S06 515-21-101 Addendum Dwgs.pdf
PDF 3 MB Posted
- Attached to
- Z1DA--HVAC Upgrades Phase II 515-21-101 Federal contract opportunity
- Solicitation number
- 36C25023B0045
About this file
This pre-solicitation notice announces the Department of Veterans Affairs' intent to issue an Invitation for Bid for HVAC upgrades at their medical center in Battle Creek, Michigan. The solicitation number is 36C25023B0045. Work includes furnishing labor, materials, equipment, and supervision to complete HVAC upgrades. Construction is scheduled for daytime business hours excluding federal holidays. The NAICS code is 238220 and small business size standard is $19 million. The acquisition is a 100% SDVOSB set-aside. The estimated value is between $2-5 million. The government intends to award a firm fixed price contract within 120 days of bid opening. The solicitation will be available on May 12, 2023 via SAM.gov. Offerors must register in SAM and VetCert prior to submitting a bid. The eventual awardee must have a current VETS-4212 report if applicable. Address questions to the listed contracting specialist by email only.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C08 Notice of Award email - Robbert Constr - 515-21-101.pdf | ||
| 515-21-101 Addendum 002.pdf | ||
| S06 36C25023B0045 0002 - 515-21-101.pdf | ||
| S06 515-21-101 Addendum 001.pdf | ||
| S06 36C25023B0045 0001 - 515-21-101.pdf | ||
| S06 Pre-Bid Site Visit Agenda - 515-21-101.pdf | ||
| S06 02 82 11 - Traditional Asbestos Abatement.pdf | ||
| S06 Pre-bid attendance - 515-21-101.pdf | ||
| S06 01 35 26 - Safety Requirements.pdf | ||
| S02 Wage Determination - MI20230079 - 5-5-23 - Calhoun - 515-21-101.pdf | ||
| S02 Contractor EMR Certification Form - 515-21-101.docx | DOCX document | |
| S02 36C25023B0045_1 - 515-21-101.pdf | ||
| S02 Wage Determination - MI20230079 - 5-5-23 - Calhoun - 515-21-101.pdf | ||
| S02 Drawings - 515-21-101.pdf | ||
| S02 RFI Form - 515-21-101.doc | DOC document | |
| S02 Specifications - 515-21-101.pdf | ||
| 36C25023B0045.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
DN
TEMPORARY IC BARRIER WALL
CONSTRUCTION (DUST WALL)
5/8" TYPE X GYP BD
3 5/8" STEEL STUDS @ 16" O.C.
BEAD OF CONT. SEALANT
6-MIL FIRE RETARDENT POLY INTERIOR SIDE
CEILING
2" DEEP LEG 3 5/8" STEEL SLIP TRACK
3 5/8" STEEL STUD TRACK
6" M
IN
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY TO DECK WITH TAPE
CONTINUOUSLY ADHERE FIRE RETARDENT
POLY TO FLOOR WITH TAPE
EXISTING DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER,
HARDWARE AND CLOSER
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
IC / PHASING LEGEND
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: D
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II AND III
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
D. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
E. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
F. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 7:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
G. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
H. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 7:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
I. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
J. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
K. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
L. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
M. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
N. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
O. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING NIGHT SHIFTS, 7:00 PM TO 5:00 AM
WHERE INDICATED. COORDINATE WITH COR. ALL WORK TO BE COMPLETED
AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S WORK.
C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
PHASING GENERAL NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PLAN NOTES
1. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR. REFER
TO ELEVATION 2/GI101.
2. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 1/GI101.
3. PROVIDE TEMPORARY INFECTION CONTROL IN THIS AREA FOR CEILING AND
HAZARDOUS MATERIALS SCOPE OF WORK SIMILAR TO PORTABLE CUBE
SYSTEM.
INFECTION CONTROL PLAN NOTES
1. SCOPE OF WORK IN THIS PROJECT AREA TO OCCUR BETWEEN 7:00 PM AND
5:00 AM ON WEEKDAY NIGHTS. SPACE AND SUPPORTING SYSTEMS SHALL BE
ONLINE PRIOR TO 5:00 AM.
PHASING PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
P
.1
V A
V
IS
N
M
I
A E
I D
IQ
\1
.1
.1
V
A B a tt le
C re e k R e p la c e
H V
A C
S y s te m s P h a s e
I I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.1
A v
.r v t
/2
/2
:0
:1
P
M
05-GC101
BUILDING 05 - INFECTION
CONTROL/PHASING PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1 1/2" = 1'-0"05-GC101
1 TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION
SCALE: 1/4" = 1'-0"05-GC101
2 TEMPORARY WALL CONSTRUCTION ELEVATION
SCALE: 1/16" = 1'-0"05-GC101
4 B05 - BASEMENT IC/PHASING PLAN
SCALE: 1/16" = 1'-0"05-GC101
6 B05 - ATTIC IC/PHASING PLAN
SCALE: 1/16" = 1'-0"05-GC101
5 B05 - FIRST FLOOR IC/PHASING PLAN
Revisions: Date:
ADDENDUM 001 06/28/2023
KEY PLAN
Scale: NTS
N
N
N N
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
IC / PHASING LEGEND
1. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR. REFER
TO ELEVATION 2/GI101.
2. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 1/GI101.
3. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: D
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
D. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
E. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
F. NOT USED.
G. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
H. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 10:00 AM TO 5:00 PM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
I. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
J. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
K. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
L. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
M. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
N. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
O. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING 8:00 AM TO 5:00 PM. COORDINATE
WITH COR.
C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
PHASING GENERAL NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
P
.1
V A
V
IS
N
M
I
A E
I D
IQ
\1
.1
.1
V
A B a tt le
C re e k R e p la c e
H V
A C
S y s te m s P h a s e
I I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.1
A v
.r v t
/2
/2
:0
:1
P
M
14-GC102
BUILDING 14 - INFECTION
CONTROL/PHASING PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"14-GC102
1 B14 - BASEMENT IC/PHASING PLAN
SCALE: 1/16" = 1'-0"14-GC102
2 B14 - FIRST FLOOR IC/PHASING PLAN
SCALE: 1/16" = 1'-0"14-GC102
3 B14 - SECOND FLOOR IC/PHASING PLAN
SCALE: 1/16" = 1'-0"14-GC102
4 B14 - ATTIC IC/PHASING PLAN
Revisions: Date:
ADDENDUM 001 06/28/2023
KEY PLAN
Scale: NTS
N
NN
N
N
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
IC / PHASING LEGEND
DISH WASH
017A
KITCHEN
STAIR
S3
OFFICE
017F
HSK
017D
OFFICE
017C
OFFICE
017B
MECH
019E
M A
X
M A
X
1. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR. REFER
TO ELEVATION 3/GI101.
2. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 2/GI101.
3. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: D
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: III
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
D. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
E. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
F. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 7:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
G. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
H. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 10:00 AM AND 5:00 PM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
I. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
J. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
K. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
L. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
M. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
N. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
O. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING NIGHT SHIFTS, 7:00 PM TO 5:00 AM
WHERE INDICATED. COORDINATE WITH COR. ALL WORK TO BE COMPLETED
AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S WORK.
C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
PHASING GENERAL NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
P
.1
V A
V
IS
N
M
I
A E
I D
IQ
\1
.1
.1
V
A B a tt le
C re e k R e p la c e
H V
A C
S y s te m s P h a s e
I I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.1
A v
.r v t
/2
/2
:0
:1
P
M
83-GC103
BUILDING 83 - INFECTION
CONTROL/PHASING PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"83-GC103
1 B83 - BASEMENT IC/PHASING PLAN
Revisions: Date:
ADDENDUM 001 06/28/2023
KEY PLAN
Scale: NTS
N
N
DN
DN
COOKING/ FOOD PREP
FOOD TRAY
ASSEMBLY
DISHWASHING AREA
101E
REFRIG
119C
REFRIG
101C
FOOD BANK
REFRIGERATOR
101D
REFRIG
INGREDIENT CONTROL
INGREDIENT CONTROL
108A
SUPERVISORS
CLERKS
HALL
C15
NOURISHMENT
101B
REFRIG.
HALL
C12A
SUPERVISOR
101A
STORAGE
100B
HALL
C12
PATIENT DINING
OFFICE
100J
SERVING
100K
SERVING
100L
DISH WASH
017A
KITCHEN
STAIR
S3
OFFICE
017F
HSK
017D
OFFICE
017C
OFFICE
017B
MECH
019E
2 3
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY
AREA FOR REMOVAL OF ASBESTOS-CONTAINING
FIBERGLASS DUCT COVERING
A. HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL
IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND
REMOVE ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION
02 82 11.
B. ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH
APPLICABLE CODES AND LAWS.
C. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL
OF PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS
TO COMPLETE THE CONSTRUCTION WORK.
D. REFER TO SPECIFICATION AND ATTACHMENTS FOR ADDITIONAL
INFORMATION.
E. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 7:00
PM AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
F. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 7:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
1. REMOVE ASBESTOS-CONTAINING FIBERGLASS DUCT INSULATION/TAPE
COVERINGS.
2. REMOVE ASBESTOS-CONTAINING LAYERED PAPER PIPE INSULATION -
APPROXIMATE 25 LF.
3. REMOVE ASBESTOS-CONTAINING MUD JOINTS - APPROXIMATE 44 JOINTS.
HAZARDOUS MATERIAL REMOVAL GENERAL NOTES
HAZARDOUS MATERIAL REMOVAL PLAN NOTES
HAZARDOUS MATERIAL REMOVAL LEGEND
AREA FOR REMOVAL OF ASBESTOS-CONTAINING LAYERED
PAPER PIPE INSULATION AND MUD JOINTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
P
.1
V A
V
IS
N
M
I
A E
I D
IQ
\1
.1
.1
V
A B a tt le
C re e k R e p la c e
H V
A C
S y s te m s P h a s e
I I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.1
A v
.r v t
/2
/2
:0
:1
P
M
HA101
BUILDING 05 & 83 - HAZARDOUS
MATERIAL REMOVAL PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
ADDENDUM 001 06/28/2023
SCALE: 1/16" = 1'-0"HA101
1 B05 - FIRST FLOOR HAZMAT PLAN
SCALE: 1/16" = 1'-0"HA101
2 B83 - BASEMENT HAZMAT PLAN
KEY PLAN
Scale: NTS
KEY PLAN
Scale: NTS
N
N N
N
K
E F G H I J LDCBA
M N O
DISHWASHING AREA
101E
SERVING
100L
SERVING
100K
OFFICE
100J
PATIENT DINING
HALL
C12
STORAGE
100B
SUPERVISOR
101A
HALL
C12A
NOURISHMENT
101B
HALL
C15
SUPERVISORS
CLERKS
TOILET
106A
HSK
COOKING/ FOOD PREP
REFRIG
101C
REFRIG
119C
REFRIG
FOOD BANK
REFRIGERATOR
101D
FOOD TRAY
ASSEMBLY
INGREDIENT CONTROL
108A
INGREDIENT CONTROL
FOOD COURT
100C
CANTEEN OFFICE
100H
CHIEFS OFFICE
100I
PATIENT DINING
STAIR
S2
HSK
100G
STOR
100F
TOILET
100D
SOILED LINEN
REFRIG
119B
STOR
RECEIVING
STORAGE
116B
FREEZER
116A EQUIPMENT CLEANING
REFRIG.
TEMPORARY KITCHEN
103G
HALL
C13
HALL
C14
TOILET
LOCKER RM
102A
TEMPORARY TRAY
LINE
103K
CLINICAL SECTION
CHIEF
103B
SECRETARY
103C
HALL
103J
TEMPORARY DRY
STORAGE
103H
ELEV
PASSAGE
103E
CLOSET
103F
CHIEF
103D
STAIR
S3
CART WASH
PAPER STORAGE
112A
PAPER STORAGE
112B
TOILET
CORRIDOR
C17
CORRIDOR
C18
RETAIL STORE
100A
HALL
C11
STAIR
S1
V .I.
F
5'
0"
V.I.F.
6' - 4"
V.I.F.
3' - 11 1/2"
V .I.
F
1'
V .I.
F
8'
V.I.F.
6' - 8"
V .I.
F
8'
1"
V .I.
F
4'
V .I.
F
3'
/2
V.I.F.
7' - 11 1/4"
V.I.F.
12' - 0"
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
C. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
D. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
E. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
F. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
G. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE
REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED
ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING
PANELS, WITHIN AND BEYOND PROJECT LIMITS.
H. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
I. TEMPORARILY SUPPORT OR RELOCATE CEILING MOUNTED EQUIPMENT,
SIGNAGE, FIXTURES, ETC. TO ALLOW FOR WORK TO TAKE PLACE.
DEMOLITION GENERAL NOTES
1. EXISTING ACCESS PANEL LOCATION FOR HAZARDOUS MATERIALS AND
DUCTWORK RELATED SCOPE.
2. REMOVE PORTION OF EXISTING ACOUSTICAL CEILING TILE AND GRID AS
SHOWN TO ALLOW FOR ABOVE CEILING WORK - SALVAGE FOR
REINSTALLATION.
3. REMOVE PORTION OF EXISTING GYPSUM BOARD CEILING SYSTEM AS
SHOWN TO ALLOW FOR ABOVE CEILING WORK.
4. REMOVE PORTION OF BULKHEAD ASSEMBLY AS SHOW TO ALLOW FOR
ABOVE CEILING WORK.
#DEMOLITION PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
P
.1
V A
V
IS
N
M
I
A E
I D
IQ
\1
.1
.1
V
A B a tt le
C re e k R e p la c e
H V
A C
S y s te m s P h a s e
I I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.1
A v
.r v t
/2
/2
:0
:0
P
M
05-AD101
BUILDING 05 - FIRST FLOOR
REFLECTED CEILING DEMO PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JF DAV
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"05-AD101
1 BUILDING 05 - FIRST FLOOR DEMOLITION RCP
Revisions: Date:
ADDENDUM 001 06/28/2023
NOTE:
DIMENSIONS ARE APPROXIMATE LOCATIONS OF CEILING
REMOVAL. CONTRACTOR TO FIELD VERIFY REQUIRED
REMOVAL LOCATIONS TO COMPLETE WORK.
KEY PLAN
Scale: NTS
N N
K
E F G H I J LDCBA
M N O
COOKING/ FOOD PREP
FOOD TRAY
ASSEMBLY
SOILED LINEN
REFRIG
119B
STOR
RECEIVING
STORAGE
116B
FREEZER
116A CORRIDOR
C17
TOILET
PAPER STORAGE
112B
PAPER STORAGE
112A
CART WASH
STAIR
S3
ELEV
PASSAGE
103E
CLOSET
103F
TEMPORARY DRY
STORAGE
103H
CHIEF
103D
SECRETARY
103C
HALL
103J
CLINICAL SECTION
CHIEF
103B
TEMPORARY TRAY
LINE
103K
TEMPORARY KITCHEN
103G
TOILET
LOCKER RM
102A
HALL
C14
HALL
C13
REFRIG.
SUPERVISORS
NOURISHMENT
101B
HALL
C12A
SUPERVISOR
101A
STORAGE
100B
HALL
C12
PATIENT DINING
OFFICE
100J
SERVING
100K
SERVING
100L
DISHWASHING AREA
101E
FOOD BANK
REFRIGERATOR
101D
REFRIG
101C
REFRIG
119C
REFRIG
PATIENT DINING
STAIR
S2
TOILET
100D STOR
100F
HSK
100G
CANTEEN OFFICE
100H
CHIEFS OFFICE
100I
FOOD COURT
100C
RETAIL STORE
100A
HALL
C11
STAIR
S1
INGREDIENT CONTROL
INGREDIENT CONTROL
108A
REFRIG.
EQUIPMENT CLEANING
CLERKS
TOILET
106A
HSK
HALL
C15
V.I.F.
7' - 11 1/4"
V .I.
F
3'
/2
V .I.
F
8'
0"
V .I.
F
4'
V.I.F.
6' - 7 3/4"
V.I.F.
6' - 4"
V.I.F.
3' - 11 1/2"
V .I.
F
1'
V .I.
F
8'
V .I.
F
5'
0"
V.I.F.
12' - 0"
A. THE ARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN THE
LAYOUT OF ALL CEILING ELEMENTS, HEIGHTS AND/OR PENETRATIONS.
COORDINATION OF THE ARCHITECTURAL AND ENGINEERING ELEMANTS ARE
THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS TO
VERIFY FIELD CONDITIONS AND REPORTS ANY DISCREPANCIES TO
ARCHITECT AND COR.
B. ACOUSTIC PANEL CEILING SHALL BE CENTERED IN THE ROOM AND
INSTALLED TO ELIMINATE NARROW CUT STRIPS OF PANELS ALONG THE
EDGES OF WALLS AND BULKHEADS, UNLESS OTHERWISE NOTED.
COORDINATE WITH THE LIGHTING LAYOUT. THE LIGHTING SHALL BE
CENTERED IN ROOMS.
C. CEILING MOUNTED ITEMS (SPRINKLER HEADS, MOUNTING DEVICES, ETC.)
SHALL BE CENTERED IN THE CEILING PANELS UNLESS NOTED OTHERWISE.
D. ABOVE CEILING WORK REQUIRED BEYOND THE SCOPE OF THE WORK SHALL
BE COORDINATED WITH PATIENT SAFETY, INFECTION CONTROL, AND COR.
E. CEILING TILE REMOVED IN ORDER TO COMPLETE ABOVE CEILING WORK
SHALL BE STORED IN A SAFE DRY LOCATION. DAMAGED OR BROKEN CEILING
TILES SHALL BE REPLACED. DRYWALL CEILINGS SHALL BE PATCHED,
PREPPED AND NEW FINISH APPLIED TO MATCH EXISTING.
F. CONTRACTOR TO COORDINATE MATCHING NEW CEILING WITH EXISTING
DEMOLISHED CEILING ELEMENTS. DESIGN INTENT IS THAT NEW CEILINGS
MATCH THE ELEMENTS THAT WERE DEMOLISHED IN KIND.
REFLECTED CEILING GENERAL NOTES
A EXISTING 2x2 ACOUSTICAL CEILING
TILE - SALVAGED FOR
REINSTALLATION AT SAME HEIGHT
REFLECTED CEILING TYPE LEGEND
TYPE GRAPHIC DESCRIPTION
B GYPSUM BOARD CEILING. PAINT TO
MATCH EXISTING.
NO CEILING / EXISTING
CEILING TO REMAIN
C 2x2 ACOUSTICAL CEILING TILE - BASIS OF
DESIGN: ARMSTRONG OPTIMA LAY IN
WHITE
#REFLECTED CEILING PLAN NOTES
1. EXISTING ACCESS PANEL LOCATION FOR HAZARDOUS MATERIALS AND
DUCTWORK RELATED SCOPE.
2. REINSTALL SALVAGED ACOUSTICAL CEILING TILE AND GRID AS SHOWN.
3. PATCH / REPAIR EXISTING GYPSUM BOARD CEILING ASSMEBLY TO MATCH
EXISTING.
4. RECONSTRUCT BULKHEAD ASSEMBLY TO MATCH EXISTING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
P
.1
V A
V
IS
N
M
I
A E
I D
IQ
\1
.1
.1
V
A B a tt le
C re e k R e p la c e
H V
A C
S y s te m s P h a s e
I I\
D ra w in g s \2
-1 A rc h it e c tu re \1
-1 R e v it \1
.1
.1
A v
.r v t
/2
/2
:0
:0
P
M
05-AE111
BUILDING 05 - FIRST FLOOR
REFLECTED CEILING PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JF DAV
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"05-AE111
1 BUILDING 05 - FIRST FLOOR RCP
Revisions: Date:
ADDENDUM 001 06/28/2023
NOTE:
DIMENSIONS ARE APPROXIMATE LOCATIONS OF CEILING
INSTALLATION. CONTRACTOR TO FIELD VERIFY REQUIRED
REINSTALLATION AND COORDINATE WITH DEMOLITION
PLANS.
KEY PLAN
Scale: NTS
N
N
DN
DN
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
x2
S A x2
S A x2
S A18x18 - SA 36x20 x1 x1
S
A
20x20 36x20
42x2032x1624x1618x16
16x16
42x2032x1622x1610x16 x2
S A x2
S A
36x2020x20
18x18
36x20 x2
S A
36x20
26x2022x2016x1614x1612x16 x1
8x14
10x12
12x12
12x14
20x2014ø
TYP.
2780 CFM
3590 CFM
4000 CFM
4000 CFM
3640 CFM
3640 CFM
3000 CFM
PATIENT
DINING
100L
SERVING
101E
DISHWASHING
AREA
101D
FOOD
BANK
REFRIGERATOR
FOOD
TRAY
ASSEMBLY
SOILED
LINEN
SOILED
LINEN
119C
REFRIG
101C
REFRIG
REFRIG
119B
REFRIG
COOKING/FOOD
PREP
100K
SERVING
100C
FOOD
COURT
100J
OFFICE
SUPERVISORS
101B
NOURISHMENT
CLERKS
106A
TOILETS
INGREDIANT
CONTROL
108A
INGREDIANT
CONTROL
REFRIG
103H
TEMPORARY
DRY
STORAGE
101A
SUPERVISOR
100B
STORAGE
103G
TEMPORARY
KITCHEN
103K
TEMPORARY
TRAY LINE
103D
CHIEF
103C
SECRETARY
103B
CLINICAL
SECTION
CHIEF
TOILET
102A
LOCKER
ROOM
PATIENT
DINING
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
PROJECT NO.
STATE COA FIRM NO.
C B
IM
\M o d e l\
-0
-M e c h C e n tr a l_
W J S a m s o n h e a p y .c o m
.r v t
/2
/2
:4
:0
A
M
05-MH101
BUILDING 05 - FIRST FLOOR PLAN
- DUCTWORKGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
BLDG 05
FREDERICK VOLLMERHAUSEN
04/07/2023 GSE KAM
100% BID DOCUMENTS
FULLY SPRINKLERED
937.224.0861
2020-05168
01528
SCALE: 1/8" = 1'-0"05-MH101
1 BUILDING 05 - FIRST FLOOR PLAN DUCTWORK
KEY PLAN
Scale: NTS
PLAN NOTES
1. SEAL EXISTING DUCTWORK WITH POLYMER PARTICLE SEALANT APPLIED FROM INSIDE
THE DUCT. SEAL ALL DUCTWORK FROM AIR HANDLING UNIT CONNECTION TO FLEX DUCT
RUNOUTS TO AIR DEVICES. BLOCK ALL DUCT MOUNTED EQUIPMENT AND ACCESSORIES
DURING THE SEALING PROCESS.
2. EXISTING REHEAT COIL TO REMAIN.
3. PROVIDE 10"x10" DUCT ACCESS PANEL IN THIS APPROXIMATE LOCATION. COORDINATE
EXACT LOCATION WITH WITH DUCT SEALING.
4. PROVIDE 12"x12" DUCT ACCESS PANEL IN THIS APPROXIMATE LOCATION. COORDINATE
EXACT LOCATION WITH WITH DUCT SEALING.
5. PROVIDE 24"x24" DUCT ACCESS PANEL IN THIS APPROXIMATE LOCATION. COORDINATE
EXACT LOCATION WITH WITH DUCT SEALING.
GENERAL NOTES
A. ALL WORK ON THIS SHEET SHALL TAKE PLACE BETWEEN 7:00 PM AND 5:00 AM.
COORDINATE CLOSELY WITH COR.
B. AIR FLOWS AND DUCT LAYOUTS ARE APPROXIMATE AND MAY VERY FROM ACTUAL
CONDITIONS.
C. SEE SHEET M001 FOR LEGEND, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
N
N
Revisions: Date:
ADDENDUM 1 6/28/2023
| Sheets |
| 05-GC101 - BUILDING 05 - INFECTION CONTROL/PHASING PLAN |
| 14-GC102 - BUILDING 14 - INFECTION CONTROL/PHASING PLAN |
| 83-GC103 - BUILDING 83 - INFECTION CONTROL/PHASING PLAN |
| HA101 - BUILDING 05 & 83 - HAZARDOUS MATERIAL REMOVAL PLAN |
| 05-AD101 - BUILDING 05 - FIRST FLOOR REFLECTED CEILING DEMO PLAN |
| 05-AE111 - BUILDING 05 - FIRST FLOOR REFLECTED CEILING PLAN |