 405
AutoCAD SHX Text
BLDG 404
AutoCAD SHX Text
BLDG 455
AutoCAD SHX Text
BLDG 455
AutoCAD SHX Text
BLDG 424
AutoCAD SHX Text
BLDG 406
AutoCAD SHX Text
BLDG 415
AutoCAD SHX Text
BLDG T70
AutoCAD SHX Text
BLDG T295
AutoCAD SHX Text
BLDG T296
AutoCAD SHX Text
BLDG 423
AutoCAD SHX Text
BLDG 423
AutoCAD SHX Text
BLDG 36
AutoCAD SHX Text
BLDG T270
AutoCAD SHX Text
BLDG 32
AutoCAD SHX Text
BLDG 401
AutoCAD SHX Text
BLDG 425
AutoCAD SHX Text
BLDG 446
AutoCAD SHX Text
BLDG 52
AutoCAD SHX Text
PROJECT LAYDOWN AREA AND STORAGE TRAILER
AutoCAD SHX Text 50'x50' TEMPARARY CONSTRUCTION FENCE. NO POWER AT THIS LOCATION
AutoCAD SHX Text GENERAL CONTRACTOR OFFICE TRAILER AREA, CONFIRM EXACT LOCATION WITH COR AND CCR BEFORE PLACING. TRAILER MUST BE SECURED TO GROUND PER VA TOMAH REQUIREMENTS. ELECTRICAL POWER CONNECTION BY CONTRACTOR, METERED AND PAID BY CONTRACTOR. WATER AND SEWER CONNECTIONS NOT AVAILABLE.
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
N
A B C D E F G H J K L M N P Q R S TG.5 M.1 M.2 U
6.5
B.2
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-21-007 Office of Facilities
Management
100% BID DOCUMENTS
OCT 16, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE BUILDING
AUTOMATION SYSTEM
(METASYS) DESIGN
3770 S. Pennsylvania Avenue, Unit 8 St. Francis, Wisconsin 53235
HAZARDOUS MATERIALS
ATTIC PLAN
HA101
JMDHFB
1 1/8" = 1'-0"
ATTIC FLOOR
NORTH
B402
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
1. THE ABATEMENT CONTRACTOR SHALL REMOVE THE ABATEMENT CONTRACTOR SHALL REMOVE ASBESTOS CONTAINING MATERIALS AND LEAD-BASE PAINT WHERE IDENTIFIED IN PLANS AS MOST LIKELY TO BE DISTURBED BY DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THIS PROJECT. THE ABATEMENT CONTRACTOR SHALL REVIEW THE "PRE-RENOVATION INSPECTION: ASBESTOS & LEAD-BASED PAINT" ASSESSMENT REPORT, WHICH IS INCLUDED WITHIN THE SPECIFICATIONS. NOTIFY COR PRIOR TO REMOVAL OF ANY ACM OR LEAD-BASED PAINT FOR APPROVAL OF CONTAINMENT, SET UP, AND REMOVAL PROCEDURES. 2. THE ABATEMENT AREA SHALL BE PREPARED AS A THE ABATEMENT AREA SHALL BE PREPARED AS A NEGATIVE PRESSURE CONTAINMENT AREA. DECONTAMINATION SUITES SHALL BE CONSTRUCTED TO PROVIDE AMPLE CLEAN CHANGE AREA FOR ABATEMENT WORKERS. 3. CONTRACTOR SHALL INSTALL ENOUGH HEPA CONTRACTOR SHALL INSTALL ENOUGH HEPA FILTERED EXHAUST FANS TO PROVIDE A MINIMUM OF 4 AIR EXCHANGES PER HOUR, AND CONTINUOUSLY MAINTAIN A PRESSURE DIFFERENTIAL OF -0.02” WATER COLUMN GAUGE. WATER COLUMN GAUGE. 4. AT THE COMPLETION OF THE ASBESTOS AND AT THE COMPLETION OF THE ASBESTOS AND LEAD-BASED PAINT REMOVAL AND CLEANING, THE CONTRACTOR'S PROFESSIONAL INDUSTRIAL HYGIENIST (CPIH) SHALL CONDUCT A THOROUGH INSPECTION TO CONFIRM THAT THE AREA HAS BEEN CLEANED PROPERLY. IF THIS INSPECTION IS SUCCESSFUL, THE VA PROFESSIONAL INDUSTRIAL HYGIENIST (VPIH) SHALL CONDUCT AN INDEPENDENT INSPECTION TO CONFIRM THE AREA HAS BEEN PROPERLY CLEANED. AFTER SUCCESSFUL VISUAL INSPECTION BY THE CPIH AND VPIH, FINAL CLEARANCE AIR SAMPLING PROCEDURES WILL BE CONDUCTED PER SPECIFICATION SECTION 02 82 11, ARTICLE 3.6.4. 5. ACM AND LEAD-BASED PAINT DISPOSAL ACM AND LEAD-BASED PAINT DISPOSAL DOCUMENTATION MUST BE SUBMITTED PRIOR TO RELEASE OF RETAINAGE AND FINAL PAYMENT. 6. ABATEMENT CONTRACTOR SHALL COORDINATE ALL ABATEMENT CONTRACTOR SHALL COORDINATE ALL WORK WITH THE VA CONTRACTING OFFICER'S REPRESENTATIVE (C0R). 7. SEE KEYED NOTES FOR APPROXIMATE LOCATIONS SEE KEYED NOTES FOR APPROXIMATE LOCATIONS OF ASBESTOS CONTAINING MATERIALS AND LEAD-BASED PAINT TO BE REMOVED.
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text
AHU-4
AutoCAD SHX Text
AHU-6
AutoCAD SHX Text
AHU-7
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
AHU-3
AutoCAD SHX Text
AHU-5
AutoCAD SHX Text
SF-7 VFD
AutoCAD SHX Text
RF-7 VFD
AutoCAD SHX Text
RF-7
AutoCAD SHX Text
KEYED NOTES
AutoCAD SHX Text
RELIEF DAMPER-7
AutoCAD SHX Text
RA DAMPER
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
AHU-7 CTRL PNL
AutoCAD SHX Text
EF-7
AutoCAD SHX Text
HUM-7
AutoCAD SHX Text
HCV
AutoCAD SHX Text
CCV
AutoCAD SHX Text
DA TEMP
AutoCAD SHX Text
RF-6
AutoCAD SHX Text
REILEF DAMPER
AutoCAD SHX Text
RETURN DAMPER
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
DA TEMP
AutoCAD SHX Text
AHU-6 CTRL PNL
AutoCAD SHX Text
HUM-6
AutoCAD SHX Text
OA TEMP SENSOR
AutoCAD SHX Text
CCV
AutoCAD SHX Text
HWSP
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HCV
AutoCAD SHX Text
HWS
AutoCAD SHX Text
CCV
AutoCAD SHX Text
RF-6 VFD
AutoCAD SHX Text
SF-6 VFD
AutoCAD SHX Text
HCV
AutoCAD SHX Text
EF-5
AutoCAD SHX Text
RF-5
AutoCAD SHX Text
HUM-5
AutoCAD SHX Text
HTG
AutoCAD SHX Text
CLG
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
RA DAMPER
AutoCAD SHX Text
RF-5 VFD
AutoCAD SHX Text
SF-5 VFD
AutoCAD SHX Text
SF-4 VFD
AutoCAD SHX Text
RF-4 VFD
AutoCAD SHX Text
RF-4
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
RA DAMPER
AutoCAD SHX Text
HCV
AutoCAD SHX Text
CCV
AutoCAD SHX Text
DA TEMP
AutoCAD SHX Text
HUM-4
AutoCAD SHX Text
REILEF DAMPER
AutoCAD SHX Text
AHU-4 CTRL PNL
AutoCAD SHX Text
COA TEMP
AutoCAD SHX Text
HWS CTRL VLV
AutoCAD SHX Text
HWS PUMP
AutoCAD SHX Text
EF-SA
AutoCAD SHX Text
EF-4
AutoCAD SHX Text
RF-3
AutoCAD SHX Text
RELIEF DAMPER
AutoCAD SHX Text
S1-NAE19-402
AutoCAD SHX Text
NC-2
AutoCAD SHX Text
HUM-3
AutoCAD SHX Text
DA TEMP
AutoCAD SHX Text
CCV
AutoCAD SHX Text
HCV
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
RA DAMPER
AutoCAD SHX Text
AHU-3 CTRL PNL
AutoCAD SHX Text
RF-3 VFD
AutoCAD SHX Text
SF-3 VFD
AutoCAD SHX Text
RF-1
AutoCAD SHX Text
SF-1 VFD
AutoCAD SHX Text
RF-1 VFD
AutoCAD SHX Text
HCV
AutoCAD SHX Text
CCV
AutoCAD SHX Text
RELIEF DAMPER (PNEUMATIC)
AutoCAD SHX Text
RA DAMPER
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
DISC TEMP
AutoCAD SHX Text
AHU-1 CTRL PNL (PNEUMATIC)
AutoCAD SHX Text
HUM-1
AutoCAD SHX Text
EF-2
AutoCAD SHX Text
RF-2
AutoCAD SHX Text
OA SENSOR
AutoCAD SHX Text
HUM-2
AutoCAD SHX Text
CLG
AutoCAD SHX Text
HTG
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
RA DAMPER
AutoCAD SHX Text
HWS PUMP
AutoCAD SHX Text
RELIEF DAMPER
AutoCAD SHX Text
SA TEMP
AutoCAD SHX Text
AHU-2 CTRL PNL
AutoCAD SHX Text
SF-2 VFD
AutoCAD SHX Text
RF-2 VFD
AutoCAD SHX Text
AutoCAD SHX Text SILVER PAINT AT CONCRETE FLOOR IN ATTIC CONTAINS ASBESTOS. WHERE CORING THROUGH FLOOR IS REQUIRED FOR NEW CABLE RUNS, PREPARE IMMEDIATE AREA AS A NEGATIVE-PRESSURE CONTAINMENT AREA TO CONTROL, ABATE, AND CLEAN AREA OF ASBESTOS DUST CREATED BY CORING ACTIVITIES. PAINT AT STEEL BEAMS AND COLUMNS IN ATTIC CONTAINS LEAD. WHERE NEW PANELS/DEVICES ARE TO BE MOUNTED ON COLUMNS, REMOVE PAINT FROM ALL SURFACES OF COLUMN, FROM BASE TO BEAM ABOVE.
AutoCAD SHX Text
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
AREA OF HAZARDOUS MATERIALS ABATEMENT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AHU-5 CTRL PNL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
A B C D E
F G H I J K L M N
P Q R S
T
4.8
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-21-007 Office of Facilities
Management
100% BID DOCUMENTS
OCT 16, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE BUILDING
AUTOMATION SYSTEM
(METASYS) DESIGN
3770 S. Pennsylvania Avenue, Unit 8 St. Francis, Wisconsin 53235
HAZARDOUS MATERIALS
ATTIC PLAN
HA102
JMDHFB
1 1/8" = 1'-0"
ATTIC FLOOR PLAN NORTH
B403
AutoCAD SHX Text
DN
AutoCAD SHX Text
S1-NAE-17-403 & S1-NAE-18-403
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text
AHU-4
AutoCAD SHX Text
AHU-5
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
AHU-2 CTRL PNL
AutoCAD SHX Text
AHU-3
AutoCAD SHX Text
EF-9
AutoCAD SHX Text
HCV
AutoCAD SHX Text
CCV
AutoCAD SHX Text
HTG COIL PUMP
AutoCAD SHX Text
SF-4 VFD
AutoCAD SHX Text
AHU-4 CTRL PNL
AutoCAD SHX Text
RF-4
AutoCAD SHX Text
RF-4 VFD
AutoCAD SHX Text
MCC SOUTH PNL
AutoCAD SHX Text
RF-5
AutoCAD SHX Text
EF-10
AutoCAD SHX Text
HUM-5
AutoCAD SHX Text
SF-5 VFD
AutoCAD SHX Text
CCV
AutoCAD SHX Text
HCV
AutoCAD SHX Text
HTG PUMP COIL
AutoCAD SHX Text
AHU-5 CTRL PNL
AutoCAD SHX Text
RF-5 VFD
AutoCAD SHX Text
EF-11
AutoCAD SHX Text
RF-3
AutoCAD SHX Text
EF-8
AutoCAD SHX Text
HTG COIL PUMP
AutoCAD SHX Text
HCV
AutoCAD SHX Text
CCV
AutoCAD SHX Text
AHU-3 CTRL PNL
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
HUM-3
AutoCAD SHX Text
SF-3 VFD
AutoCAD SHX Text
RA DAMPER
AutoCAD SHX Text
RF-3 VFD
AutoCAD SHX Text
EF-11 DAMPER
AutoCAD SHX Text
EF-8 DAMPER
AutoCAD SHX Text
RF-1
AutoCAD SHX Text
EF-1
AutoCAD SHX Text
EF-12
AutoCAD SHX Text
AFMS-EAST
AutoCAD SHX Text
AFMS-SOUTH
AutoCAD SHX Text
HTG HEATING COIL
AutoCAD SHX Text
HTG
AutoCAD SHX Text
CLG
AutoCAD SHX Text
SF-1 VFD
AutoCAD SHX Text
F/S DAMPER
AutoCAD SHX Text
DA TEMP
AutoCAD SHX Text
HUM
AutoCAD SHX Text
RF-1 VFD
AutoCAD SHX Text
RELIEF DAMPER
AutoCAD SHX Text
AHU-1 CTRL PNL
AutoCAD SHX Text
3-F/S DAMPERS
AutoCAD SHX Text
F/S DAMPER
AutoCAD SHX Text
F/S DAMPER
AutoCAD SHX Text
RA DAMPER
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
EA DAMPER
AutoCAD SHX Text
EXH-15
AutoCAD SHX Text
EXH-16
AutoCAD SHX Text
EXH-17
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
KEYED NOTES
AutoCAD SHX Text
AutoCAD SHX Text SILVER PAINT AT CONCRETE FLOOR IN ATTIC CONTAINS ASBESTOS. WHERE CORING THROUGH FLOOR IS REQUIRED FOR NEW CABLE RUNS, PREPARE IMMEDIATE AREA AS A NEGATIVE-PRESSURE CONTAINMENT AREA TO CONTROL, ABATE, AND CLEAN AREA OF ASBESTOS DUST CREATED BY CORING ACTIVITIES. PAINT AT STEEL BEAMS AND COLUMNS IN ATTIC CONTAINS LEAD. WHERE NEW PANELS/DEVICES ARE TO BE MOUNTED ON COLUMNS, REMOVE PAINT FROM ALL SURFACES OF COLUMN, FROM BASE TO BEAM ABOVE.
AutoCAD SHX Text
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
1. THE ABATEMENT CONTRACTOR SHALL REMOVE THE ABATEMENT CONTRACTOR SHALL REMOVE ASBESTOS CONTAINING MATERIALS AND LEAD-BASE PAINT WHERE IDENTIFIED IN PLANS AS MOST LIKELY TO BE DISTURBED BY DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THIS PROJECT. THE ABATEMENT CONTRACTOR SHALL REVIEW THE "PRE-RENOVATION INSPECTION: ASBESTOS & LEAD-BASED PAINT" ASSESSMENT REPORT, WHICH IS INCLUDED WITHIN THE SPECIFICATIONS. NOTIFY COR PRIOR TO REMOVAL OF ANY ACM OR LEAD-BASED PAINT FOR APPROVAL OF CONTAINMENT, SET UP, AND REMOVAL PROCEDURES. 2. THE ABATEMENT AREA SHALL BE PREPARED AS A THE ABATEMENT AREA SHALL BE PREPARED AS A NEGATIVE PRESSURE CONTAINMENT AREA. DECONTAMINATION SUITES SHALL BE CONSTRUCTED TO PROVIDE AMPLE CLEAN CHANGE AREA FOR ABATEMENT WORKERS. 3. CONTRACTOR SHALL INSTALL ENOUGH HEPA CONTRACTOR SHALL INSTALL ENOUGH HEPA FILTERED EXHAUST FANS TO PROVIDE A MINIMUM OF 4 AIR EXCHANGES PER HOUR, AND CONTINUOUSLY MAINTAIN A PRESSURE DIFFERENTIAL OF -0.02” WATER COLUMN GAUGE. WATER COLUMN GAUGE. 4. AT THE COMPLETION OF THE ASBESTOS AND AT THE COMPLETION OF THE ASBESTOS AND LEAD-BASED PAINT REMOVAL AND CLEANING, THE CONTRACTOR'S PROFESSIONAL INDUSTRIAL HYGIENIST (CPIH) SHALL CONDUCT A THOROUGH INSPECTION TO CONFIRM THAT THE AREA HAS BEEN CLEANED PROPERLY. IF THIS INSPECTION IS SUCCESSFUL, THE VA PROFESSIONAL INDUSTRIAL HYGIENIST (VPIH) SHALL CONDUCT AN INDEPENDENT INSPECTION TO CONFIRM THE AREA HAS BEEN PROPERLY CLEANED. AFTER SUCCESSFUL VISUAL INSPECTION BY THE CPIH AND VPIH, FINAL CLEARANCE AIR SAMPLING PROCEDURES WILL BE CONDUCTED PER SPECIFICATION SECTION 02 82 11, ARTICLE 3.6.4. 5. ACM AND LEAD-BASED PAINT DISPOSAL ACM AND LEAD-BASED PAINT DISPOSAL DOCUMENTATION MUST BE SUBMITTED PRIOR TO RELEASE OF RETAINAGE AND FINAL PAYMENT. 6. ABATEMENT CONTRACTOR SHALL COORDINATE ALL ABATEMENT CONTRACTOR SHALL COORDINATE ALL WORK WITH THE VA CONTRACTING OFFICER'S REPRESENTATIVE (C0R). 7. SEE KEYED NOTES FOR APPROXIMATE LOCATIONS SEE KEYED NOTES FOR APPROXIMATE LOCATIONS OF ASBESTOS CONTAINING MATERIALS AND LEAD-BASED PAINT TO BE REMOVED.
AutoCAD SHX Text
AREA OF HAZARDOUS MATERIALS ABATEMENT
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
ROOFROOF
NMLKJHGFEDCBA
P Q R WVUTS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-21-007 Office of Facilities
Management
100% BID DOCUMENTS
OCT 16, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE BUILDING
AUTOMATION SYSTEM
(METASYS) DESIGN
3770 S. Pennsylvania Avenue, Unit 8 St. Francis, Wisconsin 53235
HAZARDOUS MATERIALS
ATTIC PLAN
HA103
JMDHFB
1 1/8" = 1'-0"
ATTIC FLOOR PLAN
NORTH
B404
AutoCAD SHX Text
ATTIC AREA
AutoCAD SHX Text
AutoCAD SHX Text
EQUIPMENT RM
AutoCAD SHX Text
AutoCAD SHX Text
EQUIPMENT RM
AutoCAD SHX Text
AutoCAD SHX Text
EQUIPMENT RM
AutoCAD SHX Text
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
AHU-3
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text
AHU-4
AutoCAD SHX Text
AHU-5
AutoCAD SHX Text
EF-1
AutoCAD SHX Text
EF-3-1
AutoCAD SHX Text
EF-8
AutoCAD SHX Text
EF-8 VFD
AutoCAD SHX Text
EF-4-1
AutoCAD SHX Text
EF-10
AutoCAD SHX Text
EF-2-1
AutoCAD SHX Text
SUB PANEL
AutoCAD SHX Text
CLG
AutoCAD SHX Text
HTG
AutoCAD SHX Text
EF-9
AutoCAD SHX Text
EF-5-1
AutoCAD SHX Text
EF-6
AutoCAD SHX Text
RF-3 VFD
AutoCAD SHX Text
EF-11
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
DX CHILLER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
KEYED NOTES
AutoCAD SHX Text
AutoCAD SHX Text SILVER PAINT AT CONCRETE FLOOR IN ATTIC CONTAINS ASBESTOS. WHERE CORING THROUGH FLOOR IS REQUIRED FOR NEW CABLE RUNS, PREPARE IMMEDIATE AREA AS A NEGATIVE-PRESSURE CONTAINMENT AREA TO CONTROL, ABATE, AND CLEAN AREA OF ASBESTOS DUST CREATED BY CORING ACTIVITIES. PAINT AT STEEL BEAMS AND COLUMNS IN ATTIC CONTAINS LEAD. WHERE NEW PANELS/DEVICES ARE TO BE MOUNTED ON COLUMNS, REMOVE PAINT FROM ALL SURFACES OF COLUMN, FROM BASE TO BEAM ABOVE.
AutoCAD SHX Text
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
1. THE ABATEMENT CONTRACTOR SHALL REMOVE THE ABATEMENT CONTRACTOR SHALL REMOVE ASBESTOS CONTAINING MATERIALS AND LEAD-BASE PAINT WHERE IDENTIFIED IN PLANS AS MOST LIKELY TO BE DISTURBED BY DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THIS PROJECT. THE ABATEMENT CONTRACTOR SHALL REVIEW THE "PRE-RENOVATION INSPECTION: ASBESTOS & LEAD-BASED PAINT" ASSESSMENT REPORT, WHICH IS INCLUDED WITHIN THE SPECIFICATIONS. NOTIFY COR PRIOR TO REMOVAL OF ANY ACM OR LEAD-BASED PAINT FOR APPROVAL OF CONTAINMENT, SET UP, AND REMOVAL PROCEDURES. 2. THE ABATEMENT AREA SHALL BE PREPARED AS A THE ABATEMENT AREA SHALL BE PREPARED AS A NEGATIVE PRESSURE CONTAINMENT AREA. DECONTAMINATION SUITES SHALL BE CONSTRUCTED TO PROVIDE AMPLE CLEAN CHANGE AREA FOR ABATEMENT WORKERS. 3. CONTRACTOR SHALL INSTALL ENOUGH HEPA CONTRACTOR SHALL INSTALL ENOUGH HEPA FILTERED EXHAUST FANS TO PROVIDE A MINIMUM OF 4 AIR EXCHANGES PER HOUR, AND CONTINUOUSLY MAINTAIN A PRESSURE DIFFERENTIAL OF -0.02” WATER COLUMN GAUGE. WATER COLUMN GAUGE. 4. AT THE COMPLETION OF THE ASBESTOS AND AT THE COMPLETION OF THE ASBESTOS AND LEAD-BASED PAINT REMOVAL AND CLEANING, THE CONTRACTOR'S PROFESSIONAL INDUSTRIAL HYGIENIST (CPIH) SHALL CONDUCT A THOROUGH INSPECTION TO CONFIRM THAT THE AREA HAS BEEN CLEANED PROPERLY. IF THIS INSPECTION IS SUCCESSFUL, THE VA PROFESSIONAL INDUSTRIAL HYGIENIST (VPIH) SHALL CONDUCT AN INDEPENDENT INSPECTION TO CONFIRM THE AREA HAS BEEN PROPERLY CLEANED. AFTER SUCCESSFUL VISUAL INSPECTION BY THE CPIH AND VPIH, FINAL CLEARANCE AIR SAMPLING PROCEDURES WILL BE CONDUCTED PER SPECIFICATION SECTION 02 82 11, ARTICLE 3.6.4. 5. ACM AND LEAD-BASED PAINT DISPOSAL ACM AND LEAD-BASED PAINT DISPOSAL DOCUMENTATION MUST BE SUBMITTED PRIOR TO RELEASE OF RETAINAGE AND FINAL PAYMENT. 6. ABATEMENT CONTRACTOR SHALL COORDINATE ALL ABATEMENT CONTRACTOR SHALL COORDINATE ALL WORK WITH THE VA CONTRACTING OFFICER'S REPRESENTATIVE (C0R). 7. SEE KEYED NOTES FOR APPROXIMATE LOCATIONS SEE KEYED NOTES FOR APPROXIMATE LOCATIONS OF ASBESTOS CONTAINING MATERIALS AND LEAD-BASED PAINT TO BE REMOVED.
AutoCAD SHX Text
AREA OF HAZARDOUS MATERIALS ABATEMENT
AutoCAD SHX Text
RF-1 VFD
AutoCAD SHX Text
RA DAMPER
AutoCAD SHX Text
AF ECON
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
AHU-1 CTRL PNL
AutoCAD SHX Text
SF-1 VFD
AutoCAD SHX Text
MIN OA DAMPER
AutoCAD SHX Text
RELIEF IN UNIT
AutoCAD SHX Text
MIN AF
AutoCAD SHX Text
DA TEMP
AutoCAD SHX Text
HUM
AutoCAD SHX Text
DA TEMP
AutoCAD SHX Text
HUM
AutoCAD SHX Text
MCC-3 EQPT
AutoCAD SHX Text
MCC-2 EQPT
AutoCAD SHX Text
SF-3 VFD
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
RA DAMPER IN UNIT
AutoCAD SHX Text
RA DAMPER
AutoCAD SHX Text
OA AF ECON
AutoCAD SHX Text
CLG
AutoCAD SHX Text
HTG
AutoCAD SHX Text
AHU-3 CTRL PNL
AutoCAD SHX Text
EF-4-1 DAMPER
AutoCAD SHX Text
HTG
AutoCAD SHX Text
CLG
AutoCAD SHX Text
MIN OA AF
AutoCAD SHX Text
OA MIN DAMPER
AutoCAD SHX Text
RA DAMPER IN UNIT
AutoCAD SHX Text
OA DAMPER ECON
AutoCAD SHX Text
OA AF ECON
AutoCAD SHX Text
S1-NAE-15 404
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
OA AF ECON
AutoCAD SHX Text
RA DAMPER INSIDE UNIT
AutoCAD SHX Text
RELIEF DAMPER
AutoCAD SHX Text
RF-4 VFD
AutoCAD SHX Text
SF-4 VFD
AutoCAD SHX Text
DA TEMP / HUM
AutoCAD SHX Text
AHU-4 CTRL PNL
AutoCAD SHX Text
OA MIN DAMPER
AutoCAD SHX Text
MIN OA AF
AutoCAD SHX Text
RA DAMPER IN UNIT
AutoCAD SHX Text
RF-2 VFD
AutoCAD SHX Text
HUM
AutoCAD SHX Text
DA TEMP
AutoCAD SHX Text
SF-2 VFD
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
AHU-5 CTRL PNL
AutoCAD SHX Text
RF-5 VFD
AutoCAD SHX Text
SF-5 VFD
AutoCAD SHX Text
AHU-2 CTRL PNL
AutoCAD SHX Text
EF-6 VFD
AutoCAD SHX Text
EF-9 VFD
AutoCAD SHX Text
EF-5-1 VFD
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
G H J K L M N P Q R S TA B C D E F
7.9
10.9
U
7.8
E.5 F.2 F.8 H.8 K.1 L.2 M.6M.2 N.5 N.8 P.3
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
D
C
B
A
97 8654321
Tomah, Wisconsin
676-21-007 Office of Facilities
Management
100% BID DOCUMENTS
OCT 16, 2023
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
REPLACE BUILDING
AUTOMATION SYSTEM
(METASYS) DESIGN
3770 S. Pennsylvania Avenue, Unit 8 St. Francis, Wisconsin 53235
HA104
JMDHFB
1 1/8" = 1'-0"
ATTIC FLOOR NORTH
B408
HAZARDOUS MATERIALS
ATTIC PLAN
AutoCAD SHX Text
RF-1
AutoCAD SHX Text
EF-1-1
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text
RELIEF DAMPER
AutoCAD SHX Text
RA DAMPER
AutoCAD SHX Text
HUM-1
AutoCAD SHX Text
MIN OA DAMPER
AutoCAD SHX Text
AHU-1 CTRL PNL
AutoCAD SHX Text
S1-NAE08-408
AutoCAD SHX Text
SF-1 VFD
AutoCAD SHX Text
OA DAMPER
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
AHU-3
AutoCAD SHX Text
AHU-4
AutoCAD SHX Text
AHU-5
AutoCAD SHX Text
AHU-6
AutoCAD SHX Text
EF-4
AutoCAD SHX Text
EF-2-1
AutoCAD SHX Text
EF-2-2
AutoCAD SHX Text
RF-2
AutoCAD SHX Text
EF-1
AutoCAD SHX Text
EF-3-1
AutoCAD SHX Text
RF-3
AutoCAD SHX Text
EF-4-3
AutoCAD SHX Text
RF-4
AutoCAD SHX Text
EF-4-1
AutoCAD SHX Text
EF-6-1
AutoCAD SHX Text
EF-3
AutoCAD SHX Text
RF-6
AutoCAD SHX Text
RF-5
AutoCAD SHX Text
EF-5-1
AutoCAD SHX Text
EF-5-2
AutoCAD SHX Text
AHU-2 CTRL…