Z1DA--Replace Elevators Building 2, 7, 13, 39 & 82 515-21-103 Federal contract opportunity
Solicitation number
36C25022B0037
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document provides details of a pre-solicitation notice for a federal contract to replace elevators at a Veterans Affairs medical center. The Department of Veterans Affairs intends to issue an invitation for bid around June 3rd, 2022 to replace elevators in five buildings on its campus in Battle Creek, Michigan. The project scope involves furnishing all labor, materials, equipment and supervision to replace the elevators. The period of performance is 730 calendar days from notice to proceed. The contract type will be firm fixed price. The project cost is estimated between $1 million to $5 million. This acquisition is reserved exclusively for qualified Service-Disabled Veteran Owned Small Businesses. Offerors must be registered in the System for Award Management and Vendor Information Pages databases. The eventual awardee must also have a current VETS-4212 report on file if applicable. All questions should be directed via email to the specified contracting specialist.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

• DEDUCTIVE ALTERNATE 1 - BUILDING 13 - REMOVE ALL

WORK ASSOCIATED WITH ELEVATOR

MODERNIZATION. PROVIDE RE-KEYING OF FIRE

FIGHTING SERVICE ONLY.

• DEDUCTIVE ALTERNATE 2 - BUILDING 2, ELEVATOR 3 -

REMOVE ALL WORK ASSOCIATED WITH ELEVATOR

MODERNIZATION. PROVIDE RE-KEYING OF FIRE

FIGHTING SERVICE ONLY.

DEDUCTIVE ALTERNATES:

APPLICABLE CODES AND STANDARDS

EDITION:

BUILDING CODES:

- NFPA 101 LIFE SAFETY CODE

- NFPA NATIONAL FIRE CODES, WITH EXCEPTION OF NFPA 5000 AND NFPA 900

- INTERNATION BUILDING CODE (IBC)

- ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS)

- VA BARRIER FREE DESIGN STANDARD (PG-18-13, SUPPLEMENT TO THE ABAAS)

PLUMBING CODES:

- INTERNATIONAL PLUMBING CODE (IPC)

HVAC CODES:

- ASME BOILER AND PRESSURE VESSEL CODE

- ASME CODE FOR PRESSURE PIPING

- ASHRAE STANDARD 62.1 - VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY

- ASHRAE STANDARD 15 - SAFETY STANDARD FOR REFRIGERATION SYSTEMS

ELECTRICAL CODES:

- NATIONAL ELECTRICAL CODE (NEC - NFPA 70)

ELEVATOR CODES:

- ASME SAFETY CODES FOR ELEVATORS AND ESCALATORS A17.1

- GUIDE FOR INSPECTION OF ELEVATORS, ESCALATORS, AND MOVING WALKS A17.2

N

EW

S

LAKE ERIE

GRAND

RAPIDS

TRAVERSE

CITY

LAKE SUPERIOR

UPPER PENINSULA

MACKINAW

CITY LAKE HURONALPENA

PETOSKEY

GAYLORD

GRAYLING

LA

KE

MI

CH

IG

AN

SAGINAW

FLINT

LANSING

DETROIT

KALAMAZOO ANN

ARBOR

BATTLE

CREEK

LOCATION MAP

NOT TO SCALE

N

EW

S

VICINITY MAP

NOT TO SCALE

SK

YL

INE

DR

HI

LL

B

RA

DY

R

D.

AR

MS

TR

ON

G

RD

.FORT CUSTER DR.

RIVER RD. W.

W. MICHIGAN AVE.

S.

BE

DF

OR

D

RD

.96

89 E. D AVE.

AUGUSTA DR.

E. BECKWITH

DR.

NORTH BRANCH KALAMAZOO RIVER

E. MICHIGAN AVE.

8MILE RD.

94 94

GALESBURG

AUGUSTA

BATTLE

CREEK

W. DICKMAN RD

W. DICKMAN RD

W. DICKMAN RD

N

EW

S

PLAY GROUND

CAMPUS MAP

NOT TO SCALE

architecture · engineering

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by VA Chief Engineer:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FO

R

CO

NS

TR

UC

TI

ON

ENGINEERS · SURVEYORS · CONSULTANTS ·

LANDSCAPE ARCHITECTS · LAND PLANNERS

298 VETERANS DRIVE

FOWLERVILLE,

MICHIGAN 48836

(OFFICE) 517-223-3512

(FAX) 517-223-9987

211 E. Water Street, Suite 213L

Kalamazoo, MI 49007 269.216.0222

VA STATION

Battle Creek VA Medical Center

5500 Armstrong Road

Battle Creek, MI 49037

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

DEPARTMENT OF VETERANS AFFAIRS - BATTLE CREEK VA MEDICAL CENTER

BATTLE CREEK, MICHIGAN

SIGNATURE DATE

Director

Associate Director

Chief of Staff

Associate Director for Patient Care Services

Chief, FMS

Chief, Engineering Section

Chief, Police Service

Chief, Fire Service

Union Safety Representative

Chief, Environmental Management Section

Infection Control Officer

Patient Safety Manager

GEMS Coordinator

Safety Specialist

SIGNATURE BLOCK

POSITION DATESIGNATUREPOSITION

Associate Chief of Staff for Mental Health

Security Officer

Assistant Director

Union Rep

C:

\R ev it\2

0\2

5_ Ar ch _M eli ss a.N ap pi.

rvt

/13

/20

2:

:49 P

M

G-001

COVER SHEET REPLACE ELEVATORS BUILDINGS

2, 7, 13, 39, 82

BATTLE CREEK, MI

515-21-103

B2,B7,B13,B39,B82

13DEC2021 KJH MRB

100% BID DOCUMENTS200115

REPLACE ELEVATORS BUILDINGS

2, 7, 13, 39, 82

515-21-103

13DEC2021

100% BID DOCUMENTS

515-21-103

BLDG

SHEET

NO. SHEET NAME

GENERAL

-- G-001 COVER SHEET

-- G-002 PHASING PLAN

ARCHITECTURE

-- A-001 ARCHITECTURAL LEGENDS, SYMBOLS, AND ABBREVIATIONS

-- A-110 DETAILS, INTERIOR ELEVATIONS, AND SCHEDULES

02 02_A-002 OVERALL PLANS - AREA OF WORK

02 02_A-003 ELEVATOR PHOTOS

02 02_A-101 FLOOR PLANS AND SECTIONS - E1 & E2

02 02_A-102 FLOOR PLANS AND SECTIONS - E3

07 07_A-002 OVERALL PLANS - AREA OF WORK

07 07_A-003 ELEVATOR PHOTOS

07 07_A-101 FLOOR PLANS AND SECTIONS

13 13_A-002 OVERALL PLANS - AREA OF WORK

13 13_A-003 ELEVATOR PHOTOS

13 13_A-101 FLOOR PLANS AND SECTIONS

39 39_A-002 OVERALL PLANS - AREA OF WORK

39 39_A-003 ELEVATOR PHOTOS

39 39_A-101 FLOOR PLANS AND SECTIONS

82 82_A-002 OVERALL PLANS - AREA OF WORK

82 82_A-003 ELEVATOR PHOTOS

82 82_A-101 FLOOR PLANS AND SECTIONS

MECHANICAL

00 00_M-000 MECHANICAL GENERAL INFORMATION

02 02_M-002 OVERALL PLANS - AREA OF WORK

02 02_M-101 MECHANICAL FLOOR PLANS - E1 & E2

ELECTRICAL

00 00_E-000 ELECTRICAL GENERAL INFORMATION

02 02_E-002 OVERALL PLANS - AREA OF WORK

02 02_ED101 ELECTRICAL DEMOLITION PLANS - E1 & E2

02 02_ED102 ELECTRICAL DEMOLITION PLANS - E3

02 02_E-101 ELECTRICAL FLOOR PLANS - E1 & E2

02 02_E-102 ELECTRICAL FLOOR PLAN - E3

07 07_E-002 OVERALL PLANS - AREA OF WORK

07 07_ED101 ELECTRICAL DEMOLITION FLOOR PLANS

07 07_E-101 ELECTRICAL FLOOR PLANS

13 13_E-002 OVERALL PLANS - AREA OF WORK

13 13_ED101 ELECTRICAL DEMOLITION FLOOR PLANS

13 13_E-101 ELECTRICAL FLOOR PLANS

39 39_E-002 OVERALL PLANS - AREA OF WORK

39 39_ED101 ELECTRICAL DEMOLITION FLOOR PLANS

39 39_E-101 ELECTRICAL FLOOR PLANS

82 82_E-002 OVERALL PLANS - AREA OF WORK

82 82_ED101 ELECTRICAL DEMOLITION FLOOR PLANS

82 82_E-101 ELECTRICAL FLOOR PLANS

Revisions: Date:

12/13/2021

12/13/2021

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

DEDUCTIVE ALTERNATE 1

DEDUCTIVE

ALTERNATE 2

RE-KEYING PHASE

BUILDING 2

BUILDING 7

BUILDING 13

BUILDING 39

BUILDING 82

PHASING LEGEND

1. POTENTIAL CONSTRUCTION ACCESS TO THE

ELEVATOR EQUIPMENT ROOMS HAVE BEEN

IDENTIFIED ON INDIVIDUAL BUILDINGS WITHIN THIS

DOCUMENT. IT IS THE CONTRACTORS

RESPONSIBILITY TO VERIFY EXISTING CONDITIONS

OF ALL BUILDINGS WITHIN SCOPE OF WORK AND TO

PRESENT THE VA COR FINAL PATH OF

CONSTRUCTION.

2. ANY THROUGH ROOF CONSTRUCTION PATH FOR

REMOVAL AND INSTALLATION OF EQUIPMENT WILL

BE COMPLETED IN A MATTER TO MAINTAIN ALL

BCVAMC'S ROOF WARRANTIES. CONTRACTOR TO

REFER TO SHINGLE MANUFACTURER

RECOMMENDATIONS.

3. USE OF HEAVY EQUIPMENT ON FACILITY GROUNDS

ARE TO UTILIZE MATS TO PROTECT THE GROUNDS

FROM EXCESSIVE DAMAGE.

4. CONTRACOR TO VERIFY INSIDE NARROWEST

FINISHED CLEAR DIMENSION SHALL NOT BE ANY

LARGER THAN EXISTING NARROWEST FINISHED

CLEAR DIMENSION.

GENERAL NOTES

• DEDUCTIVE ALTERNATE 1 - BUILDING 13 - REMOVE ALL

WORK ASSOCIATED WITH ELEVATOR

MODERNIZATION. PROVIDE RE-KEYING OF FIRE

FIGHTING SERVICE ONLY.

• DEDUCTIVE ALTERNATE 2 - BUILDING 2, ELEVATOR 3 -

REMOVE ALL WORK ASSOCIATED WITH ELEVATOR

MODERNIZATION. PROVIDE RE-KEYING OF FIRE

FIGHTING SERVICE ONLY.

DEDUCTIVE ALTERNATES:

RE-KEYING PHASE

RE-KEY ALL EXIST FIRE FIGHTER'S SERVICE FOR

ELEVATORS IN BUILDINGS:

5,14,22,83,84, & 200

AND ELEVATOR #2 IN BUILDING 39 & 82

ALL KEY SWITCHS TO BE BARREL-KEY FEDK-1.

architecture · engineering

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by VA Chief Engineer:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FO

R

CO

NS

TR

UC

TI

ON

ENGINEERS · SURVEYORS · CONSULTANTS ·

LANDSCAPE ARCHITECTS · LAND PLANNERS

298 VETERANS DRIVE

FOWLERVILLE,

MICHIGAN 48836

(OFFICE) 517-223-3512

(FAX) 517-223-9987

211 E. Water Street, Suite 213L

Kalamazoo, MI 49007 269.216.0222

VA STATION

Battle Creek VA Medical Center

5500 Armstrong Road

Battle Creek, MI 49037

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

C:

\R ev it\2

0\2

5_ Ar ch _M eli ss a.N ap pi.

rvt

/13

/20

2:

:50 P

M

G-002

PHASING PLAN REPLACE ELEVATORS BUILDINGS

2, 7, 13, 39, 82

BATTLE CREEK, MI

515-21-103

B2,B7,B13,B39,B82

13DEC2021 KJH MN

100% BID DOCUMENTS200115

3/8" = 1'-0"

PHASING PLAN

Revisions: Date:

MOUNTING HEIGHT

COORDINATION

ARCHITECTURAL,

MECHANICAL &

ELECTRICAL TRADES

SHALL COORDINATE

LOCATIONS OF WALL

MOUNTED ITEMS TO ALIGN

EITHER VERTICALLY OR

HORIZONTALLY.

FINISH FLOOR LINE

DRAWING REFERENCE

SYMBOLS

RECOMMENDED MOUNTING HEIGHTS (UNLESS NOTED OTHERWISE)

MAX

REACH

DEPTH

MAX

REACH

HEIGHT

0.5"

48"

2"

46"

5"

42"

6"

40"

9"

36"

11"

34"

GENERAL MAXIMUM REACH DEPTH AND HEIGHT

FOR HAND DRYERS / TOWEL DISPENSERS

MAX REACH DEPTH

FO

R

RE

AC

H

DE

PT

H

M

AX

H

EI

GH

T

MI

RR

OR

, O

R

MI

RR

OR

S

HE

LF

M

AX

TO

W

EL

D

IS

PE

NS

ER

OR

M

UL

TI

-P

UR

PO

SE

UN

IT

TO

W

EL

D

IS

PE

NS

ER

RE

CE

PT

AC

LE

W

AS

TE

RE

CE

PT

AC

LE

CO

AT

H

OO

KS

SA

NI

TA

RY

N

AP

KI

N

VE

ND

OR

SO

AP

DI

SP

EN

SE

R

" M

AX

MO

P

ST

RI

P

SH

EL

F

12"

AD

A

ST

AN

DA

RD

SH

EL

F

CO

AT

R

OD

M

AX40

3"

24"

BOTTOM OF

OUTLET

BOTTOM OF

LIGHT FIXTURE

" M

AX

24" MIN

36" MAX

" M

IN

M

IN18

24" MIN

42" MAX

" M

AX

36" MAX

M

IN18

24" MIN

42" MAX

1/

2" M

IN

PR

OT

RU

DI

NG

TO

ILE

T

PA

PE

R

DI

SP

EN

SE

R

LO

CA

TI

ON

RE

CE

SS

ED

TO

IL

ET

P

AP

ER

DI

SP

EN

SE

R

LO

CA

TI

ON

PR

OT

RU

DI

NG

TO

ILE

T

PA

PE

R

DI

SP

EN

SE

R

LO

CA

TI

ON

M

IN15

7"-9"

" M

AX

SA

NI

TA

RY

NA

PK

IN

DI

SP

OS

AL

22"

1/

2" M

IN

PR

OT

RU

DI

NG

TO

ILE

T

PA

PE

R

DI

SP

EN

SE

R

LO

CA

TI

ON

EL

EV

AT

OR

W

AL

L

BU

TT

ON

S

" 72

(M

IN

" SE

E

EL

EC

T

EL

EC

TR

IC

O R

PA

NE

L C

AB

IN

ET

PO

W

ER

P

AN

EL

EL

EC

TR

IC

TE

LE

PH

ON

E

OR

T

V

OU

TL

ET

SW

IT

CH

PU

SH

B

UT

TO

N

FI

RE

A

LA

RM

B

OX

TH

ER

MO

ST

AT

CA

RD

R

EA

DE

R

ME

CH

AN

IC

AL

PA

NE

LS

IN

FI

NI

SH

ED

S

PA

CE

S

SE

LE

CT

OR

S W

IT

CH

R S

SW

IT

CH

O

R W

AL

L

OU

TL

ET

A

BO

VE

CA

BI

NE

T

SS

SEE PLAN

12" 12"

HA

ND

RA

IL

-R

AM

P

FI

RE

E

XT

IN

GU

IS

HE

R

FI

RE

E

XT

IN

GU

IS

HE

R

CA

BI

NE

T, F

IR

E

HO

SE

OR

C

OM

BI

NA

TI

ON

CA

BI

NE

T

54" MIN

GRAB BAR

GRAB BAR

3'- 8"

M

AX

6" MAX 36"

(MIN)

18"

GRAB BAR

40"

13" MAX

42" 42"

W

AT

ER

C

LO

SE

T

W

AT

ER

C

LO

SE

T

(M

AX

(M

AX

BA

RR

IE

R

FR

EE

U

RI

NA

L

ST

AN

DA

RD

UR

IN

AL

GRAB BAR

18"

TR

AN

SF

ER

TY

PE

S

HO

W

ER

FOLDING

SHOWER SEAT

RO

LL

-IN

-T

YP

E

SH

OW

ER

3"

6" M

IN

6"

TR

AN

SF

ER

TY

PE

S

HO

W

ER

(M

IN

(M

AX

) T O

PS

PO

UT

9"

7" M

AX

SI

NK

D

EP

TH

4"

11"

(MIN)

17"

3" (MAX)

WALL

SPACE

AVAILABLE

NOTE:

WATER SUPPLY & DRAIN

PIPES BELOW LAVATORIES

AND SINKS MUST BE

INSULATED OR OTHERWISE

CONFIGURED TO PROTECT

AGAINST CONTACT.

EW

C

OR

DR

IN

KI

NG

FO

UN

TA

IN

W

AL

L

HU

NG

LA

V

BA

RR

IE

R

FR

EE

L

AV

CO

UN

TE

R

" M

IN

MAX

0' - 4"

6" MAX

ALIGN WITH EDGE OF SEAT

6'

- 0

ENLARGED PLAN OR DETAIL

WALL SECTION

X-###

X

X

X-###

BUILDING SECTION

EXTERIOR ELEVATIONS

INTERIOR ELEVATIONS

REVISION CLOUD AND TAG

VIEW TITLE & REFERENCE

EXISTING COLUMN LINE

NEW COLUMN LINE

DETAIL

LEVEL OR ELEVATION

XX

DEMARCATION LINE

X-###

X-###

X-###

X-###

X-###

X-###

EQUIPMENT TAG

WALL TAG

###.# DOOR TAG

ROOM NAME

ROOM TAG

WINDOW TAG

X#

ARCHITECTURAL KEYNOTE

#' - #" CEILING SPOT ELEVATION

XX# FURNITURE TAG

FINISH TAG

SPECIALITY EQUIPMENT TAG

XX-#

EX

TI

NG

UI

SH

ER

A

ND

/O R

CE

NT

ER

O

F

HO

SE

V

AL

VE

5'

- 0

" T O

TO

P

OF

CE

NT

ER

O

F H

AN

DL

E

4'

- 0

" M

AX

TO

XX##

DEMO KEYNOTE

XX-#

architecture · engineering

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by VA Chief Engineer:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FO

R

CO

NS

TR

UC

TI

ON

ENGINEERS · SURVEYORS · CONSULTANTS ·

LANDSCAPE ARCHITECTS · LAND PLANNERS

298 VETERANS DRIVE

FOWLERVILLE,

MICHIGAN 48836

(OFFICE) 517-223-3512

(FAX) 517-223-9987

211 E. Water Street, Suite 213L

Kalamazoo, MI 49007 269.216.0222

VA STATION

Battle Creek VA Medical Center

5500 Armstrong Road

Battle Creek, MI 49037

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

C:

\R ev it\2

0\2

5_ Ar ch _M eli ss a.N ap pi.

rvt

/13

/20

2:

:45 P

M

A-001

ARCHITECTURAL LEGENDS,

SYMBOLS, AND ABBREVIATIONS

REPLACE ELEVATORS BUILDINGS

2, 7, 13, 39, 82

BATTLE CREEK, MI

515-21-103

B2,B7,B13,B39,B82

13DEC2021 KJH MJZ

100% BID DOCUMENTS200115

ABBREVIATIONS

ABBREV. FULL TEXT

T.O.F. OR T/F TOP OF FOOTING

T.O.M. OR T/M TOP OF MASONRY

T.O.P. OR T/P TOP OF PAVEMENT

T.O.S. OR T/S TOP OF STEEL

T.O.W. OR T/W TOP OF WALL

T/ TOP OF

TB TRUSS BEARING

TG TEMPERED GLASS

THK THICK

THRESH THRESHOLD

TLT TOILET

TP TOILET PARTITION

TR TRANSITION TRIM

TYP TYPICAL

TYP TYPICAL

UNF UNFINISHED

UNO UNLESS NOTED OTHERWISE

UR URINAL

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WC WALLCOVERING

WCO WALL CLEAN OUT

WCVR WALLCOVERING

WD WOOD

WP WATERPROOFING

WP WORKPOINT

WP WALL PROTECTION

WS WINDOW SHADE

WSCT WAINSCOT

WT WEIGHT

X-(MATERIAL) DENOTES EXISTING MATERIAL

REFRENCED

ABBREVIATIONS

ABBREV. FULL TEXT

SCWD SOLID CORE WOOD

SECT SECTION

SER.RECPT SERVICE RECEPTOR

SH SHELF

SHT SHEET

SHWR SHOWER

SIM SIMILAR

SLR CONCRETE SEALER

SLS SOLID SURFACE

SLV SHORT LEG VERTICAL

SPEC SPECIFICATION

SQ SQUARE

SQFT SQUARE FOOT

SS STAINLESS STEEL

SSK SERVICE SINK

SSM SOLID SURFACING MATERIAL

ST SMOKE-TIGHT PER CODE TO RESIST THE

PASSAGE OF SMOKE

STD STANDARD

STDW STANDARD WEIGHT (STEEL PIPE)

STL STEEL

STN STAIN

STOR STORAGE

STRL STRUCTURAL

SUPP SUPPORT

SUSP SUSPENDED

SYM SUSPENSION SYMMETRICAL

T TREAD

T&G TONGUE AND GROOVE

T.O.C. OR T/C TOP OF CONCRETE

ABBREVIATIONS

ABBREV. FULL TEXT

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLY PLYWOOD

PT PRESSURE TREATED

PT PORCELAIN TILE

PTB PORCELAIN TILE BASE

QT QUARRY TILE

QTB QUARTZ TILE BASE

QTZ QUARTZ

R RISER

RA RETURN AIR

RB RUBBER BASE

RC ROOF CONDUCTOR

RD ROOF DRAIN

RD ROUND

RECVG RECEIVING

REF REFRIGERATOR

REINF REINFORCED

REQ'D REQUIRED

RF RESILIENT FLOORING

RH RIGHT HAND

RL ROOF LADDER

RM ROOM

RO ROUGH OPENING

RS ROOF SUMP

RSN RESIN

RWD REDWOOD

RWD RIGID WALL PROTECTION

S SOUTH

S SPANDREL GLASS

SA SUPPLY AIR

SAB SOUND ATTENUATION BLANKETS

SC SOLID CORE

SCH SCHEDULE

SCONC SEALED CONCRETE

ABBREVIATIONS

ABBREV. FULL TEXT

MAX MAXIMUM

MBH THOUSAND BTU/HR

MC MEDICINE CABINET

MCA MINIMUM CIRCUIT AMPACITY

MCC MULTI-COLOR COATING

MDO MEDIUM DENSITY OVERLAY

MECH MECHANICAL

MEMBWP MEMBRANE WATERPROOFING

MET METAL

MEZZ MEZZANINE

MFR MANUFACTURER

MFS MAXIMUM FUSE SIZE

MG MEDICAL GAS

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN. MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MM MISCELLANEOUS METALS

MO MASONRY OPENING

MOCP MAXIMUM OVERCRRENT PROTECTION

MPC MICHIGAN PLUMBING CODE

MR MANUFACTURER'S RECOMMENDATIONS

MT MARBLE TILE

MTD MOUNTED

MUL. MULLION

N NORTH

N.S. NEAR SIDE

NF NO FINISH

NIC NOT IN CONTRACT

NO NUMBER

NPSH NET POSITIVE SUCTION HEAD

NSNS NON SHRINK NON STAIN GROUT

NTS NOT TO SCALE

NTS NOT TO SCALE

O.C. OR OC ON CENTER

OBSGL OBSCURE GLASS

OD OUTSIDE DIAMETER

OHDR SECTIONAL OVERHEAD DOOR

OPNG OPENING

OPP OPPOSITE

P PAINT

PART PARTITION

PB PARTICLE BOARD

PC PRECAST

PCS PIECES

PERM PERMANENT

PL PLATE

ABBREVIATIONS

ABBREV. FULL TEXT

FV FIELD VERIFY

G.B. GRAB BAR, GRADE BEAM

G.O. GRILL OPENING

GA GAUGE

GALV GALVANIZED

GCT GLAZED CERAMIC TILE

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GL GLASS

GND. GROUND

GR. GRADE

GRTG. GRATING

GSCFT GLAZED STRUCTURAL CLAY FACING TILE

GT GROUT

GYP. BD. GYPSUM BOARD

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD

HDPB HIGH DENSITY PARTICLEBOARD

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HIGH POINT

HR HOUR

HT HEIGHT

HWD HARDWARE

I.D. OR ID INSIDE DIAMETER

I.E. INVERT ELEVATION

IG INSULATING GLASS

IN INCHES

INCL INCLUDING, INCLUSIVE

INSUL INSULATION

INT INTERIOR

IPS INTERIOR PAINT SYSTEM

JAN JANITOR

JT JOINT

kW KILOWATTS kWh KILOWATT HOURS

LAD LADDER

LAM LAMINATED

LAV LAVATORY

LF LINEAR FEET

LGTH LENGTH

LH LEFT HAND

LKR LOCKER

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LO LOUVER OPENING

LP LIGHTING PANEL

LPG LIQUID PETROLEUM GAS

LPS LOW PRESSURE STEAM

LT LIGHT

LWT LEAVING WATER TEMPERATURE

MA MEDICAL AIR

MANUF MANUFACTURER

MAS MASONRY

MATL MATERIAL

ABBREVIATIONS

ABBREV. FULL TEXT

CTR COUNTER

CTSK COUNTERSINK

DEXS DOUBLE EXTRA STRONG (STEEL PIPE)

DF DRINKING FOUNTAIN

DIA DIAMETER

DIFF DIFFUSER

DN DOWN

DO DOOR OPENING

DR DOOR

DS DOWN SPOUT

DT DRAIN TILE

DTL DETAIL

DWG DRAWING

DWR DRAWER

E EAST

EA EACH

EIFS EXTERIOR INSULATION AND FINISH

SYSTEMS

EJ EXPANSION JOINT

EL ELEVATION

ELECT ELECTRICAL

ELEV ELEVATOR OR ELEVATION

ENCL ENCLOSURE

EP EPOXY PAINT

EPS EXTERIOR PAINT SYSTEM

EQ EQUAL

EQUIP EQUIPMENT

ES EXPOSED STRUCTURE

EW EACH WAY

EWC ELECTRICAL WATER COOLER

EX EXISTING

EXGR EXISTING GRADE

EXP EXPANSION

EXS EXTRA STRONG (STEEL PIPE)

EXT EXTERIOR

FA FIRE ALARM

FAB FABRIC/UPHOLSTERY

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FG FROSTED GLASS

FHC FIRE HOSE CABINET

FIN FINISH

FL FLOOR

FLL FLOOR LINE

FLUOR FLUORESCENT

FOC FACE OF COLUMN

FOCONC FACE OF CONCRETE

FRC FIBER REINFORCED CONCRETE

FRP FIELD REINFORCED PANEL

FRPFG FIREPROOFING

FS FULL SIZE

FT FIRE TREATED

FTG FOOTING

FUR FURRING

ABBREVIATIONS

ABBREV. FULL TEXT

AB ANCHOR BOLT

ABI ADDITIVE BID ITEM

AC ACOUSTICAL

ACB ACOUSTICAL CEILING BAFFLE

ACP ACOUSTICAL CEILING PANEL

ACS ACOUSTICAL CEILING SPRAY

AD AREA DRAIN

ADA ADA

AFF ABOVE FINISHED FLOOR

AL ALUMINUM

ALUM ALUMINUM

AP ACCESS DOORS

APPROX APPROXIMATE

ARCH ARCHITECTURAL

ASPH ASPHALT

AWP ACOUSTICAL WALL PANEL

B/ BOTTOM OF

BD BOARD

BF BARRIER FREE

BIT BITUMINOUS

BL BUILDING LINE

BLDG BUILDING

BLKHD BULKHEAD

BOTT BOTTOM

BP BASE PLATE

BR BUMP RAIL

BS BOTH SIDES

BUR BUILT UP ROOFING

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CG CORNER GUARD

CH CHANNEL

CHKDPL CHECKERED PLATE

CJ CONTROL JOINT

CL CENTERLINE

CL TO CL CENTERLINE TO CENTERLINE

CLG CEILING

CLK CAULKING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL COLUMN

COMP COMPRESSIBLE

COMPO COMPOSITION

CONC CONCRETE

CONN CONNECT, CONNECTION

CONST CONSTRUCTION

CONST JT CONSTRUCTION JOINT

CONT CONTINUOUS

CONTR CONTRACTOR

CPT CARPET TILE

CS CONCRETE SEALER

4'

- 0

AUXILARY ELEVATOR

CONTROL PANELWP-2WP-2

WP-1WP-1

HDR-1HDR-1

SS-1 TOE KICK W/

VENTILATION SLOTS

4'

- 0

STAINLESS STEEL,

MAIN ELEVATOR

CONTROL PANEL

WP-1WP-1

SS-1 TOE KICK W/

VENTILATION SLOTS

WP-2WP-2

4'

- 0

" HDR-1HDR-1

WP-2WP-2

WP-1WP-1

SS-1 TOE KICK W/

VENTILATION SLOTS

EMERGENCY LIGHT

REINSTALL SALVAGED

SIGNAGE, QUANTITIES

AND LOCATIONS TO

MATCH EXISTING, TYP.

4'

- 0

WP-2WP-2

WP-1WP-1

HDR-1HDR-1

SS-1 TOE KICK W/

VENTILATION SLOTS

TYPICAL TEMPORARY CONSTRUCTION

PARTITION

UNDERSIDE OF EXISTING

DECK

1 HR RATED TEMPORARY

PARTITION. HI-IMPACT 5/8" GYP.

BOARD ON 3 5/8" METAL STUDS.

FINISH OCCUPIED SIDE PER

ROOM FINISH SCHEDULE

PLASTER TAPE ALL GYP. BD.

JOINTS. SECURE ALL TAPE

WITH RAM-TACK HIGH TACK

SPRAY OR EQUAL.

OCCUPIED SIDERENOVATION SIDE

2 1/2" DEEP SLOTTED

METAL DEFLECTION

TRACK FASTENED TO

DECK @ 2'-0" O.C.

COMPRESSIBLE

INSULATION

SEAL PERIMETER

COMPRESSIBLE

INSULATION

SEAL PERIMETER

1-HR FIRE RATED / 3 5/8" METAL STUDS/ GYPSUM BOARD ON BOH SIDES

DESIGN UL-U419

96"

VA U.S. Department of Veterans Affairs

Battle Creek VA Medical Center

GENERAL CONTRACTOR

Construction Firm Name City State

ARCHITECT / ENGINEER

Architect/ Engineering Firm Name City State

VA Office of Construction & Facilities Management

FRAMED SIGN PANEL - ALUMINUM SKIN

LAMINATED TO A WOOD CORE WITH

PHYSICALLY SEALED EDGES

TY

P

6" M

IN

TYP

6" MIN

TYP

6" MIN

VA BLUE (PANTONE 541) BACKGROUND

DEPARTMENT OF VETERAN AFFAIRS

LOGO - SURFACE APPLIED VINYL OR

SCREENED GRAPHICS - COLOR WHITE

SURFACE APPLIED VINYL OR SCREENED

GRAPHICS - COLOR BLACK

WHITE BACKGROUND

PLAN VIEW

ELEVATION VIEW

4"x6" WOOD POSTS

GRADE

CONCRETE FOOTING

NOTES:

1. ALL VISIBLE SURFACE TO BE PRIMED

AND PAINTED. SURFACES NOT CALLED

OUT TO BE A SPECIFIC COLOR ARE TO

BE PAINTED WHITE.

2. SIGN TO BE ATTACHED TOGETHER

WITH WOOD SCREWS AND LAG BOLTS.

4"x6" POSTS 2"x4" FRAMING

SIGN FACE

48"

VA U.S. Department of Veterans Affairs

This Project Has Worked Days

FRAMED SIGN PANEL - ALUMINUM SKIN

LAMINATED TO A WOOD CORE WITH

PHYSICALLY SEALED EDGES

TY

P

6" M

IN

TYP

6" MIN

TYP

6" MIN

VA BLUE (PANTONE 541) BACKGROUND

DEPARTMENT OF VETERAN AFFAIRS

LOGO - SURFACE APPLIED VINYL OR

SCREENED GRAPHICS - COLOR WHITE

SURFACE APPLIED VINYL OR SCREENED

GRAPHICS - COLOR RED

WHITE BACKGROUND

PLAN VIEW

ELEVATION VIEW

4"x4" WOOD POSTS

GRADE

CONCRETE FOOTING

NOTES:

1. ALL VISIBLE SURFACE TO BE PRIMED

AND PAINTED. SURFACES NOT CALLED

OUT TO BE A SPECIFIC COLOR ARE TO

BE PAINTED WHITE.

2. SIGN TO BE ATTACHED TOGETHER

WITH WOOD SCREWS AND LAG BOLTS.

4"x4" POSTS

2"x4" FRAMING

SIGN FACE

ZERO IN

ON SAFETY

00 0 Without a Lost Time Accident

THE LIFE YOU SAVE MAY BE YOUR OWN

General Contractors Firm Name CHANGEABLE NUMBERS

SURFACE APPLIED VINYL OR SCREENED

GRAPHICS - COLOR BLACK

DIGITAL INDICATOR

"UP" OR "DOWN" LANTERNS

NOTES:

1. PROVIDE LIGHTED FLOOR INDICATOR CENTERED OVER

DOORS INSIDE ELEVATOR CAR.

2. CENTER INDICATOR PANEL VERTICALLY ABOVE

ELEVATOR DOORS IN CORRIDOR.

3. COORDINATE FLOOR NUMBERS WITH VA COR.

ACCESS KEYSWITCH

72" A.F.F.

NOTES:

1. LAYOUT OF CONTROL PANEL SHALL COMPLY WITH ABA /

ADA. ADJUST LAYOUT BASED ON SPECIFICATIONS

37" A.F.F.

UP / DOWN BUTTONS @ 42" A.F.F.

COMPLIES W/ A.D.A.A.G. CODE

CODE BLUE

ELEVATOR EMERGENCY

POWER INDICATOR

ELEVATOR COMMUNICATION

FAILURE LIGHT

FIRE PHONE JACK

FIRE SERVICE INDICATOR

UP

DN

CODE BLUE KEYSWITCH

@ 47.5" A.F.F.

BUZZER RESET KEYSWITCH

@ 41.75" A.F.F.

FIRE SERVICE SWITCH

@ 61.75" A.F.F.

FIREFIGHTERS'

OPERATION

WURTEC PN 11-930 CA

TRANSFORMER SHIPS LOOSE

NOTES:

1. LAYOUT OF CONTROL PANEL SHALL COMPLY WITH ABA /

ADA. ADJUST LAYOUT BASED ON SPECIFICATIONS

UP

NOTES:

1. LAYOUT OF CONTROL PANEL SHALL COMPLY WITH ABA /

ADA. ADJUST LAYOUT BASED ON SPECIFICATIONS

37" A.F.F.

UP / DOWN BUTTONS @ 42" A.F.F.

COMPLIES W/ A.D.A.A.G. CODE

CODE BLUE

UP

DN

CODE BLUE KEYSWITCH

@ 47.5" A.F.F.

NOTES:

1. LAYOUT OF CONTROL PANEL SHALL COMPLY WITH ABA /

ADA. ADJUST LAYOUT BASED ON SPECIFICATIONS

37" A.F.F.

UP / DOWN BUTTONS @ 42" A.F.F.

COMPLIES W/ A.D.A.A.G. CODE

CODE BLUE

UP

DN

RECESSED LED

DOWNLIGHT

SUSPENDED CEILING

ELEVATOR FRAME

SECURITY CAMERA, SEE

ELECTRICAL DRAWINGS

architecture · engineering

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by VA Chief Engineer:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FO

R

CO

NS

TR

UC

TI

ON

ENGINEERS · SURVEYORS · CONSULTANTS ·

LANDSCAPE ARCHITECTS · LAND PLANNERS

298 VETERANS DRIVE

FOWLERVILLE,

MICHIGAN 48836

(OFFICE) 517-223-3512

(FAX) 517-223-9987

211 E. Water Street, Suite 213L

Kalamazoo, MI 49007 269.216.0222

VA STATION

Battle Creek VA Medical Center

5500 Armstrong Road

Battle Creek, MI 49037

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

C:

\R ev it\2

0\2

5_ Ar ch _M eli ss a.N ap pi.

rvt

/13

/20

2:

:48 P

M

A-110

DETAILS, INTERIOR ELEVATIONS,

AND SCHEDULES

REPLACE ELEVATORS BUILDINGS

2, 7, 13, 39, 82

BATTLE CREEK, MI

515-21-103

B2,B7,B13,B39,B82

13DEC2021 KJH CA / MRB

100% BID DOCUMENTS200115

3/8" = 1'-0"2 STANDARD ELEVATOR INTERIOR - SIDE 1

3/8" = 1'-0"1 STANDARD ELEVATOR INTERIOR - FRONT

3/8" = 1'-0"3 STANDARD ELEVATOR INTERIOR - BACK

3/8" = 1'-0"4 STANDARD ELEVATOR INTERIOR - SIDE 2

ROOM FINISH SCHEDULE

ROOM NO.

ROOM

NAME

FLOOR WALL CEILING FINISH

NOTESFINISH BASE NORTH SOUTH EAST WEST FINISH

BUILDING 2

E1 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1

E2 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1

E3 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1

BUILDING 7

E1 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1

BUILDING 13

E1 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1

BUILDING 39

S7 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1

BUILDING 82

E1 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1

ABBREVIATIONS - INTERIORS

ABBREV. FULL TEXT

ACP ACOUSTICAL CEILING PANEL

HDR HANDRAIL

P PAINT

RF RESILIENT FLOORING

SS STAINLESS STEEL

WP WALL PROTECTION

MATERIALS SCHEDULE

CODE USE MANUFACTURER STYLE SIZE PATTERN AND COLOR NOTES

ACOUSTICAL CEILING PANEL

ACP-1 ACOUSTICAL CEILING PANEL USG USG FISSURED BASIC PANELS, SLT, 506 2'x2'x5/8" WHITE PANEL, WHITE GRID --

RESILIENT BASE

RB-1 STAINLESS STEEL TOE KICK -- TOE KICK WITH INTEGRATED VENTILATION

SLOTS

4" H STAINLESS STEEL, NO. 4 FINISH --

RESILIENT

RF-1 LUXURY VINYL TILE MANNINGTON AMTICO - WOOD W/ UNBEVELED EDGES 4.5" X 36" X 0.098” (2.5 MM) TH, 40 MIL SPALTED BEECH AROW7480 1/3 STAGGERED INSTALL

PAINT

P-1 HOISTWAY PAINT SHERWIN WILLIAMS -- -- SW 7006, EXTRA WHITE ALL HOISTWAYS TO BE PAINTED

MISCELLANEOUS

HDR-1 STAINLESS STEEL HANDRAIL -- DOUBLE HANDRAIL VARIES STAINLESS STEEL, NO. 4 FINISH -- WP-1 WALL PROTECTION CS GROUP .040 ACROVYN WALL COVERING VARIES COLOR TO BE DETERMINED BY VA FROM

MANUFACTURER'S FULL RANGE

WP-2 WALL PROTECTION CS GROUP .040 ACROVYN WALL COVERING -- COLOR TO BE DETERMINED BY VA FROM

MANUFACTURER'S FULL RANGE

N.T.S.Scale:

PROJECT CONSTRUCTION SIGN

N.T.S.Scale:

PROJECT SAFETY SIGN

N.T.S.Scale:

COMBINATION LANTERN / HALL POSITIONER

N.T.S.Scale:

ACCESS STATION

N.T.S.Scale:

MAIN LANDING HALL STATION

N.T.S.Scale:

TYPICAL HALL STATIONS

3/8" = 1'-0"5 REFLECTED CEILING PLAN - STANDARD ELEVATOR CAR

E2E1

E3

DEDUCTIVE ALTERNATE 2

E2E1

E3

DEDUCTIVE ALTERNATE 2

ELEVATOR MACHINE ROOM

DEDUCTIVE ALTERNATE 2

E2E1

E3

DEDUCTIVE ALTERNATE 2

N

NOT TO SCALE

CAMPUS MAP KEY PLAN

architecture · engineering

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by VA Chief Engineer:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FO

R

CO

NS

TR

UC

TI

ON

ENGINEERS · SURVEYORS · CONSULTANTS ·

LANDSCAPE ARCHITECTS · LAND PLANNERS

298 VETERANS DRIVE

FOWLERVILLE,

MICHIGAN 48836

(OFFICE) 517-223-3512

(FAX) 517-223-9987

211 E. Water Street, Suite 213L

Kalamazoo, MI 49007 269.216.0222

VA STATION

Battle Creek VA Medical Center

5500 Armstrong Road

Battle Creek, MI 49037

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

C:

\R ev it\2

0\2

5_ Ar ch _M eli ss a.N ap pi.

rvt

/13

/20

2:

:25 P

M

02_A-002

OVERALL PLANS - AREA OF

WORK

REPLACE ELEVATORS BUILDINGS

2, 7, 13, 39, 82

BATTLE CREEK, MI

515-21-103

B2

13DEC2021 KJH MRB / MN

100% BID DOCUMENTS200115

1" = 20'-0"

OVERALL PLAN - FIRST LEVEL

1" = 20'-0"

OVERALL PLAN - GROUND LEVEL

1" = 20'-0"

OVERALL PLAN - ATTIC LEVEL

1" = 20'-0"

OVERALL PLAN - SECOND LEVEL

architecture · engineering

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by VA Chief Engineer:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FO

R

CO

NS

TR

UC

TI

ON

ENGINEERS · SURVEYORS · CONSULTANTS ·

LANDSCAPE ARCHITECTS · LAND PLANNERS

298 VETERANS DRIVE

FOWLERVILLE,

MICHIGAN 48836

(OFFICE) 517-223-3512

(FAX) 517-223-9987

211 E. Water Street, Suite 213L

Kalamazoo, MI 49007 269.216.0222

VA STATION

Battle Creek VA Medical Center

5500 Armstrong Road

Battle Creek, MI 49037

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

C:

\R ev it\2

0\2

5_ Ar ch _M eli ss a.N ap pi.

rvt

/13

/20

2:

:33 P

M

02_A-003

ELEVATOR PHOTOS REPLACE ELEVATORS BUILDINGS

2, 7, 13, 39, 82

BATTLE CREEK, MI

515-21-103

B2

13DEC2021 KJH MJZ

100% BID DOCUMENTS200115

ELEVATOR 1 SHAFT

ELEVATOR 2 SHAFT

ELEVATOR 3 SHAFT

ELEVATOR 1 SHAFT

ELEVATOR 2 SHAFT

ELEVATOR 3 SHAFT

ELEVATOR 1 INDICATOR PANEL

ELEVATOR 2 INTERIOR

ELEVATOR 3 INTERIORFIRST FLOOR ELEVATOR 3 CORRIDOR

FIRST FLOOR ELEVATOR 2 CORRIDOR

FIRST FLOOR ELEVATOR 1 CORRIDOR ELEVATOR 1 INDICATOR PANELELEVATOR 1 INTERIOR

DEDUCTIVE ALTERNATE 2 - BUILDING 2, ELEVATOR 3

GROUND FLOOR ELEVATOR 3 CORRIDOR

GROUND FLOOR ELEVATOR 2 CORRIDOR

GROUND FLOOR ELEVATOR 1 CORRIDOR

SECOND FLOOR ELEVATOR 2 CORRIDOR

CAMPUS - SITE

LEVEL

920' - 1"

B02 - GROUND

FLOOR

918' - 7"

B02 - FIRST FLOOR

928' - 7"

B02 - SECOND

FLOOR

940' - 7"

B02 - FOUNDATION

915' - 9"

B02 - ROOF

952' - 6"

0" V

IF

4'

- 0

" V .I.F

9' - 7" VIF

ELEV

E1

3131 3232 3333 3434 3535

3636 3737 3838 3939

CAMPUS - SITE

LEVEL

920' - 1"

B02 - GROUND

FLOOR

918' - 7"

B02 - FIRST FLOOR

928' - 7"

B02 - SECOND

FLOOR

940' - 7"

B02 - FOUNDATION

915' - 9"

B02 - ROOF

952' - 6"

0" V

IF

4'

- 0

" V .I.F

10' - 7" VIF

ELEV

E2

3131 3232 3333 3434 3535

3636 3737 3838 3939

1. SUB-CONTRACTORS ARE TO COORDINATE WORK WITH ALL OTHER TRADES.

2. CONFLICTS BETWEEN NOTES, DETAILS, SPECIFICATIONS, ETC., SHALL BE

VERIFIED WITH THE OWNER'S REPRESENTATIVE OR THE MOST STRINGENT

PROVISIONS SHALL GOVERN.

3. DETAILS OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE SAME

NATURE AS SHOWN FOR SIMILAR CONDITIONS. ANY UNCLEAR CONDITIONS

SHALL BE VERIFIED WITH OWNER'S REPRESENTATIVE PRIOR TO

CONSTRUCTION OF THAT AREA.

4. DRAWINGS ARE NOT TO BE SCALED. ANY UNCLEAR DIMENSIONS OR

DIMENSIONAL DISCREPANCIES SHALL BE VERIFIED WITH OWNER'S

REPRESENTATIVE.

5. ALL EXISTING CONDITIONS AND ALL RELATED DIMENSIONS INDICATED IN THE

CONTRACT DOCUMENTS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION,

ERECTION, AND/OR CONSTRUCTION. ANY CONDITIONS THAT DIFFER FROM THAT

INDICATED IN THE CONTRACT DOCUMENTS SHALL BE SUBMITTED TO THE

OWNER'S REPRESENTATIVE FOR REVIEW PRIOR TO FABRICATION, ERECTION,

AND/OR CONSTRUCTION.

6. CONSTRUCTION MANAGER (CM) / GENERAL CONTRACTOR (GC) TO REVIEW

ENTIRE SET OF CONSTRUCTION DOCUMENTS AND SHALL COORDINATE WORK

BETWEEN ALL TRADES. IF CONFLICTS ARISE DUE TO COORDINATION OF

TRADES, CM / GC IS TO VERIFY CONFLICT WITH OWNER'S REPRESENTATIVE

PRIOR TO CONSTRUCTION / INSTALLATION OF CONFLICTING ITEMS.

7. PATCH ALL EXPOSED INTERIOR AND EXTERIOR WALLS WHERE ATTACHED OR

IMBEDDED ITEMS WERE REMOVED.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATIONS OF THE

FLOORS, WALLS, AND CEILINGS FOR NEW FINISHES.

9. MAINTAIN FIRE RATING AT ALL ASSEMBLIES WHERE OPENINGS PENETRATIONS,

EMBEDMENT, RECESSED EQUIPMENT, ACCESSORIES, ETC. DISRUPT THE

CONTINUITY OF THE RATING

10. REMOVE ADHESIVE/OR MORTAR LEFT FROM THE REMOVAL OF EXISTING FLOOR

COVERING AND PREP FLOOR W/CONCRETE (OR FLORSTONE) AS NECESSARY TO

ACCOMMODATE NEW FLOOR COVERINGS.

11. ALL DIMENSIONS ARE FROM FACE OF STUD, C.M.U., OR CONCRETE , U.N.O.

12. PROVIDE ISOLATION MATERIAL BETWEEN DISSIMILAR MATERIALS THAT ARE IN

CONTACT WITH ONE ANOTHER

13. PATCH & REPAIR ALL MAJOR & MINOR BLEMISHES AS REQ'D. DUE TO

DEMOLITION WORK. MATCH ADJACENT MATERIAL & COLOR.

14. PROVIDE SOLID, CONTINUOUS, NON COMBUSTIBLE BLOCKING AT LOCATIONS

WHERE MILLWORK, PLUMBING FIXTURES, EQUIP., ETC. ATTACH TO WALL OR

CEILING.

GENERAL NOTES:

02_A-101

02_A-101

2-3

2-1-A

2-C-1.8 2-E-1

PROVIDE TEMPORARY

PROTECTIVE PLASTIC

BARRIER WITH ZIPPERED

ENTRY FROM FLOOR TO THE

BOTTOM OF THE CEILING

PROVIDE WALK

OFF MATS DURING

CONSTRUCTION

DO NOT FASTEN

TEMPORARY PARTITION TO

EXISTING FINISHED FLOOR

050501012121 21212525 2525

2222 2222

7'

- 9

" V

IF

9'

- 7

" V

IF

5' - 8" VIF

7' - 5" VIF

5' - 2" VIF

7' - 7" VIF

8'

- 4

" V

IF

7" V

IF

ELEV

E1

ELEV

E2

ELEVATOR

MECHANICAL

1119E

2828 2828

02_A-101

02_A-101

2-3

2-1-A

2-C-1.8 2-E-1

PROVIDE TEMPORARY

PROTECTIVE PLASTIC

BARRIER WITH ZIPPERED

ENTRY FROM FLOOR TO THE

BOTTOM OF THE CEILING

PROVIDE WALK

OFF MATS DURING

CONSTRUCTION

DO NOT FASTEN

TEMPORARY PARTITION TO

EXISTING FINISHED FLOOR

0404 0505

040405050101

2121 21212525 2525

42422222 42422222

7'

- 9

" V

IF

9'

- 7

" V

IF

5' - 8" VIF

7' - 5" VIF

5' - 2" VIF

7' - 7" VIF

8'

- 4

" V

IF

7" V

IF

ELEV

E1

ELEVATOR

EQUIP

018E

ELEV

E2

2828 2828

02_A-101

02_A-101

2-3

2-1-A

2-C-1.8 2-E-1

ELEVATOR

EQUIP

02_A-101

02_A-101

2-3

2-1-A

2-C-1.8 2-E-1

PROVIDE TEMPORARY

PROTECTIVE PLASTIC

BARRIER WITH ZIPPERED

ENTRY FROM FLOOR TO THE

BOTTOM OF THE CEILING

PROVIDE WALK

OFF MATS DURING

CONSTRUCTION

DO NOT FASTEN

TEMPORARY PARTITION TO

EXISTING FINISHED FLOOR

050501012121 21212525 2525

0808 0808

3131 3232

3333 3434

3535 3636

3737 3838

3131 3232

3333 3434

3535 3636

3737 3838

5' - 8" VIF

7' - 5" VIF

7'

- 9

" V

IF

9'

- 7

" V

IF

8'

- 4

" V

IF

7" V

IF

5' - 2" VIF

7' - 7" VIF

ELEV

E1

STORAGE

2225A

ELEV

E2

2828 2828

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION

TYPE OF CONSTRUCTION / PROJECT ACTIVITY TABLE

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES, BUT IS NOT LIMITED TO:

- REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 20 LN FT TILE PER 160 SQ. FT. SPACE.

- PAINTING (BUT NOT SANDING)

- WALLCOVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH NO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION

- PATCHING WALLS - NOT EXCEEDING 8 SQ FT

TYPE

A

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST

INCLUDES, BUT IS NOT LIMITED TO:

- INSTALLATION OF TELEPHONE AND COMPUTER CABLING

- ACCESS TO CHASE SPACES

- CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED

- PATCHING WALLS - EXCEEDING 8 SQ FT

TYPE

B

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY

FIXED BUILDING COMPONENTS AND ASSEMBLIES OR NEW CONSTRUCTION

INCLUDES, BUT IS NOT LIMITED TO:

- SANDING OF WALLS FOR PAINTING OR WALL COVERING EXCEEDING 32 SQ. FT., OR VACANT AREAS

- REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK

- NEW WALL CONSTRUCTION

- UNCONTAINED DUCT, HVAC OR ELECTRICAL WORK ABOVE CEILINGS

- MAJOR CABLING ACTIVITIES

- ANY OTHER PROJECT WHERE HIGH LEVELS OR DUST ARE GENERATED

TYPE

C

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT IS NOT LIMITED TO:

- ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS

- REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM

- NEW CONSTRUCTION

TYPE

D

PATIENT RISK GROUP TABLE

- ADMINISTRATIVE OFFICES

- PUBLIC CORRIDORS

- ELEVATORS

- DAY ROOMS

- CANTEEN RETAIL STORE

- VACANT WARDS OR VACANT

ICU'S ETC.

GROUP 1

LOW RISK

- OUTPATIENT, URGENT CARE &

PRIMARY CARE CLINICS

- LABORATORY

- CARDIOLOGY

- ECHOCARDIOGRAPHY

- ENDOSCOPY

- FOOD SERVICES

- INTERIM CARE & MEDICAL

UNITS

- NUCLEAR MEDICINE

- PHARMACY

- PHYSICAL THERAPY

- RADIOLOGY & NUCLEAR

MEDICINE

- RESPIRATORY THERAPY

GROUP 2

MEDIUM RISK

- CCU

- EMERGENCY ROOM

- LABORATORY

- OUTPATIENT SURGERY

- PHARMACY

- POST ANESTHESIA CARE UNIT

- SURGICAL UNITS

GROUP 3

HIGH RISK

- ANY AREA CARING FOR

IMMUNICOMPROMISED

PATIENTS

- SPD STORAGE / STERILIZATION

- INTENSIVE CARE UNITS

- TB NEGATIVE PRESSURE

ISOLATION ROOMS

- OPERATING ROOM

GROUP 4

HIGHEST RISK

INFECTION CONTROL MATRIX - CLASS OF PRECAUTIONS:

CONSTRUCTION PROJECT BY PATIENT RISK

PATIENT RISK GROUP

CONSTRUCTION PROJECT TYPE

TYPE A

LOW RISK GROUP 1

MEDIUM RISK GROUP 2

HIGH RISK GROUP 3

HIGHEST RISK GROUP 4

TYPE B TYPE C TYPE D

I II II III / IV

I II II IV

I II III / IV IV

II III / IV III / IV IV

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY

AND RISK LEVEL INDICATE THAT CLASS III OR IV CONTROL PROCEDURES ARE NECESSARY

IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION

CONTROL PRECAUTIONS DEPENDING UPON

THE AREA CLASS DESIGNATION

DURING CONSTRUCTION PROJECT

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING

DUST FROM CONSTRUCTION OPERATIONS.

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED

FOR VISUAL INSPECTIONS.CL

AS

S

I

UPON COMPLETION OF PROJECT

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK

IS BEING PERFORMED.

CL

AS

S

II

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

3. WIPE WORK SURFACES WITH DISINFECTANT, WET MOP AND /

OR VACUUM WITH HEPA VACUUM BEFORE LEAVING WORK

AREA.

4. REMOVE ISOLATION OF HVAC.

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS

BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK,

PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR

IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE

COVERING UNLESS SOLID LID.

CL

AS

S

III

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED BY THE ENVIRONMENTAL

HEALTH AND SAFETY AND INFECTION CONTROL AND

THOROUGHLY CLEANED BY ENVIRONMENTAL SANITATION

SECTION.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

4. WET MOP AREA WITH DISINFECTANT.

5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE

WORK IS BEING PERFORMED.

1. OBTAIN INFECTION CONTROL PERMIT BEFORE

CONSTRUCTION BEGINS.

2. ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING

DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL

CUBE METHOD BEFORE CONSTRUCTION BEGINS.

4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

5. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES

APPROPRIATELY.

6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO

PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING

A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR

THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE THE WORK SITE.

7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO

WEAR SHOE COVERS.

CL

AS

S

IV

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS THOROUGHLY CLEANED BY

ENVIRONMENTAL MANAGEMENT.

2. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

3. WET MOP AREA WITH DISINFECTANT.

4. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

6. COVER TRANSPORT RECEPTACLES OR CARTS, TAPE

COVERING.

7. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE

WORK IS BEING PERFORMED.

1. VA PREFERS THE USE OF HARD WALL PARTITIONS OVER THE

USE OF PLASTIC SHEETING FOR SEPARATION BETWEEN

CONSTRUCTION AND EXISTING SPACES TO REMAIN

FUNCTIONING. CONTRACTOR TO SUBMIT PROPOSED PLAN

FOR TEMPORARY CONSTRUCTION PARTITION LOCATIONS

FOR COR APPROVAL. TEMPORARY PARTITION LOCATIONS

SHOWN HERE ARE RECOMMENDED LOCATIONS BASED ON

WORK NEEDING TO BE COMPLETED, BUT DOES NOT

CONSTITUTE FINAL LOCATIONS OR QUANITITIES.

2. PROVIDE WALK-OFF MATS DURING CONSTRUCTION,

LOCATIONS ARE SUGGESTED, CONTRACTOR TO PROVIDE

FINAL LOCATION.

ICRA GENERAL NOTES

TEMPORARY CONSTRUCTION

architecture · engineering

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by VA Chief Engineer:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FO

R

CO

NS

TR

UC

TI

ON

ENGINEERS · SURVEYORS · CONSULTANTS ·

LANDSCAPE ARCHITECTS · LAND PLANNERS

298 VETERANS DRIVE

FOWLERVILLE,

MICHIGAN 48836

(OFFICE) 517-223-3512

(FAX) 517-223-9987

211 E. Water Street, Suite 213L

Kalamazoo, MI 49007 269.216.0222

VA STATION

Battle Creek VA Medical Center

5500 Armstrong Road

Battle Creek, MI 49037

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

C:

\R ev it\2

0\2

5_ Ar ch _M eli ss a.N ap pi.

rvt

/13

/20

2:

:34 P

M

02_A-101

FLOOR PLANS AND SECTIONS -

E1 & E2

REPLACE ELEVATORS BUILDINGS

2, 7, 13, 39, 82

BATTLE CREEK, MI

515-21-103

B2

13DEC2021 KJH MRB

100% BID DOCUMENTS200115

1/4" = 1'-0"02_A-101

1 ELEVATOR SECTION - E1 & E2

1/4" = 1'-0"02_A-101

2 ELEVATOR SECTION - E1 & E2

CAR NOTES

ID NOTE

31 REMOVE AND REPLACE ENTIRE CAR FINISHES WITH NEW.

32 REMOVE AND REPLACE EXISTING HANDRAILS WITH NEW DOUBLE SET OF

STAINLESS STEEL HANDRAILS.

33 REMOVE AND REPLACE CAR OPERATING PANEL WITH NEW. MOUNTING

HEIGHT TO COMPLY WITH REQUIREMENTS LISTED WITHIN THE

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS).

34 REMOVE, SALVAGE AND REINSTALL EXISTING WALL MOUNTED ADVERTISING

FRAME. EACH ELEVATOR CAR TO HAVE 3-4 FRAMES, LOCATIONS TO MATCH

EXISTING.

35 REMOVE, SALVAGE AND REINSTALL EXISTING CAR SIGNAGE. LOCATION TO

MATCH EXISTING.

36 REMOVE AND REPLACE CAR DOOR OPERATOR WITH NEW.

37 REMOVE AND REPLACE CAR POSITION INDICATORS WITH NEW.

38 REMOVE SLIDE GUIDES AND REPLACE WITH ROLLER GUIDE ASSEMBLIES.

39 EXISTING CAR PLATFORM AND FRAME TO REMAIN. CONTRACTOR TO ASSESS

CAR PLATFORM AND ADD REINFORCEMENT AS REQ'D.

1/4" = 1'-0"

FLOOR PLAN - FIRST LEVEL - E1 & E2

1/4" = 1'-0"

FLOOR PLAN - GROUND LEVEL - E1 & E2

1/4" = 1'-0"

FLOOR PLAN - ATTIC LEVEL - E1 & E2

1/4" = 1'-0"

FLOOR PLAN - SECOND LEVEL - E1 & E2

CORRIDOR NOTES

ID NOTE

01 REMOVE DUAL RISER HALL STATIONS AND REPLACE WITH A SINGLE RISER

HALL STATION TO CONTROL BOTH ELEVATOR 1 AND 2. HALL STATION LOCATED

AT ELEVATOR 1 IS TO BE REMOVED IN ITS ENTIRETY. HALL STATION LOCATED

IN THE CENTER OF ELEVATOR 1 AND 2 IS TO REUSE FIXTURE BOX IF POSSIBLE.

PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO

MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW

FINISHES.

02 REMOVE AND REPLACE SINGLE RISER HALL STATION WITH NEW LOCATED

WITHIN EXISTING FIXTURE BOX, REPLACE EXISTING FIXTURE BOX AS

REQUIRED TO ACCOMODATE NEW HALL STATION. PATCH AND REPAIR

ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING

AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.

03 REMOVE AND REPLACE SINGLE RISER HALL STATION AND FIXTURE BOX WITH

NEW. MOUNTING HEIGHT TO COMPLY WITH REQUIREMENTS LISTED WITHIN

THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS).

PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO

MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW

FINISHES.

04 REMOVE HALL LANTERNS IN ITS ENTIRETY.

05 REMOVE AND REPLACE HALL POSITION INDICATORS WITH NEW COMBINATION

LANTERN/POSITION INDICATOR.

06 REMOVE, SALVAGE AND REINSTALL EXISTING SIGNAGE AS REQ'D TO INSTALL

NEW HALL STATIONS, HALL LANTERNS, HALL POSITION INDICATERS, ETC.

LOCATION AND MOUNTING HEIGHT TO COMPLY WITH REQUIREMENTS LISTED

WITHIN THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD

(ABAAS). PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF

REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR PROPER

INSTALLATION OF NEW FINISHES.

07 REMOVE FIRE DEPARTMENT EMERGENCY LIGHT INDICATOR IN ITS ENTIRETY.

08 PROVIDE ACCESS STATION, CENTER TO KEYSWITCH TO BE MOUNTED 72"

A.F.F.

09 PATCH AND REPAIR WALL(S) AS REQ'D TO MATCH EXISTING AND MAKE LIKE

NEW AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES. PROVIDE

SEALANT AROUND ALL DISSIMILAR MATERIALS. PROVIDE WALL COVERING OR

PAINT TO MATCH EXISTING. SEE PLAN FOR EXTENTS OF AREA OF WORK.

EQUIPMENT NOTES

ID NOTES

40 REMOVE EXISTING CONTROLLER AND INSTALL NEW, LOCATION TO BE

DETERMINED BY ELEVATOR CONTRACTOR.

41 REMOVE AND REPLACE EXISTING PUMP UNIT WITH NEW, INCLUDING TANK,

VALVES, PUMP, MOTOR, AND MUFFLER.

42 CONTRACTOR TO PROVIDE MEANS TO COLLECT OIL AT EXISTING CYLINDER

AND RETURN AUTOMATICALLY TO EXISTING OIL RESERVOIR.

43 REMOVE AND REPLACE EXISTING TRACTION MACHINE WITH NEW. INCLUDE

BEDPLATE MOUNTED DEFLECTOR SHEAVE, DRIVE MOTOR AND STEEL HOIST

ROPES.

44 REMOVE AND REPLACE EXISTING GOVERNOR ASSEMBLY AND GOVERNOR

TAIL SHEAVE WITH NEW.

HOISTWAY NOTES

ID NOTE

20 REMOVE AND REPLACE HOISTWAY STAINLESS STEEL DOOR FRAME, DOOR

PANELS, DOOR SILL, AND DOOR EQUIPMENT WITH NEW.

21 POLISH EXISTING HOISTWAY STAINLESS STEEL DOOR FRAMES AND DOOR

PANELS. EXISTING DOOR SILLS TO BE CLEANED AND SECURELY TIGHTENED

AND RETAINED.

22 CLEAN EXISTING HOISTWAY, RAILS AND TOP OF ELEVATOR CAB. PATCH AND

REPAIR WALL SURFACES TO MATCH EXISTING AND/OR AS REQUIRED FOR

PROPER INSTALLATION OF NEW FINISHES. REFER TO MATERIAL SELECTION

SCHEDULE.

23 CLEAN EXISTING HOISTWAY. PATCH AND REPAIR WALL SURFACES TO MATCH

EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW

FINISHES. REFER TO MATERIAL SELECTION SCHEDULE.

24 REMOVE AND REPLACE EXISTING IN-GROUND HYDRAULIC CYLINDER WITH

NEW.

25 REMOVE EXISTING FLOOR LANDING IDENTIFICATION LOCATED ON THE JAMBS

AT HOISTWAY ENTRANCES. PREPARE SURFACE FOR NEW FLOOR LANDING

IDENTIFICATION.

26 PROVIDE FLOOR LANDING IDENTIFICATION TO BE LOCATED ON THE JAMBS AT

HOISTWAY ENTRANCES.

27 REMOVE AND SALVAGE FOR REINSTALLATION ELEVATOR NUMBER

IDENTIFICATION SIGN LOCATED ON HOISTWAY DOOR FRAME.

28 REMOVE SURFACE APPLIED GRAPHIC FROM EXISTING HOISTWAY STAINLESS

STEEL DOOR PANELS.

29 PROVIDE ELEVATOR NUMBER IDENTIFICATION SIGN TO BE LOCATED CENTER

ON HOISTWAY DOOR FRAME. MATCH BUILDING 2 SIGNAGE.

Revisions: Date:

ASBESTOS NOTES

ID NOTES

50 EXISTING FLOORING AND/OR MASTIC CONTAINS ASBESTOS PER THE

ASBESTOS SURVEY PROVIDED BY THE VA. ASBESTOS CONTAINING

MATERIALS TO BE REMOVED PER THE SPECIFICATIONS AND REGULATIONS.

02_A-102

2-3

2-A

2-A1

DO NOT FASTEN

TEMPORARY PARTITION TO

EXISTING FINISHED FLOOR

ELEC

1192E

PROVIDE TEMPORARY PROTECTIVE

PLASTIC BARRIER WITH ZIPPERED

ENTRY FROM FLOOR TO THE BOTTOM

OF THE CEILING

PROVIDE WALK

OFF MATS DURING

CONSTRUCTION

09092323

ELEV

E35'

- 9 " V

IF

7'

- 5

" V

IF

7' - 9" VIF

9' - 8" VIF

02_A-102

2-3

2-A

2-A1

PROVIDE TEMPORARY PROTECTIVE

PLASTIC BARRIER WITH ZIPPERED

ENTRY FROM FLOOR TO THE BOTTOM

OF THE CEILING

PROVIDE WALK

OFF MATS DURING

CONSTRUCTION

DO NOT FASTEN

TEMPORARY PARTITION TO

EXISTING FINISHED FLOOR

DISBATCH

09092323 2424 4242

ELEV

E35'

- 9 " V

IF

7'

- 5

" V

IF

7' - 9" VIF

9' - 8" VIF

02_A-102

2-3

2-A

2-A1

DO NOT FASTEN

TEMPORARY PARTITION TO

EXISTING FINISHED FLOOR

ELEVATOR

EQUIP

2273A

STORAGE

PPROVIDE TEMPORARY PROTECTIVE

PLASTIC BARRIER WITH ZIPPERED

ENTRY FROM FLOOR TO THE BOTTOM

OF THE CEILING

PROVIDE WALK

OFF MATS DURING

CONSTRUCTION

27273030

7' - 9" VIF

9' - 8" VIF

5'

- 9

" V

IF

7'

- 5

" V

IF

ELEV

E3

CAMPUS - SITE

LEVEL

920' - 1"

B02 - GROUND

FLOOR

918' - 7"

B02 - FIRST FLOOR

928' - 7"

B02 - SECOND

FLOOR

940' - 7"

B02 - FOUNDATION

915' - 9"

B02 - ROOF

952' - 6"

7" V

IF

4'

- 0

" V

IF

ELEV

E3

2424 4242

1. SUB-CONTRACTORS ARE TO COORDINATE WORK WITH ALL OTHER TRADES.

2. CONFLICTS BETWEEN NOTES, DETAILS, SPECIFICATIONS, ETC., SHALL BE

VERIFIED WITH THE OWNER'S REPRESENTATIVE OR THE MOST STRINGENT

PROVISIONS SHALL GOVERN.

3. DETAILS OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE SAME

NATURE AS SHOWN FOR SIMILAR CONDITIONS. ANY UNCLEAR CONDITIONS

SHALL BE VERIFIED WITH OWNER'S REPRESENTATIVE PRIOR TO

CONSTRUCTION OF THAT AREA.

4. DRAWINGS ARE NOT TO BE SCALED. ANY UNCLEAR DIMENSIONS OR

DIMENSIONAL DISCREPANCIES SHALL BE VERIFIED WITH OWNER'S

REPRESENTATIVE.

5. ALL EXISTING CONDITIONS AND ALL RELATED DIMENSIONS INDICATED IN THE

CONTRACT DOCUMENTS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION,

ERECTION, AND/OR CONSTRUCTION. ANY CONDITIONS THAT DIFFER FROM THAT

INDICATED IN THE CONTRACT DOCUMENTS SHALL BE SUBMITTED TO THE

OWNER'S REPRESENTATIVE FOR REVIEW PRIOR TO FABRICATION, ERECTION,

AND/OR CONSTRUCTION.

6. CONSTRUCTION MANAGER (CM) / GENERAL CONTRACTOR (GC) TO REVIEW

ENTIRE SET OF CONSTRUCTION DOCUMENTS AND SHALL COORDINATE WORK

BETWEEN ALL TRADES. IF CONFLICTS ARISE DUE TO COORDINATION OF

TRADES, CM / GC IS TO VERIFY CONFLICT WITH OWNER'S REPRESENTATIVE

PRIOR TO CONSTRUCTION / INSTALLATION OF CONFLICTING ITEMS.

7. PATCH ALL EXPOSED INTERIOR AND EXTERIOR WALLS WHERE ATTACHED OR

IMBEDDED ITEMS WERE REMOVED.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATIONS OF THE

FLOORS, WALLS, AND CEILINGS FOR NEW FINISHES.

9. MAINTAIN FIRE RATING AT ALL ASSEMBLIES WHERE OPENINGS PENETRATIONS,

EMBEDMENT, RECESSED EQUIPMENT, ACCESSORIES, ETC. DISRUPT THE

CONTINUITY OF THE RATING

10. REMOVE ADHESIVE/OR MORTAR LEFT FROM THE REMOVAL OF EXISTING FLOOR

COVERING AND PREP FLOOR W/CONCRETE (OR FLORSTONE) AS NECESSARY TO

ACCOMMODATE NEW FLOOR COVERINGS.

11. ALL DIMENSIONS ARE FROM FACE OF STUD, C.M.U., OR CONCRETE , U.N.O.

12. PROVIDE ISOLATION MATERIAL BETWEEN DISSIMILAR MATERIALS THAT ARE IN

CONTACT WITH ONE ANOTHER

13. PATCH & REPAIR ALL MAJOR & MINOR BLEMISHES AS REQ'D. DUE TO

DEMOLITION WORK. MATCH ADJACENT MATERIAL & COLOR.

14. PROVIDE SOLID, CONTINUOUS, NON COMBUSTIBLE BLOCKING AT LOCATIONS

WHERE MILLWORK, PLUMBING FIXTURES, EQUIP., ETC. ATTACH TO WALL OR

CEILING.

GENERAL NOTES:

architecture · engineering

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by VA Chief Engineer:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FO

R

CO

NS

TR

UC

TI

ON

ENGINEERS · SURVEYORS · CONSULTANTS ·

LANDSCAPE ARCHITECTS · LAND PLANNERS

298 VETERANS DRIVE

FOWLERVILLE,

MICHIGAN 48836

(OFFICE) 517-223-3512

(FAX) 517-223-9987

211 E. Water Street, Suite 213L

Kalamazoo, MI 49007 269.216.0222

VA STATION

Battle Creek VA Medical Center

5500 Armstrong Road

Battle Creek, MI 49037

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

C:

\R ev it\2

0\2

5_ Ar ch _M eli ss a.N ap pi.

rvt

/13

/20

2:

:35 P

M

02_A-102

FLOOR PLANS AND SECTIONS -

E3

REPLACE ELEVATORS BUILDINGS

2, 7, 13, 39, 82

BATTLE CREEK, MI

515-21-103

B2

13DEC2021 KJH MRB

100% BID DOCUMENTS200115

1/4" = 1'-0"

FLOOR PLAN - FIRST LEVEL - E3

1/4" = 1'-0"

FLOOR PLAN - GROUND LEVEL - E3

1/4" = 1'-0"

FLOOR PLAN - SECOND LEVEL - E3

1/4" = 1'-0"02_A-102

1 ELEVATOR SECTION - E3

DEDUCTIVE ALTERNATE 2 - BUILDING 2, ELEVATOR 3

Revisions: Date:

CAR NOTES

ID NOTE

30 REMOVE EXISTING CAR IN ITS ENTIRETY AND PROVIDE NEW CAR IN ITS

ENTIRETY. INCLUDING NEW PLATFORM, CAR ROLLER GUIDES, CAR DOOR

PANELS WITH PROTECTION DEVICE, CAR OPERATING PANEL, CAR SHELL WITH

NEW FINISHES, DOUBLE SET OF STAINLESS STEEL HANDRAILS, CAR SIGNAGE,

(4) WALL MOUNTED ADVERTISING FRAMES, AND ALL OTHER ASSOCIATED

PARTS AND PIECES RELATED TO A NEW INSTALL.

CORRIDOR NOTES

ID NOTE

01 REMOVE DUAL RISER HALL STATIONS AND REPLACE WITH A SINGLE RISER

HALL STATION TO CONTROL BOTH ELEVATOR 1 AND 2. HALL STATION LOCATED

AT ELEVATOR 1 IS TO BE REMOVED IN ITS ENTIRETY. HALL STATION LOCATED

IN THE CENTER OF ELEVATOR 1 AND 2 IS TO REUSE FIXTURE BOX IF POSSIBLE.

PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO

MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW

FINISHES.

02 REMOVE AND REPLACE SINGLE RISER HALL STATION WITH NEW LOCATED

WITHIN EXISTING FIXTURE BOX, REPLACE EXISTING FIXTURE BOX AS

REQUIRED TO ACCOMODATE NEW HALL STATION. PATCH AND REPAIR

ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING

AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.

03 REMOVE AND REPLACE SINGLE RISER HALL STATION AND FIXTURE BOX WITH

NEW. MOUNTING HEIGHT TO COMPLY WITH REQUIREMENTS LISTED WITHIN

THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS).

PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO

MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW

FINISHES.

04 REMOVE HALL LANTERNS IN ITS ENTIRETY.

05 REMOVE AND REPLACE HALL POSITION INDICATORS WITH NEW COMBINATION

LANTERN/POSITION INDICATOR.

06 REMOVE, SALVAGE AND REINSTALL EXISTING SIGNAGE AS REQ'D TO INSTALL

NEW HALL STATIONS, HALL LANTERNS, HALL POSITION INDICATERS, ETC.

LOCATION AND MOUNTING HEIGHT TO COMPLY WITH REQUIREMENTS LISTED

WITHIN THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD

(ABAAS). PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF

REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR PROPER

INSTALLATION OF NEW FINISHES.

07 REMOVE FIRE DEPARTMENT EMERGENCY LIGHT INDICATOR IN ITS ENTIRETY.

08 PROVIDE ACCESS STATION, CENTER TO KEYSWITCH TO BE MOUNTED 72"

A.F.F.

09 PATCH AND REPAIR WALL(S) AS REQ'D TO MATCH EXISTING AND MAKE LIKE

NEW AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES. PROVIDE

SEALANT AROUND ALL DISSIMILAR MATERIALS. PROVIDE WALL COVERING OR

PAINT TO MATCH EXISTING. SEE PLAN FOR EXTENTS OF AREA OF WORK.

EQUIPMENT NOTES

ID NOTES

40 REMOVE EXISTING CONTROLLER AND INSTALL NEW, LOCATION TO BE

DETERMINED BY ELEVATOR CONTRACTOR.

41 REMOVE AND REPLACE EXISTING PUMP UNIT WITH NEW, INCLUDING TANK,

VALVES, PUMP, MOTOR, AND MUFFLER.

42 CONTRACTOR TO PROVIDE MEANS TO COLLECT OIL AT EXISTING CYLINDER

AND RETURN AUTOMATICALLY TO EXISTING OIL RESERVOIR.

43 REMOVE AND REPLACE EXISTING TRACTION MACHINE WITH NEW. INCLUDE

BEDPLATE MOUNTED DEFLECTOR SHEAVE, DRIVE MOTOR AND STEEL HOIST

ROPES.

44 REMOVE AND REPLACE EXISTING GOVERNOR ASSEMBLY AND GOVERNOR

TAIL SHEAVE WITH NEW.

HOISTWAY NOTES

ID NOTE

20 REMOVE AND REPLACE HOISTWAY STAINLESS STEEL DOOR FRAME, DOOR

PANELS, DOOR SILL, AND DOOR EQUIPMENT WITH NEW.

21 POLISH EXISTING HOISTWAY STAINLESS STEEL DOOR FRAMES AND DOOR

PANELS. EXISTING DOOR SILLS TO BE CLEANED AND SECURELY TIGHTENED

AND RETAINED.

22 CLEAN EXISTING HOISTWAY, RAILS AND TOP OF ELEVATOR CAB. PATCH AND

REPAIR WALL SURFACES TO MATCH EXISTING AND/OR AS REQUIRED FOR

PROPER INSTALLATION OF NEW FINISHES. REFER TO MATERIAL SELECTION

SCHEDULE.

23 CLEAN EXISTING HOISTWAY. PATCH AND REPAIR WALL SURFACES TO MATCH

EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW

FINISHES. REFER TO MATERIAL SELECTION SCHEDULE.

24 REMOVE AND REPLACE EXISTING IN-GROUND HYDRAULIC CYLINDER WITH

NEW.