36C25218B0596-00002001.pdf
PDF 27 MB Posted
- Solicitation number
- 36C25218B0596
About this file
36C25218B0596 00002 550-15-107 Drawings V2 REPOSTED.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25218B0596-00006002.docx | DOCX document | |
| 36C25218B0596-00006000.docx | DOCX document | |
| 36C25218B0596-00006001.pdf | ||
| 36C25218B0596-00005055.pdf | ||
| 36C25218B0596-00005057.pdf | ||
| 36C25218B0596-00005052.docx | DOCX document | |
| 36C25218B0596-00005053.pdf | ||
| 36C25218B0596-00005058.pdf | ||
| 36C25218B0596-00005056.pdf | ||
| 36C25218B0596-00005054.pdf | ||
| 36C25218B0596-00004000.docx | DOCX document | |
| 36C25218B0596-00003001.pdf | ||
| 36C25218B0596-00003000.docx | DOCX document | |
| 36C25218B0596-00003002.pdf | ||
| 36C25218B0596-00002000.docx | DOCX document | |
| 36C25218B0596-00001001.pdf | ||
| 36C25218B0596-00001000.docx | DOCX document | |
| 36C25218B0596-003.pdf | ||
| 36C25218B0596-002.docx | DOCX document | |
| 36C25218B0596-004.pdf | ||
| 36C25218B0596-001.docx | DOCX document | |
| 36C25218B0596-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHADANSHOVIM1
Typewritten Text
P-B130 PLUMBING BLDG 130
P-B131 PLUMBING BLDG 131
VHADANSHOVIM1
Line
VHADANSHOVIM1
Line
Line
PHASE 1 (TYPICAL ON ALL
FLOORS)
PHASE 2 INSTALL THE MAINS
AND CONNECT THE FIXTURE
FROM THE MAINS. BOUNDARY
AREA CAN VARY PER OWNER
DIRECTION. PROVIDE VALVE
ARRANGEMENTS ON THE MAINS
AS SHOWN
BASEMENT AREA CAN BE DONE ALL
IN ONE PHASE
GC101
PHASING PLAN
PHASING NOTES:
A. CONTRACTOR SHALL CONSTRUCT DUST PARTITIONS
PRIOR TO THE START OF DEMOLITION AND THEY MUST
REMAIN IN PLACE UNTIL THE COMPLETION OF THAT
PHASE OR SUBSEQUENT PHASES WHERE REQUIRED.
B. ADJACENT TO VA OCCUPIED AREAS IN SUCH A
MANNER TO ENSURE:
i. THE CONTINUOUS AND UNINTERRUPTED USE OF ALL
OCCUPIED AREAS, INCLUDING THE APPLICABLE
MECHANICAL AND ELECTRICAL SYSTEMS SERVING
THESE AREAS.
ii. PROTECTION OF PATIENTS AND PERSONNEL IN
OCCUPIED AREAS FROM THE HAZARDS AND DUST
ASSOCIATED WITH A CONSTRUCTION ENVIRONMENT.
iii. THE WORK AREAS ARE TO BE KEPT CLEAR, CLEAN, AND FREE OF LOOSE DEBRIS, CONSTRUCTION
MATERIALS AND PARTIALLY INSTALLED WORK WHICH
WOULD CREATE A SAFE HAZARD OR INTERFERE WITH
PATIENT AND PERSONNEL DUTIES AND TRAFFIC. THE
CONTRACTOR SHALL SWEEP THE AREAS CLEAN AT THE
END OF EACH WORK DAY AND MAKE EVERY EFFORT TO
KEEP DUST AND NOISE TO A MINIMUM AT ALL TIMES.
iv. TEMPORARY INTERRUPTIONS OR SHUTDOWN OF
ANY UTILITY OR ELECTRICAL/MECHANICAL SYSTEM
SHOULD BE REQUESTED FROM THE COR 48 HOURS
PRIOR TO THE DESIRED TIME, AND SHOULD BE
PERFORMED AT TIMES OTHER THAN THE STATION'S
NORMAL HOURS OF OPERATION OR AS DIRECTED BY
THE COR.
v. TWO WEEKS (14 CALENDAR DAYS) PRIOR TO
STARTING WORK IN ANY PHASE THE CONTRACTOR
SHALL NOTIFY THE COR, IN WRITING, OF DATE HE PLANS
TO COMPLETE THE PRECEDING PHASE. IN NO CASE
WILL BE CONTRACTOR BEGIN WORK IN ANY PHASE
WITHOUT OBTAINING WRITTEN APPROVAL FROM THE
COR.
C. EACH INDIVIDUAL PHASE OR SUB-PHASE OF WORK
INDICATED IS TO BE FULLY COMPLETED PRIOR TO THE
START OF THE NEXT SEQUENTIAL PHASE OF WORK,
WITH ACCOMMODATIONS MADE BY THE CONTRACTOR
FOR ALL NECESSARY BRIDGING WORK, TEMPORARY
CONSTRUCTION, AND OWNER MOVE-OUT / MOVE-IN
OCCUPANCY SCHEDULE.
D. ALL INTERIM LIFE SAFETY MEASURES AND OTHER
NECESSARY PROTECTION MEASURES, MUST BE
INSTALLED DURING PRE-DEMOLITION PERIODS
PRECEDING EACH PHASE, I.E. AFTER OWNER MOVES
ARE COMPLETED BUT BEFORE THE START OF
HAZARDOUS MATERIAL ABATEMENT OR DEMOLITION.
E. DURING EACH INDIVIDUAL PHASE OR SUB-PHASE OF
WORK, MAINTAIN ACTIVE PLUMBING SERVICES IN AREAS
TO BE DEMOLISHED. ALL ACTIVE PLUMBING SERVICES
MUST BE PROTECTED AND KEPT ACTIVE UNTIL NEW
PLUMBING SERVICES ARE IN PLACE AND TIE-INS TO THE
FIXTURES HAVE BEEN COMPLETED.
PHASE 1:
• BASEMENT: INSTALL NEW WATER MAIN, NEW
BACKFLOW PREVENTER, NEW WATER HEATERS,
NEW CIRCULATION PUMPS, NEW MONITORING
POINTS. INSTALL THE MAINS AND THE RISER
• 1ST, 2ND, 3RD, 4TH, 5TH AND ATTIC: INSTALL THE
RISERS AND TEE OFF HORIZONTALLY WITH VALVES.
PHASE 2:
• BASEMENT: INSTALL THE MAINS AND CONNECT THE
FIXTURE FROM THE MAINS. BOUNDARY AREA CAN
VARY PER OWNER DIRECTION. PROVIDE VALVE
ARRANGEMENTS ON THE MAINS AS SHOWN ON THE
DRAWINGS. (FOR BASEMENT PHASE 1 AND 2 CAN BE
COMBINED)
• 1ST, 4TH, 5TH AND ATTIC: PROGRESSIVE INSTALL
THE MAINS AND CONNECT THE FIXTURE FROM THE
MAINS STARTING FROM CENTER TO THE ENDS OF
EACH WING. BOUNDARY AREA CAN VARY PER
OWNER DIRECTION. PROVIDE VALVE
ARRANGEMENTS ON THE MAINS AS SHOWN ON THE
DRAWINGS.
• 2ND AND 3RD: INSTALL THE HORIZONTAL MAINS
TEE OFF VALVES FOR FUTURE CONNECTION.
PHASE 3:
• 2ND AND 3RD: CONNECT THE FIXTURE FROM THE
MAINS STARTING FROM THE ENDS OF EACH WING.
BOUNDARY AREA CAN VARY PER OWNER
DIRECTION.
PHASING
BASE BID: B58 BASEMENT, RISERS TO ATTIC,
5TH FLOOR, 4TH FLOOR, 3RD FLOOR,
2ND FLOOR & 1ST FLOOR.
INCLUDING ALL PHASES SHOWN ON GC SERIES
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND
FLOOR.
INCLUDING:
- PHASE 1 AND 2 ON GC-101
- PHASE 1 AND 2 ON GC-102
- PHASE 1 ON GC-103 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 ON GC-104 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 AND 2 ON GC-105
- PHASE 1 AND 2 ON GC-106
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #2: WITHOUT CONTINUOUS
MONITORING SYSTEM FOR B58, B39, B101,
B102, B128 AND B129
INCLUDING:
- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,
4TH FLOOR, 3RD FLOOR, 2ND FLOOR
& 1ST FLOOR. INCLUDING ALL PHASES SHOWN
ON GC SERIES
7/11/2017
PHASE 2 PROGESSIVE INSTALL
THE MAINS AND CONNECT THE
FIXTURE FROM THE MAINS
STARTING FROM CENTER TO THE
ENDS OF EACH WING.
BOUNDARY AREA CAN VARY PER
OWNER DIRECTION. PROVIDE
VALVE ARRANGEMENTS ON THE
MAINS AS SHOWN
GC102
PHASING PLAN
BASE BID: B58 BASEMENT, RISERS TO ATTIC,
5TH FLOOR, 4TH FLOOR, 3RD FLOOR,
2ND FLOOR & 1ST FLOOR.
INCLUDING ALL PHASES SHOWN ON GC SERIES
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND
FLOOR.
INCLUDING:
- PHASE 1 AND 2 ON GC-101
- PHASE 1 AND 2 ON GC-102
- PHASE 1 ON GC-103 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 ON GC-104 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 AND 2 ON GC-105
- PHASE 1 AND 2 ON GC-106
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #2: WITHOUT CONTINUOUS
MONITORING SYSTEM FOR B58, B39, B101,
B102, B128 AND B129
INCLUDING:
- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,
4TH FLOOR, 3RD FLOOR, 2ND FLOOR
& 1ST FLOOR. INCLUDING ALL PHASES SHOWN
PHASE 2 INSTALL THE
HORIZONTAL MAINS TEE OFF
VALVES FOR FUTURE
CONNECTION
PHASE 3 CONNECT THE FIXTURE
FROM THE MAINS STARTING
FROM THE ENDS OF EACH WING.
BONDRY AREA CAN VARY PER
OWNER DIRECTION
GC103
PHASING PLAN
BASE BID: B58 BASEMENT, RISERS TO ATTIC,
5TH FLOOR, 4TH FLOOR, 3RD FLOOR,
2ND FLOOR & 1ST FLOOR.
INCLUDING ALL PHASES SHOWN ON GC SERIES
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND
FLOOR.
INCLUDING:
- PHASE 1 AND 2 ON GC-101
- PHASE 1 AND 2 ON GC-102
- PHASE 1 ON GC-103 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 ON GC-104 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 AND 2 ON GC-105
- PHASE 1 AND 2 ON GC-106
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #2: WITHOUT CONTINUOUS
MONITORING SYSTEM FOR B58, B39, B101,
B102, B128 AND B129
INCLUDING:
- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,
4TH FLOOR, 3RD FLOOR, 2ND FLOOR
& 1ST FLOOR. INCLUDING ALL PHASES SHOWN
PHASE 2 INSTALL THE
HORIZONTAL MAINS TEE OFF
VALVES FOR FUTURE
CONNECTION
PHASE 3 CONNECT THE FIXTURE
FROM THE MAINS STARTING
FROM THE ENDS OF EACH WING.
BOUNDARY AREA CAN VARY PER
OWNER DIRECTION
GC104
PHASING PLAN
BASE BID: B58 BASEMENT, RISERS TO ATTIC,
5TH FLOOR, 4TH FLOOR, 3RD FLOOR,
2ND FLOOR & 1ST FLOOR.
INCLUDING ALL PHASES SHOWN ON GC SERIES
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND
FLOOR.
INCLUDING:
- PHASE 1 AND 2 ON GC-101
- PHASE 1 AND 2 ON GC-102
- PHASE 1 ON GC-103 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 ON GC-104 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 AND 2 ON GC-105
- PHASE 1 AND 2 ON GC-106
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #2: WITHOUT CONTINUOUS
MONITORING SYSTEM FOR B58, B39, B101,
B102, B128 AND B129
INCLUDING:
- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,
4TH FLOOR, 3RD FLOOR, 2ND FLOOR
& 1ST FLOOR. INCLUDING ALL PHASES SHOWN
PHASE 2 PROGESIVE INSTALL
THE MAINS AND CONNECT THE
FIXTURE FROM THE MAINS
STARTING FROM CENTER TO THE
ENDS OF EACH WING.
BOUNDARY AREA CAN VARY PER
OWNER DIRECTION. PROVIDE
VALVE ARRANGEMENTS ON THE
MAINS AS SHOWN
GC105
PHASING PLAN
BASE BID: B58 BASEMENT, RISERS TO ATTIC,
5TH FLOOR, 4TH FLOOR, 3RD FLOOR,
2ND FLOOR & 1ST FLOOR.
INCLUDING ALL PHASES SHOWN ON GC SERIES
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND
FLOOR.
INCLUDING:
- PHASE 1 AND 2 ON GC-101
- PHASE 1 AND 2 ON GC-102
- PHASE 1 ON GC-103 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 ON GC-104 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 AND 2 ON GC-105
- PHASE 1 AND 2 ON GC-106
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #2: WITHOUT CONTINUOUS
MONITORING SYSTEM FOR B58, B39, B101,
B102, B128 AND B129
INCLUDING:
- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,
4TH FLOOR, 3RD FLOOR, 2ND FLOOR
& 1ST FLOOR. INCLUDING ALL PHASES SHOWN
PHASE 2 PROGESIVE INSTALL
THE MAINS AND CONNECT THE
FIXTURE FROM THE MAINS
STARTING FROM CENTER TO THE
ENDS OF EACH WING.
BOUNDARY AREA CAN VARY PER
OWNER DIRECTION. PROVIDE
VALVE ARRANGEMENTS ON THE
MAINS AS SHOWN
GC106
PHASING PLAN
BASE BID: B58 BASEMENT, RISERS TO ATTIC,
5TH FLOOR, 4TH FLOOR, 3RD FLOOR,
2ND FLOOR & 1ST FLOOR.
INCLUDING ALL PHASES SHOWN ON GC SERIES
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND
FLOOR.
INCLUDING:
- PHASE 1 AND 2 ON GC-101
- PHASE 1 AND 2 ON GC-102
- PHASE 1 ON GC-103 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 ON GC-104 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 AND 2 ON GC-105
- PHASE 1 AND 2 ON GC-106
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #2: WITHOUT CONTINUOUS
MONITORING SYSTEM FOR B58, B39, B101,
B102, B128 AND B129
INCLUDING:
- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,
4TH FLOOR, 3RD FLOOR, 2ND FLOOR
& 1ST FLOOR. INCLUDING ALL PHASES SHOWN
PHASE 2 PROGESIVE INSTALL
THE MAINS AND CONNECT THE
FIXTURE FROM THE MAINS
STARTING FROM CENTER TO THE
ENDS OF EACH WING.
BOUNDARY AREA CAN VARY PER
OWNER DIRECTION. PROVIDE
VALVE ARRANGEMENTS ON THE
MAINS AS SHOWN
GC107
PHASING PLAN
BASE BID: B58 BASEMENT, RISERS TO ATTIC,
5TH FLOOR, 4TH FLOOR, 3RD FLOOR,
2ND FLOOR & 1ST FLOOR.
INCLUDING ALL PHASES SHOWN ON GC SERIES
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND
FLOOR.
INCLUDING:
- PHASE 1 AND 2 ON GC-101
- PHASE 1 AND 2 ON GC-102
- PHASE 1 ON GC-103 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 ON GC-104 (DO NOT INCLUDE
PHASES 2 AND 3)
- PHASE 1 AND 2 ON GC-105
- PHASE 1 AND 2 ON GC-106
INCLUDING B58 CONTINUOUS MONITORING
SYSTEM INCLUDING B39, B101,
B102, B128, AND B129 CONTINUOUS
MONITORING SYSTEM
BID ALT #2: WITHOUT CONTINUOUS
MONITORING SYSTEM FOR B58, B39, B101,
B102, B128 AND B129
INCLUDING:
- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,
4TH FLOOR, 3RD FLOOR, 2ND FLOOR
& 1ST FLOOR. INCLUDING ALL PHASES SHOWN
Text Box 22 11 00
SPA 7
MMA-1
MMA-2
ACM DEBRIS ABOVE PLASTER CEILING
o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Basement
RBE JEM
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *
ITEM
(BASEMENT)
680 L.F.AIR CELL PIPE & PIPE FITTING INS.
340 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 250 EA.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
= ACM CORK CEILING MASTIC
LEGEND
540 S.F.CORK CEILING & MASTIC
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-B
Department of
Veterans Affairs
TPA-1
SPA-1
MXA-1
MCA-1
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey First Floor
RBE JEM
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *ITEM
(1ST FLOOR)
572 L.F.AIR CELL PIPE & PIPE FITTING INS.
154 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 252 EA.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
70 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-1
MATCHLINE
MATCHLINE
MATCHLINE
TPA-2
MCA-2
SPA-2
MXA-2
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Second Floor
RBE JEM
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *ITEM
(2ND FLOOR)
384 L.F.AIR CELL PIPE & PIPE FITTING INS.
192 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 120 EA.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
40 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS
MAG BLOCK PIPE & PIPE FITTING INSULATION 48 L.F.
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-2
MATCHLINE
MATCHLINE
MCA-3
TPA-3
MXA-3
SPA-3
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Third Floor
RBE JEM
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
ESTIMATED QUANTITIES
QUANTITY *ITEM
(3RD FLOOR)
288 L.F.AIR CELL PIPE & PIPE FITTING INS.
144 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 64 EA.
80 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-3
MCB-2
MXA-4
MCB-1
MCC-1
MCC-2
SPA-4
ACM DEBRIS ABOVE CEILING
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Fourth Floor
RBE JEM
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *ITEM
(4TH FLOOR)
144 L.F.AIR CELL PIPE & PIPE FITTING INS.
72 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 140 EA.
15 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-4
MCC-3
SPA-6
MCB-3
SPA-5
MXA-5
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Fifth Floor
RBE JEM
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *
ITEM
(5TH FLOOR)
72 L.F.AIR CELL PIPE & PIPE FITTING INS.
36 L.F.PLY PIPE & PIPE FITTING INS.
PIPE FITTING INSULATION ON F.G. RUNS 46 EA.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-5
(EX) CW RISER
(EX) HOSE BIBB
HB-1
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
CONSULTANTS: Office of Construction and Facilities Management
7 8 9
4/14/2017
550-15-107Remediate Legionella Station
Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198
NO REVISIONS DATE
NORTH
Asbestos Survey Attic
RBE JEM
ESTIMATED QUANTITIES
* ALL QUANTITIES OF ACM ARE APPROXIMATE.
QUANTITY *ITEM
(ATTIC)
PIPE FITTING INSULATION ON F.G. RUNS 4 EA.
= ACM PIPING AND OR FITTINGS
= NON ACM PIPING
= ASSUMED ACM PIPING IN CHASES
AND WALL CAVITIES
LEGEND
BODINE
ENVIRONMENTAL SERVICES, INC.
5350 EAST FIREHOUSE ROAD
DECATUR, ILLINOIS 62521 ASB-A
| G-000 |
| P-001 |
| P-101 |
| P-101D |
| P-102 |
| P-102D |
| P-103 |
| P-103D |
| P-104 |
| P-104D |
| P-105 |
| P-105D |
| P-106 |
| P-106D |
| P-107 |
| P-107D |
| P-201 |
| P-202 |
| P-501 |
| P-701 |
| E-101 |
| P-B101 |
| P-B103 |
| P-B128 |
| P-B129 |
| P-B39 |
File details come from the government source that posted it.