PWS Hood Inspection and Cleaning updated.pdf
PDF 153 KB Posted
- Attached to
- J012--Fire Suppression System Maintenance and
- Solicitation number
- 36C25027Q0078
About this file
This is a Performance Work Statement (PWS) for fire suppression system maintenance and kitchen exhaust cleaning services at the Richard L Roudebush VA Medical Center in Indianapolis, Indiana, with an additional service location at Building 402.
The contractor must maintain five kitchen fire suppression systems (ANSUL wet chemical, NFPA 17A) and five Kidde IND-21 Hazmat dry chemical suppression systems (NFPA 17), performing monthly visual inspections of all ten systems, semiannual maintenance with service certification, and annual manufacturer-required tasks. Kitchen exhaust services include quarterly inspections and complete interior/exterior cleaning of five hoods (KH-01 through KH-05) and their connected duct systems, with grease removal from plenums, filters, ducts, fans, and collectors per NFPA 96 standards. The contractor must also provide quarterly inspection, complete pump-out, and cleaning of grease trap GT-01 at Building 402. The contract structure includes a base year from January 1, 2027 through December 31, 2027, with four optional one-year periods through 2031 (all estimated dates subject to Contracting Officer determination). Pricing shall be firm-fixed-price with separately identifiable service categories, including all labor, supervision, transportation, tools, materials, cleaning supplies, waste disposal, testing, service labels, documentation, routine maintenance consumables, and correction of contractor deficiencies. Personnel must hold documented manufacturer training and appropriate certifications; suppression technicians require factory authorization for specific equipment, Kidde IND-21 work requires factory-authorized Kidde service personnel, kitchen exhaust personnel must have NFPA 96 experience, and grease-trap workers must hold required licenses. Work windows are restricted to evening and overnight hours for kitchen areas and Building 402 (7:00 p.m. to 5:00 a.m. for most locations; 8:00 p.m. to 5:00 a.m. for Production Kitchen; Monday-Friday 3:00 p.m. to 5:00 a.m. or any time Saturday-Sunday for Canteen). The contractor must submit comprehensive service reports within five business days of each visit in searchable PDF format and editable XLSX or CSV inventory logs, with monthly reconciliation of completed versus due work and immediate notification of critical deficiencies.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Roudebush VAMC | Page 1
Performance Work Statement Fire Suppression System Maintenance and Kitchen Exhaust Cleaning
Richard L Roudebush VA Medical Center
1481 West 10th Street, Indianapolis, Indiana 46202
Additional service location: 9045 East 59th Street, Building 402, Indianapolis, Indiana 46216
1 Purpose and Scope
The Contractor shall maintain the identified fire suppression systems in a serviceable condition, remove grease accumulation from the complete identified kitchen exhaust systems, and maintain the Building 402 grease trap.
The Contractor shall provide all labor, supervision, transportation, tools, access equipment, routine maintenance materials, cleaning supplies, waste handling, testing, service labels, and documentation required by this PWS.
The recurring scope includes five kitchen fire suppression systems and five Kidde IND-21 Hazmat dry chemical systems, with monthly inspections of all ten systems, semiannual maintenance and service certification, and annual maintenance tasks. All five hoods require quarterly exhaust inspections and complete interior and exterior cleaning. The Building 402 grease trap requires quarterly inspection, pump-out, and cleaning. Appendix
A identifies equipment and locations; Appendix B states service quantities, deliverables, and performance standards.
The prime Contractor remains responsible for all subcontracted work and for submitting complete records directly to the COR. A kitchen cleaning report does not document fire suppression system maintenance, monthly suppression inspections, or grease-trap service; each service shall have its own identifiable record.
2 Period of Performance and Contract Structure
Period Beginning Ending
Base year January 1, 2027 estimated December 31, 2027 estimated
Option year 1 January 1, 2028 estimated December 31, 2028 estimated
Option year 2 January 1, 2029 estimated December 31, 2029 estimated
Option year 3 January 1, 2030 estimated December 31, 2030 estimated
Option year 4 January 1, 2031 estimated December 31, 2031 estimated
Beginning and ending dates are target dates only. Actual beginning and ending dates to be determined by the
Contracting Officer. Options may be exercised only by the Contracting Officer (CO). Recurring services shall be firm-fixed-price, with separately identifiable service categories in the pricing schedule. Pricing shall include routine off-hours cleaning, subcontractor coordination, mobilization, routine replacement items, waste disposal, reporting, and correction of the Contractor's deficient work.
Roudebush VAMC | Page 2
3 Applicable Requirements
Work shall comply with listed manufacturer installation, inspection, testing, and maintenance instructions;
applicable NFPA standards; environmental and waste-handling requirements; and VA site procedures. Use the code editions applicable to this facility as determined by the VA authority having jurisdiction. Record each unit's applicable manufacturer manual in the inventory and service log.
Equipment or activity Applicable reference
Kitchen ventilation, exhaust inspection, and cleaning
NFPA 96
Wet chemical suppression, including ANSUL R-102 where installed
NFPA 17A and the specific manufacturer manual
Kidde IND-21 Hazmat dry chemical suppression NFPA 17 and the applicable Kidde IND Design, Installation, Operation, and Maintenance manual
Suppression system fire alarm interfaces Applicable NFPA 72 interface requirements and VA test procedures
Grease-trap service and waste disposal Applicable sewer authority, environmental, health, and manufacturer requirements
The Contractor shall identify any inconsistency that affects safe performance and notify the COR and CO before the affected work. The Contractor shall not silently omit a required task, substitute another service, or change a service frequency. Changes to contract scope, quantities, or price require CO authorization.
4 Personnel Qualifications
Before the first visit, submit the personnel and subcontractor roster, names, assigned duties, training, current required credentials, and evidence of competency for the assigned equipment. Submit replacement personnel's qualifications before they begin work.
Suppression maintenance and testing shall be performed by technicians with documented manufacturer training and any authorization required for the installed make and model. Kidde IND-21 maintenance shall be performed by factory-authorized Kidde service personnel with documented IND training. Submit qualification evidence for each system type, including ANSUL R-102 where installed.
Monthly visual inspectors shall have documented training on the inspection checklist and recognition of deficiencies for the assigned systems.
Kitchen exhaust personnel shall have documented training and experience in complete commercial kitchen exhaust inspection and cleaning consistent with NFPA 96. Provide applicable certification or other qualification evidence acceptable to the VA authority having jurisdiction.
Grease-trap service shall use personnel, vehicles, transporters, and receiving facilities holding the licenses or permits required for the actual waste and work. Provide credentials on request.
5 Scheduling and Transition
Within 10 business days of each performance period's start, submit the equipment inventory, service due register, and dated schedule described in Appendix A. Use verified prior service dates; a contract transition does not restart intervals. Perform the first monthly inspection within 15 calendar days of the start, or earlier to meet the verified due date. Report missing history or overdue work immediately.
Provide the COR with written notice of each scheduled visit at least five business days in advance and coordinate service dates through the COR. Notify the COR promptly of schedule changes and urgent follow-up needs.
Follow the visit-notice, check-in, check-out, and work-hour requirements in Section 11.
Roudebush VAMC | Page 3
6 Fire Suppression System Services
6.1 Monthly Inspections
The Contractor shall inspect each of the ten identified systems once every calendar month, with no more than
31 calendar days between inspections of a unit. This obligation is assigned to the Contractor. A semiannual visit may also satisfy that month's visual inspection only when the monthly checklist and unit-specific results are separately recorded.
Verify the system is in place, armed, and protecting the identified hazard; note moved cooking equipment or other changes that may affect coverage.
Verify manual actuators are accessible, identified, and unobstructed, and tamper indicators and seals are intact.
Verify the service tag or certificate is present, legible, current, and consistent with verified service records.
Inspect for obvious damage, corrosion, leakage, obstructions, missing nozzle caps, disturbed detection components, or other conditions that could prevent operation.
Check pressure indications, cylinder condition, and other visible status indicators where provided by the actual system design; record actual readings where applicable.
Perform additional manufacturer-required visual checks. Correct routine items included in the fixed price and report other deficiencies under Section 10.
No system may be omitted because its room is locked, it is difficult to locate, or a subcontractor did not attend.
Record access limitations and notify the COR on the visit date; reschedule promptly. An inaccessible or uninspected unit shall be reported as not completed.
6.2 Semiannual and Annual Maintenance
Service every identified unit at intervals not exceeding six calendar months and provide two documented semiannual services per performance year. Complete annual manufacturer-required tasks once each performance year; they may be performed during one semiannual visit and shall be identified separately in the report. Do not duplicate a charge for annual tasks included in a semiannual service.
Verify the protected hazards, appliance arrangement, nozzle types and positions, detection arrangement, piping, support, and components against the system listing and manufacturer instructions; document discrepancies.
Inspect agent containers, mounting, hoses where installed, pressure or weight checks where applicable, and service-life markings. Check release mechanisms, linkages, cables, pulleys, conduit, seals, and manual release components.
Perform manufacturer-required functional testing of detection and remote manual actuation in the prescribed safe test configuration. Verify applicable fuel and electrical shutoffs, fan interlocks, switches, and alarm interface operation with VA personnel.
Replace metal fusible links at the required interval, and replace routine seals, nozzle caps, and other included consumables as required. Use the correct listed parts and temperature ratings. Do not treat reusable detection elements as disposable metal links.
Reset and re-arm the system, verify all bypasses and temporary test arrangements are removed, and document return to service. Provide the service certification and updated tag for each unit; identify any unit that fails or remains impaired.
Routine agent discharge is not required unless prescribed for the identified system and specifically included in the service schedule. Coordinate the safe test method before actuation. Identify extended-interval examinations, hydrostatic tests, and other periodic tasks in the service due register described in Appendix A.
Roudebush VAMC | Page 4
7 Kitchen Exhaust Inspection and Cleaning
ID Hood Room or location Exhaust fan Inspection and complete cleaning
KH-01 Canteen Hood 1 C-1166 148 Quarterly; 4 of each/year
KH-02 Canteen Hood 2 C-1166 144 Quarterly; 4 of each/year
KH-03 Canteen Hood 3 C-1166 145 Quarterly; 4 of each/year
KH-04 Production main hood C-B144 168 Quarterly; 4 of each/year
KH-05 59th Street hood Building 402 Field identify
Quarterly; 4 of each/year
Verify approximate Canteen hood lengths of 14, 6, and 5 feet and the 30-foot Production island hood with about
60 feet of cleaning surface. Clean all connected ducts, fans, and filters, including the eight previously listed main-campus duct systems, 100 feet of horizontal duct, vertical runs, and fourth- and fifth-floor connections.
Dimensions do not limit cleaning extent.
7.1 Grease Buildup Inspections
Inspect each hood and its complete connected exhaust system four times per performance year, no more than three calendar months apart. Inspect before cleaning and separately record grease buildup, access limitations, cleaning needs, and hazards. Report any need for more frequent service to the COR; the CO authorizes changes in contracted scope, frequency, or price.
7.2 Complete Cleaning
Clean each hood, KH-01 through KH-05, and its complete connected system four times per performance year, no more than three calendar months apart. Remove grease and combustible deposits from plenums, filters, grease-extraction/washdown chambers, accessible baffles and dampers, ducts, fans, and grease collectors. Meet NFPA
96 and manufacturer requirements, including bare metal where required inside. Automatic hood washing does not satisfy complete exhaust cleaning. Follow the Section 11 work windows.
At every full cleaning, clean exterior canopy faces, sides, undersides, and exposed trim. Remove grease, dust, and residue with compatible products; protect finishes, nameplates, labels, and occupied areas. Include exterior cleaning in the fixed price. Provide a checklist and dated before-and-after photos of representative interiors/exteriors, duct access locations, every fan, and inaccessible or uncleaned areas. Identify all serviced hoods, routes, and fans.
Report access limitations by exact location and reason. Clean accessible portions, identify remaining work and access corrections, and obtain COR/CO direction. Do not certify uncleaned or inaccessible portions as completely cleaned. Permanent access panels, duct reconstruction, and fan modifications require separate CO authorization unless specifically priced.
7.3 Restoration and Cleaning Labels
Protect food, appliances, suppression, and electrical components. Keep Melink Intelli-Hood optics, touchpads, lights, processors, and fan disconnects dry under the manufacturer guide; clean lenses with approved nonabrasive methods. Remove coverings, verify sensor/control and fan operation, and record faults. Capture waste for lawful disposal, away from roof/storm drains. Restore covers, filters, and work areas. Include the coordinated post-cleaning suppression check before kitchen use. This replaces semiannual service only if all semiannual tasks are completed and documented.
Provide durable, legible hood labels and replace damaged ones. State hood ID, verified full-cleaning date, company/technician, separate next inspection and full-cleaning dates, and report reference for incomplete areas. Match dates to the schedule.
Roudebush VAMC | Page 5
8 Building 402 Grease Trap
The Contractor shall inspect and service grease trap GT-01 at 9045 East 59th Street, Building 402. Record its physical location, type, rated or estimated capacity, access conditions, and lawful disposal arrangements in the initial inventory. Additional unlisted traps require CO authorization.
8.1 Condition Checks and Cleaning
Provide four inspection, complete pump-out, and cleaning events each performance year, at intervals not exceeding three calendar months. Inspect the trap before pumping and record grease and solids accumulation, visible condition, access limitations, and whether earlier pumping is needed. Inspection is included in each quarterly service. Measurements shall be made safely without confined-space entry.
At each complete service, remove accumulated fats, oils, grease, settled solids, and the liquid contents needed for complete cleaning. Clean the accessible interior surfaces and baffles, inspect visible inlet and outlet components, document damage or blockage, and restore the trap to operating condition according to its design.
Reinstall and secure covers, clean the surrounding area, and verify normal drainage where practicable. Skimming the surface alone does not constitute complete service.
Transport removed waste to an authorized receiving facility. Submit a pumping and disposal record showing the service date, trap ID and location, volume removed, service provider, transporter, receiving facility, and disposal receipt or other traceable receiving documentation. Report abnormal loading and provide a recommended interval adjustment. Any change in the contracted frequency or price requires CO action.
9 Routine Maintenance and Corrective Repairs
Routine inspection, cleaning, testing, adjustment, service labels, metal fusible links where required, disposable seals, standard nozzle caps, and normal maintenance consumables shall be included in the recurring firm-fixed prices. Repair of damage caused by the Contractor and completion or reperformance of the Contractor's deficient work shall be provided at no additional cost to the Government.
For deficiencies requiring work beyond the priced recurring scope, submit a written firm-fixed-price repair proposal within five business days of identifying the deficiency, unless the CO establishes another deadline.
Identify the affected unit, defect, consequence, proposed work, parts, labor, return-to-service testing, lead time, and total price. Separate urgent corrective work from recommended upgrades. Only the CO may authorize additional billable work.
Agent recharge following a fire or accidental discharge, major component replacement, system redesign, permanent access modifications, and extended-interval testing shall be separately identified and priced when required. Perform scheduled extended-interval work only under its applicable fixed-price line item or a CO-authorized modification. Report discoveries during performance with the due date and a proposal; the
Contractor shall not perform unpriced additional work on the assumption that the COR can authorize payment.
Do not leave a system impaired without notifying the COR. Provide the condition, immediate precautions recommended by the manufacturer, and restoration needs. Facility staff determine operational restrictions, interim protection, or kitchen shutdown. The Contractor shall support restoration after authorized repairs and issue the required final test record.
Roudebush VAMC | Page 6
10 Service Records and Deficiency Reporting
Submit complete service reports to the COR within five business days of each visit, including subcontractor work.
Provide a searchable PDF and an editable cumulative inventory and service log in XLSX or CSV format. Records shall be organized by unit, location, activity, and actual service date. The Government shall be able to retain and use them without a paid vendor subscription.
Every inspection, maintenance, test, or cleaning record shall include the following, as applicable to the activity:
Contract and service order identifiers; activity name and required frequency; actual start and completion dates; COR arrival and departure notification times; next due date.
Unit or hood/trap ID, exact building and room/location, equipment description, make/model where relevant, and a complete list of items serviced.
Technician's full name, company affiliation, contact information, and applicable qualification identification.
Governing NFPA reference and manufacturer procedure for fire protection activities; a task checklist with pass, fail, not applicable, or not completed results and explanations.
Actual readings or functional-test results where required; replaced parts; deficiencies, uncleaned areas, access limitations, and any unresolved impairment.
Return-to-service status, service certification where applicable, corrected labels, labeled photographs, and waste disposal records for the relevant service.
Notify the COR immediately when a condition could prevent required protection or creates an immediate hazard, and provide a written deficiency notice within two hours. For other deficiencies, notify the COR on the visit date and include them in the service report. Maintain a deficiency log identifying the unit, date found, priority, proposed correction, responsible party, authorization status, and verified closure. A service shall not be recorded as completed solely because a visit was scheduled or an invoice was submitted.
By the fifth business day of the following month, submit a reconciliation showing services due, services actually completed, reports delivered, work not completed, reasons, and proposed dates. Distinguish work not due from work missed. Include all ten suppression units and the separately scheduled kitchen exhaust and grease-trap activities. A combined visit may satisfy several tasks only when each task and result are documented.
Roudebush VAMC | Page 7
11 Access Security and Site Requirements
Check in directly with the COR upon arrival, before beginning work, and check out directly with the COR upon departure. Use the telephone number or electronic contact method designated by the COR for the visit, including overnight visits, and record both notification times in the visit report. Submit personnel names in advance, carry government-issued identification, and comply with VA badging, screening, site orientation, and safety requirements. Use only VA-designated parking and loading areas; on-site parking is limited.
The written visit notice required by Section 5 shall state the proposed service date, arrival and completion times, locations, equipment, tasks, personnel/subcontractors, and anticipated outages or testing. Coordinate dates and changes through the COR. Urgent follow-up shall be coordinated as soon as the need is identified.
Location and covered work Permitted work window
9045 East 59th Street, Building 402; all on-site contract work, including KS-05, KH-05, and GT-01
Daily, 7:00 p.m. to 5:00 a.m. the following day
Production Kitchen, room C-B144; KH-04 and associated suppression work
Daily, 8:00 p.m. to 5:00 a.m. the following day
Canteen, room C-1166; KH-01 through KH-03 and associated suppression work
Monday through Friday, 3:00 p.m. to 5:00 a.m. the following day; any time Saturday or Sunday
All times are local to Indianapolis. Complete inspections, maintenance, cleaning, cleanup, and restoration within the applicable window. Include required evening, overnight, and weekend work in the recurring fixed prices. At other locations, normal inspection and maintenance hours are Monday through Friday, 7:00 a.m. to 4:00 p.m., excluding Federal holidays.
Coordinate testing, fuel/electrical shutdowns, fan outages, fire alarm signals, and any temporary impairments with the COR and designated VA staff before work. Follow applicable lockout/tagout, ladder, fall protection, chemical handling, and confined-space requirements. No confined-space entry is included in routine trap service. Notify the COR if entry would be necessary and obtain an approved, separately scoped work plan before proceeding.
Protect patients, staff, food-service operations, and adjoining spaces. Establish barriers and containment as directed by VA infection prevention and safety personnel. Do not disturb suspect asbestos or other hazardous building materials. Report the condition and obtain direction. Contractor photographs shall exclude patients, protected health information, and unrelated sensitive material. No VA network access is required by this recurring service scope. The C&A requirements do not apply and a Security Accreditation Package is not required.
12 Acceptance
The COR will verify equipment serviced, tasks, dates, reports, tags, and return-to-service status using Appendix
B. An invoice or partial report does not establish completion of other service categories. An accurately reported failed test may be accepted as an inspection record; it does not establish equipment serviceability or completed repairs. The COR tracks discrepancies and corrections; the CO administers contractual remedies and payment terms. COR review does not relieve the Contractor of responsibility for complete, accurate work.
Roudebush VAMC | Page 8
Appendix A Equipment and Location Schedule
The following equipment is included in recurring service. Use these PWS tracking IDs in all records and cross-reference facility asset IDs provided by the COR. Identify equipment at Building 402 by its building and equipment ID; a room number is not required.
A.1 Fire Suppression Systems
Tracking
ID
Category Location and association System and standard
KS-01 Kitchen suppression Canteen Hood 1, room C-1166; KH-01 ANSUL wet chemical
NFPA 17A
KS-02 Kitchen suppression Canteen Hood 2, room C-1166; KH-02 ANSUL wet chemical
NFPA 17A
KS-03 Kitchen suppression Canteen Hood 3, room C-1166; KH-03 ANSUL wet chemical
NFPA 17A
KS-04 Kitchen suppression Production Kitchen, room C-B144; KH-
ANSUL wet chemical
NFPA 17A
KS-05 Kitchen suppression 59th Street, Building 402; KH-05 Installed kitchen system Manufacturer manual
HM-01 Hazmat dry chemical Building 22, white fence Kidde IND-21; NFPA 17 ABC dry chemical; 21 lb
HM-02 Hazmat dry chemical Building 1, white fence Kidde IND-21; NFPA 17 ABC dry chemical; 21 lb
HM-03 Hazmat dry chemical Building 1, white fence Kidde IND-21; NFPA 17 ABC dry chemical; 21 lb
HM-04 Hazmat dry chemical Building 1, white fence Kidde IND-21; NFPA 17 ABC dry chemical; 21 lb
HM-05 Hazmat dry chemical Building 1, white fence Kidde IND-21; NFPA 17 ABC dry chemical; 21 lb
KS-01 through KS-05 receive monthly inspections and semiannual service under Section 6. Record each kitchen system's nameplate model, agent, cylinder capacity, and governing manual during the initial inventory. Identify
KS-05's suppression type and applicable NFPA standard from the installed equipment; maintain it under that standard and its manufacturer instructions.
HM-01 is behind the white fence next to Building 22. HM-02 through HM-05 are the four units behind the white fence next to Building 1. Each Kidde IND-21 cylinder is rated for 21 lb of ABC dry chemical. U.S. Chemical Storage
/ FireLoc labels identify the storage buildings. Assign and record the individual HM IDs against each system's serial number and physical position within its fenced group.
The annual suppression quantities are 120 monthly unit inspections and 20 semiannual unit services, covering all ten listed systems. Report inventory discrepancies to the COR; changes in billable equipment quantities require
CO authorization.
Roudebush VAMC | Page 9
Appendix A Hoods and Grease Trap
A.2 Hoods and Exhaust Fans
ID Equipment Location Exhaust fan Exhaust fan location
KH-01 Canteen Hood 1 Canteen, room C-1166 148 C-Wing, 2nd Floor roof;
access door in room C-
KH-02 Canteen Hood 2 Canteen, room C-1166 144 C-Wing, 2nd Floor roof;
access door in room C-
KH-03 Canteen Hood 3 Canteen, room C-1166 145 C-Wing, 2nd Floor roof;
access door in room C-
KH-04 Production main hood Production Kitchen, room C-B144 168
C-Wing, 5th Floor Penthouse Roof; Access door located in room C-
KH-05 59th Street hood 9045 East 59th Street, Building 402 Field identify Field identify
All five hoods and their complete connected exhaust systems receive quarterly inspection and interior/exterior cleaning under Section 7. The Production hood is an Avtec AWDP series unit. Record installed hood nameplate data, washdown equipment, Melink Intelli-Hood controls and sensors where present, and the Building 402 hood's exhaust fan ID in the initial inventory.
A.3 Grease Trap
ID Equipment Location Service
GT-01 Grease trap 9045 East 59th Street, Building 402 Quarterly inspection, complete pump-out, and cleaning; 4 events/year
A.4 Initial Inventory and Service Due Register
Submit the following within 10 business days of performance start and update the records as equipment data or service dates change:
For every suppression system, record PWS/facility ID, location, make/model, serial number, agent, cylinder capacity/count, protected hazard, interfaces, governing standard, and applicable manufacturer manual.
Record verified last and next service dates; identify missing history, impairments, and overdue work.
Map each hood's complete duct route, connected fans, filters, access points, dimensions, controls, and associated suppression system. Record cooking methods and operating profile. For GT-01, record physical location, type/capacity, cover and truck access, and lawful transport/disposal arrangements.
Maintain a due register for recurring and extended-interval tasks. Identify each unit, required procedure, verified last completion, next due date, and applicable priced line item. Report unpriced periodic tests or corrective work with a proposal under Section 9; obtain CO authorization before additional billable work.
Roudebush VAMC | Page 10
Appendix B Service and Performance Schedule
Annual quantities repeat in each exercised option year. All five hoods require quarterly service: 20 inspections and 20 complete cleanings. Section 11 work windows apply, including Building 402 suppression and grease-trap work. Annual suppression tasks are included in one semiannual visit.
Service category Frequency and annual quantity Completion standard
Monthly suppression inspections
12 events covering all 10 units; 120 unit inspections
Every calendar month; no more than 31 days between a unit's inspections; unit-specific results
Suppression maintenance and certification
2 events covering all 10 units; 20 unit services
Intervals no greater than 6 calendar months; full required procedures and service certification
Annual suppression tasks 1 per unit; included in a semiannual visit Manufacturer-required annual tasks identified and documented for every unit
Exhaust grease buildup inspections
Quarterly: 4 per hood, KH-01 through KH- 05; 20 hood/system inspections
No more than 3 calendar months apart; inspect before cleaning and record results separately
Production exhaust and hood cleaning Quarterly: 4 cleanings of KH-04 and its connected system; EF 168 No more than 3 calendar months apart; Section 7 interior/exterior cleaning, restoration, and labels
Canteen exhaust and hood cleaning Quarterly: 4 per hood, KH-01 through KH-
03; 12 hood cleanings; EFs 148, 144, 145 No more than 3 calendar months apart; Section 7 interior/exterior cleaning, restoration, and labels
59th Street exhaust and hood cleaning Quarterly: 4 cleanings of KH-05 and its connected system at Building 402 No more than 3 calendar months apart; Section 7 interior/exterior cleaning, restoration, and labels
GT-01 inspection, complete pumping and cleaning
Quarterly: 4 complete services No more than 3 calendar months apart; condition check, complete cleaning, and traceable disposal record
Additional cleaning or corrective work
Only as ordered under priced line items or a CO modification
Scope and price authorized; work and return-to-service verification documented
B.1 Deliverables and Government Verification
Deliverable Deadline Verification
Credentials inventory reconciliation and schedule Within 10 business days of period start;
personnel credentials before work All equipment and subcontractors covered;
inherited due dates addressed
Written scheduled visit notice At least 5 business days before each visit; urgent follow-up coordinated promptly
Date, arrival/completion times, locations, tasks, personnel, and outages stated
COR arrival and departure check-in Upon arrival before work and upon departure Direct COR notifications; times recorded in the visit report
Critical deficiency notice Immediate verbal notice; written within
2 hours Unit, hazard, current condition, and restoration needs identified
Visit report and supporting records Within 5 business days after each visit
Required fields, checklists, tags/photos and disposal evidence complete
Monthly reconciliation and deficiency log Fifth business day of following month
Due work compared to completed work and reports; omissions and dates identified
Firm-fixed-price repair proposal Within 5 business days of finding the deficiency, unless CO sets another deadline
Scope, parts, labor, testing, lead time, and total price stated
File details come from the government source that posted it. Updated .