36C25218B0596-00005057.pdf
PDF 14 MB Posted
- Solicitation number
- 36C25218B0596
About this file
36C25218B0596 00005 550-15-107 Drawings V3 - Vol 2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25218B0596-00006002.docx | DOCX document | |
| 36C25218B0596-00006000.docx | DOCX document | |
| 36C25218B0596-00006001.pdf | ||
| 36C25218B0596-00005055.pdf | ||
| 36C25218B0596-00005052.docx | DOCX document | |
| 36C25218B0596-00005053.pdf | ||
| 36C25218B0596-00005058.pdf | ||
| 36C25218B0596-00005056.pdf | ||
| 36C25218B0596-00005054.pdf | ||
| 36C25218B0596-00004000.docx | DOCX document | |
| 36C25218B0596-00003001.pdf | ||
| 36C25218B0596-00003000.docx | DOCX document | |
| 36C25218B0596-00003002.pdf | ||
| 36C25218B0596-00002001.pdf | ||
| 36C25218B0596-00002000.docx | DOCX document | |
| 36C25218B0596-00001001.pdf | ||
| 36C25218B0596-00001000.docx | DOCX document | |
| 36C25218B0596-003.pdf | ||
| 36C25218B0596-002.docx | DOCX document | |
| 36C25218B0596-004.pdf | ||
| 36C25218B0596-001.docx | DOCX document | |
| 36C25218B0596-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHADANSHOVIM1
Text Box 22 11 00
22 11 00
VHADANSHOVIM1
Typewritten Text
3. ROVIDE NEW MONITORING POINT FOR INCOMING
BUILDING WATER PRESSURE.
22 11 00
VHADANSHOVIM1
Typewritten Text
3. PROVIDE NEW MONITORING POINT FOR INCOMING BUILDING WATER PRESSURE..
22 11 00
VHADANSHOVIM1
3. PROVIDE NEW MONITORING POINT FOR INCOMING BUILDING WATER PRESSURE.
22 11 00
VHADANSHOVIM1
2. PROVIDE NEW MONITORING POINT FOR INCOMING BUILDING WATER PRESSURE.
22 11 00
VHADANSHOVIM1
22 11 00
VHADANSHOVIM1
22 11 00
VHADANSHOVIM1
SPA 7
MMA-1
MMA-2
ACM DEBRIS ABOVE PLASTER CEILING
o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Basement
RBE JEM
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *
ITEM
(BASEMENT)
680 L.F.AIR CELL PIPE & PIPE FITTING INS.
340 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 250 EA.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
= ACM CORK CEILING MASTIC
LEGEND
540 S.F.CORK CEILING & MASTIC
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-B
Department of
Veterans Affairs
TPA-1
SPA-1
MXA-1
MCA-1
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey First Floor
RBE JEM
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *ITEM
(1ST FLOOR)
572 L.F.AIR CELL PIPE & PIPE FITTING INS.
154 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 252 EA.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
70 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-1
MATCHLINE
MATCHLINE
MATCHLINE
TPA-2
MCA-2
SPA-2
MXA-2
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Second Floor
RBE JEM
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *ITEM
(2ND FLOOR)
384 L.F.AIR CELL PIPE & PIPE FITTING INS.
192 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 120 EA.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
40 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS
MAG BLOCK PIPE & PIPE FITTING INSULATION 48 L.F.
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-2
MATCHLINE
MATCHLINE
MCA-3
TPA-3
MXA-3
SPA-3
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Third Floor
RBE JEM
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
ESTIMATED QUANTITIES
QUANTITY *ITEM
(3RD FLOOR)
288 L.F.AIR CELL PIPE & PIPE FITTING INS.
144 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 64 EA.
80 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-3
MCB-2
MXA-4
MCB-1
MCC-1
MCC-2
SPA-4
ACM DEBRIS ABOVE CEILING
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Fourth Floor
RBE JEM
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *ITEM
(4TH FLOOR)
144 L.F.AIR CELL PIPE & PIPE FITTING INS.
72 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 140 EA.
15 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-4
MCC-3
SPA-6
MCB-3
SPA-5
MXA-5
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Fifth Floor
RBE JEM
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *
ITEM
(5TH FLOOR)
72 L.F.AIR CELL PIPE & PIPE FITTING INS.
36 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 46 EA.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-5
(EX) CW RISER
(EX) HOSE BIBB
HB-1
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Attic
RBE JEM
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *ITEM
(ATTIC)
PIPE FITTING INSULATION ON F.G. RUNS 4 EA.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-A
File details come from the government source that posted it.