2023-3-11 ABB VA Hospital Cincinnati LV Breaker Test Sheets.pdf
PDF 359 KB Posted
- Attached to
- J061--Emergency Switchgear Repairs PWS 539
- Solicitation number
- 36C25027Q0125
About this file
This document is a series of test and inspection reports for low-voltage circuit breakers and switchgear equipment at Cincinnati VA Hospital, dated March 11, 2023, with Project/Task Number 4126174.
The reports document detailed testing and inspection results for multiple ABB Entelliguard G circuit breakers in various positions (102C, 103C, 101B, 104A, 104B, 104C, and 104D) installed in the Generator Switchgear. Equipment specifications include 600-volt insulated case breakers with 3200-amp frames rated at 24-amp continuous duty and 2500-amp trip unit ratings. Each breaker underwent comprehensive visual and mechanical inspection covering nameplate verification, drawout mechanisms, interlocks, exterior condition, connections, disconnect mechanisms, and lubrication. All visual inspections rated "Acceptable" (status A or OK across all breakers). Test results included long-time pickup, LT delay, short-time pickup, ST delay, instantaneous pickup, ground fault pickup, and ground fault delay testing, with current injection metering tests conducted at 100 amps showing results within tolerance ranges of 90-110A. Contact resistance measurements using micro-ohms ranged from 12 to 52 micro-ohms, and insulation resistance testing at 1,000 VDC showed values between 2.14 and 3 megohms. The final test report for position 101B, dated January 20, 2023, notes contact resistance should be checked before maintenance at asset numbers 976/1265/1056, with instantaneous pickup set to 6x for trip testing at 15,000 amp pickup. One breaker (104D) required replacement of its trip unit. A switchgear and switchboard summary sheet documents GE equipment with Zenith catalog number 1579688, rated 480 volts, 3200 amps, with insulation resistance testing completed on February 22, 2023, showing acceptable status across all visual and mechanical inspection items and high-potential testing results.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3/11/2023 Project/Task Number:
Location: Position:
Owner:
CINCINNATI VA HOSPITALCustomer:
PAGE:
GENERATOR SWITCHGEARSub / Board:
4126174Date:
CINCINNATI VA HOSPITAL
102C
20 RELATIVE HUMIDITY:°C 50 % LOCATION: N/AWEATHER:AMBIENT TEMP.: INDOOR
TEST EQUIPMENT: ASSET NO. / CALIBRATION DUE DATE
CONTACT RESISTANCE: INSULATION RESISTANCE:CURRENT INJECTION:
VISUAL & MECHANICAL INSPECTION
A
A
A
AINDICATOR / FLAGS
TRIP LATCH
MECHANISM OPERATION
ARC CHUTES
MAIN CONTACTS
ARC BLADE A
A
A
A
A
A
A
NA
AAA
INTERPHASE BARRIERS
LUBRICATION
SPRING CHARGING MOTOR
SHUNT TRIP / CLOSE
UNDERVOLTAGE RELEASE
CONTACT/ALIGNMENT SEQUENCE
AA
SECONDARY DISCONNECT
PRIMARY CONNECTIONS
EXTERIOR CONDITION
INTERLOCKS
DRAWOUT MECHANISM
NAMEPLATE VS. DRAWINGS
A
ITEM ITEMNOTESSTATUSITEMNOTESSTATUS STATUS NOTES
LOW VOLTAGE CIRCUIT BREAKER
TEST RESULTS
EQUIPMENT DATA
@ VDC
BREAKER OPENBREAKER CLOSED
A-B
1.89 2.22.14
MICRO-OHMS MILLIVOLTS
P
A
P
B
P
C
90 - 110 A
±50%
TOLERANCE
C-CB-B
A-A
B-C
2.56
C-A
C-GNDB-GNDA-GND
CONTACT RESISTANCE:
INSULATION
RESISTANCE
Pass / Fail
MIN/MAX
1,000
MICRO-OHMS MILLIVOLTS ±50%FUSE RESISTANCE:
(T Ω) (M Ω)
100 Ω)(M
INST. PU (IPU) GROUND FAULT PU (GFPU) GF DELAY (GFD)
NAC5
LONG TIME PU (LTPU) LT DELAY (LTD)
1.0 xIn 3.5 xLT 15.0 xIn NAOFF
EVENT LOG CLEARING (Event 0 is Blank)
METERING TEST - Phase Current On
0 0 0 0 AMETERING TEST - Phase Current Off
P P P Pass / FailBREAKER TRIP TEST (Breaker trip w/ no bell alarm or Event Log)
NA NA NA Pass / FailGROUND FAULT TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
P P P Pass / FailOVERLOAD TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
PROCEDURE
NAAMPS NA NA +/-10%PRIMARY CURRENT INJECTION METERING TEST
TEST SETUP
TEST AMPS
100 A
SHORT TIME PU (STPU)
NOTES
BY
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
ANSI
ANSI
ST DELAY (STD)
Jagdeep ChahalTested By: Reviewed By:Witnessed By:
NOTES / RECOMMENDATIIONS
ACCEPTABLE QUESTIONABLE UNACCEPTABLE
D e fi c ie n c ie s
C ri ti c a l D e fi c ie n c ie s
C o m m e n ts
*STATUS: A-ACCEPTABLE C-CORRECTED NIS-NOT IN SCOPE NA-NOT APPLICABLE R-REPAIR, REPLACE, OR ADJUST
RECOMMENDATIONS:
1 2,500
TRIP UNIT MFR: GE
P0051DATE CODE: SENSOR RATING:
TRIP UNIT MODEL:
RATING PLUG:3200
EntelliGuard TU CATALOG #: SERIAL #:
TIME CURVE:
AMPS)
AMPS)37,500
37,5002,500
NA
3.5
3.5
(AS FOUND
AS LEFT
RANGES
8,750
8,750 AMPS)
AMPS)
AMPS)
AMPS)
1.5 - 9.0 xLT
SHORT TIME PU
(STPU)
Off - 11 / Off - Max I2T
6 / OFF
6 / OFF
ST DELAY
(STD)
2 - 15 xln
INST. PU
(IPU)
NA 37,500
37,500 AMPS)
AMPS)(
2-15 / Off - Max
GF DELAY
(GFD)
NA
1.5 - 15 xln
NA
GROUND FAULT PU
(GFPU)
0.2 - 1 xCT (1200A max)
AMPS)
AMPS)
RELT
0.5 - 1.0 xln
LONG TIME PU
(LTPU)
LT DELAY
(LTD)
CMin-C19 / I2T-I4T
C5
C5
On - Off
THERMAL
MEMORY
OFF
OFF
GGN32L5X6MFXXXX
120CLOSING VOLT:
MFR.: TYPE
24TRIPPING VOLT:
CAT #:
MFR: 3200
AIC:
AMPS
VoltsKA @
P04009238200101GE Entelliguard G
635 CHARGING VOLT:
TYPE: S/N.: VOLT: FRAME:
UNFUSED Volts AMPSFUSED
INSTRUCTION MANUAL:
POWER BREAKER INSULATED CASE MOLDED CASEBREAKER TYPE:
GA32N1HEMXX8CLXL5X62CAT:
Owner:
CINCINNATI VA HOSPITALCustomer:
PAGE:
103C
20 RELATIVE HUMIDITY:°C 50 % LOCATION: N/AWEATHER:AMBIENT TEMP.: INDOOR
TEST EQUIPMENT: ASSET NO. / CALIBRATION DUE DATE
CONTACT RESISTANCE: INSULATION RESISTANCE:CURRENT INJECTION:
VISUAL & MECHANICAL INSPECTION
A
A
A
AINDICATOR / FLAGS
TRIP LATCH
MECHANISM OPERATION
ARC CHUTES
MAIN CONTACTS
ARC BLADE A
A
A
A
A
A
A
NA
AAA
INTERPHASE BARRIERS
LUBRICATION
SPRING CHARGING MOTOR
SHUNT TRIP / CLOSE
UNDERVOLTAGE RELEASE
CONTACT/ALIGNMENT SEQUENCE
AA
SECONDARY DISCONNECT
PRIMARY CONNECTIONS
EXTERIOR CONDITION
INTERLOCKS
DRAWOUT MECHANISM
NAMEPLATE VS. DRAWINGS
A
ITEM ITEMNOTESSTATUSITEMNOTESSTATUS STATUS NOTES
LOW VOLTAGE CIRCUIT BREAKER
TEST RESULTS
EQUIPMENT DATA
@ VDC
BREAKER OPENBREAKER CLOSED
A-B
3 2.92.75
MICRO-OHMS MILLIVOLTS
P
A
P
B
P
C
90 - 110 A
±50%
TOLERANCE
C-CB-B
A-A
B-C
2.26
C-A
2.753
C-GNDB-GNDA-GND
CONTACT RESISTANCE:
INSULATION
RESISTANCE
Pass / Fail
MIN/MAX
1,000
MICRO-OHMS MILLIVOLTS ±50%FUSE RESISTANCE:
(T Ω) (M Ω)
100 Ω)(M
INST. PU (IPU) GROUND FAULT PU (GFPU) GF DELAY (GFD)
NAC MIN
LONG TIME PU (LTPU) LT DELAY (LTD)
0.50 xIn 9.0 xLT 10.0 xIn NAOFF
EVENT LOG CLEARING (Event 0 is Blank)
METERING TEST - Phase Current On
0 0 0 0 AMETERING TEST - Phase Current Off
P P P Pass / FailBREAKER TRIP TEST (Breaker trip w/ no bell alarm or Event Log)
NA NA NA Pass / FailGROUND FAULT TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
P P P Pass / FailOVERLOAD TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
PROCEDURE
NAAMPS NA NA +/-10%PRIMARY CURRENT INJECTION METERING TEST
TEST SETUP
TEST AMPS
100 A
SHORT TIME PU (STPU)
NOTES
BY
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
ANSI
ANSI
ST DELAY (STD)
Jagdeep ChahalTested By: Reviewed By:Witnessed By:
NOTES / RECOMMENDATIIONS
ACCEPTABLE QUESTIONABLE UNACCEPTABLE
D e fi c ie n c ie s
C ri ti c a l D e fi c ie n c ie s
C o m m e n ts
*STATUS: A-ACCEPTABLE C-CORRECTED NIS-NOT IN SCOPE NA-NOT APPLICABLE R-REPAIR, REPLACE, OR ADJUST
RECOMMENDATIONS:
1 2,500
TRIP UNIT MFR: GE
P0051DATE CODE: SENSOR RATING:
TRIP UNIT MODEL:
RATING PLUG:3200
EntelliGuard TU CATALOG #: SERIAL #:
TIME CURVE:
AMPS)
AMPS)37,500
37,5002,500
NA
3.5
3.5
(AS FOUND
AS LEFT
RANGES
8,750
8,750 AMPS)
AMPS)
AMPS)
AMPS)
1.5 - 9.0 xLT
SHORT TIME PU
(STPU)
Off - 11 / Off - Max I2T
6 / OFF
6 / OFF
ST DELAY
(STD)
2 - 15 xln
INST. PU
(IPU)
NA 37,500
37,500 AMPS)
AMPS)(
2-15 / Off - Max
GF DELAY
(GFD)
NA
1.5 - 15 xln
NA
GROUND FAULT PU
(GFPU)
0.2 - 1 xCT (1200A max)
AMPS)
AMPS)
RELT
0.5 - 1.0 xln
LONG TIME PU
(LTPU)
LT DELAY
(LTD)
CMin-C19 / I2T-I4T
C5
C5
On - Off
THERMAL
MEMORY
OFF
OFF
GGN32L5X6MFXXXX
120CLOSING VOLT:
MFR.: TYPE
24TRIPPING VOLT:
CAT #:
MFR: 3200
AIC:
AMPS
VoltsKA @
P04008997000101GE Entelliguard G
635 CHARGING VOLT:
TYPE: S/N.: VOLT: FRAME:
UNFUSED Volts AMPSFUSED
INSTRUCTION MANUAL:
GA32N1HEMXX8CLXL5X62CAT:
1/20/2023 Project/Task Number:
Owner:
CINCINNATI VA HOSPITALCustomer:
PAGE:
101B
20 RELATIVE HUMIDITY:°C 50 % LOCATION: N/AWEATHER:AMBIENT TEMP.: INDOOR
52197 2/23/20242270000215 2/22/2023 52197101559197
TEST EQUIPMENT: ASSET NO. / CALIBRATION DUE DATE
4/13/20233
CONTACT RESISTANCE: INSULATION RESISTANCE:CURRENT INJECTION:
VISUAL & MECHANICAL INSPECTION
C
C
C
OKINDICATOR / FLAGS
TRIP LATCH
MECHANISM OPERATION
ARC CHUTES
MAIN CONTACTS
ARC BLADE OK
C
C
OK
C
OK
OK
N/A
OKCOK
INTERPHASE BARRIERS
LUBRICATION
SPRING CHARGING MOTOR
SHUNT TRIP / CLOSE
UNDERVOLTAGE RELEASE
CONTACT/ALIGNMENT SEQUENCE
CC
SECONDARY DISCONNECT
PRIMARY CONNECTIONS
EXTERIOR CONDITION
INTERLOCKS
DRAWOUT MECHANISM
NAMEPLATE VS. DRAWINGS
OK
ITEM ITEMNOTESSTATUSITEMNOTESSTATUS STATUS NOTES
LOW VOLTAGE CIRCUIT BREAKER
TEST RESULTS
EQUIPMENT DATA
% OF SETTING150
PRIMARY INJECTION
% OF SETTING
% OF SETTING
NOTES
AMPS
SEC.
AMPS
SEC.
AMPS
AMPS
SEC.
12.087
13284
.1350
15142
NA
NA
A
12.179
13128
.1345
14953
NA
NA
B
12.175
13148
.1322
15198
NA
NA
C
11-15
-9% / +11%
.11-.17
+/- 10%
+/- 15%
TOLERANCE
TEST AMPS
LONG TIME (LT) PICKUP
SHORT TIME (ST) PICKUP
ST DELAY @
INSTANTANEOUS PICKUP
GROUND FAULT PICKUP
BY
+/-10%
MIN/MAX
7,500
13,125
2,500
8,750
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
15,000
AMPS
AMPS
AMPS
AMPS
SECONDARY INJECTION
LT DELAY @
GF DELAY @
1006 +/-10% Mfr1000PRIMARY CURRENT INJECTION METERING TEST AMPS
AMPS 15142 14953 15198 +/- 10%RELT PICKUP MfrAMPS
15,000
Benjamin DeatonTested By: Reviewed By:Witnessed By:
NOTES / RECOMMENDATIIONS
ACCEPTABLE QUESTIONABLE UNACCEPTABLE
D e fi c ie n c ie s
C ri ti c a l D e fi c ie n c ie s
C o m m e n ts
Contact resistance before maintenance 976 / 1265 / 1056
Set instantaneous to 6x for trip testing - 15,000 amp pickup
*STATUS: A-ACCEPTABLE C-CORRECTED NIS-NOT IN SCOPE NA-NOT APPLICABLE R-REPAIR, REPLACE, OR ADJUST
RECOMMENDATIONS:
1 2,500
TRIP UNIT MFR: GE
P0051DATE CODE: SENSOR RATING:
TRIP UNIT MODEL:
RATING PLUG:3200
Entelliguard TU CATALOG #: SERIAL #:
DES-090ATIME CURVE:
AMPS)
AMPS)37,500
37,5002,500
.37 1,184
3.5
3.5
(AS FOUND
AS LEFT
RANGES
8,750
8,750 AMPS)
AMPS)
AMPS)
AMPS)
1.5 - 9.0 xLT
SHORT TIME PU
(STPU)
Off - 11 / Off - Max I2T
ST DELAY
(STD)
2 - 15 xln
INST. PU
(IPU)
NA 37,500
37,500 AMPS)
AMPS)(
2-15 / Off - Max
GF DELAY
(GFD)
1.5 - 15 xln
NA
GROUND FAULT PU
(GFPU)
0.2 - 1 xCT (1200A max)
AMPS)
AMPS)
151,184
RELT
0.5 - 1.0 xln
LONG TIME PU
(LTPU)
LT DELAY
(LTD)
CMin-C19 / I2T-I4T
C5
C5
On - Off
THERMAL
MEMORY
GGN32L5X6MFXXXX
120VDCCLOSING VOLT:
MFR.: TYPE
24VDCTRIPPING VOLT:
CAT #:
MFR: 3200
AIC:
AMPS
VoltsKA @
P04008997000102GE Entelliguard G
635 CHARGING VOLT:
TYPE: S/N.: VOLT: FRAME:
UNFUSED Volts AMPSFUSED
DEH41305INSTRUCTION MANUAL:
120VDC
POWER BREAKER INSULATED CASE MOLDED CASEBREAKER TYPE:
GA32N1HEMXX8CLXL5X62CAT:
MICRO-OHMS MILLIVOLTS 9.4 8.7 9.5 ±50%CONTACT RESISTANCE: ANSI
MICRO-OHMS MILLIVOLTS ±50% ANSIFUSE RESISTANCE:
@ VDC
A-B
3 33 3
C-CB-B
A-A
B-C
2.48
C-A
C-GNDB-GNDA-GND
BREAKER CLOSEDINSULATION
RESISTANCE
1,000
BREAKER OPEN
100 &)(M
TOLERANCE
MIN/MAX BY
NOTES
TERA & TERA &
Owner:
CINCINNATI VA HOSPITALCustomer:
PAGE:
104A
20 RELATIVE HUMIDITY:°C 50 % LOCATION: N/AWEATHER:AMBIENT TEMP.: INDOOR
101559197 2/22/2023009515 2/23/2024 10155919752197
TEST EQUIPMENT: ASSET NO. / CALIBRATION DUE DATE
1/18/20263
CONTACT RESISTANCE: INSULATION RESISTANCE:CURRENT INJECTION:
VISUAL & MECHANICAL INSPECTION
A
A
A
AINDICATOR / FLAGS
TRIP LATCH
MECHANISM OPERATION
ARC CHUTES
MAIN CONTACTS
ARC BLADE A
A
A
A
A
A
A
NA
AAA
INTERPHASE BARRIERS
LUBRICATION
SPRING CHARGING MOTOR
SHUNT TRIP / CLOSE
UNDERVOLTAGE RELEASE
CONTACT/ALIGNMENT SEQUENCE
AA
SECONDARY DISCONNECT
PRIMARY CONNECTIONS
EXTERIOR CONDITION
INTERLOCKS
DRAWOUT MECHANISM
NAMEPLATE VS. DRAWINGS
A
ITEM ITEMNOTESSTATUSITEMNOTESSTATUS STATUS NOTES
LOW VOLTAGE CIRCUIT BREAKER
TEST RESULTS
EQUIPMENT DATA
@ VDC
BREAKER OPENBREAKER CLOSED
A-B
3 33
MICRO-OHMS MILLIVOLTS
P
A
P
B
P
C
90 - 110 A
±50%
TOLERANCE
C-CB-B
A-A
B-C
C-A
C-GNDB-GNDA-GND
CONTACT RESISTANCE:
INSULATION
RESISTANCE
Pass / Fail
MIN/MAX
1,000
MICRO-OHMS MILLIVOLTS ±50%FUSE RESISTANCE:
(T Ω) (T Ω)
100 Ω)(M
INST. PU (IPU) GROUND FAULT PU (GFPU) GF DELAY (GFD)
NAC5
LONG TIME PU (LTPU) LT DELAY (LTD)
0.50 xIn 10.0 xLT 15.0 xIn NA3
EVENT LOG CLEARING (Event 0 is Blank)
METERING TEST - Phase Current On
0 0 0 0 AMETERING TEST - Phase Current Off
P P P Pass / FailBREAKER TRIP TEST (Breaker trip w/ no bell alarm or Event Log)
NA NA NA Pass / FailGROUND FAULT TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
P P P Pass / FailOVERLOAD TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
PROCEDURE
NAAMPS NA NA +/-10%PRIMARY CURRENT INJECTION METERING TEST
TEST SETUP
TEST AMPS
100 A
SHORT TIME PU (STPU)
NOTES
BY
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
ANSI
ANSI
ST DELAY (STD)
Chris ScheidtBenjamin DeatonTested By: Reviewed By:Witnessed By:
NOTES / RECOMMENDATIIONS
ACCEPTABLE QUESTIONABLE UNACCEPTABLE
D e fi c ie n c ie s
C ri ti c a l D e fi c ie n c ie s
C o m m e n ts
*STATUS: A-ACCEPTABLE C-CORRECTED NIS-NOT IN SCOPE NA-NOT APPLICABLE R-REPAIR, REPLACE, OR ADJUST
RECOMMENDATIONS:
0.5 200
0.5
TRIP UNIT MFR: GE
P004!DATE CODE: SENSOR RATING:
TRIP UNIT MODEL:
RATING PLUG:800
EntelliGuard TU CATALOG #: SERIAL #:
TIME CURVE:
AMPS)
AMPS)6,000
6,000200
NA
(AS FOUND
AS LEFT
RANGES
2,000
2,000 AMPS)
AMPS)
AMPS)
AMPS)
1.5 - 9.0 xLT
SHORT TIME PU
(STPU)
Off - 11 / Off - Max I2T
3 / OFF
3 / OFF
ST DELAY
(STD)
2 - 15 xln
INST. PU
(IPU)
NA 6,000
6,000 AMPS)
AMPS)(
2-15 / Off - Max
GF DELAY
(GFD)
NA
1.5 - 15 xln
NA
GROUND FAULT PU
(GFPU)
0.2 - 1 xCT (1200A max)
AMPS)
AMPS)
RELT
0.5 - 1.0 xln
LONG TIME PU
(LTPU)
LT DELAY
(LTD)
CMin-C19 / I2T-I4T
C5
C5
On - Off
THERMAL
MEMORY
OFF
OFF
GGN08L5X6MFXXXX
120CLOSING VOLT:
MFR.: TYPE
24TRIPPING VOLT:
CAT #:
MFR: 1600
AIC:
AMPS
VoltsKA @
P04008996400101GE Entelliguard G
635 CHARGING VOLT:
TYPE: S/N.: VOLT: FRAME:
UNFUSED Volts AMPSFUSED
INSTRUCTION MANUAL:
GN08N1HEMXX8CXXL5X6HCAT:
Owner:
CINCINNATI VA HOSPITALCustomer:
PAGE:
104B
20 RELATIVE HUMIDITY:°C 50 % LOCATION: N/AWEATHER:AMBIENT TEMP.: INDOOR
101559197 2/22/2023009515 2/23/2024 10155919752197
TEST EQUIPMENT: ASSET NO. / CALIBRATION DUE DATE
1/18/20263
CONTACT RESISTANCE: INSULATION RESISTANCE:CURRENT INJECTION:
VISUAL & MECHANICAL INSPECTION
A
A
A
A
INDICATOR / FLAGS
TRIP LATCH
MECHANISM OPERATION
ARC CHUTES
MAIN CONTACTS
ARC BLADE A
A
A
A
A
A
A
NA
AAA
INTERPHASE BARRIERS
LUBRICATION
SPRING CHARGING MOTOR
SHUNT TRIP / CLOSE
UNDERVOLTAGE RELEASE
CONTACT/ALIGNMENT SEQUENCE
AC
SECONDARY DISCONNECT
PRIMARY CONNECTIONS
EXTERIOR CONDITION
INTERLOCKS
DRAWOUT MECHANISM
NAMEPLATE VS. DRAWINGS
A
ITEM ITEMNOTESSTATUSITEMNOTESSTATUS STATUS NOTES
LOW VOLTAGE CIRCUIT BREAKER
TEST RESULTS
EQUIPMENT DATA
@ VDC
BREAKER OPENBREAKER CLOSED
A-B
3 33
MICRO-OHMS MILLIVOLTS
P
A
P
B
P
C
90 - 110 A
±50%
TOLERANCE
C-CB-B
A-A
B-C
C-A
C-GNDB-GNDA-GND
CONTACT RESISTANCE:
INSULATION
RESISTANCE
Pass / Fail
MIN/MAX
1,000
MICRO-OHMS MILLIVOLTS ±50%FUSE RESISTANCE:
(T Ω) (T Ω)
100 Ω)(M
INST. PU (IPU) GROUND FAULT PU (GFPU) GF DELAY (GFD)
CMIN
LONG TIME PU (LTPU) LT DELAY (LTD)
1 xLN 6.0 xLT 15.0 xIn NAOFF
EVENT LOG CLEARING (Event 0 is Blank)
METERING TEST - Phase Current On
0 0 0 0 AMETERING TEST - Phase Current Off
P P P Pass / FailBREAKER TRIP TEST (Breaker trip w/ no bell alarm or Event Log)
NA NA NA Pass / FailGROUND FAULT TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
P P P Pass / FailOVERLOAD TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
PROCEDURE
NAAMPS NA NA +/-10%PRIMARY CURRENT INJECTION METERING TEST
TEST SETUP
TEST AMPS
100 A
SHORT TIME PU (STPU)
NOTES
BY
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
ANSI
ANSI
ST DELAY (STD)
Chris ScheidtBenjamin DeatonTested By: Reviewed By:Witnessed By:
NOTES / RECOMMENDATIIONS
ACCEPTABLE QUESTIONABLE UNACCEPTABLE
D e fi c ie n c ie s
C ri ti c a l D e fi c ie n c ie s
C o m m e n ts
1 Drawout mechnism is working fine, but the position indicator shows "Test" while in the fully withdrawn position. Lubricated and adjusted position flag linkage. Issue resolved
Drawout mechnism is working fine, but the position indicator shows "Test" while in the fully withdrawn position. Lubricated and adjusted position flag linkage. Issue resolved
*STATUS: A-ACCEPTABLE C-CORRECTED NIS-NOT IN SCOPE NA-NOT APPLICABLE R-REPAIR, REPLACE, OR ADJUST
RECOMMENDATIONS:
1 1,600
TRIP UNIT MFR: GE
P004!DATE CODE: SENSOR RATING:
TRIP UNIT MODEL:
RATING PLUG:1600
EntelliGuard TU CATALOG #: SERIAL #:
TIME CURVE:
AMPS)
AMPS)24,000
24,0001,600
NA
(AS FOUND
AS LEFT
RANGES
9,600
9,600 AMPS)
AMPS)
AMPS)
AMPS)
1.5 - 9.0 xLT
SHORT TIME PU
(STPU)
Off - 11 / Off - Max I2T
4 / OFF
4 / OFF
ST DELAY
(STD)
2 - 15 xln
INST. PU
(IPU)
NA 24,000
24,000 AMPS)
AMPS)(
2-15 / Off - Max
GF DELAY
(GFD)
NA
1.5 - 15 xln
NA
GROUND FAULT PU
(GFPU)
0.2 - 1 xCT (1200A max)
AMPS)
AMPS)
RELT
0.5 - 1.0 xln
LONG TIME PU
(LTPU)
LT DELAY
(LTD)
CMin-C19 / I2T-I4T
C5
C5
On - Off
THERMAL
MEMORY
OFF
OFF
GGN16L5XMFXXXX
120CLOSING VOLT:
MFR.: TYPE
24TRIPPING VOLT:
CAT #:
MFR: 1600
AIC:
AMPS
VoltsKA @
P04008996600101GE Entelliguard G
635 CHARGING VOLT:
TYPE: S/N.: VOLT: FRAME:
UNFUSED Volts AMPSFUSED
INSTRUCTION MANUAL:
GN16N1HEMXX8CXXL5X6VCAT:
Owner:
CINCINNATI VA HOSPITALCustomer:
PAGE:
104C
20 RELATIVE HUMIDITY:°C 50 % LOCATION: N/AWEATHER:AMBIENT TEMP.: INDOOR
101559197 2/22/2023009515 2/23/2024 10155919752197
TEST EQUIPMENT: ASSET NO. / CALIBRATION DUE DATE
1/18/20263
CONTACT RESISTANCE: INSULATION RESISTANCE:CURRENT INJECTION:
VISUAL & MECHANICAL INSPECTION
A
A
A
AINDICATOR / FLAGS
TRIP LATCH
MECHANISM OPERATION
ARC CHUTES
MAIN CONTACTS
ARC BLADE A
A
A
A
A
A
A
NA
AAA
INTERPHASE BARRIERS
LUBRICATION
SPRING CHARGING MOTOR
SHUNT TRIP / CLOSE
UNDERVOLTAGE RELEASE
CONTACT/ALIGNMENT SEQUENCE
AA
SECONDARY DISCONNECT
PRIMARY CONNECTIONS
EXTERIOR CONDITION
INTERLOCKS
DRAWOUT MECHANISM
NAMEPLATE VS. DRAWINGS
A
ITEM ITEMNOTESSTATUSITEMNOTESSTATUS STATUS NOTES
LOW VOLTAGE CIRCUIT BREAKER
TEST RESULTS
EQUIPMENT DATA
@ VDC
BREAKER OPENBREAKER CLOSED
A-B
3 33
MICRO-OHMS MILLIVOLTS
P
A
P
B
P
C
90 - 110 A
±50%
TOLERANCE
C-CB-B
A-A
B-C
C-A
C-GNDB-GNDA-GND
CONTACT RESISTANCE:
INSULATION
RESISTANCE
Pass / Fail
MIN/MAX
1,000
MICRO-OHMS MILLIVOLTS ±50%FUSE RESISTANCE:
(T Ω) (T Ω)
100 Ω)(M
INST. PU (IPU) GROUND FAULT PU (GFPU) GF DELAY (GFD)
NAC4
LONG TIME PU (LTPU) LT DELAY (LTD)
0.55 xIn 1.5 xLT 2.0 xIn NA4
EVENT LOG CLEARING (Event 0 is Blank)
METERING TEST - Phase Current On
0 0 0 0 AMETERING TEST - Phase Current Off
P P P Pass / FailBREAKER TRIP TEST (Breaker trip w/ no bell alarm or Event Log)
NA NA NA Pass / FailGROUND FAULT TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
P P P Pass / FailOVERLOAD TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
PROCEDURE
NAAMPS NA NA +/-10%PRIMARY CURRENT INJECTION METERING TEST
TEST SETUP
TEST AMPS
100 A
SHORT TIME PU (STPU)
NOTES
BY
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
ANSI
ANSI
ST DELAY (STD)
Chris ScheidtBenjamin DeatonTested By: Reviewed By:Witnessed By:
NOTES / RECOMMENDATIIONS
ACCEPTABLE QUESTIONABLE UNACCEPTABLE
D e fi c ie n c ie s
C ri ti c a l D e fi c ie n c ie s
C o m m e n ts
*STATUS: A-ACCEPTABLE C-CORRECTED NIS-NOT IN SCOPE NA-NOT APPLICABLE R-REPAIR, REPLACE, OR ADJUST
RECOMMENDATIONS:
0.55 1,100
0.55
TRIP UNIT MFR: GE
P004!DATE CODE: SENSOR RATING:
TRIP UNIT MODEL:
RATING PLUG:2000
EntelliGuard TU CATALOG #: SERIAL #:
TIME CURVE:
AMPS)
AMPS)4,000
4,0001,100
NA
1.5
1.5
(AS FOUND
AS LEFT
RANGES
1,650
1,650 AMPS)
AMPS)
AMPS)
AMPS)
1.5 - 9.0 xLT
SHORT TIME PU
(STPU)
Off - 11 / Off - Max I2T
4 / OFF
4 / OFF
ST DELAY
(STD)
2 - 15 xln
INST. PU
(IPU)
NA 3,000
3,000 AMPS)
AMPS)(
2-15 / Off - Max
GF DELAY
(GFD)
NA
1.5 - 15 xln
NA
GROUND FAULT PU
(GFPU)
0.2 - 1 xCT (1200A max)
AMPS)
AMPS)
1.5
1.5
RELT
0.5 - 1.0 xln
LONG TIME PU
(LTPU)
LT DELAY
(LTD)
CMin-C19 / I2T-I4T
C4
C4
On - Off
THERMAL
MEMORY
OFF
OFF
GGN20L5XMFXXXX
120CLOSING VOLT:
MFR.: TYPE
24TRIPPING VOLT:
CAT #:
MFR: 2000
AIC:
AMPS
VoltsKA @
P04008996700101GE Entelliguard G
635 CHARGING VOLT:
TYPE: S/N.: VOLT: FRAME:
UNFUSED Volts AMPSFUSED
INSTRUCTION MANUAL:
GN20N1HEMXX8CXXL5X6YCAT:
Owner:
CINCINNATI VA HOSPITALCustomer:
PAGE:
104D
20 RELATIVE HUMIDITY:°C 50 % LOCATION: N/AWEATHER:AMBIENT TEMP.: INDOOR
101559197 2/22/2023009515 2/23/2024 10155919752197
TEST EQUIPMENT: ASSET NO. / CALIBRATION DUE DATE
1/18/20263
CONTACT RESISTANCE: INSULATION RESISTANCE:CURRENT INJECTION:
VISUAL & MECHANICAL INSPECTION
A
A
A
AINDICATOR / FLAGS
TRIP LATCH
MECHANISM OPERATION
ARC CHUTES
MAIN CONTACTS
ARC BLADE A
A
A
A
A
A
A
NA
AAA
INTERPHASE BARRIERS
LUBRICATION
SPRING CHARGING MOTOR
SHUNT TRIP / CLOSE
UNDERVOLTAGE RELEASE
CONTACT/ALIGNMENT SEQUENCE
AA
SECONDARY DISCONNECT
PRIMARY CONNECTIONS
EXTERIOR CONDITION
INTERLOCKS
DRAWOUT MECHANISM
NAMEPLATE VS. DRAWINGS
A
ITEM ITEMNOTESSTATUSITEMNOTESSTATUS STATUS NOTES
LOW VOLTAGE CIRCUIT BREAKER
TEST RESULTS
EQUIPMENT DATA
@ VDC
BREAKER OPENBREAKER CLOSED
A-B
3 33
MICRO-OHMS MILLIVOLTS
P
A
P
B
P
C
90 - 110 A
±50%
TOLERANCE
C-CB-B
A-A
B-C
C-A
C-GNDB-GNDA-GND
CONTACT RESISTANCE:
INSULATION
RESISTANCE
Pass / Fail
MIN/MAX
1,000
MICRO-OHMS MILLIVOLTS ±50%FUSE RESISTANCE:
(T Ω) (T Ω)
100 Ω)(M
INST. PU (IPU) GROUND FAULT PU (GFPU) GF DELAY (GFD)
NAC5
LONG TIME PU (LTPU) LT DELAY (LTD)
1.0 xIn 8.0 xLT 15.0 xIn NA4
EVENT LOG CLEARING (Event 0 is Blank)
METERING TEST - Phase Current On
0 0 0 0 AMETERING TEST - Phase Current Off
P - 0.083 P - 0.085 P - 0.085 Pass / FailBREAKER TRIP TEST (Breaker trip w/ no bell alarm or Event Log)
NA NA NA Pass / FailGROUND FAULT TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
P - 12.505 P - 12.492 P - 12.499 Pass / FailOVERLOAD TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
PROCEDURE
NAAMPS NA NA +/-10%PRIMARY CURRENT INJECTION METERING TEST
TEST SETUP
TEST AMPS
100 A
SHORT TIME PU (STPU)
NOTES
BY
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
ANSI
ANSI
ST DELAY (STD)
Chris ScheidtBenjamin DeatonTested By: Reviewed By:Witnessed By:
NOTES / RECOMMENDATIIONS
ACCEPTABLE QUESTIONABLE UNACCEPTABLE
D e fi c ie n c ie s
C ri ti c a l D e fi c ie n c ie s
C o m m e n ts
*STATUS: A-ACCEPTABLE C-CORRECTED NIS-NOT IN SCOPE NA-NOT APPLICABLE R-REPAIR, REPLACE, OR ADJUST
RECOMMENDATIONS:
1 1,000
TRIP UNIT MFR: GE
FL309@DATE CODE: SENSOR RATING:
TRIP UNIT MODEL:
RATING PLUG:1600
EntelliGuard TU CATALOG #: SERIAL #:
TIME CURVE:
AMPS)
AMPS)15,000
15,0001,000
NA
(AS FOUND
AS LEFT
RANGES
8,000
8,000 AMPS)
AMPS)
AMPS)
AMPS)
1.5 - 9.0 xLT
SHORT TIME PU
(STPU)
Off - 11 / Off - Max I2T
4 / OFF
4 / OFF
ST DELAY
(STD)
2 - 15 xln
INST. PU
(IPU)
NA 15,000
15,000 AMPS)
AMPS)(
2-15 / Off - Max
GF DELAY
(GFD)
NA
1.5 - 15 xln
NA
GROUND FAULT PU
(GFPU)
0.2 - 1 xCT (1200A max)
AMPS)
AMPS)
RELT
0.5 - 1.0 xln
LONG TIME PU
(LTPU)
LT DELAY
(LTD)
CMin-C19 / I2T-I4T
C5
C5
On - Off
THERMAL
MEMORY
OFF
OFF
GGN16L5X6MRXXXX
120CLOSING VOLT:
MFR.: TYPE
24TRIPPING VOLT:
CAT #:
MFR: 1600
AIC:
AMPS
VoltsKA @
P04009761100101GE Entelliguard G
635 CHARGING VOLT:
TYPE: S/N.: VOLT: FRAME:
UNFUSED Volts AMPSFUSED
INSTRUCTION MANUAL:
POWER BREAKER INSULATED CASE MOLDED CASEBREAKER TYPE:
GN16N1HEMXX8CXXL5X6QCAT:
Replaced Trip Unit on this breaker
Owner:
CINCINNATI VA HOSPITALCustomer:
PAGE:
100 SPARE
20 RELATIVE HUMIDITY:°C 50 % LOCATION: N/AWEATHER:AMBIENT TEMP.: INDOOR
101559197 2/22/2023009515 2/23/2024 10155919752197
TEST EQUIPMENT: ASSET NO. / CALIBRATION DUE DATE
1/18/20263
CONTACT RESISTANCE: INSULATION RESISTANCE:CURRENT INJECTION:
VISUAL & MECHANICAL INSPECTION
A
A
A
AINDICATOR / FLAGS
TRIP LATCH
MECHANISM OPERATION
ARC CHUTES
MAIN CONTACTS
ARC BLADE A
A
A
A
A
NA
NA
NA
AAA
INTERPHASE BARRIERS
LUBRICATION
SPRING CHARGING MOTOR
SHUNT TRIP / CLOSE
UNDERVOLTAGE RELEASE
CONTACT/ALIGNMENT SEQUENCE
AA
SECONDARY DISCONNECT
PRIMARY CONNECTIONS
EXTERIOR CONDITION
INTERLOCKS
DRAWOUT MECHANISM
NAMEPLATE VS. DRAWINGS
A
ITEM ITEMNOTESSTATUSITEMNOTESSTATUS STATUS NOTES
LOW VOLTAGE CIRCUIT BREAKER
TEST RESULTS
EQUIPMENT DATA
@ VDC
BREAKER OPENBREAKER CLOSED
A-B
3 33
MICRO-OHMS MILLIVOLTS
P
A
P
B
P
C
90 - 110 A
±50%
TOLERANCE
C-CB-B
A-A
B-C
C-A
C-GNDB-GNDA-GND
CONTACT RESISTANCE:
INSULATION
RESISTANCE
Pass / Fail
MIN/MAX
1,000
MICRO-OHMS MILLIVOLTS ±50%FUSE RESISTANCE:
(T Ω) (T Ω)
100 Ω)(M
INST. PU (IPU) GROUND FAULT PU (GFPU) GF DELAY (GFD)
NAC15
LONG TIME PU (LTPU) LT DELAY (LTD)
1.0 xIn 8.0 xLT 15.0 xIn NA5
EVENT LOG CLEARING (Event 0 is Blank)
METERING TEST - Phase Current On
0 0 0 0 AMETERING TEST - Phase Current Off
P P P Pass / FailBREAKER TRIP TEST (Breaker trip w/ no bell alarm or Event Log)
NA NA NA Pass / FailGROUND FAULT TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
P P P Pass / FailOVERLOAD TEST (Breaker trip w/ bell alarm or Event Log 0 = 1.5 xIn)
PROCEDURE
NAAMPS NA NA +/-10%PRIMARY CURRENT INJECTION METERING TEST
TEST SETUP
TEST AMPS
100 A
SHORT TIME PU (STPU)
NOTES
BY
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
Mfr
ANSI
ANSI
ST DELAY (STD)
Chris ScheidtBenjamin DeatonTested By: Reviewed By:Witnessed By:
NOTES / RECOMMENDATIIONS
ACCEPTABLE QUESTIONABLE UNACCEPTABLE
D e fi c ie n c ie s
C ri ti c a l D e fi c ie n c ie s
C o m m e n ts
*STATUS: A-ACCEPTABLE C-CORRECTED NIS-NOT IN SCOPE NA-NOT APPLICABLE R-REPAIR, REPLACE, OR ADJUST
RECOMMENDATIONS:
1 800
TRIP UNIT MFR: GE
BN734!DATE CODE: SENSOR RATING:
TRIP UNIT MODEL:
RATING PLUG:800
EntelliGuard TU CATALOG #: SERIAL #:
TIME CURVE:
AMPS)
AMPS)12,000
12,000800
NA
(AS FOUND
AS LEFT
RANGES
6,400
6,400 AMPS)
AMPS)
AMPS)
AMPS)
1.5 - 9.0 xLT
SHORT TIME PU
(STPU)
Off - 11 / Off - Max I2T
5 / OFF
5 / OFF
ST DELAY
(STD)
2 - 15 xln
INST. PU
(IPU)
NA 2,400
2,400 AMPS)
AMPS)(
2-15 / Off - Max
GF DELAY
(GFD)
NA
1.5 - 15 xln
NA
GROUND FAULT PU
(GFPU)
0.2 - 1 xCT (1200A max)
AMPS)
AMPS)
RELT
0.5 - 1.0 xln
LONG TIME PU
(LTPU)
LT DELAY
(LTD)
CMin-C19 / I2T-I4T
C15
C15
On - Off
THERMAL
MEMORY
OFF
OFF
GGN08L3X2AFXXXX
NACLOSING VOLT:
MFR.: TYPE
NATRIPPING VOLT:
CAT #:
MFR: 800
AIC:
AMPS
VoltsKA @
401000253784GE Entelliguard G
635 CHARGING VOLT:
TYPE: S/N.: VOLT: FRAME:
UNFUSED Volts AMPSFUSED
INSTRUCTION MANUAL:
NA
GN08PDXXXXX2XXXl3X2OCAT:
Wφ
1579688
GE
Zenith
KA3
SWITCHGEAR & SWITCHBOARD
s
3/11/2023 Project/Task Number:
Location: Position:
Owner:
CINCINNATI VA HOSPITALCustomer:
PAGE:
GENERATOR SWITCHGEARSub / Board:Generator Sub
EQUIPMENT DATA
Chris ScheidtBenjamin DeatonTested By: Reviewed By:Witnessed By:
NOTES / RECOMMENDATIIONS
ACCEPTABLE QUESTIONABLE UNACCEPTABLE
D e fi c ie n c ie s
C ri ti c a l D e fi c ie n c ie s
C o m m e n ts
*STATUS: A-ACCEPTABLE C-CORRECTED NIS-NOT IN SCOPE NA-NOT APPLICABLE R-REPAIR, REPLACE, OR ADJUST
RECOMMENDATIONS:
101559197 101559197
TEST EQUIPMENT: ASSET NO. / CALIBRATION DUE DATE
2/22/20231
HIGH POTENTIAL:INSULATION RESISTANCE:
TEST EQUIPMENT: ASSET NO. / CALIBRATION DUE DATE
20 RELATIVE HUMIDITY:°C 50 % LOCATION: N/AWEATHER:AMBIENT TEMP.: INDOOR
ØC - A, B, N & GND
ØB - A,C, N & GND
ØA - B, C, N & GND
RESULTS
PASS/FAIL
HIGH POTENTIAL TEST
AC DC
TOLERANCE BY NOTESSETUP
1,000
FROM:
1 MIN.DURATION:
TEST VOLTAGE: µΑ µΑ µΑ
* Optional (customer authorization requied)
1 MIN.DURATION:
ØA - GND
ØB - GND
ØC - GNDØC - ØA
RESULTS IN
FROM:
TOLERANCE
ØB - ØC
ØA - ØB
INSULATION RESISTANCE TESTS
DC 1.398
1.607
1.632
1.451
1.419
NOTESBY
1.881
SETUP
AC1,000TEST VOLTAGE:
ΜΩ
TERA &
CAT S.O. :
MANUFACTURER:
SERIAL NUMBER :
OTHER :
MANUFACTURER DATE :
RATED VOLTAGE:
PHASE, WIRE & AIC:
AMPS: 3200
3 100
SURGE ARRESTORS
INDICATOR LIGHTS
ANCHORAGE & ALIGNMENT
CLEANLINESS
PHYSICAL & MECHANICAL CONDITION
NAMEPLATE VS DRAWINGS
CONTROL POWER TRANSFORMER
SPACE HEATERS
FILTERS & VENTS
DOORS & PANELS
SHUTTER ASSEMBLY
INTERLOCKS
NOTES STATUSSTATUS NOTESITEMITEM
A
C
C
C
A
A
A
A
A
A
A
A
A
A
VISUAL & MECHANICAL INSPECTION
LUBRICATION
CLEARANCES
GROUNDING
AAINSULATORS & BARRIERS
File details come from the government source that posted it. Updated .