This file contains 100% bid documents for a roof replacement project at the VA Ann Arbor Healthcare System, a Department of Veterans Affairs facility located in Ann Arbor, Michigan. The project is identified as Project No. 506-26-201, Building 1W (Liberty Building), with a bid scope area of approximately 7,482 square feet. The documents were issued on December 1, 2023, and include architectural drawings prepared by the joint venture firm Alliance|7GAE, with offices in Kalamazoo, Michigan and Alexandria, Virginia.
The roof replacement work encompasses multiple roof sections across the 1W building, including the 9th floor roof (9,068 SF and 2,942 SF sections), 10th floor penthouse roof (1,822 SF), and machine room roof (2,390 SF). The project scope requires complete tear-off of existing low-slope built-up, rolled, or EPDM roofing and insulation layers down to the existing concrete deck, followed by installation of new roofing systems. Base bid specifications call for R-49 insulation (minimum R-33 as alternate) with 0.60 mil EPDM membrane, fully adhered to the existing asphalt-primed concrete deck, with 1/2-inch cover board. The work includes replacement of flashing around all roof penetrations, relocation of existing rooftop equipment, installation of new roofing walkway pads, design and installation of a new lightning protection system with complete appurtenances, and inspection and repair of the existing roof deck after demolition. An allowance for 7% replacement of unforeseen damaged deck material is included. The contractor is responsible for verification of dimensions and quantities, provision of third-party certified roofing inspections, continuity testing of the lightning protection system, and proper drainage system functionality upon completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25026B0018 0005.docx | DOCX document | |
| 506-21-202 VA AA ROOF REPLACEMENT B1W - Photos.pdf | ||
| 36C25026B0018 0004.docx | DOCX document | |
| Wage Determination MI20260100 01.02.2026.pdf | ||
| Proposed Crane Location - 506-26-201.pdf | ||
| 36C25026B0018 0003.docx | DOCX document | |
| 36C25026B0018 0002.docx | DOCX document | |
| S04 Pre-Bid Site Visit Agenda 506-26-201 Rpl Roof Bldg 1W.pdf | ||
| 36C25026B0018 0001.docx | DOCX document | |
| S04 Site Visit Sign-In Sheet 506-26-201 Rpl Roof Bldg 1W.pdf | ||
| 506-26-201 SPECS - ROOF REPLACEMENT B1W - Project Manual R1.pdf | ||
| Contractor EMR Certification Form - 506-26-201.docx | DOCX document | |
| Wage Determination MI20250100 12.12.2025.pdf | ||
| 36C25026B0018_2.docx | DOCX document | |
| RFI Form - 506-26-201.doc | DOC document | |
| 506-26-201 VA AA ROOF REPLACEMENT B1W - Drawings.pdf | ||
| ATTACHMENT VAAR 852.219-75 DEVIATION Jan 2023 LIMITATIONS OF SUBCONTRACTING COMPLIANCE CERTIFICATION.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 08
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
COVER SHEET ROOF REPLACEMENT
ANN ARBOR VAMC
220109
1W
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
G001
ANN ARBOR, MICHIGAN
NORTH
LOCATION MAPPROJECT TEAM
ARCHITECTURE:
OWNER:
DESCRIPTIONSHEET ISSUE DATE
PHONE: 269.927.0144
269.593.5933FAX:
ALLIANCE│7GAE JV
KALAMAZOO, MI 49007
600 E. MICHIGAN AVENUE - SUITE B
WEB: WWW.7GENAE.COM
OFFICE OF CONSTRUCTION &
FACILITES MANAGEMENT
DEPARTMENT OF VETERANS AFFAIRS
ANN ARBOR, MI, 48105
2215 FULLER ROAD
PROJECT NO. 506-26-201 ROOF REPLACEMENT, B1W
VA ANN ARBOR HEALTHCARE SYSTEM
DEPARTMENT OF VETERANS AFFAIRS
ANN ARBOR, MICHIGAN
G001
GS100
01W-AS140
01W-AS141
01W-AS200
01W-AS201
01W-AS340
COVER SHEET
SITE CAMPUS MAP
COMPOSITE ROOF PLAN
ROOF PLAN - UNIT A
EXTERIOR ELEVATIONS
EXTERIOR ELEVATIONS
ROOF SECTIONS AND DETAILS
DECEMBER 1, 2023
DECEMBER 1, 2023
DECEMBER 1, 2023
DECEMBER 1, 2023
DECEMBER 1, 2023
DECEMBER 1, 2023
DECEMBER 1, 2023
PROJECT LOCATION
100% BID DOCUMENTS
DIRECTOR
ASSOCIATE DIRECTOR
PROJECT #506-21-202 SIGNATURE DATE
CHIEF OF STAFF
CHIEF, FMS
CHIEF, ENGINEERING SECTION
CHIEF, ENVIRONMENTAL MANAGEMENT SECTION
INFECTION CONTROL OFFICER
PATIENT SAFETY MANAGER
GEMS COORDINATOR
CHIEF, POLICE SERVICE
CHIEF, FIRE SERVICE
UNION SAFETY REPRESENTATIVE
CONTRACTING OFFICER
COR
SAFETY SPECIALIST
ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
NO.
36980
T500
WALK
CONC.
FREEDOM BUILDING (1E)
LIBERTY BUILDING (1W)
SITE CAMPUS MAP LEGEND
BUILDING ROOF IN SCOPE OF WORK
PROPOSED PROJECT LAYDOWN AREAS (TO BE
CONFIRMED BY CONTRACTOR W/ COR)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 08
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
A
B
SITE CAMPUS MAP ROOF REPLACEMENT
ANN ARBOR VAMC
220109
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
GS100
NORTH
SCALE: 1" = 60'-0"
SITE PLAN
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
45' - 9"
55' - 11"
/2
/2
15' - 0" 47' - 1"
38' - 3"
/2
/2
9TH FLOOR:
-ASPHALT PRIMED CONCRETE DECK
- FULLY ADHERED
-1.0" ISO
-1.5" ISO
-TAPERED ISO
-0.60 mil EPDM
10TH FLOOR ROOF:
-ASPHALT PRIMED CONCRETE DECK
- FULLY ADHERED
-1.5" ISO
-2.0" ISO
-TAPERED ISO
-0.60 mil EPDM
38' - 3"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
A
B
COMPOSITE ROOF PLAN ROOF REPLACEMENT
ANN ARBOR VAMC
220109
1W
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
01W-AS140
DWG. _0_3_ OF 07
NORTH
SCALE: 1/16" = 1'-0"
COMPOSITE ROOF PLAN
NOTE: DIMENSIONS SHOWN ARE APPROXIMATE.
CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
OF QUANTITIES USED IN THEIR BIDS.
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
NO.
36980
Bid Scope Area
(approx 7482 sq. ft.)
9TH FLOOR
ROOF
2,942 SF
(10TH FLOOR)
PENTHOUSE
ROOF
1,822 SF
(11TH FLOOR)
MACHINE
ROOM ROOF
2,390 SF
9TH FLOOR
ROOF
9,068 SF
01W-AS340
01W-AS340
01W-AS340
6 6
01W-AS340
EXISTING
BALLASTED
ANTENNA
A1
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
A6
A5
A4
A2
A3
01W-AS340
01W-AS340
01W-AS340
01W-AS340
1 1
6 6
01W-AS340
01W-AS340
01W-AS340 02
01W-AS340
01W-AS340
01W-AS34002
01W-AS340
EXISTING WIND
TURBINE
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
7 7
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
RAISED CURB
01W-AS340
CAPPED BACK
CHIMNEY TO REMAIN
01W-AS340
01W-AS340
01W-AS340
SIM 3
SIDES
CONCRETE CAPPED
BRICK STACK
EXISTING
RAISED CURB
EXISTING CONCRETE
WALKWAY PAD
TO BE REMOVED
ROOF PLAN KEYNOTES
NEW (LOW SLOPE) EPDM ROOFING AND INSULATION ON EXISTING DECK. PONDING
NOT ALLOWED @ ANY LOCATION. ALTERNATE 1: ADDITIONAL INSULATION AND EPDM
OVER EXISTING INSULATION.
DESIGN/INSTALL NEW LIGHTNING PROTECTION SYSTEM AND INCLUDE ALL
APPURTENANCES FOR A COMPLETE AND FUNCTIONAL SYSTEM. BOND MPE EQUIPMENT
NEAR LP DOWNLEADS. CONTRACTOR IS RESPONSIBLE FOR PROVIDING CONTINUITY
TESTING AS REQUIRED FOR CERTIFICATION OF THE SYSTEM (SEE DESIGN/BUILD
PERFORMANCE SPECIFICATION - 26 41 00 FACILITY LIGHTNING PROTECTION).
CLEAN AND PROVIDE PROTECTION OVER AFFECTED AREA OF EXISTING FLAT ROOF
DURING CONSTRUCTION PERIOD.
CONTRACTOR TO HAVE EXISTING FLAT ROOF CLOSELY INSPECTED BY A 3RD PARTY
CERTIFIED ROOFING INSPECTOR FAMILIAR WITH THE EXISTING ROOF SYSTEM
MANUFACTURER. INSPECT THE ROOF DECK AFTER ROOF AND INSULATION SYSTEM
DEMO AND PRIOR TO INSTALLING NEW MEMBRANE SYSTEM. AS ROOFTOP UNITS AND
LIGHTNING PROTECTION EQUIPMENT ARE RESET AND REINSTALLED, INSPECT TO VERIFY
NO DAMAGE OCCURED DURING THOSE INSTALLATIONS. MAKE ANY REPAIRS TO
EXISTING ROOF FOUND DURING FINAL INSPECTION AT NO ADDITIONAL COST TO THE
GOVERNMENT. CONTRACTOR SHALL NOTIFY COR 7 DAYS PRIOR TO INSPECTIONS AS
THE COR MUST BE PRESENT.
FURNISH AND INSTALL NEW ROOFING WALKWAY PADS IN AREAS SHOWN. PADS SHALL
BE ADHERED TO THE ROOF. COLOR TO BE BLACK. SEE SPECIFICATION FOR FURTHER
INFORMATION.
CONTRACTOR SHALL RELOCATE ANY EXISTING EQUIPMENT DURING ROOF
REPLACEMENT ACTIVITIES. RELOCATION PLAN SHALL BE APPROVED BY COR PRIOR TO
WORK.
EXISTING WALL ATTACHED ROOF LADDER TO REMAIN.
EXISTING ROOFTOP EQUIPMENT TO REMAIN. EXTEND CURB HEIGHTS AS NEEDED TO
MAINTAIN 8" CLEAR ABOVE ADJACENT ROOF PLANES. PATCH AND REPAIR ANY
ADJACENT SURFACES AS NEEDED.
NOTE: ALL KEY NOTES FOR THE PROJECT ARE LISTED BUT DO NOT NECESSARILY APPLY TO
EVERY PLAN OR ELEVATION. REFER TO DRAWINGS FOR APPLICABILITY.
ROOF PLAN LEGEND
EXISTING ROOF DRAIN
NEW MEMBRANE ROOFING
EXISTING EXHAUST FAN (E.F.) OR RELIEF VENT (R.V.) IN ROOF AREA
RUBBER WALKWAY TRAFFIC PAD
GENERAL NOTES - ROOF PLAN
1. PRIOR TO COMMENCING EACH NEW PHASE OF WORK CONTRACTORS ARE TO
VERIFY EXISTING FIELD CONDITIONS AND DIMENSIONS. INSPECT EXISTING WORK
AREAS AND OBSERVE FOR ANY DAMAGE OR POTENTIAL ADVERSE EFFECT OF NEW
WORK ON STRUCTURAL INTEGRITY OF THE BUILDING. IMMEDIATELY NOTIFY THE COR
OF ALL DISCREPANCIES OR CONCERNS A MINIMUM OF (10) TEN WORKING DAYS IN
ADVANCE OF THE WORK.
2. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TESTING & ALL
APPURTENANCES TO COMPLETE THE PROJECT AND DELIVER A COMPLETE,
FUNCTIONAL ROOF SYSTEM.
3. PROVIDE MINIMUM ¼” PER FOOT SLOPE AT ALL LOW-SLOPE ROOF AREAS. SLOPE TO
DRAINS WITH A MINIMUM OF 3” INSULATION THICKNESS OF INSULATION AT THE
LOWEST SUMP POINT, INCLUDING SCUPPERS.
4. REPLACE FLASHING AROUND ALL ROOF PENETRATIONS INCLUDING BUT NOT LIMITED
TO, STAND PIPES, PLUMBING VENTS, HVAC INTAKE/EXHAUST FANS, ETC.
5. ALL CONSTRUCTION AREAS ARE TO BE PROPERLY IDENTIFIED, CLEANED AND
MAINTAINED BY THE CONTRACTOR ON A DAILY BASIS. NO CONSTRUCTION DEBRIS IS
TO REMAIN ON SITE AT PROJECT COMPLETION.
6. CONTRACTOR TO VERIFY CONSTRUCTION WASTE DUMPSTER LOCATIONS WITH THE
COR PRIOR TO BEGINNING ANY DEMOLITION AT EACH BUILDING.
7. ALL CONTRACTORS ARE TO PROTECT EXISTING EQUIPMENT, FINISHES AND BUILDING
COMPONENTS FROM CONSTRUCTION ACTIVITIES.
8. CONTRACTORS SHALL BE RESPONSIBLE FOR ANY/ALL DAMAGE CAUSED DURING
CONSTRUCTION OPERATIONS INCLUDING BUT NOT LIMITED TO SIDEWALK, CURBS,
BUILDINGS, IRRIGATION, PRIVATE PROPERTY, LAWN RESTORATION, ETC. THE
CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY IF ANY DAMAGE OCCURS AS A
RESULT OF WORK ACTIVITIES.
9. CONTRACTOR IS TO TAKE PRECAUTIONARY MEASURES TO PROTECT ALL TURF, TREES
AND PLANTS THAT ARE IN THE VICINITY OF CONSTRUCTION AREAS AND BE
RESPONSIBLE TO REPAIR/REPLACE ANY DAMAGED VEGETATION AND/OR PERFORM
ANY LAWN RESTORATION AS A RESULT.
10. CONTRACTOR SHALL NOT BLOCK AREAS OF INGRESS/EGRESS FOR VEHICLE TRAFFIC
OR PATIENT/STAFF ACCESS DURING CONSTRUCTION ACTIVITIES. IF THIS CANNOT BE
AVOIDED, WRITTEN PERMISSION MUST BE OBTAINED FROM THE COR PRIOR. PROVIDE
TRAFFIC CONES OR BARRICADES AND/OR PROVIDE A PERSON AT THE SUBJECT AREA
TO ALERT PEDESTRIANS DURING THE WORK.
11. CONTRACTOR SHALL INSPECT ALL ROOF DECKS AND PARAPETS WHILE EXPOSED
AFTER DEMOLITION OF ROOFING MATERIALS. ALL DAMAGED ROOF DECK AND
PARAPET MATERIAL SHALL BE REMOVED AND REPLACED WITH NEW MATCHING
ROOF DECK TO MATCH EXISTING. CONTRACTOR SHALL CARRY AN ALLOWANCE
FOR 7% REPLACEMENT OF UNFORESEEN DAMAGED DECK (SEE ALLOWANCES).
12. UPON PROJECT COMPLETION, CONTRACTOR SHALL CONFIRM PROPER FUNCTION
OF ROOF DRAINAGE SYSTEMS, CLEAR ANY CLOGS & REPLACE MISSING OR
DAMAGED STRAINER BASKETS WITH NEW TO MATCH EXISTING QUALITY/FUNCTION
AND WITH THE ABILITY TO SECURE/REMOVE FOR ROUTINE MAINTENANCE.
13. CONTRACTOR IS RESPONSIBLE FOR HOSTING SUBMITTAL EXCHANGE IN ONLINE
SUBMITTAL TRACKING PLATFORM.
PHOTO REFERENCE - SEE SHEET 01W-AS341
EXISTING WALKWAY TRAFFIC PAD TO BE OMITTED
DEMOLITION KEYNOTES
REMOVE EXISTING (LOW-SLOPE) BUILT-UP, ROLLED OR EPDM ROOFING AND
INSULATION LAYERS DOWN TO THE DECK – COMPLETE TEAR-OFF INCLUDING ALL
FASTENERS. PREP FOR NEW ROOF SYSTEM AS INDICATED. ALTERNATE 1: EXISTING
INSULATION TO REMAIN.
REMOVE EXISTING METAL FASCIA/COPING AND REPLACE WITH NEW AS
SHOWN/SPECIFIED.
EXISTING INTERNAL ROOF DRAIN TO REMAIN, MODIFY/ADJUST HEIGHT AND ADD
COLLAR EXTENSION AS NEEDED TO ACCOMMODATE NEW ROOF INSULATION
THICKNESS.
REMOVE EXISTING LIGHTNING PROTECTION COMPONENTS FOR ROOF REPLACEMENT
WORK. EXISTING AIR TERMINALS CAN BE REUSED AS LONG AS THEIR PHYSICAL
CONDITION IS INTACT. EXISTING DOWNLEADS AND GROUNDING ARE MOSTLY INTACT
AND CAN BE REUSED WITH MINOR REPAIRS, REATTACHMENT AND RE-ROUTE AS
REQUIRED TO MEET PERFORMANCE SPEC REQUIREMENTS FOR A COMPLETE AND
FUNCTIONAL SYSTEM.
REMOVE EXISTING ROOFTOP EQUIPMENT.
EXISTING VENTS, DRAINS, EQUIPMENT OR OTHER ROOFTOP PENETRATIONS TO REMAIN,
U.N.O. REMOVE ANY PIPE BOOTS, FLASHING, AND SEALANTS AROUND PENETRATIONS.
RAISE TO RECEIVE NEW ROOFING AND INSULATION SYSTEM. EXISTING ROOF DRAIN
PIPING TO REMAIN FOR RECONNECTION. REMOVE AND REPLACE EXISTING DRAIN
BODY, SUMP AND ASSOCIATED FASTENERS. COMPLETELY REMOVE ANY DEBRIS FROM
EXISTING ROOF DRAIN PIPE TO ALLOW FOR PROPER DRAINAGE.
PREVIOUS EXISTING ROOF VENT (OR OTHER) LOCATION. PATCH/INFILL WITH NEW ROOF
DECK MATERIAL AND SHIM AS REQUIRED TO BE FLUSH WITH ADJACENT EXISTING.
ENSURE PATCHES ARE ADEQUATELY SUPPORTED TO MEET CODE MIN. LIVE AND DEAD
LOAD DESIGN CRITERIA. ALL WORK TO BE COMPLETED FROM ABOVE. FILL ANY GAPS IN
THE INSULATION BARRIER WITH LIKE MATERIALS MATCHING QUALITY AND
PERFORMANCE. AT OPENINGS LARGER THAN 6 INCH DIAMETER, RETAIN EXISTING CURB
STRUCTURE, FRAME ACROSS OPENING WITH P.T. 2X6 AT 16" O.C. WITH 3/4" MARINE
GRADE PLYWOOD DECK. INSTALL INSULATION, COVERBOARD AND EPDM OVER NEW
ASSEMBLY.
CAPPED PIPES. REMOVE AND CAP BELOW ROOF-LINE. ALL WORK TO BE COMPLETED
FROM ABOVE.
NOTE: ALL KEY NOTES FOR THE PROJECT ARE LISTED BUT DO NOT NECESSARILY APPLY TO
EVERY PLAN OR ELEVATION. REFER TO DRAWINGS FOR APPLICABILITY.
SEE SPECIFICATIONS FOR GENERAL DEMOLITION AND PATCHING REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
A
B C
DE
ROOF PLAN ROOF REPLACEMENT
ANN ARBOR VAMC
220109
1W
PROJECT DIRECTOR
FEBRUARY 18, 2022 JD GN
100% BID
DOCUMENTS
01W-AS141
DWG. _4__ OF 7
NORTH
SCALE: 1/8" = 1'-0"
UNIT A ROOF PLAN
Revisions: Date:
35% SCHEMATIC DESIGN 12/21/20
65% DESIGN DEVELOPMENT 02/19/21
65% DESIGN DEVELOPMENT RESUBMISSION 04/15/21
95% CONSTRUCTION DOCUMENTS 06/14/21
100% BID DOCUMENTS 02/18/22 JAMES F.
DERKS
ARCHITECT
1W - 2ND FLOOR
839' - 2"
1W - 1ST FLOOR
827' - 3"
1W - BSMT
816' - 3"
1W - 3RD FLOOR
850' - 2"
1W - 4TH FLOOR
861' - 2"
1W - 5TH FLOOR
873' - 9 1/4"
1W - SUBBSMT
810' - 3"
1W - 6TH FLOOR
885' - 8 1/4"
1W - 7TH FLOOR
896' - 8 1/4"
1W - 8TH FLOOR
908' - 7 1/4"
1W - 9TH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4"
UNIT A - NORTH
8TH FLOOR ROOF
UNIT A - NORTH
9TH FLOOR ROOF
UNIT B - 10TH FLOOR
PENTHOUSE ROOF
1W - 2ND FLOOR
839' - 2"
1W - 1ST FLOOR
827' - 3"
1W - BSMT
816' - 3"
1W - 3RD FLOOR
850' - 2"
1W - 4TH FLOOR
861' - 2"
1W - 5TH FLOOR
873' - 9 1/4"
1W - SUBBSMT
810' - 3"
1W - 6TH FLOOR
885' - 8 1/4"
1W - 7TH FLOOR
896' - 8 1/4"
1W - 8TH FLOOR
908' - 7 1/4"
1W - 9TH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4"
UNIT B - SOUTH 8TH
FLOOR ROOF
UNIT E - SOUTH ELECTRICAL ROOF
UNIT B - SOUTH 8TH FLOOR ROOF
UNIT B - 10TH FLOOR
PENTHOUSE ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
EXTERIOR ELEVATIONS ROOF REPLACEMENT
ANN ARBOR VAMC
220109
1W
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
01W-AS200
DWG. _0_5_ OF 07
SCALE: 1/16" = 1'-0"01W-AS200
NORTH ELEVATION02
SCALE: 1/16" = 1'-0"01W-AS200
SOUTH ELEVATION01
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
1W - 2ND FLOOR
839' - 2"
1W - 1ST FLOOR
827' - 3"
1W - BSMT
816' - 3"
1W - 3RD FLOOR
850' - 2"
1W - 4TH FLOOR
861' - 2"
1W - 5TH FLOOR
873' - 9 1/4"
1W - SUBBSMT
810' - 3"
1W - 6TH FLOOR
885' - 8 1/4"
1W - 7TH FLOOR
896' - 8 1/4"
1W - 8TH FLOOR
908' - 7 1/4"
1W - 9TH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4" UNIT B - 10TH FLOOR
PENTHOUSE ROOF
UNIT A - 9TH
FLOOR ROOF
UNIT A - 8TH
FLOOR ROOF
UNIT B - SOUTH
8TH FLOOR ROOF
1W - 2ND FLOOR
839' - 2"
1W - 1ST FLOOR
827' - 3"
1W - BSMT
816' - 3"
1W - 3RD FLOOR
850' - 2"
1W - 4TH FLOOR
861' - 2"
1W - 5TH FLOOR
873' - 9 1/4"
1W - SUBBSMT
810' - 3"
1W - 6TH FLOOR
885' - 8 1/4"
1W - 7TH FLOOR
896' - 8 1/4"
1W - 8TH FLOOR
908' - 7 1/4"
1W - 9TH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4"
UNIT A - NORTH 8TH
FLOOR ROOF
UNIT A - NORTH 9TH
FLOOR ROOF
UNIT B - SOUTH 8TH
FLOOR ROOF
UNIT B - 10TH FLOOR
PENTHOUSE ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
EXTERIOR ELEVATIONS ROOF REPLACEMENT
ANN ARBOR VAMC
220109
PROJECT DIRECTOR
DECEMBER 1, 2023 Checker Author
100% BID
DOCUMENTS
01W-AS201
DWG. _0_6_ OF 07
SCALE: 1/16" = 1'-0"01W-AS201
EAST ELEVATION02
SCALE: 1/16" = 1'-0"01W-AS201
WEST ELEVATION01
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
NEW EPDM MEMBRANE
ROOFING
EXISTING CONCRETE DECK TO
REMAIN
NEW PRE-MFR. RUBBER VENT
FLASHING BOOT
TYPICAL EXISTING PENETRATION
NEW DRAW BAND
NEW SEALANT
NEW RIGID INSULATION OVER
EXISTING(R-33 MIN. TOTAL)
NEW 1/2" COVER BOARD
SINGLE-PLY
MEMBRANE OVER
1/2" COVERBOARD
BONDING ADHESIVE
INSULATION
(SEE NOTES)
SUBSTRATE
NOTES
1. APPLICATION:
-REMOVE EXISTING FLASHING DOWN TO THE METAL BOWL.
-REPAIR OR REPLACE BROKEN DRAIN COMPONENTS.
-DRILL AND TAP BROKEN DRAINS , BOLTS, AND
REPLACE IF NECESSARY.
2. PROVIDE ALL NEW STRAINER BASKETS AND LEAF GRATES.
3. TAPERED INSULATION SLOPE: 1/4" PER FOOT.
SUMP AREA FIELD SEAM REQUIREMENTS:
A. IF SEAM EDGE IS WITHIN 9" OF DRAIN
COMPRESSION RING, ROOFING MEMBRANE PATCH REQUIRED.
B. IF FIELD EDGE IS WITHIN 9" TO 18" OF DRAIN COMPRESSION RING, INSTALL A LAYER OF
5" QUICKSEAM FLASHING CENTERED OVER SEAM EDGE.
5" QUICK SEAM FLASHING SHALL EXTEND 3" MIN.
BEYOND EDGE OF SUMP.
REMOVE/REPLACE
STRAINER BASKET
NEW COMPRESSION
RING TO FIT EXISTING
DRAIN BODY
ADD EXTENSION AS NEEDED TO
COORDINATE WITH ADDITIONAL
INSULATION THICKNESS
DECK
NOTE:
WHEN ATTACHING THE PARAPET FLASHING TO THE SUBSTRATE, THE
APPROPRIATE FASTENER MUST BE USED. THE FASTENER FOR THE WALL FLASHING
MAY BE DIFFERENT THAN THE FASTENER USED ON THE HORIZONTAL ROOF
DECKING.
SINGLE-PLY EPDM FLASHING
(SELF-ADHERING) TURNED UP
PARAPET FACE.
PERIMETER FASTENERS PER
ROOFING MFCTR.
RECOMMENDATIONS FOR
ADHERED SYSTEM
ROOFING
MEMBRANE
SEALANT
TERMINATION BAR (FASTEN 6-INCHES
ON CENTER USING ROOFING SYSTEM
MFR'S RECOMMENDED FASTENERS)
2 PIECE REGLET &
COUNTER FLASHING
RIVET INTO PLACE
(24-INCHES ON
CENTER, MAX.)
NEW MORTAR AT REGLET INSERT IN COMPLIANCE
WITH ASTM INTERNATIONAL C144-11 AGGREGATE
FOR MASONRY MORTAR, C270-14A MORTAR OF
UNIT MASONRY AND C1329/C1329M-15 MORTAR
CEMENT.
CAST STONE CAP
TO REMAIN
PA
R
A
PE
T C
A P
A T
4T H
TH
F
LO
O
R S
NOTE:
AT NORTH SIDES OF UNIT C 4TH AND 5TH FLOOR ROOFS, MEMBRANE
FLASHING AND TERMINATION WILL OCCUR ON TOP OF EXISTING CAST
STONE ORIGINAL PARAPET CAP IN LIEU OF MEMBRANE.
1/2" COVERBOARD
EPDM MEMBRANE
AND COVER STRIPS
BASE BID IS R-49 INSULATION ON EXISTING
DECK. DEDUCT ALTERNATE IS TWO (2) LAYERS
OF 3 INCH INSULATION FOR R-33 MIN.
DECK
GALVANIZED NAILS 6-
INCHES ON CENTER
EXISTING RECTANGULAR PENETRATION
SINGLE-PLY EPDM FLASHING (SELF-
ADHERING) WRAP UP AND OVER
CURB
DECK
8" M
IN
NEW P.T. 2X BLOCKING W/ 1/2" EXT.
GRADE PLYWOOD AS REQUIRED FOR
MINIMUM HEIGHT
PERIMETER FASTENERS PER ROOFING
MFR'S. RECOMMENDATIONS FOR
ADHERED SYSTEM
1/2" COVERBOARD
BASE BID IS R-49 INSULATION ON
EXISTING DECK. DEDUCT ALTERNATE
IS TWO (2) LAYERS OF 3 INCH
INSULATION FOR R-33 MIN.
EXISTING STRUCTURE
TO REMAIN
ROOFING MEMBRANE CORNER
FLASHING
EXISTING MASONRY
WALL AND CAST STONE
CAP TO REMAIN
TAPERED RIGID ROOF INSULATION
TO EXISTING SCUPPER
AIR TERMINAL CONDUCTOR.
PROVIDE ADDITIONAL LAYER OF
ROOFING MEMBRANE AT
CONNECTIONS AND GROUND WIRE
ANCHORS, TYP.
CONTINUOUS SEALANT
EXISTING SCUPPER TO
REMAIN
ROOFING MEMBRANE - UP PARAPET
EXISTING CONCRETE ROOF
DECK
PARAPET FLASHING AND COUNTER-
FLASHING (SEE DETAIL 04).
EPDM OVER 1/2" COVERBOARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
ROOF SECTIONS AND DETAILS ROOF REPLACEMENT
ANN ARBOR VAMC
220109
1W
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
01W-AS340
DWG. _0_87 OF 07
SCALE: 1 1/2" = 1'-0"01W-AS340
TYP. LOW SLOPE ROOF PENETRATION DETAIL01
SCALE: N.T.S.01W-AS340
TYP. ROOF DRAIN DETAIL02
SCALE: N.T.S.01W-AS340
TYP. PARAPET WALL FLASHING AND
COUNTERFLASHING DETAIL04
SCALE: N.T.S.01W-AS340
TYP. EXISTING RECTANGULAR PENETRATION DETAIL05
SCALE: 1 1/2" = 1'-0"01W-AS340
SCUPPER DETAIL03
REFERENCE PHOTO - A1
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
| Sheets |
| G001 - COVER SHEET |
| GS100 - SITE CAMPUS MAP |
| 01W-AS140 - COMPOSITE ROOF PLAN |
| 01W-AS141 - ROOF PLAN - UNIT A |
| 01W-AS142 - ROOF PLAN - UNIT B |
| 01W-AS200 - EXTERIOR ELEVATIONS |
| 01W-AS201 - EXTERIOR ELEVATIONS |
| 01W-AS340 - ROOF SECTIONS AND DETAILS |
File details come from the government source that posted it. Updated .