S02 Drawings - 515-21-101.pdf
PDF 33 MB Posted
- Attached to
- Z1DA--HVAC Upgrades Phase II 515-21-101 Federal contract opportunity
- Solicitation number
- 36C25023B0045
About this file
This document is a presolicitation notice for an invitation for bids on an HVAC upgrades project at a VA medical center. The Department of Veterans Affairs intends to solicit bids for project 515-21-101 to provide all labor, materials, equipment, and supervision to complete HVAC upgrades at the VA medical center in Battle Creek, Michigan. The project magnitude is estimated between $2-5 million. The contract type will be firm fixed price with an award date targeted within 120 days of bid opening in May 2023. This is a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses. The NAICS code is 238220 for plumbing, heating, and air conditioning contractors with a $19 million small business size standard. All work must comply with manufacturer recommendations, codes and standards and be performed during normal business hours excluding federal holidays.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C08 Notice of Award email - Robbert Constr - 515-21-101.pdf | ||
| S06 36C25023B0045 0002 - 515-21-101.pdf | ||
| 515-21-101 Addendum 002.pdf | ||
| S06 Pre-Bid Site Visit Agenda - 515-21-101.pdf | ||
| S06 515-21-101 Addendum Dwgs.pdf | ||
| S06 02 82 11 - Traditional Asbestos Abatement.pdf | ||
| S06 Pre-bid attendance - 515-21-101.pdf | ||
| S06 01 35 26 - Safety Requirements.pdf | ||
| S06 515-21-101 Addendum 001.pdf | ||
| S06 36C25023B0045 0001 - 515-21-101.pdf | ||
| S02 Wage Determination - MI20230079 - 5-5-23 - Calhoun - 515-21-101.pdf | ||
| S02 Contractor EMR Certification Form - 515-21-101.docx | DOCX document | |
| S02 36C25023B0045_1 - 515-21-101.pdf | ||
| S02 Wage Determination - MI20230079 - 5-5-23 - Calhoun - 515-21-101.pdf | ||
| S02 RFI Form - 515-21-101.doc | DOC document | |
| S02 Specifications - 515-21-101.pdf | ||
| 36C25023B0045.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXECUTIVE MEDICAL CENTER DIRECTOR
PROJECT # 515-22-101 SIGNATURE DATE
ASSISTANT DIRECTOR
ASSOCIATE DIRECTOR
CHIEF OF STAFF
ASSOCIATE DIRECTOR FOR PATIENT SERVICES
ASSOCIATE C.O.S. FOR MENTAL HEALTH
CHIEF. FMS
CHIEF, ENGINEERING SECTION
CHIEF, ENVIRONMENTAL MANAGEMENT SECTION
INFECTIOUS CONTROL OFFICER
PATIENT SAFETY MANAGER
GEMS COORDINATOR
SAFETY SPECIALIST
CHIEF, POLICE SERVICE
CHIEF, FIRE SECTION
UNION SAFETY REPRESENTATIVE
CONTRACTING OFFICER
CONTRACTING OFFICER REPRESENTATIVE
PROJECT LOCATION
PROJECT LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
C U s e rs
\c h a w k \D o c u m e n ts \1
.1
.1
A v c h a w k D
D
W
.r v t
/7
/2
:2
:4
P M
GI000
COVER SHEET
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 CDH DMC
515-21-101
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK VA MEDICAL CENTER
BATTLE CREEK, MI
100% BID DOCUMENTS
100% BID DOCUMENTS
FULLY SPRINKLERED
SHEET INDEX
SHEET NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
05-GI101 BUILDING 05 - LIFE SAFETY PLAN
05-GC101 BUILDING 05 - INFECTION CONTROL/PHASING PLAN
14-GI102 BUILDING 14 - LIFE SAFETY PLAN
14-GC102 BUILDING 14 - INFECTION CONTROL/PHASING PLAN
83-GI103 BUILDING 83 - LIFE SAFETY PLAN
83-GC103 BUILDING 83 - INFECTION CONTROL/PHASING PLAN
HA101 BUILDING 05 & 83 - HAZARDOUS MATERIAL REMOVAL PLAN
CIVIL
05-C100 BUILDING 05 - SITE PLAN
14-C100 BUILDING 14 - SITE PLAN
83-C100 BUILDING 83 - SITE PLAN
ARCHITECTURAL
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
05-AD101 BUILDING 05 - FIRST FLOOR REFLECTED CEILING DEMO PLAN
05-AD102 BUILDING 05 - DEMOLITION ATTIC PLAN
05-AE111 BUILDING 05 - FIRST FLOOR REFLECTED CEILING PLAN
14-AD100 BUILDING 14 - DEMOLITION FLOOR PLANS
14-AE100 BUILDING 14 - FLOOR PLANS
83-AD102 BUILDING 83 - BASEMENT FLOOR REFLECTED CEILING DEMO PLAN
83-AE112 BUILDING 83 - BASEMENT FLOOR REFLECTED CEILING PLAN
FIRE SUPPRESSION
F001 FIRE SUPPRESSION COVER SHEET
05-FS100 BUILDING 05 - FIRE SUPPRESSION PLAN
14-FS100 BUILDING 14 - FIRE SUPPRESSION PLAN
83-FS100 BUILDING 83 - FIRE SUPPRESSION PLAN
MECHANICAL
M001 ABBREVIATIONS, LEGENDS & DRAWING INDEX
05-MD103 BUILDING 05 - ATTIC PLAN - REMOVALS
05-MH101 BUILDING 05 - FIRST FLOOR PLAN - DUCTWORK
05-MH103 BUILDING 05 - ATTIC PLAN - DUCTWORK
05-MP103 BUILDING 05 - ATTIC PLAN - PIPING
14-M100 BUILDING 14 - BASEMENT PLAN
14-M101 BUILDING 14 - FIRST FLOOR PLAN
14-M102 BUILDING 14 - SECOND FLOOR PLAN
14-MD103 BUILDING 14 - ATTIC PLAN - REMOVALS
14-MH103 BUILDING 14 - ATTIC PLAN - DUCTWORK
14-MP100 BUILDING 14 - STEAM RISER
14-MP103 BUILDING 14 - ATTIC PLAN - PIPING
83-MD100 BUILDING 83 - BASEMENT PLAN - REMOVALS
83-MH100 BUILDING 83 - BASEMENT PLAN - DUCTWORK
83-MP100 BUILDING 83 - BASEMENT PLAN - PIPING
M401 BUILDING 05 ENLARGED MECHANICAL PLANS
M402 BUILDING 14 HX ENLARGED MECHANICAL PLANS
M403 BUILDING 14 AHU'S 1 & 2 ENLARGED MECHANICAL PLANS
M404 BUILDING 14 AHU'S 3 & 4 ENLARGED MECHANICAL PLANS
M405 BUILDING 83 ENLARGED MECHANICAL PLANS
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M504 MECHANICAL DETAILS
M505 MECHANICAL DETAILS
M506 MECHANICAL HOT WATER SYSTEM SCHEMATIC
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES
M701 MECHANICAL CONTROLS
M702 MECHANICAL CONTROLS
M703 MECHANICAL CONTROLS
M704 MECHANICAL CONTROLS
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
05-EDP100 BUILDING 05 - BASEMENT FLOOR DEMOLITION POWER PLAN
05-EDP103 BUILDING 05 - ATTIC FLOOR DEMOLITION POWER PLAN
05-EP100 BUILDING 05 - BASEMENT FLOOR POWER PLAN
05-EP103 BUILDING 05 - ATTIC FLOOR POWER PLAN
14-EDP103 BUILDING 14 - ATTIC FLOOR DEMOLITION POWER PLAN
14-EP103 BUILDING 14 - ATTIC FLOOR POWER PLAN
83-EDP100 BUILDING 83 - BASEMENT FLOOR DEMOLITION POWER PLAN
83-EP100 BUILDING 83 - BASEMENT FLOOR POWER PLAN
EP500 ELECTRICAL DETAILS
EP600 ELECTRICAL SCHEDULES
Contact:Contact:Contact: Contact:
GUIDON DESIGN INC.
Christopher Hawk
PE, Project Manager
MECHANICAL,
ELECTRICAL &
PLUMBING
Mark Vanderwoude
PE
STRUCTURAL
ENGINEER
GUIDON DESIGN INC.BATTLE CREEK VA MEDICAL CENTER
Brian Maher
COR
5500 Armstrong Road Battle Creek, MI 49037 p: 269.966.5600 x 35487 e: brian.maher@va.gov
OWNER
GUIDON DESIGN INC.
James Gooden
Architect
1221 North Pennsylvania Street Indianapolis, IN 46202 p: 317.800.6388 x 145 e: jgooden@guidondesign.com
ARCHITECT
1221 North Pennsylvania Street Indianapolis, IN 46202 p: 317.800.6388 x 119 e: mvanderwoude@guidondesign.com
1221 North Pennsylvania Street Indianapolis, IN 46202 p: 317.800.6388 x 167 e: chawk@guidondesign.com
AREA MAP
VICINITY MAP
CAMPUS MAP
PROJECT LOCATION
Contact:
HEAPY, INC.
William Samson
PE
MECHANICAL,
ELECTRICAL &
PLUMBING
1440 W Dorothy Lane Dayton, OH 45409 p: 937.224.0861 x 1024 e: wjsamson@heapy.com
N
N
N
Revisions: Date:
DN
DN
DN
MAIN REFRIGERATION
STORAGE
TRANSFORMER RM
004A
STAIR
S3
ELEV
STAIR
S4
005E
C01
CRAWL SPACE
CRAWL SPACE CRAWL SPACE
CRAWL SPACE
EXIT
E X
IT
STAIR
S2
TOILET
100D
HSK
100G
STOR
100F
PATIENT DINING
SERVING
100L
DISHWASHING AREA
101E
FOOD BANK
REFRIGERATOR
101D
FOOD TRAY
ASSEMBLY
REFRIG
101C
REFRIG
119C
SOILED LINEN
REFRIG
119B
STOR
118 REFRIG
FREEZER
116A
STORAGE
116B
RECEIVING
TOILET
PAPER STORAGE
112B
PAPER STORAGE
112A
CART WASH
STAIR
S3
ELEV
TEMPORARY DRY
STORAGE
103H
CLOSET
103F
CHIEF
103D
SECRETARY
103C
CLINICAL SECTION
CHIEF
103B
TEMPORARY TRAY
LINE
103K
TEMPORARY KITCHEN
103G
REFRIG.
EQUIPMENT CLEANING
INGREDIENT CONTROL
108A
INGREDIENT CONTROL
CLERKS
TOILET
106A
HSK
REFRIG.
NOURISHMENT
101B
SUPERVISORS
TOILET
LOCKER RM
102A
FIRE CLOSET
103A SUPERVISOR
101A
STORAGE
100B
STAIR
S1
RETAIL STORE
100A
PATIENT DINING
CHIEFS OFFICE
100I
CANTEEN OFFICE
100H
CLOSET
100HA
FOOD COURT
100C
OFFICE
100J
SERVING
100K
ELEC
100E
COOKING/ FOOD PREP
FIRE CLOSET
101B
HALL
C15
HALL
C13
HALL
C12A
HALL
C14
HALL
C12
HALL
C11
E X
IT
EXIT
EXIT
E X
IT
E X
IT
STAIR
S2
STAIR
S1 IT
ATTIC
EXIT
EXIT
CODE CRITERIA
GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED
EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC
HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.
NOTES:
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE
AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
CODE REVIEW
THE 2021 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS. FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2015 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN USED.
PROJECT SCOPE
THE PROJECT SCOPE IS WITHIN A VARIETY OF BUILDING AND DOES NOT AFFECT CONSTRUCTION TYPE, CHANGE OCCUPANCY TYPES OR MEANS OF EGRESS ROUTES. THE REQUIRED CONSTRUCTION AFFECTING CONSTRUCTION RATINGS SHALL MATCH EXISTING ADJACENT CONSTRUCTION TYPE AT TO MEET THE FIRE RESISTIVE RATING OUTLINED BELOW. MEANS OF EGRESS WILL NOT CHANGE. THE EXISTING CONSTRUCTION AND CODE PARAMETERS WILL REMAIN UNCHANGED. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS SHALL BE CONSTRUCTED AND MAINTAINED PER NFPA 241 WHERE CONSTRUCTION WILL REQUIRE AREA UNDER CONSTRUCTION TO NOT BE PROTECTED BY A FIRE SPRINKLER SYSTEM. THERE IS NO ANTICIPATED AE SCOPE REQUIRED FOR COORDINATION WITH THE STATE HISTORIC PRESERVATION OFFICE.
CODE ANALYSIS
THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2021 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE IB AND LSC 18 CONSTRUCTION AS FOLLOWS:
1. OCCUPANCY TYPE: I-2 INSTITUTIONAL, IBC CHAPTER 3/LSC CHAPTER 18 HEALTHCARE
2. CONSTRUCTION TYPE: IB (IBC CHAPTER 5)
3. FIRE RESISTIVE RATINGS TYPE IB CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:
STRUCTURAL FRAME: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
BEARING WALLS
EXTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
NON-BEARING WALLS AND PARTITIONS
EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE
FLOOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
ROOF: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE
SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)
SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)
4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.
5. ALLOWABLE HEIGHT: EXISTING, NO CHANGE (IBC, TABLE 504.3)
6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: EXISTING, NO CHANGE (IBC, TABLE 504.4)
7. ALLOWABLE AREA: EXISTING, NO CHANGE (IBC, TABLE 506.2)
8. BUILDING SEPARATION: EXISTING, NO CHANGE (IBC, TABLE 602)
9. OCCUPANCY SEPARATION: EXISTING, NO CHANGE
10. MEANS OF EGRESS: EXISTING, NO CHANGE
11. WHERE GENERAL ANESTHESIA OR LIFE SUPPORT EQUIPMENT IS USED AND ESSENTIAL ELECTRICAL SYSTEM PER NFPA 99 SHALL BE PROVIDED.
12. HAZARDOUS AREAS. ANY HAZARDOUS AREAS SHALL BE PROTECTED IN ACCORDANCE WITH SECTION 8.7, AND THE AREAS DESCRIBED IN TABLE 18.3.2.1 SHALL BE PROTECTED
AS INDICATED. (LSC 18.3.2.2)
TABLE 18.3.2.1 HAZARDOUS AREA PROTECTION
HAZARDOUS AREA DESCRIPTION: PROTECTION / SEPARATION (MINIMUM FIRE RESISTANCE RATING)
• BOILER AND FUEL-FIRED HEATER ROOMS: 1 HOUR
• CENTRAL/BULK LAUNDRIES LARGER THAN 100 FT2 (9.3 M2): 1 HOUR
• LABORATORIES EMPLOYING FLAMMABLE OR COMBUSTIBLE MATERIALS IN QUANTITIES LESS THAN THOSE THAT WOULD BE CONSIDERED A SEVERE HAZARD:
SEE 18.3.6.3.11.
• LABORATORIES THAT USE HAZARDOUS MATERIALS THAT WOULD BE CLASSIFIED AS A SEVERE HAZARD IN ACCORDANCE WITH NFPA 99, STANDARD FOR HEALTH CARE
FACILITIES: 1 HOUR
• PAINT SHOPS EMPLOYING HAZARDOUS SUBSTANCES AND MATERIALS IN QUANTITIES LESS THAN THOSE THAT WOULD BE CLASSIFIED AS A SEVERE HAZARD: 1
HOUR
• PHYSICAL PLANT MAINTENANCE SHOPS: 1 HOUR
• ROOMS WITH SOILED LINEN IN VOLUME EXCEEDING 64 GAL (242 L): 1 HOUR
• STORAGE ROOMS LARGER THAN 50 FT2(4.6 M2) BUT NOT EXCEEDING 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL: SEE 18.3.6.3.11.
• STORAGE ROOMS LARGER THAN 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL: 1 HOUR
• ROOMS WITH COLLECTED TRASH IN VOLUME EXCEEDING 64 GAL (242 L): 1 HOUR
13. INTERIOR FINISH
• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 10.2 OF THE NFPA 101 TO CLASS A MATERIALS. (LSC 18.4.3.6.2)
• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.
• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I.
• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS SERVING AS
FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD METHODS OF FIRE
TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.
• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA 260, NFPA
261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590
14. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10.
15. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.
• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)
• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 18.3.4.2.1)(LSC 9.6.2)
• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS PER 9.6.3. (LSC 18.3.4.3)
• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.
• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM PER 9.6.4. (LSC 18.3.4.3.2)
16. FIRE SUPPRESSION:
SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.
THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF VETERANS
AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:
STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:
ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 250 GPM
ALL OTHER AREAS SHALL BE PROTECTED AS:
LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 100 GPM
ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.
17. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS SHALL BE CONSTRUCTED AND MAINTAINED PER NFPA 241.
CODE ANALYSIS - NFPA 101, INSTITUTIONAL HEALTHCARE CHAPTER 18
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS,
GUIDELINES AND REGULATIONS, BELOW LISTING IS NOT
COMPREHENSIVE.
NFPA 10 Standard for Portable Fire Extinguisher NFPA 13 Standard for The Installation of Sprinkler Systems NFPA 72 Fire Alarm Code NFPA 70, NEC National Electrical Code NFPA 80 Standard for Fire Doors and Fire Windows NFPA 99 Healthcare Facilities Code NPFA 101 Life Safety Code NFPA 220 Standard on Types of Building Construction NFPA 241 Standard for Safeguarding Construction Alteration, And Demolition Operations
ICC Codes, International Code Council full listing of current codes, Including but not limited to:
International Building Code International Plumbing Code International Mechanical Code International Fuel Gas Code International Fire Code International Energy and Conservation Code
ASHRAE Standards, as referenced within other codes including, but not limited To:
Standard 90.1-2013, Energy Standard for Buildings except Low-Rise Residential Buildings Standard 170-2017, Ventilation of Healthcare Facilities Standard 188-2018, Legionellosis: Risk Management For Building Water Systems
Accessibility Codes ADAAG, Ada Accessibility Guidelines VA Barrier Free Design Guide Pg-18-13, ABAAS
FGI, The Facility Guidelines Institute Guidelines for Design and Construction of Hospitals Guidelines for Design and Construction of Outpatient Facilities
Systems Relating to Maintenance of Facilities Osha, Occupational, Safety and Health Administration Standards
Codes and guidelines referenced within NFPA And ICC codes are to also be followed and applied to all design and construction. Refer to VA Manual Pg-18-3, specifications for additional codes, standards, guidelines and regulations.
Contractor Is responsible for constructing work compliant with OSHA, Occupational, Safety and Health Administration Standards.
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
GOVERNING CODES
VA DESIGN MANUALS PG-18-10
ARCHITECTURAL
ASBESTOS ABATEMENT
AUTOMATED TRANSPORT SYSTEMS
COMMISSIONING AND RETRO COMISSIONING
ELECTRICAL
ESTIMATING
FIRE PROTECTION
HVAC
INTERIOR DESIGN
LIGHTING DESIGN
PHYSICAL SECURITY
PLUMBING
SITE PARKING, SITE DEVELOPMENT, SITE APPENDIX
STEAM, HEATING, HOT WATER, AND OUTSIDE DISTRIBUTION
SYSTEMS
STRUCTURAL
SUSTAINABILITY
TELECOMMUNICATIONS
AUG-14
JUL-11
NOV-20
NOV-13
DEC-19
MAR-11
DEC-15
NOV-20
NOV-20
DEC-15
OCT-20
NOV-14
APR-13, FEB-13
SEPT-16, NOV-20
FEB-14
MAY-14
TEB-16
2018 ED
2019 ED
2019 ED
2020 ED
2019 ED
2018 ED
2018 ED
2021 ED
2019 ED
2018 ED
2018 ED
2018 ED
2018 ED
2018 ED
2018 ED
2018 ED
2018 ED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
C
U s e rs \d c h ri s te n s e n \D o c u m e n ts \1
.1
.1
A v d c h ri s te n s e n M
N F
X
.r v t
/7
/2
:2
:4
P M
05-GI101
BUILDING 05 - LIFE SAFETY PLAN
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"05-GI101
2 B05 - BASEMENT
SCALE: 1/16" = 1'-0"05-GI101
3 B05 - FIRST FLOOR
SCALE: 1/16" = 1'-0"05-GI101
4 B05 - ATTIC
Revisions: Date:
KEY PLAN
Scale: NTS
NN N
DN
DN
TEMPORARY IC BARRIER WALL
CONSTRUCTION (DUST WALL)
5/8" TYPE X GYP BD
3 5/8" STEEL STUDS @ 16" O.C.
BEAD OF CONT. SEALANT
6-MIL FIRE RETARDENT POLY INTERIOR SIDE
CEILING
2" DEEP LEG 3 5/8" STEEL SLIP TRACK
3 5/8" STEEL STUD TRACK
6" M
IN
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY TO DECK WITH TAPE
CONTINUOUSLY ADHERE FIRE RETARDENT
POLY TO FLOOR WITH TAPE
EXISTING DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER,
HARDWARE AND CLOSER
TRIATEK MONITOR
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: D
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
D. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
E. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
F. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
G. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
H. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
I. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
J. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
K. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
L. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
M. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
N. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
O. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING NIGHT SHIFTS, 7:00 PM TO 5:00 AM
WHERE INDICATED. COORDINATE WITH COR. ALL WORK TO BE COMPLETED
AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S WORK.
C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
PHASING GENERAL NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PLAN NOTES
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
IC / PHASING LEGEND
1. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
CARD READER ACCESS. REFER TO ELEVATION 2/GI101.
2. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 1/GI101.
3. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
INFECTION CONTROL PLAN NOTES
1. SCOPE OF WORK IN THIS PROJECT AREA TO OCCUR BETWEEN 7:00 PM AND
5:00 AM ON WEEKDAY NIGHTS. SPACE AND SUPPORTING SYSTEMS SHALL BE
ONLINE PRIOR TO 5:00 AM.
PHASING PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
C
U s e rs \d c h ri s te n s e n \D o c u m e n ts \1
.1
.1
A v d c h ri s te n s e n M
N F
X
.r v t
/7
/2
:2
:3
P M
05-GC101
BUILDING 05 - INFECTION
CONTROL/PHASING PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1 1/2" = 1'-0"05-GC101
1 TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION
SCALE: 1/4" = 1'-0"05-GC101
2 TEMPORARY WALL CONSTRUCTION ELEVATION
SCALE: 1/16" = 1'-0"05-GC101
4 B05 - BASEMENT IC/PHASING PLAN
SCALE: 1/16" = 1'-0"05-GC101
6 B05 - ATTIC IC/PHASING PLAN
SCALE: 1/16" = 1'-0"05-GC101
5 B05 - FIRST FLOOR IC/PHASING PLAN
Revisions: Date:
KEY PLAN
Scale: NTS
N
N
E X
IT
E X
IT
E X
IT
E X
IT
E X
IT
E X
IT
E X
IT
E X
IT
EXIT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
C
U s e rs \d c h ri s te n s e n \D o c u m e n ts \1
.1
.1
A v d c h ri s te n s e n M
N F
X
.r v t
/7
/2
:2
:4
P M
14-GI102
BUILDING 14 - LIFE SAFETY PLAN
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"14-GI102
1 B14 - BASEMENT LIFE SAFETY
SCALE: 1/16" = 1'-0"14-GI102
2 B14 - FIRST FLOOR LIFE SAFETY
SCALE: 1/16" = 1'-0"14-GI102
3 B14 - SECOND FLOOR LIFE SAFETY
SCALE: 1/16" = 1'-0"14-GI102
4 B14 - ATTIC LIFE SAFETY
NOTE:
REFER TO SHEET GI101 FOR CODE ANALYSIS.
Revisions: Date:
KEY PLAN
Scale: NTS
N
NN
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: D
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
D. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
E. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
F. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
G. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
H. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
I. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
J. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
K. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
L. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
M. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
N. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
O. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING NIGHT SHIFTS, 7:00 PM TO 5:00 AM
WHERE INDICATED. COORDINATE WITH COR. ALL WORK TO BE COMPLETED
AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S WORK.
C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
PHASING GENERAL NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PLAN NOTES
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
IC / PHASING LEGEND
1. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
CARD READER ACCESS. REFER TO ELEVATION 2/GI101.
2. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 1/GI101.
3. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
INFECTION CONTROL PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
C
U s e rs \d c h ri s te n s e n \D o c u m e n ts \1
.1
.1
A v d c h ri s te n s e n M
N F
X
.r v t
/7
/2
:2
:4
P M
14-GC102
BUILDING 14 - INFECTION
CONTROL/PHASING PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"14-GC102
1 B14 - BASEMENT IC/PHASING PLAN
SCALE: 1/16" = 1'-0"14-GC102
2 B14 - FIRST FLOOR IC/PHASING PLAN
SCALE: 1/16" = 1'-0"14-GC102
3 B14 - SECOND FLOOR IC/PHASING PLAN
SCALE: 1/16" = 1'-0"14-GC102
4 B14 - ATTIC IC/PHASING PLAN
Revisions: Date:
KEY PLAN
Scale: NTS
N
NN
EXIT
EXIT
E X
IT
E X
IT
EXIT
EXIT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
C
U s e rs \d c h ri s te n s e n \D o c u m e n ts \1
.1
.1
A v d c h ri s te n s e n M
N F
X
.r v t
/7
/2
:2
:4
P M
83-GI103
BUILDING 83 - LIFE SAFETY PLAN
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
NOTE:
REFER TO SHEET GI101 FOR CODE ANALYSIS.
SCALE: 1/16" = 1'-0"83-GI103
1 B83 - BASEMENT
Revisions: Date:
KEY PLAN
Scale: NTS
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: D
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
D. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
E. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
F. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
G. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
H. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
I. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
J. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
K. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
L. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
M. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
N. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
O. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING NIGHT SHIFTS, 7:00 PM TO 5:00 AM
WHERE INDICATED. COORDINATE WITH COR. ALL WORK TO BE COMPLETED
AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S WORK.
C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
PHASING GENERAL NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PLAN NOTES
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
IC / PHASING LEGEND
DISH WASH
017A
KITCHEN
STAIR
S3
OFFICE
017F
HSK
017D
OFFICE
017C
OFFICE
017B
MECH
019E
M A
X
M A
X
1. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
CARD READER ACCESS. REFER TO ELEVATION 3/GI101.
2. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 2/GI101.
3. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
INFECTION CONTROL PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
C
U s e rs \d c h ri s te n s e n \D o c u m e n ts \1
.1
.1
A v d c h ri s te n s e n M
N F
X
.r v t
/7
/2
:2
:4
P M
83-GC103
BUILDING 83 - INFECTION
CONTROL/PHASING PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"83-GC103
1 B83 - BASEMENT IC/PHASING PLAN
Revisions: Date:
KEY PLAN
Scale: NTS
DN
DN
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY
AREA FOR REMOVAL OF ASBESTOS-CONTAINING
FIBERGLASS DUCT COVERING
A. HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL
IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND
REMOVE ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION
02 82 11.
B. ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH
APPLICABLE CODES AND LAWS.
C. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL
OF PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS
TO COMPLETE THE CONSTRUCTION WORK.
D. REFER TO SPECIFICATION AND ATTACHMENTS FOR ADDITIONAL
INFORMATION.
1. REMOVE ASBESTOS-CONTAINING FIBERGLASS DUCT COVERING -
APPROXIMATE 4,800 SF.
2. REMOVE ASBESTOS-CONTAINING LAYERED PAPER PIPE INSULATION -
APPROXIMATE 25 LF.
3. REMOVE ASBESTOS-CONTAINING MUD JOINTS - APPROXIMATE 44 JOINTS.
HAZARDOUS MATERIAL REMOVAL GENERAL NOTES
HAZARDOUS MATERIAL REMOVAL PLAN NOTES
HAZARDOUS MATERIAL REMOVAL LEGEND
AREA FOR REMOVAL OF ASBESTOS-CONTAINING LAYERED
PAPER PIPE INSULATION AND MUD JOINTS
COOKING/ FOOD PREP
FOOD TRAY
ASSEMBLY
DISHWASHING AREA
101E
REFRIG
119C
REFRIG
101C
FOOD BANK
REFRIGERATOR
101D
REFRIG
INGREDIENT CONTROL
INGREDIENT CONTROL
108A
SUPERVISORS
CLERKS
HALL
C15
NOURISHMENT
101B
REFRIG.
HALL
C12A
SUPERVISOR
101A
STORAGE
100B
HALL
C12
PATIENT DINING
OFFICE
100J
SERVING
100K
SERVING
100L
DISH WASH
017A
KITCHEN
STAIR
S3
OFFICE
017F
HSK
017D
OFFICE
017C
OFFICE
017B
MECH
019E
2 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
937.224.0861
C
U s e rs \d c h ri s te n s e n \D o c u m e n ts \1
.1
.1
A v d c h ri s te n s e n M
N F
X
.r v t
/7
/2
:2
:5
P M
HA101
BUILDING 05 & 83 - HAZARDOUS
MATERIAL REMOVAL PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CHRISTOPHER HAWK
HEAPY
1400 W. DOROTHY LN
DAYTON, OHIO 45409
REPLACE HVAC SYSTEM PHASE II
BATTLE CREEK, MI
515-21-101
5, 14, 83
FREDERICK VOLLMERHAUSEN
04/07/2023 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 1/16" = 1'-0"HA101
1 B05 - FIRST FLOOR HAZMAT PLAN
SCALE: 1/16" = 1'-0"HA101
2 B83 - BASEMENT HAZMAT PLAN
KEY PLAN
Scale: NTS
KEY PLAN
Scale: NTS
N
N N
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
LED WALL MOUNTED LIGHT FIXTURE
LED SURFACE MOUNTED LIGHT FIXTURE
LED SURFACE MOUNTED LIGHT FIXTURE
LED RECESSED LIGHT FIXTURE
HVAC RETURN AIR GRILLE
HVAC SUPPLY DIFFUSER
PENDANT LIGHT
ACCESS PANEL
EXIT LIGHTING
S
D
SPEAKER
SMOKE DETECTOR
LED RECESSED LIGHT FIXTURE
A 9'-0"
CEILING TAG CEILING TYPE
FINISHED CEILING HEIGHT
REFER TO CEILING LEGEND FOR MORE
INFORMATION
EXTENT OF REVISION
REVISION SET
MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APPD APPROVED
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ATCH ATTACHMENT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BEV BEVEL
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL OR CHANNEL CELSIUS
C CONC CAST CONCRETE
C TO C CENTER TO CENTER
CAB CABINET
CB CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CLEANOUT
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST CONCRETE STONE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEG NEGATIVE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND CEMENT
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
YD YARD
YR YEAR
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH
OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED
WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,
ACCESS CONTROL, ETC.
5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS
AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED
METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
10. MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS SHOW
INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL
CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING
AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND
STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.
11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR
MISSING DIMENSIONS.
12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
15. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.
16. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
17. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
18. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
19. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
20. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY
CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
21. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
24. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT
CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE
CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
COST TO THE OWNER.
25. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE COR SHALL BE PROVIDED.
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM OR DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOZ DOZEN
DN DOWN
DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
ETS EXPOSE TO STRUCTURE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD OR FLAT HEAD SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIP FILLER PANEL
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF…
This is the start of the file's text. The full file is on GovTribe.