2023-1-8 ABB CSR VA HOSPITAL PSG Repairs_Redacted.pdf

PDF 36 KB Posted

Attached to
J061--Emergency Switchgear Repairs PWS 539
Solicitation number
36C25027Q0125
Issued by

About this file

This is a Service Report documenting maintenance and repair work performed on switchgear equipment at the Cincinnati VA Medical Center. The service was provided by ABB's US-EL/North/OhioValley field service location in Sharonville, Ohio, and was completed on July 29, 2023, under Work Order 00380193 with Customer PO 22212ABB. The work, classified as a Fixed Price Contract under the Commissioning service subcategory, was performed for Calvary Contracting and involved Y1284 Switchgear Repair, Preventive Maintenance, and Start-Up & Commissioning services at the Cincinnati VA Medical Center located at 1300 Vine Street, Cincinnati, Ohio.

The service work was completed by ABB technicians Michael Kibler and Ben Deaton over July 28-29, 2023. Key tasks included replacement of potential transformers, installation of a new VICOR module on the control panel with associated wiring reconnection, installation of a new trip unit on the Load Bank circuit breaker with programming and testing, and system commissioning and testing. During work, technicians identified and corrected a missing jumper wire between terminal blocks TBV-6 and TBV-2. All system tests performed by the customer—including START, TRANSFER GEN #1 to GEN #2, TRANSFER GEN #2 to GEN #1, and STOP functions—operated successfully. The work was completed and signed off on January 8, 2023, with both engineer and customer signatures confirming satisfactory completion.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Service Report

US-EL/North/OhioValley.FSL 1 Crowne Point Court, Suite 130 Sharonville Ohio 45241 United States Phone: +18005335885 Email: epis.service@abb.com

Prepared By

Date 01/08/2023

CSR# 1690911431

Customer Information

Order Address

Calvary Contracting 4125 Gibson Dr Tipp City Ohio, 45371 United States

Delivery Address

Cincinnati VA Medical Center 1300 Vine Street Cincinnati Ohio 45520 United States

Work Details

Work Order Number 00380193 Subject

Y1284 Switchgear Repair, PM, SU&C

Contact Person on Site

Name:

Phone:

Email:

Cust PO Number

22212ABB

Service Contract Type

Fixed Price Contract

Service SubCategory

Commissioning

CS Service Order Number

000004126174

SD Sales Order Number

0152588340

Critical Recommendations

Status Work Step Symptom Action/Performed Measured Value

Work Order Line Items

Asset/Location Serial Number WOLI Number Status Service Event Type

Recommendations / Additional Comments - Service Appointment

SA-683807 - 29/07/2023 - Michael Kibler Friday 7/28/2023 traveled from Virginia to Cincinnati, Ohio Saturday 7/29/2023 Travelled from the Hotel to the VA Hospital at 0700, looked up job information. Called Ben Deaton he said that he was on his way. At 0745 I called the site contact Jason Weidig and arranged to meet him and begin preparations fort the LOTO process. I began job prep documentation and then Ben showed up with the materials for installation. The customer completed the LOTO and Ben and I put our locks on. Ben began to install the PTs and I began work on the VICOR panel. I contacted Bahvin to review the process again. I then removed the 15 Amp fuses from the VICOR terminal board. I then disconnected the terminals from TBV6 to TBV1 and insulated them as they were removed. I was then able to remove the VICOR panel and remove the new VICOR module from the old panel and install it on the new panel so that all three were in place on the new panel. I temporarily mounted the new panel in the PSG section 1 and began re-connecting the wiring to the terminal block. after I had attached the ground to TVB -1 I realized that there was a wire missing on TBV -2. I traced this out on the old panel and looked at the prints. I found that there was a jumper missing from TBV-6 to TBV-2. I installed the jumper and then completed hooking up the remaining wires to TBV. while I was doing this Ben had finished installing the new Trip Unit in the Load bank circuit breaker and had configured and tested it. At this point we were ready to test the system so we removed or locks from the LOTO and Jason was called to perform the testing. All of the testing that he could do, START, TRANSFER GEN #1 to GEN #2, TRANSFER GEN #2 to GEN #1, and STOP worked fine. We were not able to test the generators loaded but everyone there felt that was not necessary.

I travelled back to the hotel to complete the report .

Sunday 7/30/2023 traveled from Cincinnati, Ohio to Virginia SA-669870 - 29/07/2023 - Ben Deaton Mike and I started at 8:00. Customer locked out the generators and we added our locks. I replaced the potential transformers in the back of the switchgear while Mike worked on the Vicor unit in the control compartment. After I finished with the PT replacement I installed the new trip unit on the Load bank breaker, programmed the settings, set the clock, and tested the trip functions, which was confirmed by a rep for the customer. Mike finished the Vicor wiring and the customer was notified that we were ready for testing around 10:30. Customer came back to test run the generators. After starting and running for a while the Gen optimization priority was swapped to confirm that gen 2 came online, ran parallel with gen one, then gen 1 opened and ran on cooldown. after running for a while on gen 2, they switched back to gen 1 and everything worked correctly. Both gens were shut down and we cleaned up the packing material from the new parts and confirmed with the customer that everything was working as expected. Mike and I left around 12:30.

Service Report - Images

Signature

Engineer's Signature

01/08/2023 13:36:55

Customer's Signature

01/08/2023 13:36:56

This document is for your information only; it is not an invoice.