2023-1-8 ABB CSR VA HOSPITAL PSG Repairs_Redacted.pdf
PDF 36 KB Posted
- Attached to
- J061--Emergency Switchgear Repairs PWS 539
- Solicitation number
- 36C25027Q0125
About this file
This is a Service Report documenting maintenance and repair work performed on switchgear equipment at the Cincinnati VA Medical Center. The service was provided by ABB's US-EL/North/OhioValley field service location in Sharonville, Ohio, and was completed on July 29, 2023, under Work Order 00380193 with Customer PO 22212ABB. The work, classified as a Fixed Price Contract under the Commissioning service subcategory, was performed for Calvary Contracting and involved Y1284 Switchgear Repair, Preventive Maintenance, and Start-Up & Commissioning services at the Cincinnati VA Medical Center located at 1300 Vine Street, Cincinnati, Ohio.
The service work was completed by ABB technicians Michael Kibler and Ben Deaton over July 28-29, 2023. Key tasks included replacement of potential transformers, installation of a new VICOR module on the control panel with associated wiring reconnection, installation of a new trip unit on the Load Bank circuit breaker with programming and testing, and system commissioning and testing. During work, technicians identified and corrected a missing jumper wire between terminal blocks TBV-6 and TBV-2. All system tests performed by the customer—including START, TRANSFER GEN #1 to GEN #2, TRANSFER GEN #2 to GEN #1, and STOP functions—operated successfully. The work was completed and signed off on January 8, 2023, with both engineer and customer signatures confirming satisfactory completion.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Service Report
US-EL/North/OhioValley.FSL 1 Crowne Point Court, Suite 130 Sharonville Ohio 45241 United States Phone: +18005335885 Email: epis.service@abb.com
Prepared By
Date 01/08/2023
CSR# 1690911431
Customer Information
Order Address
Calvary Contracting 4125 Gibson Dr Tipp City Ohio, 45371 United States
Delivery Address
Cincinnati VA Medical Center 1300 Vine Street Cincinnati Ohio 45520 United States
Work Details
Work Order Number 00380193 Subject
Y1284 Switchgear Repair, PM, SU&C
Contact Person on Site
Name:
Phone:
Email:
Cust PO Number
22212ABB
Service Contract Type
Fixed Price Contract
Service SubCategory
Commissioning
CS Service Order Number
000004126174
SD Sales Order Number
0152588340
Critical Recommendations
Status Work Step Symptom Action/Performed Measured Value
Work Order Line Items
Asset/Location Serial Number WOLI Number Status Service Event Type
Recommendations / Additional Comments - Service Appointment
SA-683807 - 29/07/2023 - Michael Kibler Friday 7/28/2023 traveled from Virginia to Cincinnati, Ohio Saturday 7/29/2023 Travelled from the Hotel to the VA Hospital at 0700, looked up job information. Called Ben Deaton he said that he was on his way. At 0745 I called the site contact Jason Weidig and arranged to meet him and begin preparations fort the LOTO process. I began job prep documentation and then Ben showed up with the materials for installation. The customer completed the LOTO and Ben and I put our locks on. Ben began to install the PTs and I began work on the VICOR panel. I contacted Bahvin to review the process again. I then removed the 15 Amp fuses from the VICOR terminal board. I then disconnected the terminals from TBV6 to TBV1 and insulated them as they were removed. I was then able to remove the VICOR panel and remove the new VICOR module from the old panel and install it on the new panel so that all three were in place on the new panel. I temporarily mounted the new panel in the PSG section 1 and began re-connecting the wiring to the terminal block. after I had attached the ground to TVB -1 I realized that there was a wire missing on TBV -2. I traced this out on the old panel and looked at the prints. I found that there was a jumper missing from TBV-6 to TBV-2. I installed the jumper and then completed hooking up the remaining wires to TBV. while I was doing this Ben had finished installing the new Trip Unit in the Load bank circuit breaker and had configured and tested it. At this point we were ready to test the system so we removed or locks from the LOTO and Jason was called to perform the testing. All of the testing that he could do, START, TRANSFER GEN #1 to GEN #2, TRANSFER GEN #2 to GEN #1, and STOP worked fine. We were not able to test the generators loaded but everyone there felt that was not necessary.
I travelled back to the hotel to complete the report .
Sunday 7/30/2023 traveled from Cincinnati, Ohio to Virginia SA-669870 - 29/07/2023 - Ben Deaton Mike and I started at 8:00. Customer locked out the generators and we added our locks. I replaced the potential transformers in the back of the switchgear while Mike worked on the Vicor unit in the control compartment. After I finished with the PT replacement I installed the new trip unit on the Load bank breaker, programmed the settings, set the clock, and tested the trip functions, which was confirmed by a rep for the customer. Mike finished the Vicor wiring and the customer was notified that we were ready for testing around 10:30. Customer came back to test run the generators. After starting and running for a while the Gen optimization priority was swapped to confirm that gen 2 came online, ran parallel with gen one, then gen 1 opened and ran on cooldown. after running for a while on gen 2, they switched back to gen 1 and everything worked correctly. Both gens were shut down and we cleaned up the packing material from the new parts and confirmed with the customer that everything was working as expected. Mike and I left around 12:30.
Service Report - Images
Signature
Engineer's Signature
01/08/2023 13:36:55
Customer's Signature
01/08/2023 13:36:56
This document is for your information only; it is not an invoice.
For more details on how ABB use your personal data and your data privacy rights, please visit our Privacy Notice on https://new.abb.com/privacy-notice .
File details come from the government source that posted it. Updated .