This is an executive summary of completed work for Project #4126174 at a VA Medical Center facility in Cincinnati, Ohio, dated March 14, 2023. ABB performed comprehensive testing, inspection, maintenance, and commissioning services on electrical generator paralleling switchgear and associated control systems.

The scope of work included visual inspection and preventative maintenance of all switchgear cubicle devices (switches, PTs, CTs, and breakers), with breaker removal, water damage assessment, arc chute removal, secondary injection testing, contact resistance and insulation resistance measurements, and operation verification. The contractor inspected and powered up remote annunciator equipment in the basement and visually inspected the Remote Terminal Unit for damage and unsafe conditions. For generator paralleling switchgear and control services, the contractor verified equipment compliance with O&M documentation, ground connections, interior cleanliness, lights and fuses, and site personnel approval for operation. Load bank testing was performed with measurement and recording of bus voltage and frequency at analog meters and PQMII. The contractor replaced old PLCs with new units, rewired input/output cards on rack IC200CHS022, removed and rewired ice cube relays in multiple compartments, and performed comprehensive testing in both manual and automatic modes, including breaker sequencing and synchronizing controls verification. Generator testing verified load sharing controls, automatic and manual start/stop functions, and proper status and alarming. Final deliverables included controls energization, I/O checks from 30 ATS units, PLC and HMI program downloads, system testing with generator optimization and emergency start verification from all ATS units, submission of updated drawings and documentation to the customer, and updated MOP with PLC programs. The contractor recommended upgrading the MFR1 analog reverse power relay to digital relays such as SR 489 or ABB REG relay and updating two annunciators in the Remote Annunciator Panel in the basement.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Y1284 VA Cincinnati

Executive Summary

March 14, 2023

3200 Vine St, Cincinnati, OH, 45220

Project # 4126174

Visually inspected switchgear

• Inspection of all cubicle devices – switches, PTs, CTs, etc

• Tested and verified of breaker operation in cubicles

• Removed all breakers from cubicles and inspected breaker cubicles for any water damages.

• Performed preventative maintenance of breakers by removal of arc chutes, secondary injection, contact resistance (doctor), insulation resistance (megger), operation checks

• Remote Annunciator in basement was inspected and powered up during testing phase.

• Visually Inspected Remote Terminal Unit for damage and any unsafe conditions

Y1284 VA Cincinnati Executive Summary

Generator Paralleling Switchgear and Control Services

• Visually inspected the switchgear for damage and any unsafe operational conditions.

• Verified that the equipment installation complies with O&M documentation.

• Verified that the equipment ground connection is properly terminated.

• Equipment interior is clear of debris and ok for operation.

• Tested all lights and fuses.

• Verified with site personnel that equipment may be cycled/operated

• Placed the engine-generator units in the automatic position and verified that they may be started and operated under load when connected to load bank

• Measured and record bus voltage and frequency at analog meters and at PQMII

• Verified all meters are operational and properly displaying values.

• Tested DC source inputs for proper values.

• Verified proper operations and values of any protection relays.

• Verified the Human Machine Interface (HMI) is operational, and all settings and values are

• correct.

• Removed old PLC in Master cubicle and installed new PLCs and rewired all Input/Output cards

• No new wiring changes were made

• Performed a complete test in manual mode.

• Performed a complete test in automatic mode.

• Verified proper sequencing of the electrically operated breakers.

• Verified proper operation of the synchronizing controls.

Generators

• Verified proper operation of the load sharing controls in automatic mode

• Verified operation of the load sharing when generators were running

• Verified automatic start and stop controls

• Verified manual start and stop controls

• Verify proper status and alarming conditions.

• Recorded values of all measurements taken, voltages, amperage, and frequency.

• Completed testing GEN AL/SD, SOO & failure modes.

• PLC Input/Outputs cards were removed, and new cards were wired on rack # IC200CHS022

• Ice cube Relays were removed and rewired in Master cubicles

• Ice cube relays were swapped in generator controls, and load add/shed compartments.

Testing and Commissioning

• Controls Energization, completed I/O Checks by receiving start signals from 30 ATS, downloaded PLC, HMI programs

• Basic System Testing

• Generators Pre-Start Up – Start, Stop, Shutdown and Safety checks.

• Tested and verified of breaker operation in cubicles.

• Breaker functionality checks, paralleled Generators, applied load via load bank, confirmed load sharing and performed metering checks on analog and PQMII meters

• Performed system testing by verifying Gen Optimization, Emergency Start from every ATS on site, Load add status updates and ATS priority checks

• Job completion & Sign Off

• Submitted copy of drawings to customer.

• Updated MOP and submitted PLC Programs to customer for reference.

Recommendations

• Need to upgrade MFR1, Analog Reverse Power relay to newer digital relays such as SR 489 or ABB REG relay.

• Need to update 2 Annunciators in Remote Annunciator Panel in Basement

Thanks for the opportunity to provide service to VA Cincinnati. Please contact us if we can be of further assistance.