36C25219B0050-007.pdf
PDF 12 MB Posted
- Solicitation number
- 36C25219B0050
About this file
36C25219B0050 Drawings 3 of 4.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25219C0175-000.docx | DOCX document | |
| 36C25219B0050-0004001.pdf | ||
| 36C25219B0050-0004000.docx | DOCX document | |
| 36C25219B0050-0003001.pdf | ||
| 36C25219B0050-0003000.docx | DOCX document | |
| 36C25219B0050-0002004.pdf | ||
| 36C25219B0050-0002001.pdf | ||
| 36C25219B0050-0002003.pdf | ||
| 36C25219B0050-0002005.zip | ZIP file | |
| 36C25219B0050-0002000.docx | DOCX document | |
| 36C25219B0050-0002002.pdf | ||
| 36C25219B0050-0001000.docx | DOCX document | |
| 36C25219B0050-0001001.pdf | ||
| 36C25219B0050-010.pdf | ||
| 36C25219B0050-014.pdf | ||
| 36C25219B0050-015.pdf | ||
| 36C25219B0050-004.docx | DOCX document | |
| 36C25219B0050-005.pdf | ||
| 36C25219B0050-012.pdf | ||
| 36C25219B0050-011.pdf | ||
| 36C25219B0050-009.pdf | ||
| 36C25219B0050-008.pdf | ||
| 36C25219B0050-006.pdf | ||
| 36C25219B0050-013.pdf | ||
| 36C25219B0050-016.pdf | ||
| 36C25219B0050-001.docx | DOCX document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
JOHNSONWILBUR ADAMS, INC.
Wheaton, Illinois 60187 330 S. Naperville Road Suite 300
STRUCTURAL ENGINEERING
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
95% RE-SUBMISSION ON SCOPE OF WORK DWGS 01-22-2019
FINAL CONSTRUCTION DOCUMENT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
JOHNSONWILBUR ADAMS, INC.
Wheaton, Illinois 60187 330 S. Naperville Road Suite 300
STRUCTURAL ENGINEERING
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
JOHNSONWILBUR ADAMS, INC.
Wheaton, Illinois 60187 330 S. Naperville Road Suite 300
STRUCTURAL ENGINEERING
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
JOHNSONWILBUR ADAMS, INC.
Wheaton, Illinois 60187 330 S. Naperville Road Suite 300
STRUCTURAL ENGINEERING
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
JOHNSONWILBUR ADAMS, INC.
Wheaton, Illinois 60187 330 S. Naperville Road Suite 300
STRUCTURAL ENGINEERING
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
JOHNSONWILBUR ADAMS, INC.
Wheaton, Illinois 60187 330 S. Naperville Road Suite 300
STRUCTURAL ENGINEERING
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
T
FID
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
18x18
S1
6x4
S1
6x4
S1
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
6x4
S1
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
ACCESS PANEL
ACCESS DOOR
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
TYPICAL MANUAL AIR VENT
TYPICAL CHILLED AND HOT WATER
PIPING DRAIN VALVE CONNECTIONS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
SEE DRAWINGS FOR PIPE
SIZE AND MATERIAL.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
SA
VFD
OA
SA
VFD
Split
VFD
RA
SA
VFD
Split
VFD
RA
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
RELIEF
AIR
VFD
RETURN AIR
INDOORS OUTDOORS
DPS
AI
OUTSIDE
AIR
AI-OUTDOOR AIRFLOW
VFD
AI
SUPPLY AIR
H-1 AI
D-3
D-1
BI- HIGH PRESSURE STATIC
B1 TO FIRE ALARM
AI
T-2
AI
D-2
STEAM HUMIDIFIER
LOCATED AT THE NORTH
FACE OF BUILDING WALL
COORDINATE EXACT
LOCATION WITH
COR/BUILDING ENGINEER.
LOCATED IN THE
SPACE. FIELD VERIFY
EXACT LOCATION
V-1 V-2
GLYCOL CHILLED WATER &
GYLCOL PREHEAT COIL
SUPPLY AIR
BI- DUCT PRESSURE STATIC
T
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
OUTSIDE
AIR
AI-OUTDOOR AIRFLOW
VFD
AI
SUPPLY AIR
D-1
BI- HIGH PRESSURE STATIC
B1 TO FIRE ALARM
AI
STEAM HUMIDIFIER
V-1 V-2
GLYCOL CHILLED
WATER & GYLCOL
PREHEAT COIL
T
H
VFD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
VFD
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
1 2 3 4 5 6 87 9
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
NOTES:
SPECIAL NOTES:
MOUNTING HEIGHTSDEVICE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018