36C25219B0050-006.pdf
PDF 12 MB Posted
- Solicitation number
- 36C25219B0050
About this file
36C25219B0050 Drawings 2 of 4.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25219C0175-000.docx | DOCX document | |
| 36C25219B0050-0004001.pdf | ||
| 36C25219B0050-0004000.docx | DOCX document | |
| 36C25219B0050-0003001.pdf | ||
| 36C25219B0050-0003000.docx | DOCX document | |
| 36C25219B0050-0002004.pdf | ||
| 36C25219B0050-0002001.pdf | ||
| 36C25219B0050-0002003.pdf | ||
| 36C25219B0050-0002005.zip | ZIP file | |
| 36C25219B0050-0002000.docx | DOCX document | |
| 36C25219B0050-0002002.pdf | ||
| 36C25219B0050-0001000.docx | DOCX document | |
| 36C25219B0050-0001001.pdf | ||
| 36C25219B0050-010.pdf | ||
| 36C25219B0050-014.pdf | ||
| 36C25219B0050-015.pdf | ||
| 36C25219B0050-004.docx | DOCX document | |
| 36C25219B0050-005.pdf | ||
| 36C25219B0050-012.pdf | ||
| 36C25219B0050-007.pdf | ||
| 36C25219B0050-011.pdf | ||
| 36C25219B0050-009.pdf | ||
| 36C25219B0050-008.pdf | ||
| 36C25219B0050-013.pdf | ||
| 36C25219B0050-016.pdf | ||
| 36C25219B0050-001.docx | DOCX document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
95% RE-SUBMISSION ON SCOPE OF WORK DWGS 01-22-2019
X
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
SEQUENCE A-1
SEQUENCE A-1
SEQUENCE A-1
S E
Q U
E N
C E
A
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
S E
Q U
E N
SEQUENCE A-1
S E
Q U
E N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
SEQUENCE B-2
SEQUENCE C-2
SEQUENCE D-2
SEQUENCE C-2
S E
Q U
E N
B
SEQUENCE A-1
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
SD
SD
S
SD
SD
SEQUENCE A-1
SEQUENCE A-1
SEQUENCE B-1
S E
Q U
E N
S E
Q U
E N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
SD
SD
WAP
SEQUENCE A-1
SEQUENCE C-2
S E
Q U
E N
S E
Q U
E N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
WAP
WAP
V
V V
T
V
S E
Q U
E N
SEQUENCE B-2
SEQUENCE C-2
SEQUENCE D-2
SEQUENCE D-2
SEQUENCE E-1
SEQUENCE E-1
SEQUENCE E-1
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
AT GRADE
LEVEL
SIM.
SEQUENCE A-2
SEQUENCE A-2
S E
Q U
E N
ALONG
ENTIRE
WALL
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
SEQUENCE A-2
SEQUENCE B-5
SEQUENCE C-6
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
SD
S
SD
SD
SEQUENCE A-2
SEQUENCE A-2
S E
Q U
E N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
WAP
S
SD
SD
SEQUENCE A-2
SEQUENCE C-6
SEQUENCE C-6
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
WAP
WAP
S
V
V V
T
V
SEQUENCE B-2
SEQUENCE B-5
S E
Q U
E N
SEQUENCE C-6
SEQUENCE D-4
SEQUENCE D-4
SEQUENCE E-2
SEQUENCE E-2
SEQUENCE C-6
SEQUENCE E-2
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
95% RE-SUBMISSION ON SCOPE OF WORK DWGS 01-22-2019
1.
2.
3.
4.
5.
6.
7.
8.
9.
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
95% RE-SUBMISSION ON SCOPE OF WORK DWGS 01-22-2019
1.
2.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
A-501
A-501
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
File details come from the government source that posted it.