36C25219B0050-0002001.pdf
PDF 3 MB Posted
- Solicitation number
- 36C25219B0050
About this file
36C25219B0050 0002 AMD 0002 Drawing G004A.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25219C0175-000.docx | DOCX document | |
| 36C25219B0050-0004001.pdf | ||
| 36C25219B0050-0004000.docx | DOCX document | |
| 36C25219B0050-0003001.pdf | ||
| 36C25219B0050-0003000.docx | DOCX document | |
| 36C25219B0050-0002004.pdf | ||
| 36C25219B0050-0002003.pdf | ||
| 36C25219B0050-0002005.zip | ZIP file | |
| 36C25219B0050-0002000.docx | DOCX document | |
| 36C25219B0050-0002002.pdf | ||
| 36C25219B0050-0001000.docx | DOCX document | |
| 36C25219B0050-0001001.pdf | ||
| 36C25219B0050-010.pdf | ||
| 36C25219B0050-014.pdf | ||
| 36C25219B0050-015.pdf | ||
| 36C25219B0050-004.docx | DOCX document | |
| 36C25219B0050-005.pdf | ||
| 36C25219B0050-012.pdf | ||
| 36C25219B0050-007.pdf | ||
| 36C25219B0050-011.pdf | ||
| 36C25219B0050-009.pdf | ||
| 36C25219B0050-008.pdf | ||
| 36C25219B0050-006.pdf | ||
| 36C25219B0050-013.pdf | ||
| 36C25219B0050-016.pdf | ||
| 36C25219B0050-001.docx | DOCX document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT + ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Bancroft AE No.
700 Nicholas Blvd. Suite 300
Elk Grove Village, IL 60007
T:847.952.9362 www.bancroft-ae.com
Revisions: Date
KEY PLAN:
14-101-06
FINAL CONSTRUCTION DOCUMENT
35% SCHEMATIC DESIGN SUBMISSION
03-09-2018
95% CONSTRUCTION DOCUMENT SUBMISSION 10-12-2018
N
ENGINEERS + CONSULTANTS:
VA CONTRACT NO. VA69D-14-D-0109
65% DESIGN DEVELOPMENT SUBMISSION
04-27-2018
65% DESIGN DEVELOPMENT RE-SUBMISSION 08-06-2018
95% C.D.RE-SUBMISSION 12-12-2018
FINAL CONSTRUCTION DOCUMENT 02-21-2019
95% RE-SUBMISSION ON SCOPE OF WORK DWGS 01-22-2019
Amendment 2 5/30/2019
File details come from the government source that posted it.