Remediate Legionella Station-Wide Phase-1 550-15-107
Solicitation number
36C25218B0596
Issued by

About this file

36C25218B0596 00005 550-15-107 Drawings V3 - Vol 1.pdf

View the file

Other files

File Type Posted
36C25218B0596-00006002.docx DOCX document
36C25218B0596-00006000.docx DOCX document
36C25218B0596-00006001.pdf PDF
36C25218B0596-00005055.pdf PDF
36C25218B0596-00005057.pdf PDF
36C25218B0596-00005052.docx DOCX document
36C25218B0596-00005053.pdf PDF
36C25218B0596-00005058.pdf PDF
36C25218B0596-00005054.pdf PDF
36C25218B0596-00004000.docx DOCX document
36C25218B0596-00003001.pdf PDF
36C25218B0596-00003000.docx DOCX document
36C25218B0596-00003002.pdf PDF
36C25218B0596-00002001.pdf PDF
36C25218B0596-00002000.docx DOCX document
36C25218B0596-00001001.pdf PDF
36C25218B0596-00001000.docx DOCX document
36C25218B0596-003.pdf PDF
36C25218B0596-002.docx DOCX document
36C25218B0596-004.pdf PDF
36C25218B0596-001.docx DOCX document
36C25218B0596-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHADANSHOVIM1

Typewritten Text

P-B130 PLUMBING BLDG 130

P-B131 PLUMBING BLDG 131

VHADANSHOVIM1

Line

VHADANSHOVIM1

Line

Line

PHASE 1 (TYPICAL ON ALL

FLOORS)

PHASE 2 INSTALL THE MAINS

AND CONNECT THE FIXTURE

FROM THE MAINS. BOUNDARY

AREA CAN VARY PER OWNER

DIRECTION. PROVIDE VALVE

ARRANGEMENTS ON THE MAINS

AS SHOWN

BASEMENT AREA CAN BE DONE ALL

IN ONE PHASE

GC101

PHASING PLAN

PHASING NOTES:

A. CONTRACTOR SHALL CONSTRUCT DUST PARTITIONS

PRIOR TO THE START OF DEMOLITION AND THEY MUST

REMAIN IN PLACE UNTIL THE COMPLETION OF THAT

PHASE OR SUBSEQUENT PHASES WHERE REQUIRED.

B. ADJACENT TO VA OCCUPIED AREAS IN SUCH A

MANNER TO ENSURE:

i. THE CONTINUOUS AND UNINTERRUPTED USE OF ALL

OCCUPIED AREAS, INCLUDING THE APPLICABLE

MECHANICAL AND ELECTRICAL SYSTEMS SERVING

THESE AREAS.

ii. PROTECTION OF PATIENTS AND PERSONNEL IN

OCCUPIED AREAS FROM THE HAZARDS AND DUST

ASSOCIATED WITH A CONSTRUCTION ENVIRONMENT.

iii. THE WORK AREAS ARE TO BE KEPT CLEAR, CLEAN, AND FREE OF LOOSE DEBRIS, CONSTRUCTION

MATERIALS AND PARTIALLY INSTALLED WORK WHICH

WOULD CREATE A SAFE HAZARD OR INTERFERE WITH

PATIENT AND PERSONNEL DUTIES AND TRAFFIC. THE

CONTRACTOR SHALL SWEEP THE AREAS CLEAN AT THE

END OF EACH WORK DAY AND MAKE EVERY EFFORT TO

KEEP DUST AND NOISE TO A MINIMUM AT ALL TIMES.

iv. TEMPORARY INTERRUPTIONS OR SHUTDOWN OF

ANY UTILITY OR ELECTRICAL/MECHANICAL SYSTEM

SHOULD BE REQUESTED FROM THE COR 48 HOURS

PRIOR TO THE DESIRED TIME, AND SHOULD BE

PERFORMED AT TIMES OTHER THAN THE STATION'S

NORMAL HOURS OF OPERATION OR AS DIRECTED BY

THE COR.

v. TWO WEEKS (14 CALENDAR DAYS) PRIOR TO

STARTING WORK IN ANY PHASE THE CONTRACTOR

SHALL NOTIFY THE COR, IN WRITING, OF DATE HE PLANS

TO COMPLETE THE PRECEDING PHASE. IN NO CASE

WILL BE CONTRACTOR BEGIN WORK IN ANY PHASE

WITHOUT OBTAINING WRITTEN APPROVAL FROM THE

COR.

C. EACH INDIVIDUAL PHASE OR SUB-PHASE OF WORK

INDICATED IS TO BE FULLY COMPLETED PRIOR TO THE

START OF THE NEXT SEQUENTIAL PHASE OF WORK,

WITH ACCOMMODATIONS MADE BY THE CONTRACTOR

FOR ALL NECESSARY BRIDGING WORK, TEMPORARY

CONSTRUCTION, AND OWNER MOVE-OUT / MOVE-IN

OCCUPANCY SCHEDULE.

D. ALL INTERIM LIFE SAFETY MEASURES AND OTHER

NECESSARY PROTECTION MEASURES, MUST BE

INSTALLED DURING PRE-DEMOLITION PERIODS

PRECEDING EACH PHASE, I.E. AFTER OWNER MOVES

ARE COMPLETED BUT BEFORE THE START OF

HAZARDOUS MATERIAL ABATEMENT OR DEMOLITION.

E. DURING EACH INDIVIDUAL PHASE OR SUB-PHASE OF

WORK, MAINTAIN ACTIVE PLUMBING SERVICES IN AREAS

TO BE DEMOLISHED. ALL ACTIVE PLUMBING SERVICES

MUST BE PROTECTED AND KEPT ACTIVE UNTIL NEW

PLUMBING SERVICES ARE IN PLACE AND TIE-INS TO THE

FIXTURES HAVE BEEN COMPLETED.

PHASE 1:

• BASEMENT: INSTALL NEW WATER MAIN, NEW

BACKFLOW PREVENTER, NEW WATER HEATERS,

NEW CIRCULATION PUMPS, NEW MONITORING

POINTS. INSTALL THE MAINS AND THE RISER

• 1ST, 2ND, 3RD, 4TH, 5TH AND ATTIC: INSTALL THE

RISERS AND TEE OFF HORIZONTALLY WITH VALVES.

PHASE 2:

• BASEMENT: INSTALL THE MAINS AND CONNECT THE

FIXTURE FROM THE MAINS. BOUNDARY AREA CAN

VARY PER OWNER DIRECTION. PROVIDE VALVE

ARRANGEMENTS ON THE MAINS AS SHOWN ON THE

DRAWINGS. (FOR BASEMENT PHASE 1 AND 2 CAN BE

COMBINED)

• 1ST, 4TH, 5TH AND ATTIC: PROGRESSIVE INSTALL

THE MAINS AND CONNECT THE FIXTURE FROM THE

MAINS STARTING FROM CENTER TO THE ENDS OF

EACH WING. BOUNDARY AREA CAN VARY PER

OWNER DIRECTION. PROVIDE VALVE

ARRANGEMENTS ON THE MAINS AS SHOWN ON THE

DRAWINGS.

• 2ND AND 3RD: INSTALL THE HORIZONTAL MAINS

TEE OFF VALVES FOR FUTURE CONNECTION.

PHASE 3:

• 2ND AND 3RD: CONNECT THE FIXTURE FROM THE

MAINS STARTING FROM THE ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER OWNER

DIRECTION.

PHASING

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

ON GC SERIES

7/11/2017

Text Box

PHASE 2 PROGESSIVE INSTALL

THE MAINS AND CONNECT THE

FIXTURE FROM THE MAINS

STARTING FROM CENTER TO THE

ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER

OWNER DIRECTION. PROVIDE

VALVE ARRANGEMENTS ON THE

MAINS AS SHOWN

GC102

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

ON GC SERIES

7/11/2017

PHASE 2 INSTALL THE

HORIZONTAL MAINS TEE OFF

VALVES FOR FUTURE

CONNECTION

PHASE 3 CONNECT THE FIXTURE

FROM THE MAINS STARTING

FROM THE ENDS OF EACH WING.

BONDRY AREA CAN VARY PER

OWNER DIRECTION

GC103

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

ON GC SERIES

7/11/2017

PHASE 2 INSTALL THE

HORIZONTAL MAINS TEE OFF

VALVES FOR FUTURE

CONNECTION

PHASE 3 CONNECT THE FIXTURE

FROM THE MAINS STARTING

FROM THE ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER

OWNER DIRECTION

GC104

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

ON GC SERIES

7/11/2017

PHASE 2 PROGESIVE INSTALL

THE MAINS AND CONNECT THE

FIXTURE FROM THE MAINS

STARTING FROM CENTER TO THE

ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER

OWNER DIRECTION. PROVIDE

VALVE ARRANGEMENTS ON THE

MAINS AS SHOWN

GC105

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

ON GC SERIES

7/11/2017

PHASE 2 PROGESIVE INSTALL

THE MAINS AND CONNECT THE

FIXTURE FROM THE MAINS

STARTING FROM CENTER TO THE

ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER

OWNER DIRECTION. PROVIDE

VALVE ARRANGEMENTS ON THE

MAINS AS SHOWN

GC106

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

ON GC SERIES

7/11/2017

PHASE 2 PROGESIVE INSTALL

THE MAINS AND CONNECT THE

FIXTURE FROM THE MAINS

STARTING FROM CENTER TO THE

ENDS OF EACH WING.

BOUNDARY AREA CAN VARY PER

OWNER DIRECTION. PROVIDE

VALVE ARRANGEMENTS ON THE

MAINS AS SHOWN

GC107

PHASING PLAN

BASE BID: B58 BASEMENT, RISERS TO ATTIC,

5TH FLOOR, 4TH FLOOR, 3RD FLOOR,

2ND FLOOR & 1ST FLOOR.

INCLUDING ALL PHASES SHOWN ON GC SERIES

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #1: B58 WITHOUT 3RD FLOOR & 2ND

FLOOR.

INCLUDING:

- PHASE 1 AND 2 ON GC-101

- PHASE 1 AND 2 ON GC-102

- PHASE 1 ON GC-103 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 ON GC-104 (DO NOT INCLUDE

PHASES 2 AND 3)

- PHASE 1 AND 2 ON GC-105

- PHASE 1 AND 2 ON GC-106

INCLUDING B58 CONTINUOUS MONITORING

SYSTEM INCLUDING B39, B101,

B102, B128, AND B129 CONTINUOUS

MONITORING SYSTEM

BID ALT #2: WITHOUT CONTINUOUS

MONITORING SYSTEM FOR B58, B39, B101,

B102, B128 AND B129

INCLUDING:

- B58 BASEMENT, RISERS TO ATTIC, 5TH FLOOR,

4TH FLOOR, 3RD FLOOR, 2ND FLOOR

& 1ST FLOOR. INCLUDING ALL PHASES SHOWN

ON GC SERIES

7/11/2017

Typewritten Text

2. PROVIDE NEW MONITORING POINT FOR INCOMING BUILDING WATER PRESSURE.

G-000
P-001
P-101
P-101D
P-102
P-102D
P-103
P-103D
P-104
P-104D
P-105
P-105D
P-106
P-106D
P-107
P-107D
P-201
P-202
P-501
P-701
E-101
P-B101
P-B103
P-B128
P-B129
P-B39