1-AE115 - PHASE B1 NEW WORK PLAN R1.pdf
PDF 3 MB Posted
- Solicitation number
- 36C25025Q0398
About this file
This document is an architectural drawing (1-AE115) for a Phase B1 New Work Plan at the Ann Arbor VA Medical Center in Michigan, detailing basement upgrade and renovation work. The plan includes specific modifications to various spaces such as storage areas, freezers, coolers, mechanical rooms, and corridors, with key elements including new walk-in freezer and cooler installations with insulated panel floors and ramps, installation of emergency management carts, free-standing racks, stainless steel work surfaces, and various equipment placement details. The drawing provides precise room measurements, equipment locations, and notes for work to be performed by equipment manufacturers and other contractors, with the project phase focused on upgrading the basement of Building 1 West at the medical center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 28-AE111 - PHASE A2 NEW WORK PLAN.pdf | ||
| 36C25025Q0398 0002.docx | DOCX document | |
| 1-AE116 - PHASE B2 NEW WORK PLAN.pdf | ||
| 36C25025Q0398 0001.docx | DOCX document | |
| 36C25025Q0398.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
A
M
N P Q R
4 4
UP
UP
/4
N&FS
STORAGE
BB09A
BB13B
BB13
BIO MED
BB09B
N&FS
FREEZER
BB09A
CANTEEN
FREEZER
VESTIBULE
BB09
CANTEEN
COOLER
PATRIOT CAFE
STORAGE
7' - 0"
927 SF
N&FS DRY
BB18
293 SF
MECHANICAL
AB21A
RADIATION
SAFETY
STORAGE
AB31
RADIATION
SAFETY
STORAGE
AB33
ELEC.
AB35
CORRIDOR
C1
STAIR #5
STORAGE
AB39
FLAMMABLE
WASTE
A37C
EXIT STAIR
MECHANICAL
AB37A
AB37B
AB37
FLAMMABLE
WASTE
FLAMMABLE
WASTE
STORAGE
CLOSET
495 SF
N&FS FREEZER
BB18A
TYP.
TYP.
TYP.
TYP.
18' - 0"
TYP.
TYP.
DOCK CORRIDOR
C3.5
T8
254 SF
N&FS COOLER
BB18C
/2
/4
18' - 4"
19' - 4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
/2
/2
:0
:0
A
M
1-AE115
PHASE B1 NEW WORK PLAN
01/13/2023
UPGRADE BASEMENT,
BUILDING 1 WEST
506-20-102
ANN ARBOR, MICHIGAN
BID DOCUMENTS
1W
ANN ARBOR VA
MEDICAL
CENTER
Approved: Veteran's Affairs Medical Center
1/4" = 1'-0"
ENLARGED NEW WORK PLAN - PHASE B1
KEYPLAN
D R A W I N G N O T E S -
FOR WORK PROVIDED BY EQUIPMENT MANUFACTURER
1 NO NEW WORK IN THIS AREA.
2 NEW FLUSH MOUNTED FLOOR ACCESS DOOR FOR EXISTING 24" X 24" FLOOR OPENING TO SUB-BASEMENT.
3 ALIGN NEW WALL FLUSH WITH ADJACENT WALL
4 DASHED LINE OF FUTURE OPENING
5 NEW COOLER / FREEZER CONDENSER UNITS
11 15" X 10" SCALE (VV).
STANDARDS FOR SHELF MOUNTING AT 3'-8" TO 6'-8" A.F.F. - PROVIDE THREE SHELVES STACKED (CC)."
20 METAL COVER CLIP.
21 PROVIDE PREFABRICATED TEMPORARY CONSTRUCTION SMOKE PARTITION WALL TO TERMINATE
EXISTING CEILING. EXISTING CEILING TO REMAIN. IF ADJACENT SURFACES ARE DISTURBED, CONTRACTOR
TO PATCH AND REPAIR.
22 PROVIDE TEMPORARY CONSTRUCTION SIGNAGE - SEE DETAIL 4/GI003. INSTALL SIGNAGE TEMPORARILY SECURED TO DOOR AT
5'-0" A.F.F. REMOVE AT CONCLUSION OF CONSTRUCTION PHASE.
23 INFILL OPENING WITH CMU. MATCH EXISTING INTERIOR FINISH.
24 (DELETED)
27 FULLY RECESSED FIRE EXTINGUISHER CABINET WITH 10LBS ABC FIRE EXTINGUISHER.
28 HALF HEIGHT 6" CMU WALL AT 4'-0" HIGH.
No. Revisions: Date:
BID DOCUMENTS 01/13/2023
1 BULLETIN 01 07/12/2024
6 3'-0" X 4'-0" EMERGENCY MANAGEMENT CART (VV).
7 5'-4" X 2'-4" FREE STANDING RACK (VV).
8 24" DEEP STAINLESS STEEL WORK SURFACE.
9 CLEARANCE SPACE FOR (2) PALLETS (VV).
10 WALL MOUNTED PHONE - TOP AT 48" AFF.
12 CARD READER AUTO-OPERATOR
13 TOUCHLESS AUTO-OPERATOR
14 EXISTING COOLER / FREEZER CONDENSER UNITS TO REMAIN.
15 SOAP DISPENSER (VC).
16 WALL MOUNTED LAVATORY
17 PAPER TOWEL DISPENSER (VC).
18 INFILL EXISTING OPENING AT THE CONCLUSION OF PHASE
19 12" DEEP ADJUSTABLE STAINLESS STEEL SHELVES ON BRACKETS AND VERTICAL STANDARDS . INSTALL
SEE MECHANICAL DRAWINGS.
BY OHERS
EDITED FOR EQUIPMENT PROCUREMENT 10/7/2024
D R A W I N G N O T E S - FOR WORK PROVIDED BY
OTHERS
25 NEW WALK-IN FREEZER WITH INSULATED PANEL FLOOR AND RAMP - CLEARANCES PER MANUFACTURER -
26 NEW WALK-IN COOLER WITH INSULATED PANEL FLOOR AND RAMP - CLEARANCES PER MANUFACTURER -
SEE MECHANICAL DRAWINGS.
| Sheets |
| 1-AE115 - PHASE B1 NEW WORK PLAN |
File details come from the government source that posted it. Updated .