1-AE116 - PHASE B2 NEW WORK PLAN.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25025Q0398
About this file
This document is an architectural drawing for a Phase B2 new work plan for the Ann Arbor VA Medical Center, specifically detailing basement upgrades for Building 1 West. The drawing includes key specifications for canteen and storage areas, featuring new walk-in cooler and freezer installations with insulated panel floors and ramps, new condenser units, and various equipment and infrastructure modifications. Drawing notes indicate specific requirements such as stainless steel corner guards, card reader access control, temporary construction signage, and provisions for protecting existing flooring and finishes. The plan encompasses multiple room spaces including canteen freezer (280 SF), canteen cooler (337 SF), canteen vending area (216 SF), dry storage (326 SF), and mechanical spaces, with precise dimensional annotations and equipment placement details. The document is marked as bid documents, with the most recent revision dated 07/12/2024, suggesting an ongoing renovation or equipment upgrade project for the VA Medical Center's basement area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 28-AE111 - PHASE A2 NEW WORK PLAN.pdf | ||
| 1-AE115 - PHASE B1 NEW WORK PLAN R1.pdf | ||
| 36C25025Q0398 0002.docx | DOCX document | |
| 36C25025Q0398 0001.docx | DOCX document | |
| 36C25025Q0398.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C C
A
M
K L
N
2A
UP
U P
TYP. AROUND
COLUMN
TYP.
2 2
337 SF
CANTEEN
FREEZER
BB09B
280 SF
CANTEEN
COOLER
BB09A
216 SF
CANTEEN
VENDING
BB13
326 SF
CANTEEN DRY
STORAGE
BB09
293 SF
MECHANICAL
AB21A
RADIATION
SAFETY
STORAGE
AB31
RADIATION
SAFETY
STORAGE
AB33
1122 SF
SOUTH
CORRIDOR -
WEST
C1
3 3
DOCK CORRIDOR
WEST
BB06
16' - 4 1/2"
2A
14' - 2 7/8"
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
6 6
2A
3' - 8"
T
11 11 11 1111 11
16' - 10"
20' - 6"
114'
0"
HOLD
2' - 10 5/8"4' - 0" +/-
T4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
7/
/2
5:
:4
PM
1-AE116
PHASE B2 NEW WORK PLAN
01/13/2023
UPGRADE BASEMENT,
BUILDING 1 WEST
506-20-102
ANN ARBOR, MICHIGAN
BID DOCUMENTS
1W
ANN ARBOR VA
MEDICAL
CENTER Approved: Veteran's Affairs Medical Center
D R A W I N G N O T E S - FOR WORK PROVIDED
BY OTHERS
KEYPLAN
1/4" = 1'-0"1 ENLARGED NEW WORK PLAN - PHASE B2
1 STAINLESS STEEL CORNER GUARD.
2 5'-4" X 2'-4" FREE STANDING RACK (VV).
CARD READER ACCESS CONTROL - SEE ELECTRICAL AND TELECOMMUNICATIONS DRAWINGS.
INFILL EXISTING OPENING AT THE CONCLUSION OF PHASE - SEE PHASING NOTES. STAINLESS
STEEL CLOSURE PANEL BY EQUIPMENT VENDOR
TEMPORARY CONSTRUCTION SIGNAGE
REMOVE SUSPENDED PLASTIC BARRIER WITH ZIPPER DOOR AT CONCLUSION OF PHASE.
INFILL OPENING WITH CMU. MATCH EXISTING INTERIOR FINISH.
EXISTING BOLLARD TO REMAIN.
INSTALL 6" HIGH AND 3" DEEP STAINLESS STEEL WALL GUARD TO PROTECT WALL MOUNTED OBJECT.
MOUNT CENTERED AT AND WITHIN 3: OF ADJACENT OBJECT.
THERMOSTAT - BY OTHERS
CONTRACTOR SHALL PROTECT EXISTING FLOORING TO REMAIN IN THIS SPACE - REPAIR ANY DAMAGED
FINISHES AT CONCLUSION OF PHASE.
REMOVE PREFABRICATED TEMPORARY WALL AT CONCLUSION OF WORK IN THIS AREA - PATCH AND
REPAIR ANY DISTURBED FINISHES TO MATCH EXISTING ADJACENT.
TOUCHLESS AUTO-OPERATOR
No. Revisions: Date:
BID DOCUMENTS 01/13/2023
1 BULLETIN 01 07/12/2024
EDITED FOR EQUIPMENT PROCUREMENT 10/7/2024
D R A W I N G N O T E S -
FOR WORK PROVIDED BY EQUIPMENT MANUFACTURER
SEE MECHANICAL DRAWINGS.
4 NEW COOLER / FREEZER CONDENSER UNITS - SEE MECHANICAL DRAWINGS.
13 NEW WALK-IN COOLER WITH INSULATED PANEL FLOOR AND RAMP - CLEARANCES PER MANUFACTURER -
14 NEW WALK-IN FREEZER WITH INSULATED PANEL FLOOR AND RAMP - CLEARANCES PER MANUFACTURER -
SEE MECHANICAL DRAWINGS.
| Sheets |
| 1-AE112 - PHASE A3 NEW WORK PLAN |
| 1-AE114 - PHASE A5 NEW WORK PLAN |
| 1-AE115 - PHASE B1 NEW WORK PLAN |
| 1-AE116 - PHASE B2 NEW WORK PLAN |
| 1-AE312 - WALL SECTIONS |
| 1-AE602 - DOOR SCHEDULE AND DETAILS |
File details come from the government source that posted it. Updated .