This document is an architectural plan (drawing number 28-AE111) for a Phase A2 upgrade project at the Ann Arbor VA Medical Center in Michigan, specifically focusing on a basement renovation. The plan details a comprehensive renovation of a morgue and associated spaces, including a new 12' x 10'6" mortuary cooler with front and rear roll-in loading capabilities. The plan includes multiple room specifications such as an autopsy room (472 SF), morgue cooler (131 SF), workroom (379 SF), waiting area (116 SF), viewing room (113 SF), and various supporting spaces like corridors, restrooms, and a mechanical room.

The drawing includes extensive technical notes describing specific installation requirements, equipment placements, and renovation details. Key elements include wall modifications, installation of grab bars, medical equipment repositioning, new flooring, wall guards, storage cabinets, specimen storage, lockers, and specific infrastructure upgrades. The document is marked as a bid document dated 01/13/2023, with one revision bulletin issued on 07/12/2024, indicating an ongoing design and procurement process for the VA Medical Center's facility upgrade project.

View the file

Other files

File Type Posted
1-AE115 - PHASE B1 NEW WORK PLAN R1.pdf PDF
36C25025Q0398 0002.docx DOCX document
1-AE116 - PHASE B2 NEW WORK PLAN.pdf PDF
36C25025Q0398 0001.docx DOCX document
36C25025Q0398.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

A

A

C

A A

2 3 4 5

6 7

A

B

B.5

C

2.5

DNUP EXISTING BUILDING 28

ELEVATION IS 18" BELOW

NEW MORGUE SPACE

EXISTING BUILDING 1W

ELEVATION IS 18" ABOVE

NEW MORGUE SPACE

472 SF

AUTOPSY ROOM

FG104A

68 SF

AUTOPSY

OFFICE

FG103

39 SF

STORAGE

FG102

131 SF

MORGUE

COOLER

FG101A

130 SF

CORRIDOR

C5.1

116 SF

WAITING

FG100

113 SF

VIEWING

FG100A

379 SF

WORKROOM

FG101

LANDING

833 SF

CORRIDOR

C5

ELEVATOR

82 SF

SINGLE USER

RESTROOM

FG104B

100 SF

ANTE

FG104

TYP.

11' - 0"

9' - 0"

10' - 9 3/4"

3' - 9"

11 1

15 15 15

6' - 0" 30' - 0" 7' - 0" 30' - 0"

19' - 8 1/2" +/-

/4

/4

28' - 2 1/4"

6'

0" 2' - 10"

7' - 0 3/4" +/-12' - 4 1/4"

135°

40' - 4 3/4" +/-

19' - 1" 5' - 1"

21 21

813' - 2 1/2"

814' - 8 1/2"

16' - 0" 16' - 0" 16' - 0"

2' - 0"

6' - 0 1/2"

FG00

MECHANICAL

ROOM

3' - 5 1/2"

12' - 4"

/4

/4

AA

4.2

/4

4' - 7 1/4"

LANDING

6' - 0"

2 2 2

37 37 37

38 3939

5' - 8"

2 2

28-AE311

3' - 6"

8 5/8"

9"

T1

RECREATION

THERAPY

CLINIC

WORKROOM

FG10

2.12

FG01

9' - 3"

6' - 1 1/2" 5' - 4"

8' - 1 3/4"

8' - 0"

25 25

6' - 4"

10' - 6"

SIM

M

IN

" 64

2' - 3"

5' - 0" 10"

P-4

RES-3

WC-1

WC-1

WC-1

P-4

RES-3

WC-1

WC-1

14 7 54

P-4

17 58

P-4

RES-3

WC-1

WC-1

RES-3

WC-1

P-4

WC-1

P-4

RES-3

WC-1

RES-3

28-AE311

Sim

3' - 0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\q u in n \O n e

D ri v e \D o c u m e n ts

\R e v it L o c a l F ile s \2

\A n n

A rb o r

B ld g p a tr ic k .q u in n F

B N

E U

.r v t

/2

/2

:5

:2

P

M

28-AE111

PHASE A2 NEW WORK PLAN

01/13/2023

UPGRADE BASEMENT, BUILDING 1

WEST

506-20-102

ANN ARBOR, MICHIGAN

BID DOCUMENTS

ANN ARBOR VA

MEDICAL

CENTER Approved: Veteran's Affairs Medical Center

1/4" = 1'-0"

NEW WORK PLAN - PHASE A2

KEYPLAN

N

D R A W I N G N O T E S - FOR WORK PROVIDED BY OTHERS

1 EXISTING MANHOLE. REMOVE EXISTING DIRT, DEBRIS, AND

RUST FROM FRAME. PROVIDE CORROSIVE RESISTANT

COATING AT EXISTING MANHOLE FRAME. PROVIDE NEW

GALVANIZED LID.

2 EXISTING MANHOLE. REMOVE EXISTING DIRT, DEBRIS, AND

RUST FROM FRAME. PROVIDE CORROSIVE RESISTANT

COATING AT EXISTING MANHOLE FRAME. PROVIDE NEW

GALVANIZED LID WITH GASKET.

3 STAINLESS STEEL CORNER GUARD.

4 36" GRAB BAR.

5 42" GRAB BAR.

6 WALL MOUNTED LAVATORY - SEE PLUMBING DRAWINGS

7 WALL MOUNTED WATER CLOSET - SEE PLUMBING DRAWINGS

8 5'-0" X 3'-0" ACCESSIBLE SHOWER - SLOPE SLAB AT 1/4" PER

FOOT - SLOPE RESINOUS FLOORING TO DRAIN AT 1/4" PER

FOOT. INSTALL SCHEDULED WALL TILE FULL HEIGHT AT

SHOWER WALLS.

9 AUTOPSY TABLE WITH SINK - RELOCATE FROM EXISTING

LOCATION ON-SITE. (R)

10 MOP SINK - SEE PLUMBING DRAWINGS

11 AREA SHOWN AS HATCHED INDICATES BUILT-UP FLOORING -

SEE STRUCTURAL DRAWING

12 SOAP DISPENSER (VC).

13 PAPER TOWEL DISPENSER (VC).

14 TOILET TISSUE DISPENSER (VC).

15 NEW RAMP AND LANDING - SLOPE RAMP AT 1:20 - SEE

STRUCTURAL DRAWINGS

16 24" X 36" FRAMED MIRROR.

17 HOSE BIB - SEE PLUMBING DRAWINGS

18 TOUCHLESS AUTO-OPERATOR - SEE ELECTRICAL AND

TELECOMMUNICATIONS DRAWINGS.

19 CARD READER AUTO-OPERATOR - SEE ELECTRICAL AND

TELECOMMUNICATIONS DRAWINGS.

20 TALL STORAGE CABINET - CW080 AT 72" X 36" X 16"

21 INFILL EXISTING OPENING IN WALL TO MATCH EXISTING - SEE

SECTION ON SHEET 1 / 28-AE/311.

22 ALIGN NEW WALL FLUSH WITH FACE OF EXISTING ADJACENT

WALL.

23 30" X 82" STAINLESS STEEL GROSSING TABLE WITH

INTEGRAL SINK (R).

24 PLASTIC LAMINATE WORKSURFACE AT 32" AFF - PROVIDE

CONCEALED SUPPORTS BEHIND WALL. SEE TYPICAL

SECTION ON SHEET AE401.

25 RESILIENT WALL GUARD HANDRAIL COMBINATION INSTALLED

AT 2'-10" A.F.F.

26 WALL MOUNTED SANITATION STATION (VV).

27 GLOVES AND MASK STATION (VV).

28 48" MONITOR - TOP AT 84" AFF (VC).

29 WALL MOUNTED PHONE - TOP AT 48" AFF. - SEE ELECTRICAL

DRAWINGS

30 PLASTIC LAMINATE (PL-1) BASE CASEWORK AND SOLID

SURFACE COUNTERTOP AT 2'-10" A.F.F - SEE SECTION

4/1-AE401.

31 SCISSOR LIFT (VV).

32 HYDRAULIC CADAVER CARRIER CLEARANCE.

33 SCISSOR LIFT CLEARANCE.

34 PORTABLE SIDE LOADING 4-TIER STORAGE RACK (VV)

35 FLOOR DRAIN.

36 2" EXPANSION JOINT - PREPARE FOR EXPANSION JOINT

COVER IN PHASE A3 WORK.

37 STAINLESS STEEL SPECIMEN STORAGE CABINETS - 84" X 36"

X 24"

38 (2) FULL HEIGHT 12" X 21" X 72" HPDE LOCKERS.

39 (2) DOUBLE TIERED 12" X 21" X 72" HPDE LOCKERS.

40 INFILL EXISTING OPENING IN WALL TO MATCH EXISTING - SEE

SECTION ON SHEET 2 / 28-AE/311.

41 INFILL EXISTING OPENING IN WALL TO MATCH EXISTING - SEE

SECTION ON SHEET 4 / 28-AE/311.

1/4" = 1'-0"

RESTROOM ELEVATION - NORTH

1/4" = 1'-0"

RESTROOM ELEVATION - EAST

1/4" = 1'-0"

RESTROOM ELEVATION - SOUTH

1/4" = 1'-0"

RESTROOM ELEVATION - WEST

5/8" GYPSUM BOARD TYPE "X" ON EXISTING FRAMING

MOP RACK (VC).

WALL MOUNTED SINK WITH FOOT PEDAL - SEE PLUMBING

DRAWINGS

WALL MOUNTED EYE WASH AND DRENCH HOSE UNIT.

ROBE HOOK AT 48" A.F.F.

SOILED LINENS BIN. (VV)

REMOVE PREFABRICATED TEMPORARY WALL AT

CONCLUSION OF WORK IN THIS AREA - PATCH AND REPAIR

ANY DISTURBED FINISHES TO MATCH EXISTING ADJACENT.

REMOVE SUSPENDED PLASTIC BARRIER WITH ZIPPER DOOR

AT CONCLUSION OF PHASE.

TEMPORARY CONSTRUCTION SIGNAGE - SEE DETAIL 4/GI003.

INSTALL SIGNAGE TEMPORARILY SECURED TO DOOR AT 5'-0"

A.F.F. REMOVE AT CONCLUSION OF CONSTRUCTION PHASE.

GYPSUM BOARD BULKHEAD AT APPROX. 7'-6" A.F.F. -

COORDINATE HEIGHT TOP OF MORGUE COOLER.

39"W X 48"H ALUMINUM STOREFRONT WINDOW - INSTALL AT

3'-0" A.F.F.

- CLEARANCES PER MANUFACTURER - SEE MECHANICAL

DRAWINGS.

SEMI RECESSED FIRE EXTINGUISHER CABINET WITH 10LBS

ABC FIRE EXTINGUISHER.

STAINLESS STEEL ANGLE - SEE DETAILS ON SHEET 28-AE311.

WALL MOUNTED STRIP LIGHTING - SEE ELECTRICAL

DRAWINGS.

WALL CLEANOUT - SEE PLUMBING DRAWINGS.

24" GRAB BAR.

SHOWER CURTAIN ROD AT 78" A.F.F.

RECESSED SOAP DISH.

WALL MOUNTED HAND HELD SHOWER HEAD - SEE PLUMBING

DRAWINGS.

FIRE STROBE - SEE ELECTRICAL DRAWINGS.

LIGHT SWITCH - SEE ELECTRICAL DRAWINGS.

STAINLESS STEEL BOLLARD WITH THREADED BASE - 2"

DIAMETER BY 32" HIGH - SEE DETAIL 7 ON SHEET 28-AE311.

No. Revisions: Date:

BID DOCUMENTS 01/13/2023

1 BULLETIN 1 07/12/2024

D R A W I N G N O T E S - FOR WORK PROVIDED BY

EQUIPMENT VENDOR

53 NEW 12'-0" X 10'-6" MORTUARY COOLER WITH FRONT AND REAR ROLL-IN LOADING

EDITED FOR EQUIPMENT PROCUREMENT 10/7/2024

Sheets
28-AE111 - PHASE A2 NEW WORK PLAN

File details come from the government source that posted it. Updated .