1-AE116 - PHASE B2 NEW WORK PLAN.pdf

PDF 2 MB Posted

Attached to
4110--Equipment - Walk-in Coolers/Freezers - Ann Arbor
Solicitation number
36C25025Q0398
Issued by

About this file

This document is an architectural drawing for a Phase B2 new work plan for the Ann Arbor VA Medical Center, specifically detailing basement upgrades for Building 1 West. The drawing includes key specifications for canteen and storage areas, featuring new walk-in cooler and freezer installations with insulated panel floors and ramps, new condenser units, and various equipment and infrastructure modifications. Drawing notes indicate specific requirements such as stainless steel corner guards, card reader access control, temporary construction signage, and provisions for protecting existing flooring and finishes. The plan encompasses multiple room spaces including canteen freezer (280 SF), canteen cooler (337 SF), canteen vending area (216 SF), dry storage (326 SF), and mechanical spaces, with precise dimensional annotations and equipment placement details. The document is marked as bid documents, with the most recent revision dated 07/12/2024, suggesting an ongoing renovation or equipment upgrade project for the VA Medical Center's basement area.

View the file

Other files

File Type Posted
28-AE111 - PHASE A2 NEW WORK PLAN.pdf PDF
1-AE115 - PHASE B1 NEW WORK PLAN R1.pdf PDF
36C25025Q0398 0002.docx DOCX document
36C25025Q0398 0001.docx DOCX document
36C25025Q0398.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C C

A

M

K L

N

2A

UP

U P

TYP. AROUND

COLUMN

TYP.

2 2

337 SF

CANTEEN

FREEZER

BB09B

280 SF

CANTEEN

COOLER

BB09A

216 SF

CANTEEN

VENDING

BB13

326 SF

CANTEEN DRY

STORAGE

BB09

293 SF

MECHANICAL

AB21A

RADIATION

SAFETY

STORAGE

AB31

RADIATION

SAFETY

STORAGE

AB33

1122 SF

SOUTH

CORRIDOR -

WEST

C1

3 3

DOCK CORRIDOR

WEST

BB06

16' - 4 1/2"

2A

14' - 2 7/8"

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

6 6

2A

3' - 8"

T

11 11 11 1111 11

16' - 10"

20' - 6"

114'

0"

HOLD

2' - 10 5/8"4' - 0" +/-

T4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

7/

/2

5:

:4

PM

1-AE116

PHASE B2 NEW WORK PLAN

01/13/2023

UPGRADE BASEMENT,

BUILDING 1 WEST

506-20-102

ANN ARBOR, MICHIGAN

BID DOCUMENTS

1W

ANN ARBOR VA

MEDICAL

CENTER Approved: Veteran's Affairs Medical Center

D R A W I N G N O T E S - FOR WORK PROVIDED

BY OTHERS

KEYPLAN

1/4" = 1'-0"1 ENLARGED NEW WORK PLAN - PHASE B2

1 STAINLESS STEEL CORNER GUARD.

2 5'-4" X 2'-4" FREE STANDING RACK (VV).

CARD READER ACCESS CONTROL - SEE ELECTRICAL AND TELECOMMUNICATIONS DRAWINGS.

INFILL EXISTING OPENING AT THE CONCLUSION OF PHASE - SEE PHASING NOTES. STAINLESS

STEEL CLOSURE PANEL BY EQUIPMENT VENDOR

TEMPORARY CONSTRUCTION SIGNAGE

REMOVE SUSPENDED PLASTIC BARRIER WITH ZIPPER DOOR AT CONCLUSION OF PHASE.

INFILL OPENING WITH CMU. MATCH EXISTING INTERIOR FINISH.

EXISTING BOLLARD TO REMAIN.

INSTALL 6" HIGH AND 3" DEEP STAINLESS STEEL WALL GUARD TO PROTECT WALL MOUNTED OBJECT.

MOUNT CENTERED AT AND WITHIN 3: OF ADJACENT OBJECT.

THERMOSTAT - BY OTHERS

CONTRACTOR SHALL PROTECT EXISTING FLOORING TO REMAIN IN THIS SPACE - REPAIR ANY DAMAGED

FINISHES AT CONCLUSION OF PHASE.

REMOVE PREFABRICATED TEMPORARY WALL AT CONCLUSION OF WORK IN THIS AREA - PATCH AND

REPAIR ANY DISTURBED FINISHES TO MATCH EXISTING ADJACENT.

TOUCHLESS AUTO-OPERATOR

No. Revisions: Date:

BID DOCUMENTS 01/13/2023

1 BULLETIN 01 07/12/2024

EDITED FOR EQUIPMENT PROCUREMENT 10/7/2024

D R A W I N G N O T E S -

FOR WORK PROVIDED BY EQUIPMENT MANUFACTURER

SEE MECHANICAL DRAWINGS.

4 NEW COOLER / FREEZER CONDENSER UNITS - SEE MECHANICAL DRAWINGS.

13 NEW WALK-IN COOLER WITH INSULATED PANEL FLOOR AND RAMP - CLEARANCES PER MANUFACTURER -

14 NEW WALK-IN FREEZER WITH INSULATED PANEL FLOOR AND RAMP - CLEARANCES PER MANUFACTURER -

SEE MECHANICAL DRAWINGS.

Sheets
1-AE112 - PHASE A3 NEW WORK PLAN
1-AE114 - PHASE A5 NEW WORK PLAN
1-AE115 - PHASE B1 NEW WORK PLAN
1-AE116 - PHASE B2 NEW WORK PLAN
1-AE312 - WALL SECTIONS
1-AE602 - DOOR SCHEDULE AND DETAILS

File details come from the government source that posted it. Updated .