36C25218B0596-00002001.pdf

PDF 27 MB Posted

Attached to
Remediate Legionella Station-Wide Phase-1 550-15-107
Solicitation number
36C25218B0596
Issued by

About this file

36C25218B0596 00002 550-15-107 Drawings V2 REPOSTED.pdf

View the file

Other files

File Type Posted
36C25218B0596-00006002.docx DOCX document
36C25218B0596-00006000.docx DOCX document
36C25218B0596-00006001.pdf PDF
36C25218B0596-00005055.pdf PDF
36C25218B0596-00005057.pdf PDF
36C25218B0596-00005052.docx DOCX document
36C25218B0596-00005053.pdf PDF
36C25218B0596-00005058.pdf PDF
36C25218B0596-00005056.pdf PDF
36C25218B0596-00005054.pdf PDF
36C25218B0596-00004000.docx DOCX document
36C25218B0596-00003001.pdf PDF
36C25218B0596-00003000.docx DOCX document
36C25218B0596-00003002.pdf PDF
36C25218B0596-00002000.docx DOCX document
36C25218B0596-00001001.pdf PDF
36C25218B0596-00001000.docx DOCX document
36C25218B0596-003.pdf PDF
36C25218B0596-002.docx DOCX document
36C25218B0596-004.pdf PDF
36C25218B0596-001.docx DOCX document
36C25218B0596-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHADANSHOVIM1

Typewritten Text

P-B130 PLUMBING BLDG 130

P-B131 PLUMBING BLDG 131

VHADANSHOVIM1

Line

VHADANSHOVIM1

Line

Line

PHASE 1 (TYPICAL ON ALL

FLOORS)

PHASE 2 INSTALL THE MAINS

AND CONNECT THE FIXTURE

FROM THE MAINS. BOUNDARY

AREA CAN VARY PER OWNER

DIRECTION. PROVIDE VALVE

ARRANGEMENTS ON THE MAINS

AS SHOWN

BASEMENT AREA CAN BE DONE ALL

IN ONE PHASE

GC101

PHASING PLAN

PHASING NOTES:

A. CONTRACTOR SHALL CONSTRUCT DUST PARTITIONS

PRIOR TO THE START OF DEMOLITION AND THEY MUST

REMAIN IN PLACE UNTIL THE COMPLETION OF THAT

PHASE OR SUBSEQUENT PHASES WHERE REQUIRED.

B. ADJACENT TO VA OCCUPIED AREAS IN SUCH A

MANNER TO ENSURE:

i. THE CONTINUOUS AND UNINTERRUPTED USE OF ALL

OCCUPIED AREAS, INCLUDING THE APPLICABLE

MECHANICAL AND ELECTRICAL SYSTEMS SERVING

THESE AREAS.

ii. PROTECTION OF PATIENTS AND PERSONNEL IN

OCCUPIED AREAS FROM THE HAZARDS AND DUST

ASSOCIATED WITH A CONSTRUCTION ENVIRONMENT.

iii. THE WORK AREAS ARE TO BE KEPT CLEAR, CLEAN, AND FREE OF LOOSE DEBRIS, CONSTRUCTION

MATERIALS AND PARTIALLY INSTALLED WORK WHICH

WOULD CREATE A SAFE HAZARD OR INTERFERE WITH

PATIENT AND PERSONNEL DUTIES AND TRAFFIC. THE

CONTRACTOR SHALL SWEEP THE AREAS CLEAN AT THE

END OF EACH WORK DAY AND MAKE EVERY EFFORT TO

KEEP DUST AND NOISE TO A MINIMUM AT ALL TIMES.

iv. TEMPORARY INTERRUPTIONS OR SHUTDOWN OF

ANY UTILITY OR ELECTRICAL/MECHANICAL SYSTEM

SHOULD BE REQUESTED FROM THE COR 48 HOURS

PRIOR TO THE DESIRED TIME, AND SHOULD BE

PERFORMED AT TIMES OTHER THAN THE STATION'S

NORMAL HOURS OF OPERATION OR AS DIRECTED BY

THE COR.

v. TWO WEEKS (14 CALENDAR DAYS) PRIOR TO

STARTING WORK IN ANY PHASE THE CONTRACTOR

SHALL NOTIFY THE COR, IN WRITING, OF DATE HE PLANS

TO COMPLETE THE PRECEDING PHASE. IN NO CASE

WILL BE CONTRACTOR BEGIN WORK IN ANY PHASE

WITHOUT OBTAINING WRITTEN APPROVAL FROM THE

COR.

C. EACH INDIVIDUAL PHASE OR SUB-PHASE OF WORK

INDICATED IS TO BE FULLY COMPLETED PRIOR TO THE

START OF THE NEXT SEQUENTIAL PHASE OF WORK,

WITH ACCOMMODATIONS MADE BY THE CONTRACTOR

FOR ALL NECESSARY BRIDGING WORK, TEMPORARY

CONSTRUCTION, AND OWNER MOVE-OUT / MOVE-IN

OCCUPANCY SCHEDULE.

D. ALL INTERIM LIFE SAFETY MEASURES AND OTHER

NECESSARY PROTECTION MEASURES, MUST BE

INSTALLED DURING PRE-DEMOLITION PERIODS

PRECEDING EACH PHASE, I.E. AFTER OWNER MOVES

ARE COMPLETED BUT BEFORE THE START OF

HAZARDOUS MATERIAL ABATEMENT OR DEMOLITION.

E. DURING EACH INDIVIDUAL PHASE OR SUB-PHASE OF

WORK, MAINTAIN ACTIVE PLUMBING SERVICES IN AREAS

TO BE DEMOLISHED. ALL ACTIVE PLUMBING SERVICES

MUST BE PROTECTED AND KEPT ACTIVE UNTIL NEW

PLUMBING SERVICES ARE IN PLACE AND TIE-INS TO THE

FIXTURES HAVE BEEN COMPLETED.

PHASE 1:

• BASEMENT: INSTALL NEW WATER MAIN, NEW

BACKFLOW PREVENTER, NEW WATER HEATERS,

NEW CIRCULATION PUMPS, NEW MONITORING

POINTS. INSTALL THE MAINS AND THE RISER

• 1ST, 2ND, 3RD, 4TH, 5TH AND ATTIC: INSTALL THE

RISERS AND TEE OFF HORIZONTALLY WITH VALVES.

PHASE 2:

• BASEMENT: INSTALL THE MAINS AND CONNECT THE

FIXTURE FROM THE MAINS. BOUNDARY AREA CAN

VARY PER OWNER DIRECTION. PROVIDE VALVE

ARRANGEMENTS ON THE MAINS AS SHOWN ON THE

DRAWINGS. (FOR BASEMENT PHASE 1 AND 2 CAN BE

COMBINED)

• 1ST, 4TH, 5TH AND ATTIC: PROGRESSIVE INSTALL

THE MAINS AND CONNECT THE FIXTURE FROM THE

MAINS STARTING FROM CENTER TO THE ENDS OF

EACH WING. BOUNDARY AREA CAN VARY PER

OWNER DIRECTION. PROVIDE VALVE

ARRANGEMENTS ON THE MAINS AS SHOWN ON THE

DRAWINGS.

• 2ND AND 3RD: INSTALL THE HORIZONTAL MAINS

TEE OFF VALVES FOR FUTURE CONNECTION.

PHASE 3:

• 2ND AND 3RD: CONNECT THE FIXTURE FROM THE

MAINS STARTING FROM THE ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER OWNER

DIRECTION.

PHASING

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

ON GC SERIES

7/11/2017

PHASE 2 PROGESSIVE INSTALL

THE MAINS AND CONNECT THE

FIXTURE FROM THE MAINS

STARTING FROM CENTER TO THE

ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER

OWNER DIRECTION. PROVIDE

VALVE ARRANGEMENTS ON THE

MAINS AS SHOWN

GC102

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

PHASE 2 INSTALL THE

HORIZONTAL MAINS TEE OFF

VALVES FOR FUTURE

CONNECTION

PHASE 3 CONNECT THE FIXTURE

FROM THE MAINS STARTING

FROM THE ENDS OF EACH WING.

BONDRY AREA CAN VARY PER

OWNER DIRECTION

GC103

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

PHASE 2 INSTALL THE

HORIZONTAL MAINS TEE OFF

VALVES FOR FUTURE

CONNECTION

PHASE 3 CONNECT THE FIXTURE

FROM THE MAINS STARTING

FROM THE ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER

OWNER DIRECTION

GC104

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

PHASE 2 PROGESIVE INSTALL

THE MAINS AND CONNECT THE

FIXTURE FROM THE MAINS

STARTING FROM CENTER TO THE

ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER

OWNER DIRECTION. PROVIDE

VALVE ARRANGEMENTS ON THE

MAINS AS SHOWN

GC105

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

PHASE 2 PROGESIVE INSTALL

THE MAINS AND CONNECT THE

FIXTURE FROM THE MAINS

STARTING FROM CENTER TO THE

ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER

OWNER DIRECTION. PROVIDE

VALVE ARRANGEMENTS ON THE

MAINS AS SHOWN

GC106

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

PHASE 2 PROGESIVE INSTALL

THE MAINS AND CONNECT THE

FIXTURE FROM THE MAINS

STARTING FROM CENTER TO THE

ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER

OWNER DIRECTION. PROVIDE

VALVE ARRANGEMENTS ON THE

MAINS AS SHOWN

GC107

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

Text Box 22 11 00

SPA 7

MMA-1

MMA-2

ACM DEBRIS ABOVE PLASTER CEILING

o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

1 2 3 4 5 6 7 8 9

CONSULTANTS: Office of Construction and Facilities Management

7 8 9

4/14/2017

550-15-107Remediate Legionella Station

Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198

NO REVISIONS DATE

NORTH

Asbestos Survey Basement

RBE JEM

ESTIMATED QUANTITIES

* ALL QUANTITIES OF ACM ARE APPROXIMATE.

QUANTITY *

ITEM

(BASEMENT)

680 L.F.AIR CELL PIPE & PIPE FITTING INS.

340 L.F.PLY PIPE & PIPE FITTING INS.

PIPE FITTING INSULATION ON F.G. RUNS 250 EA.

= ACM PIPING AND OR FITTINGS

= NON ACM PIPING

= ASSUMED ACM PIPING IN CHASES

AND WALL CAVITIES

= ACM CORK CEILING MASTIC

LEGEND

540 S.F.CORK CEILING & MASTIC

BODINE

ENVIRONMENTAL SERVICES, INC.

5350 EAST FIREHOUSE ROAD

DECATUR, ILLINOIS 62521 ASB-B

Department of

Veterans Affairs

TPA-1

SPA-1

MXA-1

MCA-1

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

1 2 3 4 5 6 7 8 9

CONSULTANTS: Office of Construction and Facilities Management

7 8 9

4/14/2017

550-15-107Remediate Legionella Station

Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198

NO REVISIONS DATE

NORTH

Asbestos Survey First Floor

RBE JEM

ESTIMATED QUANTITIES

* ALL QUANTITIES OF ACM ARE APPROXIMATE.

QUANTITY *ITEM

(1ST FLOOR)

572 L.F.AIR CELL PIPE & PIPE FITTING INS.

154 L.F.PLY PIPE & PIPE FITTING INS.

PIPE FITTING INSULATION ON F.G. RUNS 252 EA.

= ACM PIPING AND OR FITTINGS

= NON ACM PIPING

= ASSUMED ACM PIPING IN CHASES

AND WALL CAVITIES

LEGEND

70 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS

BODINE

ENVIRONMENTAL SERVICES, INC.

5350 EAST FIREHOUSE ROAD

DECATUR, ILLINOIS 62521 ASB-1

MATCHLINE

MATCHLINE

MATCHLINE

TPA-2

MCA-2

SPA-2

MXA-2

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

1 2 3 4 5 6 7 8 9

CONSULTANTS: Office of Construction and Facilities Management

7 8 9

4/14/2017

550-15-107Remediate Legionella Station

Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198

NO REVISIONS DATE

NORTH

Asbestos Survey Second Floor

RBE JEM

ESTIMATED QUANTITIES

* ALL QUANTITIES OF ACM ARE APPROXIMATE.

QUANTITY *ITEM

(2ND FLOOR)

384 L.F.AIR CELL PIPE & PIPE FITTING INS.

192 L.F.PLY PIPE & PIPE FITTING INS.

PIPE FITTING INSULATION ON F.G. RUNS 120 EA.

= ACM PIPING AND OR FITTINGS

= NON ACM PIPING

= ASSUMED ACM PIPING IN CHASES

AND WALL CAVITIES

LEGEND

40 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS

MAG BLOCK PIPE & PIPE FITTING INSULATION 48 L.F.

BODINE

ENVIRONMENTAL SERVICES, INC.

5350 EAST FIREHOUSE ROAD

DECATUR, ILLINOIS 62521 ASB-2

MATCHLINE

MATCHLINE

MCA-3

TPA-3

MXA-3

SPA-3

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

1 2 3 4 5 6 7 8 9

CONSULTANTS: Office of Construction and Facilities Management

7 8 9

4/14/2017

550-15-107Remediate Legionella Station

Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198

NO REVISIONS DATE

NORTH

Asbestos Survey Third Floor

RBE JEM

* ALL QUANTITIES OF ACM ARE APPROXIMATE.

= ACM PIPING AND OR FITTINGS

= NON ACM PIPING

= ASSUMED ACM PIPING IN CHASES

AND WALL CAVITIES

LEGEND

ESTIMATED QUANTITIES

QUANTITY *ITEM

(3RD FLOOR)

288 L.F.AIR CELL PIPE & PIPE FITTING INS.

144 L.F.PLY PIPE & PIPE FITTING INS.

PIPE FITTING INSULATION ON F.G. RUNS 64 EA.

80 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS

BODINE

ENVIRONMENTAL SERVICES, INC.

5350 EAST FIREHOUSE ROAD

DECATUR, ILLINOIS 62521 ASB-3

MCB-2

MXA-4

MCB-1

MCC-1

MCC-2

SPA-4

ACM DEBRIS ABOVE CEILING

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

1 2 3 4 5 6 7 8 9

CONSULTANTS: Office of Construction and Facilities Management

7 8 9

4/14/2017

550-15-107Remediate Legionella Station

Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198

NO REVISIONS DATE

NORTH

Asbestos Survey Fourth Floor

RBE JEM

= ACM PIPING AND OR FITTINGS

= NON ACM PIPING

= ASSUMED ACM PIPING IN CHASES

AND WALL CAVITIES

LEGEND

ESTIMATED QUANTITIES

* ALL QUANTITIES OF ACM ARE APPROXIMATE.

QUANTITY *ITEM

(4TH FLOOR)

144 L.F.AIR CELL PIPE & PIPE FITTING INS.

72 L.F.PLY PIPE & PIPE FITTING INS.

PIPE FITTING INSULATION ON F.G. RUNS 140 EA.

15 L.F.FOAM GLASS INS. & MASTIC W/TAPED FITTINGS

BODINE

ENVIRONMENTAL SERVICES, INC.

5350 EAST FIREHOUSE ROAD

DECATUR, ILLINOIS 62521 ASB-4

MCC-3

SPA-6

MCB-3

SPA-5

MXA-5

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

1 2 3 4 5 6 7 8 9

CONSULTANTS: Office of Construction and Facilities Management

7 8 9

4/14/2017

550-15-107Remediate Legionella Station

Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198

NO REVISIONS DATE

NORTH

Asbestos Survey Fifth Floor

RBE JEM

ESTIMATED QUANTITIES

* ALL QUANTITIES OF ACM ARE APPROXIMATE.

QUANTITY *

ITEM

(5TH FLOOR)

72 L.F.AIR CELL PIPE & PIPE FITTING INS.

36 L.F.PLY PIPE & PIPE FITTING INS.

PIPE FITTING INSULATION ON F.G. RUNS 46 EA.

= ACM PIPING AND OR FITTINGS

= NON ACM PIPING

= ASSUMED ACM PIPING IN CHASES

AND WALL CAVITIES

LEGEND

BODINE

ENVIRONMENTAL SERVICES, INC.

5350 EAST FIREHOUSE ROAD

DECATUR, ILLINOIS 62521 ASB-5

(EX) CW RISER

(EX) HOSE BIBB

HB-1

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

1 2 3 4 5 6 7 8 9

CONSULTANTS: Office of Construction and Facilities Management

7 8 9

4/14/2017

550-15-107Remediate Legionella Station

Wide Phase 1 VA Illiana Health Care System 1900 East Main Street, Danville, IL 61832-5198

NO REVISIONS DATE

NORTH

Asbestos Survey Attic

RBE JEM

ESTIMATED QUANTITIES

* ALL QUANTITIES OF ACM ARE APPROXIMATE.

QUANTITY *ITEM

(ATTIC)

PIPE FITTING INSULATION ON F.G. RUNS 4 EA.

= ACM PIPING AND OR FITTINGS

= NON ACM PIPING

= ASSUMED ACM PIPING IN CHASES

AND WALL CAVITIES

LEGEND

BODINE

ENVIRONMENTAL SERVICES, INC.

5350 EAST FIREHOUSE ROAD

DECATUR, ILLINOIS 62521 ASB-A

G-000
P-001
P-101
P-101D
P-102
P-102D
P-103
P-103D
P-104
P-104D
P-105
P-105D
P-106
P-106D
P-107
P-107D
P-201
P-202
P-501
P-701
E-101
P-B101
P-B103
P-B128
P-B129
P-B39

File details come from the government source that posted it.