This document is an email correspondence regarding a facility repair project at the Cincinnati VA. The sender communicates to VA facility management that the only viable solution to address an emergency power supply system issue is to upgrade the MFR13 Relay, a scope that extends significantly beyond the original plan. The required work includes programming of the upgraded relay, door modifications to accommodate installation and operation, wiring modifications, and updates to existing systems drawings. The upgrade is expected to cost considerably more than the initial estimate due to these additional labor and material requirements. The sender offers to prepare a detailed quote outlining the additional costs and references that a similar quote was provided in 2025 for this relay upgrade. The email involves multiple recipients from the VA facility (VHACIN), external contractors including ABB representatives, and service providers such as Calvary Contracting and Queen City Generator Service. No specific response deadline, project timeline, or final pricing is provided in this correspondence; it functions as a status update requesting authorization to proceed with quote preparation.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Winslow, Juliet J. VHACIN

From:

Sent: Monday, July 27, 2026 6:20 PM

To:

Cc:

Subject: [EXTERNAL] Re: Cincinnati VA - Repair Emergency Power Supply System - Meeting minutes 7/22/2026- Relay still did not work

Julie, After reviewing the project requirements and available options, it has been determined that the only viable solution is to upgrade the MFR13 Relay.

The upgrade is expected to be more expensive than originally anticipated because the scope of work extends beyond simply replacing the relay. The upgrade will also require:

• Programming of the upgraded relay to ensure proper system functionality.

• Door modifications to support the installation and operation of the upgraded relay.

• Wiring modifications to accommodate the upgraded relay

• Changes to the existing systems drawings for the upgrade.

Due to these additional labor and material requirements, the total project cost will be higher than our initial estimate. While this was not anticipated as the solution, these modifications are necessary to ensure the system functions properly.

Please let us know if you would like us to prepare a quote outlining the additional costs associated with this work for your review. I believe a similar quote was provided in 2025 for the relay upgrade.

If you have any questions or would like to discuss the project in more detail, please feel free to reach out.

Thanks, From: Winslow, Juliet J. VHACIN <Juliet.Winslow@va.gov>

Sent: Wednesday, July 22, 2026 1:17 PM

To: Weidig, Jason H., VHACIN <Jason.Weidig@va.gov>; Kevin MILLER <kevin.miller@us.abb.com>; Smith, Chad A.

<Chad.Smith2@va.gov>; queencitygenservice@gmail.com <queencitygenservice@gmail.com>; Rodney Washburn

<rwashburn@calvarycontracting.com>; Eric Deaton [EXT] <eric.deaton@us.abb.com>; Brian Bednar

<brian.bednar@us.abb.com>

Cc: Fred Ervin <fred.ervin@us.abb.com>; John Moon <jmoon@calvarycontracting.com>; Appelgate, Conner VHACIN