28-AE111 - PHASE A2 NEW WORK PLAN.pdf
PDF 3 MB Posted
- Solicitation number
- 36C25025Q0398
About this file
This document is an architectural plan (drawing number 28-AE111) for a Phase A2 upgrade project at the Ann Arbor VA Medical Center in Michigan, specifically focusing on a basement renovation. The plan details a comprehensive renovation of a morgue and associated spaces, including a new 12' x 10'6" mortuary cooler with front and rear roll-in loading capabilities. The plan includes multiple room specifications such as an autopsy room (472 SF), morgue cooler (131 SF), workroom (379 SF), waiting area (116 SF), viewing room (113 SF), and various supporting spaces like corridors, restrooms, and a mechanical room.
The drawing includes extensive technical notes describing specific installation requirements, equipment placements, and renovation details. Key elements include wall modifications, installation of grab bars, medical equipment repositioning, new flooring, wall guards, storage cabinets, specimen storage, lockers, and specific infrastructure upgrades. The document is marked as a bid document dated 01/13/2023, with one revision bulletin issued on 07/12/2024, indicating an ongoing design and procurement process for the VA Medical Center's facility upgrade project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-AE115 - PHASE B1 NEW WORK PLAN R1.pdf | ||
| 36C25025Q0398 0002.docx | DOCX document | |
| 1-AE116 - PHASE B2 NEW WORK PLAN.pdf | ||
| 36C25025Q0398 0001.docx | DOCX document | |
| 36C25025Q0398.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
A
A
C
A A
2 3 4 5
6 7
A
B
B.5
C
2.5
DNUP EXISTING BUILDING 28
ELEVATION IS 18" BELOW
NEW MORGUE SPACE
EXISTING BUILDING 1W
ELEVATION IS 18" ABOVE
NEW MORGUE SPACE
472 SF
AUTOPSY ROOM
FG104A
68 SF
AUTOPSY
OFFICE
FG103
39 SF
STORAGE
FG102
131 SF
MORGUE
COOLER
FG101A
130 SF
CORRIDOR
C5.1
116 SF
WAITING
FG100
113 SF
VIEWING
FG100A
379 SF
WORKROOM
FG101
LANDING
833 SF
CORRIDOR
C5
ELEVATOR
82 SF
SINGLE USER
RESTROOM
FG104B
100 SF
ANTE
FG104
TYP.
11' - 0"
9' - 0"
10' - 9 3/4"
3' - 9"
11 1
15 15 15
6' - 0" 30' - 0" 7' - 0" 30' - 0"
19' - 8 1/2" +/-
/4
/4
28' - 2 1/4"
6'
0" 2' - 10"
7' - 0 3/4" +/-12' - 4 1/4"
135°
40' - 4 3/4" +/-
19' - 1" 5' - 1"
21 21
813' - 2 1/2"
814' - 8 1/2"
16' - 0" 16' - 0" 16' - 0"
2' - 0"
6' - 0 1/2"
FG00
MECHANICAL
ROOM
3' - 5 1/2"
12' - 4"
/4
/4
AA
4.2
/4
4' - 7 1/4"
LANDING
6' - 0"
2 2 2
37 37 37
38 3939
5' - 8"
2 2
28-AE311
3' - 6"
8 5/8"
9"
T1
RECREATION
THERAPY
CLINIC
WORKROOM
FG10
2.12
FG01
9' - 3"
6' - 1 1/2" 5' - 4"
8' - 1 3/4"
8' - 0"
25 25
6' - 4"
10' - 6"
SIM
M
IN
" 64
2' - 3"
5' - 0" 10"
P-4
RES-3
WC-1
WC-1
WC-1
P-4
RES-3
WC-1
WC-1
14 7 54
P-4
17 58
P-4
RES-3
WC-1
WC-1
RES-3
WC-1
P-4
WC-1
P-4
RES-3
WC-1
RES-3
28-AE311
Sim
3' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\q u in n \O n e
D ri v e \D o c u m e n ts
\R e v it L o c a l F ile s \2
\A n n
A rb o r
B ld g p a tr ic k .q u in n F
B N
E U
.r v t
/2
/2
:5
:2
P
M
28-AE111
PHASE A2 NEW WORK PLAN
01/13/2023
UPGRADE BASEMENT, BUILDING 1
WEST
506-20-102
ANN ARBOR, MICHIGAN
BID DOCUMENTS
ANN ARBOR VA
MEDICAL
CENTER Approved: Veteran's Affairs Medical Center
1/4" = 1'-0"
NEW WORK PLAN - PHASE A2
KEYPLAN
N
D R A W I N G N O T E S - FOR WORK PROVIDED BY OTHERS
1 EXISTING MANHOLE. REMOVE EXISTING DIRT, DEBRIS, AND
RUST FROM FRAME. PROVIDE CORROSIVE RESISTANT
COATING AT EXISTING MANHOLE FRAME. PROVIDE NEW
GALVANIZED LID.
2 EXISTING MANHOLE. REMOVE EXISTING DIRT, DEBRIS, AND
RUST FROM FRAME. PROVIDE CORROSIVE RESISTANT
COATING AT EXISTING MANHOLE FRAME. PROVIDE NEW
GALVANIZED LID WITH GASKET.
3 STAINLESS STEEL CORNER GUARD.
4 36" GRAB BAR.
5 42" GRAB BAR.
6 WALL MOUNTED LAVATORY - SEE PLUMBING DRAWINGS
7 WALL MOUNTED WATER CLOSET - SEE PLUMBING DRAWINGS
8 5'-0" X 3'-0" ACCESSIBLE SHOWER - SLOPE SLAB AT 1/4" PER
FOOT - SLOPE RESINOUS FLOORING TO DRAIN AT 1/4" PER
FOOT. INSTALL SCHEDULED WALL TILE FULL HEIGHT AT
SHOWER WALLS.
9 AUTOPSY TABLE WITH SINK - RELOCATE FROM EXISTING
LOCATION ON-SITE. (R)
10 MOP SINK - SEE PLUMBING DRAWINGS
11 AREA SHOWN AS HATCHED INDICATES BUILT-UP FLOORING -
SEE STRUCTURAL DRAWING
12 SOAP DISPENSER (VC).
13 PAPER TOWEL DISPENSER (VC).
14 TOILET TISSUE DISPENSER (VC).
15 NEW RAMP AND LANDING - SLOPE RAMP AT 1:20 - SEE
STRUCTURAL DRAWINGS
16 24" X 36" FRAMED MIRROR.
17 HOSE BIB - SEE PLUMBING DRAWINGS
18 TOUCHLESS AUTO-OPERATOR - SEE ELECTRICAL AND
TELECOMMUNICATIONS DRAWINGS.
19 CARD READER AUTO-OPERATOR - SEE ELECTRICAL AND
TELECOMMUNICATIONS DRAWINGS.
20 TALL STORAGE CABINET - CW080 AT 72" X 36" X 16"
21 INFILL EXISTING OPENING IN WALL TO MATCH EXISTING - SEE
SECTION ON SHEET 1 / 28-AE/311.
22 ALIGN NEW WALL FLUSH WITH FACE OF EXISTING ADJACENT
WALL.
23 30" X 82" STAINLESS STEEL GROSSING TABLE WITH
INTEGRAL SINK (R).
24 PLASTIC LAMINATE WORKSURFACE AT 32" AFF - PROVIDE
CONCEALED SUPPORTS BEHIND WALL. SEE TYPICAL
SECTION ON SHEET AE401.
25 RESILIENT WALL GUARD HANDRAIL COMBINATION INSTALLED
AT 2'-10" A.F.F.
26 WALL MOUNTED SANITATION STATION (VV).
27 GLOVES AND MASK STATION (VV).
28 48" MONITOR - TOP AT 84" AFF (VC).
29 WALL MOUNTED PHONE - TOP AT 48" AFF. - SEE ELECTRICAL
DRAWINGS
30 PLASTIC LAMINATE (PL-1) BASE CASEWORK AND SOLID
SURFACE COUNTERTOP AT 2'-10" A.F.F - SEE SECTION
4/1-AE401.
31 SCISSOR LIFT (VV).
32 HYDRAULIC CADAVER CARRIER CLEARANCE.
33 SCISSOR LIFT CLEARANCE.
34 PORTABLE SIDE LOADING 4-TIER STORAGE RACK (VV)
35 FLOOR DRAIN.
36 2" EXPANSION JOINT - PREPARE FOR EXPANSION JOINT
COVER IN PHASE A3 WORK.
37 STAINLESS STEEL SPECIMEN STORAGE CABINETS - 84" X 36"
X 24"
38 (2) FULL HEIGHT 12" X 21" X 72" HPDE LOCKERS.
39 (2) DOUBLE TIERED 12" X 21" X 72" HPDE LOCKERS.
40 INFILL EXISTING OPENING IN WALL TO MATCH EXISTING - SEE
SECTION ON SHEET 2 / 28-AE/311.
41 INFILL EXISTING OPENING IN WALL TO MATCH EXISTING - SEE
SECTION ON SHEET 4 / 28-AE/311.
1/4" = 1'-0"
RESTROOM ELEVATION - NORTH
1/4" = 1'-0"
RESTROOM ELEVATION - EAST
1/4" = 1'-0"
RESTROOM ELEVATION - SOUTH
1/4" = 1'-0"
RESTROOM ELEVATION - WEST
5/8" GYPSUM BOARD TYPE "X" ON EXISTING FRAMING
MOP RACK (VC).
WALL MOUNTED SINK WITH FOOT PEDAL - SEE PLUMBING
DRAWINGS
WALL MOUNTED EYE WASH AND DRENCH HOSE UNIT.
ROBE HOOK AT 48" A.F.F.
SOILED LINENS BIN. (VV)
REMOVE PREFABRICATED TEMPORARY WALL AT
CONCLUSION OF WORK IN THIS AREA - PATCH AND REPAIR
ANY DISTURBED FINISHES TO MATCH EXISTING ADJACENT.
REMOVE SUSPENDED PLASTIC BARRIER WITH ZIPPER DOOR
AT CONCLUSION OF PHASE.
TEMPORARY CONSTRUCTION SIGNAGE - SEE DETAIL 4/GI003.
INSTALL SIGNAGE TEMPORARILY SECURED TO DOOR AT 5'-0"
A.F.F. REMOVE AT CONCLUSION OF CONSTRUCTION PHASE.
GYPSUM BOARD BULKHEAD AT APPROX. 7'-6" A.F.F. -
COORDINATE HEIGHT TOP OF MORGUE COOLER.
39"W X 48"H ALUMINUM STOREFRONT WINDOW - INSTALL AT
3'-0" A.F.F.
- CLEARANCES PER MANUFACTURER - SEE MECHANICAL
DRAWINGS.
SEMI RECESSED FIRE EXTINGUISHER CABINET WITH 10LBS
ABC FIRE EXTINGUISHER.
STAINLESS STEEL ANGLE - SEE DETAILS ON SHEET 28-AE311.
WALL MOUNTED STRIP LIGHTING - SEE ELECTRICAL
DRAWINGS.
WALL CLEANOUT - SEE PLUMBING DRAWINGS.
24" GRAB BAR.
SHOWER CURTAIN ROD AT 78" A.F.F.
RECESSED SOAP DISH.
WALL MOUNTED HAND HELD SHOWER HEAD - SEE PLUMBING
DRAWINGS.
FIRE STROBE - SEE ELECTRICAL DRAWINGS.
LIGHT SWITCH - SEE ELECTRICAL DRAWINGS.
STAINLESS STEEL BOLLARD WITH THREADED BASE - 2"
DIAMETER BY 32" HIGH - SEE DETAIL 7 ON SHEET 28-AE311.
No. Revisions: Date:
BID DOCUMENTS 01/13/2023
1 BULLETIN 1 07/12/2024
D R A W I N G N O T E S - FOR WORK PROVIDED BY
EQUIPMENT VENDOR
53 NEW 12'-0" X 10'-6" MORTUARY COOLER WITH FRONT AND REAR ROLL-IN LOADING
EDITED FOR EQUIPMENT PROCUREMENT 10/7/2024
| Sheets |
| 28-AE111 - PHASE A2 NEW WORK PLAN |
File details come from the government source that posted it. Updated .