Drawings - 515-21-103.pdf
PDF 21 MB Posted
- Attached to
- Z1DA--Replace Elevators Building 2, 7, 13, 39 & 82 515-21-103 Federal contract opportunity
- Solicitation number
- 36C25022B0037
About this file
This document provides details of a pre-solicitation notice for a federal contract to replace elevators at a Veterans Affairs medical center. The Department of Veterans Affairs intends to issue an invitation for bid around June 3rd, 2022 to replace elevators in five buildings on its campus in Battle Creek, Michigan. The project scope involves furnishing all labor, materials, equipment and supervision to replace the elevators. The period of performance is 730 calendar days from notice to proceed. The contract type will be firm fixed price. The project cost is estimated between $1 million to $5 million. This acquisition is reserved exclusively for qualified Service-Disabled Veteran Owned Small Businesses. Offerors must be registered in the System for Award Management and Vendor Information Pages databases. The eventual awardee must also have a current VETS-4212 report on file if applicable. All questions should be directed via email to the specified contracting specialist.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25022B0037 0002.docx | DOCX document | |
| S04 - Pre-Bid Site Visit Attendance Log - 515-21-103.pdf | ||
| 36C25022B0037 0001.docx | DOCX document | |
| S02 - Wage Determination MI20220157 June 3 - 515-21-103.pdf | ||
| S02 - Contractor EMR Certification Form - 515-21-103.pdf | ||
| P01 - Attachment 3 KABA Brand Name Only Justification signed - 515-21-103.pdf | ||
| 36C25022B0037_1.pdf | ||
| S02 - RFI Form - 515-21-103.pdf | ||
| P09 - SOW Final - 515-21-103.pdf | ||
| P01 - Attachment 3 PACS Brand Name Only Justification signed - 515-21-103.pdf | ||
| P01 - Specifications - 515-21-103.pdf | ||
| P01 - Attachment 3 Sarix IMP Brand Name Only Justification signed - 515-21-103.pdf | ||
| 36C25022B0037.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
• DEDUCTIVE ALTERNATE 1 - BUILDING 13 - REMOVE ALL
WORK ASSOCIATED WITH ELEVATOR
MODERNIZATION. PROVIDE RE-KEYING OF FIRE
FIGHTING SERVICE ONLY.
• DEDUCTIVE ALTERNATE 2 - BUILDING 2, ELEVATOR 3 -
REMOVE ALL WORK ASSOCIATED WITH ELEVATOR
MODERNIZATION. PROVIDE RE-KEYING OF FIRE
FIGHTING SERVICE ONLY.
DEDUCTIVE ALTERNATES:
APPLICABLE CODES AND STANDARDS
EDITION:
BUILDING CODES:
- NFPA 101 LIFE SAFETY CODE
- NFPA NATIONAL FIRE CODES, WITH EXCEPTION OF NFPA 5000 AND NFPA 900
- INTERNATION BUILDING CODE (IBC)
- ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS)
- VA BARRIER FREE DESIGN STANDARD (PG-18-13, SUPPLEMENT TO THE ABAAS)
PLUMBING CODES:
- INTERNATIONAL PLUMBING CODE (IPC)
HVAC CODES:
- ASME BOILER AND PRESSURE VESSEL CODE
- ASME CODE FOR PRESSURE PIPING
- ASHRAE STANDARD 62.1 - VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
- ASHRAE STANDARD 15 - SAFETY STANDARD FOR REFRIGERATION SYSTEMS
ELECTRICAL CODES:
- NATIONAL ELECTRICAL CODE (NEC - NFPA 70)
ELEVATOR CODES:
- ASME SAFETY CODES FOR ELEVATORS AND ESCALATORS A17.1
- GUIDE FOR INSPECTION OF ELEVATORS, ESCALATORS, AND MOVING WALKS A17.2
N
EW
S
LAKE ERIE
GRAND
RAPIDS
TRAVERSE
CITY
LAKE SUPERIOR
UPPER PENINSULA
MACKINAW
CITY LAKE HURONALPENA
PETOSKEY
GAYLORD
GRAYLING
LA
KE
MI
CH
IG
AN
SAGINAW
FLINT
LANSING
DETROIT
KALAMAZOO ANN
ARBOR
BATTLE
CREEK
LOCATION MAP
NOT TO SCALE
N
EW
S
VICINITY MAP
NOT TO SCALE
SK
YL
INE
DR
HI
LL
B
RA
DY
R
D.
AR
MS
TR
ON
G
RD
.FORT CUSTER DR.
RIVER RD. W.
W. MICHIGAN AVE.
S.
BE
DF
OR
D
RD
.96
89 E. D AVE.
AUGUSTA DR.
E. BECKWITH
DR.
NORTH BRANCH KALAMAZOO RIVER
E. MICHIGAN AVE.
8MILE RD.
94 94
GALESBURG
AUGUSTA
BATTLE
CREEK
W. DICKMAN RD
W. DICKMAN RD
W. DICKMAN RD
N
EW
S
PLAY GROUND
CAMPUS MAP
NOT TO SCALE
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by VA Chief Engineer:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FO
R
CO
NS
TR
UC
TI
ON
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
DEPARTMENT OF VETERANS AFFAIRS - BATTLE CREEK VA MEDICAL CENTER
BATTLE CREEK, MICHIGAN
SIGNATURE DATE
Director
Associate Director
Chief of Staff
Associate Director for Patient Care Services
Chief, FMS
Chief, Engineering Section
Chief, Police Service
Chief, Fire Service
Union Safety Representative
Chief, Environmental Management Section
Infection Control Officer
Patient Safety Manager
GEMS Coordinator
Safety Specialist
SIGNATURE BLOCK
POSITION DATESIGNATUREPOSITION
Associate Chief of Staff for Mental Health
Security Officer
Assistant Director
Union Rep
C:
\R ev it\2
0\2
5_ Ar ch _M eli ss a.N ap pi.
rvt
/13
/20
2:
:49 P
M
G-001
COVER SHEET REPLACE ELEVATORS BUILDINGS
2, 7, 13, 39, 82
BATTLE CREEK, MI
515-21-103
B2,B7,B13,B39,B82
13DEC2021 KJH MRB
100% BID DOCUMENTS200115
REPLACE ELEVATORS BUILDINGS
2, 7, 13, 39, 82
515-21-103
13DEC2021
100% BID DOCUMENTS
515-21-103
BLDG
SHEET
NO. SHEET NAME
GENERAL
-- G-001 COVER SHEET
-- G-002 PHASING PLAN
ARCHITECTURE
-- A-001 ARCHITECTURAL LEGENDS, SYMBOLS, AND ABBREVIATIONS
-- A-110 DETAILS, INTERIOR ELEVATIONS, AND SCHEDULES
02 02_A-002 OVERALL PLANS - AREA OF WORK
02 02_A-003 ELEVATOR PHOTOS
02 02_A-101 FLOOR PLANS AND SECTIONS - E1 & E2
02 02_A-102 FLOOR PLANS AND SECTIONS - E3
07 07_A-002 OVERALL PLANS - AREA OF WORK
07 07_A-003 ELEVATOR PHOTOS
07 07_A-101 FLOOR PLANS AND SECTIONS
13 13_A-002 OVERALL PLANS - AREA OF WORK
13 13_A-003 ELEVATOR PHOTOS
13 13_A-101 FLOOR PLANS AND SECTIONS
39 39_A-002 OVERALL PLANS - AREA OF WORK
39 39_A-003 ELEVATOR PHOTOS
39 39_A-101 FLOOR PLANS AND SECTIONS
82 82_A-002 OVERALL PLANS - AREA OF WORK
82 82_A-003 ELEVATOR PHOTOS
82 82_A-101 FLOOR PLANS AND SECTIONS
MECHANICAL
00 00_M-000 MECHANICAL GENERAL INFORMATION
02 02_M-002 OVERALL PLANS - AREA OF WORK
02 02_M-101 MECHANICAL FLOOR PLANS - E1 & E2
ELECTRICAL
00 00_E-000 ELECTRICAL GENERAL INFORMATION
02 02_E-002 OVERALL PLANS - AREA OF WORK
02 02_ED101 ELECTRICAL DEMOLITION PLANS - E1 & E2
02 02_ED102 ELECTRICAL DEMOLITION PLANS - E3
02 02_E-101 ELECTRICAL FLOOR PLANS - E1 & E2
02 02_E-102 ELECTRICAL FLOOR PLAN - E3
07 07_E-002 OVERALL PLANS - AREA OF WORK
07 07_ED101 ELECTRICAL DEMOLITION FLOOR PLANS
07 07_E-101 ELECTRICAL FLOOR PLANS
13 13_E-002 OVERALL PLANS - AREA OF WORK
13 13_ED101 ELECTRICAL DEMOLITION FLOOR PLANS
13 13_E-101 ELECTRICAL FLOOR PLANS
39 39_E-002 OVERALL PLANS - AREA OF WORK
39 39_ED101 ELECTRICAL DEMOLITION FLOOR PLANS
39 39_E-101 ELECTRICAL FLOOR PLANS
82 82_E-002 OVERALL PLANS - AREA OF WORK
82 82_ED101 ELECTRICAL DEMOLITION FLOOR PLANS
82 82_E-101 ELECTRICAL FLOOR PLANS
Revisions: Date:
12/13/2021
12/13/2021
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
DEDUCTIVE ALTERNATE 1
DEDUCTIVE
ALTERNATE 2
RE-KEYING PHASE
BUILDING 2
BUILDING 7
BUILDING 13
BUILDING 39
BUILDING 82
PHASING LEGEND
1. POTENTIAL CONSTRUCTION ACCESS TO THE
ELEVATOR EQUIPMENT ROOMS HAVE BEEN
IDENTIFIED ON INDIVIDUAL BUILDINGS WITHIN THIS
DOCUMENT. IT IS THE CONTRACTORS
RESPONSIBILITY TO VERIFY EXISTING CONDITIONS
OF ALL BUILDINGS WITHIN SCOPE OF WORK AND TO
PRESENT THE VA COR FINAL PATH OF
CONSTRUCTION.
2. ANY THROUGH ROOF CONSTRUCTION PATH FOR
REMOVAL AND INSTALLATION OF EQUIPMENT WILL
BE COMPLETED IN A MATTER TO MAINTAIN ALL
BCVAMC'S ROOF WARRANTIES. CONTRACTOR TO
REFER TO SHINGLE MANUFACTURER
RECOMMENDATIONS.
3. USE OF HEAVY EQUIPMENT ON FACILITY GROUNDS
ARE TO UTILIZE MATS TO PROTECT THE GROUNDS
FROM EXCESSIVE DAMAGE.
4. CONTRACOR TO VERIFY INSIDE NARROWEST
FINISHED CLEAR DIMENSION SHALL NOT BE ANY
LARGER THAN EXISTING NARROWEST FINISHED
CLEAR DIMENSION.
GENERAL NOTES
• DEDUCTIVE ALTERNATE 1 - BUILDING 13 - REMOVE ALL
WORK ASSOCIATED WITH ELEVATOR
MODERNIZATION. PROVIDE RE-KEYING OF FIRE
FIGHTING SERVICE ONLY.
• DEDUCTIVE ALTERNATE 2 - BUILDING 2, ELEVATOR 3 -
REMOVE ALL WORK ASSOCIATED WITH ELEVATOR
MODERNIZATION. PROVIDE RE-KEYING OF FIRE
FIGHTING SERVICE ONLY.
DEDUCTIVE ALTERNATES:
RE-KEYING PHASE
RE-KEY ALL EXIST FIRE FIGHTER'S SERVICE FOR
ELEVATORS IN BUILDINGS:
5,14,22,83,84, & 200
AND ELEVATOR #2 IN BUILDING 39 & 82
ALL KEY SWITCHS TO BE BARREL-KEY FEDK-1.
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by VA Chief Engineer:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FO
R
CO
NS
TR
UC
TI
ON
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C:
\R ev it\2
0\2
5_ Ar ch _M eli ss a.N ap pi.
rvt
/13
/20
2:
:50 P
M
G-002
PHASING PLAN REPLACE ELEVATORS BUILDINGS
2, 7, 13, 39, 82
BATTLE CREEK, MI
515-21-103
B2,B7,B13,B39,B82
13DEC2021 KJH MN
100% BID DOCUMENTS200115
3/8" = 1'-0"
PHASING PLAN
Revisions: Date:
MOUNTING HEIGHT
COORDINATION
ARCHITECTURAL,
MECHANICAL &
ELECTRICAL TRADES
SHALL COORDINATE
LOCATIONS OF WALL
MOUNTED ITEMS TO ALIGN
EITHER VERTICALLY OR
HORIZONTALLY.
FINISH FLOOR LINE
DRAWING REFERENCE
SYMBOLS
RECOMMENDED MOUNTING HEIGHTS (UNLESS NOTED OTHERWISE)
MAX
REACH
DEPTH
MAX
REACH
HEIGHT
0.5"
48"
2"
46"
5"
42"
6"
40"
9"
36"
11"
34"
GENERAL MAXIMUM REACH DEPTH AND HEIGHT
FOR HAND DRYERS / TOWEL DISPENSERS
MAX REACH DEPTH
FO
R
RE
AC
H
DE
PT
H
M
AX
H
EI
GH
T
MI
RR
OR
, O
R
MI
RR
OR
S
HE
LF
M
AX
TO
W
EL
D
IS
PE
NS
ER
OR
M
UL
TI
-P
UR
PO
SE
UN
IT
TO
W
EL
D
IS
PE
NS
ER
RE
CE
PT
AC
LE
W
AS
TE
RE
CE
PT
AC
LE
CO
AT
H
OO
KS
SA
NI
TA
RY
N
AP
KI
N
VE
ND
OR
SO
AP
DI
SP
EN
SE
R
" M
AX
MO
P
ST
RI
P
SH
EL
F
12"
AD
A
ST
AN
DA
RD
SH
EL
F
CO
AT
R
OD
M
AX40
3"
24"
BOTTOM OF
OUTLET
BOTTOM OF
LIGHT FIXTURE
" M
AX
24" MIN
36" MAX
" M
IN
M
IN18
24" MIN
42" MAX
" M
AX
36" MAX
M
IN18
24" MIN
42" MAX
1/
2" M
IN
PR
OT
RU
DI
NG
TO
ILE
T
PA
PE
R
DI
SP
EN
SE
R
LO
CA
TI
ON
RE
CE
SS
ED
TO
IL
ET
P
AP
ER
DI
SP
EN
SE
R
LO
CA
TI
ON
PR
OT
RU
DI
NG
TO
ILE
T
PA
PE
R
DI
SP
EN
SE
R
LO
CA
TI
ON
M
IN15
7"-9"
" M
AX
SA
NI
TA
RY
NA
PK
IN
DI
SP
OS
AL
22"
1/
2" M
IN
PR
OT
RU
DI
NG
TO
ILE
T
PA
PE
R
DI
SP
EN
SE
R
LO
CA
TI
ON
EL
EV
AT
OR
W
AL
L
BU
TT
ON
S
" 72
(M
IN
" SE
E
EL
EC
T
EL
EC
TR
IC
O R
PA
NE
L C
AB
IN
ET
PO
W
ER
P
AN
EL
EL
EC
TR
IC
TE
LE
PH
ON
E
OR
T
V
OU
TL
ET
SW
IT
CH
PU
SH
B
UT
TO
N
FI
RE
A
LA
RM
B
OX
TH
ER
MO
ST
AT
CA
RD
R
EA
DE
R
ME
CH
AN
IC
AL
PA
NE
LS
IN
FI
NI
SH
ED
S
PA
CE
S
SE
LE
CT
OR
S W
IT
CH
R S
SW
IT
CH
O
R W
AL
L
OU
TL
ET
A
BO
VE
CA
BI
NE
T
SS
SEE PLAN
12" 12"
HA
ND
RA
IL
-R
AM
P
FI
RE
E
XT
IN
GU
IS
HE
R
FI
RE
E
XT
IN
GU
IS
HE
R
CA
BI
NE
T, F
IR
E
HO
SE
OR
C
OM
BI
NA
TI
ON
CA
BI
NE
T
54" MIN
GRAB BAR
GRAB BAR
3'- 8"
M
AX
6" MAX 36"
(MIN)
18"
GRAB BAR
40"
13" MAX
42" 42"
W
AT
ER
C
LO
SE
T
W
AT
ER
C
LO
SE
T
(M
AX
(M
AX
BA
RR
IE
R
FR
EE
U
RI
NA
L
ST
AN
DA
RD
UR
IN
AL
GRAB BAR
18"
TR
AN
SF
ER
TY
PE
S
HO
W
ER
FOLDING
SHOWER SEAT
RO
LL
-IN
-T
YP
E
SH
OW
ER
3"
6" M
IN
6"
TR
AN
SF
ER
TY
PE
S
HO
W
ER
(M
IN
(M
AX
) T O
PS
PO
UT
9"
7" M
AX
SI
NK
D
EP
TH
4"
11"
(MIN)
17"
3" (MAX)
WALL
SPACE
AVAILABLE
NOTE:
WATER SUPPLY & DRAIN
PIPES BELOW LAVATORIES
AND SINKS MUST BE
INSULATED OR OTHERWISE
CONFIGURED TO PROTECT
AGAINST CONTACT.
EW
C
OR
DR
IN
KI
NG
FO
UN
TA
IN
W
AL
L
HU
NG
LA
V
BA
RR
IE
R
FR
EE
L
AV
CO
UN
TE
R
" M
IN
MAX
0' - 4"
6" MAX
ALIGN WITH EDGE OF SEAT
6'
- 0
ENLARGED PLAN OR DETAIL
WALL SECTION
X-###
X
X
X-###
BUILDING SECTION
EXTERIOR ELEVATIONS
INTERIOR ELEVATIONS
REVISION CLOUD AND TAG
VIEW TITLE & REFERENCE
EXISTING COLUMN LINE
NEW COLUMN LINE
DETAIL
LEVEL OR ELEVATION
XX
DEMARCATION LINE
X-###
X-###
X-###
X-###
X-###
X-###
EQUIPMENT TAG
WALL TAG
###.# DOOR TAG
ROOM NAME
ROOM TAG
WINDOW TAG
X#
ARCHITECTURAL KEYNOTE
#' - #" CEILING SPOT ELEVATION
XX# FURNITURE TAG
FINISH TAG
SPECIALITY EQUIPMENT TAG
XX-#
EX
TI
NG
UI
SH
ER
A
ND
/O R
CE
NT
ER
O
F
HO
SE
V
AL
VE
5'
- 0
" T O
TO
P
OF
CE
NT
ER
O
F H
AN
DL
E
4'
- 0
" M
AX
TO
XX##
DEMO KEYNOTE
XX-#
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by VA Chief Engineer:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FO
R
CO
NS
TR
UC
TI
ON
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C:
\R ev it\2
0\2
5_ Ar ch _M eli ss a.N ap pi.
rvt
/13
/20
2:
:45 P
M
A-001
ARCHITECTURAL LEGENDS,
SYMBOLS, AND ABBREVIATIONS
REPLACE ELEVATORS BUILDINGS
2, 7, 13, 39, 82
BATTLE CREEK, MI
515-21-103
B2,B7,B13,B39,B82
13DEC2021 KJH MJZ
100% BID DOCUMENTS200115
ABBREVIATIONS
ABBREV. FULL TEXT
T.O.F. OR T/F TOP OF FOOTING
T.O.M. OR T/M TOP OF MASONRY
T.O.P. OR T/P TOP OF PAVEMENT
T.O.S. OR T/S TOP OF STEEL
T.O.W. OR T/W TOP OF WALL
T/ TOP OF
TB TRUSS BEARING
TG TEMPERED GLASS
THK THICK
THRESH THRESHOLD
TLT TOILET
TP TOILET PARTITION
TR TRANSITION TRIM
TYP TYPICAL
TYP TYPICAL
UNF UNFINISHED
UNO UNLESS NOTED OTHERWISE
UR URINAL
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WC WALLCOVERING
WCO WALL CLEAN OUT
WCVR WALLCOVERING
WD WOOD
WP WATERPROOFING
WP WORKPOINT
WP WALL PROTECTION
WS WINDOW SHADE
WSCT WAINSCOT
WT WEIGHT
X-(MATERIAL) DENOTES EXISTING MATERIAL
REFRENCED
ABBREVIATIONS
ABBREV. FULL TEXT
SCWD SOLID CORE WOOD
SECT SECTION
SER.RECPT SERVICE RECEPTOR
SH SHELF
SHT SHEET
SHWR SHOWER
SIM SIMILAR
SLR CONCRETE SEALER
SLS SOLID SURFACE
SLV SHORT LEG VERTICAL
SPEC SPECIFICATION
SQ SQUARE
SQFT SQUARE FOOT
SS STAINLESS STEEL
SSK SERVICE SINK
SSM SOLID SURFACING MATERIAL
ST SMOKE-TIGHT PER CODE TO RESIST THE
PASSAGE OF SMOKE
STD STANDARD
STDW STANDARD WEIGHT (STEEL PIPE)
STL STEEL
STN STAIN
STOR STORAGE
STRL STRUCTURAL
SUPP SUPPORT
SUSP SUSPENDED
SYM SUSPENSION SYMMETRICAL
T TREAD
T&G TONGUE AND GROOVE
T.O.C. OR T/C TOP OF CONCRETE
ABBREVIATIONS
ABBREV. FULL TEXT
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLY PLYWOOD
PT PRESSURE TREATED
PT PORCELAIN TILE
PTB PORCELAIN TILE BASE
QT QUARRY TILE
QTB QUARTZ TILE BASE
QTZ QUARTZ
R RISER
RA RETURN AIR
RB RUBBER BASE
RC ROOF CONDUCTOR
RD ROOF DRAIN
RD ROUND
RECVG RECEIVING
REF REFRIGERATOR
REINF REINFORCED
REQ'D REQUIRED
RF RESILIENT FLOORING
RH RIGHT HAND
RL ROOF LADDER
RM ROOM
RO ROUGH OPENING
RS ROOF SUMP
RSN RESIN
RWD REDWOOD
RWD RIGID WALL PROTECTION
S SOUTH
S SPANDREL GLASS
SA SUPPLY AIR
SAB SOUND ATTENUATION BLANKETS
SC SOLID CORE
SCH SCHEDULE
SCONC SEALED CONCRETE
ABBREVIATIONS
ABBREV. FULL TEXT
MAX MAXIMUM
MBH THOUSAND BTU/HR
MC MEDICINE CABINET
MCA MINIMUM CIRCUIT AMPACITY
MCC MULTI-COLOR COATING
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MEMBWP MEMBRANE WATERPROOFING
MET METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MFS MAXIMUM FUSE SIZE
MG MEDICAL GAS
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN. MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MM MISCELLANEOUS METALS
MO MASONRY OPENING
MOCP MAXIMUM OVERCRRENT PROTECTION
MPC MICHIGAN PLUMBING CODE
MR MANUFACTURER'S RECOMMENDATIONS
MT MARBLE TILE
MTD MOUNTED
MUL. MULLION
N NORTH
N.S. NEAR SIDE
NF NO FINISH
NIC NOT IN CONTRACT
NO NUMBER
NPSH NET POSITIVE SUCTION HEAD
NSNS NON SHRINK NON STAIN GROUT
NTS NOT TO SCALE
NTS NOT TO SCALE
O.C. OR OC ON CENTER
OBSGL OBSCURE GLASS
OD OUTSIDE DIAMETER
OHDR SECTIONAL OVERHEAD DOOR
OPNG OPENING
OPP OPPOSITE
P PAINT
PART PARTITION
PB PARTICLE BOARD
PC PRECAST
PCS PIECES
PERM PERMANENT
PL PLATE
ABBREVIATIONS
ABBREV. FULL TEXT
FV FIELD VERIFY
G.B. GRAB BAR, GRADE BEAM
G.O. GRILL OPENING
GA GAUGE
GALV GALVANIZED
GCT GLAZED CERAMIC TILE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GL GLASS
GND. GROUND
GR. GRADE
GRTG. GRATING
GSCFT GLAZED STRUCTURAL CLAY FACING TILE
GT GROUT
GYP. BD. GYPSUM BOARD
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD
HDPB HIGH DENSITY PARTICLEBOARD
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HT HEIGHT
HWD HARDWARE
I.D. OR ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IG INSULATING GLASS
IN INCHES
INCL INCLUDING, INCLUSIVE
INSUL INSULATION
INT INTERIOR
IPS INTERIOR PAINT SYSTEM
JAN JANITOR
JT JOINT
kW KILOWATTS kWh KILOWATT HOURS
LAD LADDER
LAM LAMINATED
LAV LAVATORY
LF LINEAR FEET
LGTH LENGTH
LH LEFT HAND
LKR LOCKER
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LO LOUVER OPENING
LP LIGHTING PANEL
LPG LIQUID PETROLEUM GAS
LPS LOW PRESSURE STEAM
LT LIGHT
LWT LEAVING WATER TEMPERATURE
MA MEDICAL AIR
MANUF MANUFACTURER
MAS MASONRY
MATL MATERIAL
ABBREVIATIONS
ABBREV. FULL TEXT
CTR COUNTER
CTSK COUNTERSINK
DEXS DOUBLE EXTRA STRONG (STEEL PIPE)
DF DRINKING FOUNTAIN
DIA DIAMETER
DIFF DIFFUSER
DN DOWN
DO DOOR OPENING
DR DOOR
DS DOWN SPOUT
DT DRAIN TILE
DTL DETAIL
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EIFS EXTERIOR INSULATION AND FINISH
SYSTEMS
EJ EXPANSION JOINT
EL ELEVATION
ELECT ELECTRICAL
ELEV ELEVATOR OR ELEVATION
ENCL ENCLOSURE
EP EPOXY PAINT
EPS EXTERIOR PAINT SYSTEM
EQ EQUAL
EQUIP EQUIPMENT
ES EXPOSED STRUCTURE
EW EACH WAY
EWC ELECTRICAL WATER COOLER
EX EXISTING
EXGR EXISTING GRADE
EXP EXPANSION
EXS EXTRA STRONG (STEEL PIPE)
EXT EXTERIOR
FA FIRE ALARM
FAB FABRIC/UPHOLSTERY
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FG FROSTED GLASS
FHC FIRE HOSE CABINET
FIN FINISH
FL FLOOR
FLL FLOOR LINE
FLUOR FLUORESCENT
FOC FACE OF COLUMN
FOCONC FACE OF CONCRETE
FRC FIBER REINFORCED CONCRETE
FRP FIELD REINFORCED PANEL
FRPFG FIREPROOFING
FS FULL SIZE
FT FIRE TREATED
FTG FOOTING
FUR FURRING
ABBREVIATIONS
ABBREV. FULL TEXT
AB ANCHOR BOLT
ABI ADDITIVE BID ITEM
AC ACOUSTICAL
ACB ACOUSTICAL CEILING BAFFLE
ACP ACOUSTICAL CEILING PANEL
ACS ACOUSTICAL CEILING SPRAY
AD AREA DRAIN
ADA ADA
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
ALUM ALUMINUM
AP ACCESS DOORS
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AWP ACOUSTICAL WALL PANEL
B/ BOTTOM OF
BD BOARD
BF BARRIER FREE
BIT BITUMINOUS
BL BUILDING LINE
BLDG BUILDING
BLKHD BULKHEAD
BOTT BOTTOM
BP BASE PLATE
BR BUMP RAIL
BS BOTH SIDES
BUR BUILT UP ROOFING
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CG CORNER GUARD
CH CHANNEL
CHKDPL CHECKERED PLATE
CJ CONTROL JOINT
CL CENTERLINE
CL TO CL CENTERLINE TO CENTERLINE
CLG CEILING
CLK CAULKING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMP COMPRESSIBLE
COMPO COMPOSITION
CONC CONCRETE
CONN CONNECT, CONNECTION
CONST CONSTRUCTION
CONST JT CONSTRUCTION JOINT
CONT CONTINUOUS
CONTR CONTRACTOR
CPT CARPET TILE
CS CONCRETE SEALER
4'
- 0
AUXILARY ELEVATOR
CONTROL PANELWP-2WP-2
WP-1WP-1
HDR-1HDR-1
SS-1 TOE KICK W/
VENTILATION SLOTS
4'
- 0
STAINLESS STEEL,
MAIN ELEVATOR
CONTROL PANEL
WP-1WP-1
SS-1 TOE KICK W/
VENTILATION SLOTS
WP-2WP-2
4'
- 0
" HDR-1HDR-1
WP-2WP-2
WP-1WP-1
SS-1 TOE KICK W/
VENTILATION SLOTS
EMERGENCY LIGHT
REINSTALL SALVAGED
SIGNAGE, QUANTITIES
AND LOCATIONS TO
MATCH EXISTING, TYP.
4'
- 0
WP-2WP-2
WP-1WP-1
HDR-1HDR-1
SS-1 TOE KICK W/
VENTILATION SLOTS
TYPICAL TEMPORARY CONSTRUCTION
PARTITION
UNDERSIDE OF EXISTING
DECK
1 HR RATED TEMPORARY
PARTITION. HI-IMPACT 5/8" GYP.
BOARD ON 3 5/8" METAL STUDS.
FINISH OCCUPIED SIDE PER
ROOM FINISH SCHEDULE
PLASTER TAPE ALL GYP. BD.
JOINTS. SECURE ALL TAPE
WITH RAM-TACK HIGH TACK
SPRAY OR EQUAL.
OCCUPIED SIDERENOVATION SIDE
2 1/2" DEEP SLOTTED
METAL DEFLECTION
TRACK FASTENED TO
DECK @ 2'-0" O.C.
COMPRESSIBLE
INSULATION
SEAL PERIMETER
COMPRESSIBLE
INSULATION
SEAL PERIMETER
1-HR FIRE RATED / 3 5/8" METAL STUDS/ GYPSUM BOARD ON BOH SIDES
DESIGN UL-U419
96"
VA U.S. Department of Veterans Affairs
Battle Creek VA Medical Center
GENERAL CONTRACTOR
Construction Firm Name City State
ARCHITECT / ENGINEER
Architect/ Engineering Firm Name City State
VA Office of Construction & Facilities Management
FRAMED SIGN PANEL - ALUMINUM SKIN
LAMINATED TO A WOOD CORE WITH
PHYSICALLY SEALED EDGES
TY
P
6" M
IN
TYP
6" MIN
TYP
6" MIN
VA BLUE (PANTONE 541) BACKGROUND
DEPARTMENT OF VETERAN AFFAIRS
LOGO - SURFACE APPLIED VINYL OR
SCREENED GRAPHICS - COLOR WHITE
SURFACE APPLIED VINYL OR SCREENED
GRAPHICS - COLOR BLACK
WHITE BACKGROUND
PLAN VIEW
ELEVATION VIEW
4"x6" WOOD POSTS
GRADE
CONCRETE FOOTING
NOTES:
1. ALL VISIBLE SURFACE TO BE PRIMED
AND PAINTED. SURFACES NOT CALLED
OUT TO BE A SPECIFIC COLOR ARE TO
BE PAINTED WHITE.
2. SIGN TO BE ATTACHED TOGETHER
WITH WOOD SCREWS AND LAG BOLTS.
4"x6" POSTS 2"x4" FRAMING
SIGN FACE
48"
VA U.S. Department of Veterans Affairs
This Project Has Worked Days
FRAMED SIGN PANEL - ALUMINUM SKIN
LAMINATED TO A WOOD CORE WITH
PHYSICALLY SEALED EDGES
TY
P
6" M
IN
TYP
6" MIN
TYP
6" MIN
VA BLUE (PANTONE 541) BACKGROUND
DEPARTMENT OF VETERAN AFFAIRS
LOGO - SURFACE APPLIED VINYL OR
SCREENED GRAPHICS - COLOR WHITE
SURFACE APPLIED VINYL OR SCREENED
GRAPHICS - COLOR RED
WHITE BACKGROUND
PLAN VIEW
ELEVATION VIEW
4"x4" WOOD POSTS
GRADE
CONCRETE FOOTING
NOTES:
1. ALL VISIBLE SURFACE TO BE PRIMED
AND PAINTED. SURFACES NOT CALLED
OUT TO BE A SPECIFIC COLOR ARE TO
BE PAINTED WHITE.
2. SIGN TO BE ATTACHED TOGETHER
WITH WOOD SCREWS AND LAG BOLTS.
4"x4" POSTS
2"x4" FRAMING
SIGN FACE
ZERO IN
ON SAFETY
00 0 Without a Lost Time Accident
THE LIFE YOU SAVE MAY BE YOUR OWN
General Contractors Firm Name CHANGEABLE NUMBERS
SURFACE APPLIED VINYL OR SCREENED
GRAPHICS - COLOR BLACK
DIGITAL INDICATOR
"UP" OR "DOWN" LANTERNS
NOTES:
1. PROVIDE LIGHTED FLOOR INDICATOR CENTERED OVER
DOORS INSIDE ELEVATOR CAR.
2. CENTER INDICATOR PANEL VERTICALLY ABOVE
ELEVATOR DOORS IN CORRIDOR.
3. COORDINATE FLOOR NUMBERS WITH VA COR.
ACCESS KEYSWITCH
72" A.F.F.
NOTES:
1. LAYOUT OF CONTROL PANEL SHALL COMPLY WITH ABA /
ADA. ADJUST LAYOUT BASED ON SPECIFICATIONS
37" A.F.F.
UP / DOWN BUTTONS @ 42" A.F.F.
COMPLIES W/ A.D.A.A.G. CODE
CODE BLUE
ELEVATOR EMERGENCY
POWER INDICATOR
ELEVATOR COMMUNICATION
FAILURE LIGHT
FIRE PHONE JACK
FIRE SERVICE INDICATOR
UP
DN
CODE BLUE KEYSWITCH
@ 47.5" A.F.F.
BUZZER RESET KEYSWITCH
@ 41.75" A.F.F.
FIRE SERVICE SWITCH
@ 61.75" A.F.F.
FIREFIGHTERS'
OPERATION
WURTEC PN 11-930 CA
TRANSFORMER SHIPS LOOSE
NOTES:
1. LAYOUT OF CONTROL PANEL SHALL COMPLY WITH ABA /
ADA. ADJUST LAYOUT BASED ON SPECIFICATIONS
UP
NOTES:
1. LAYOUT OF CONTROL PANEL SHALL COMPLY WITH ABA /
ADA. ADJUST LAYOUT BASED ON SPECIFICATIONS
37" A.F.F.
UP / DOWN BUTTONS @ 42" A.F.F.
COMPLIES W/ A.D.A.A.G. CODE
CODE BLUE
UP
DN
CODE BLUE KEYSWITCH
@ 47.5" A.F.F.
NOTES:
1. LAYOUT OF CONTROL PANEL SHALL COMPLY WITH ABA /
ADA. ADJUST LAYOUT BASED ON SPECIFICATIONS
37" A.F.F.
UP / DOWN BUTTONS @ 42" A.F.F.
COMPLIES W/ A.D.A.A.G. CODE
CODE BLUE
UP
DN
RECESSED LED
DOWNLIGHT
SUSPENDED CEILING
ELEVATOR FRAME
SECURITY CAMERA, SEE
ELECTRICAL DRAWINGS
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by VA Chief Engineer:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FO
R
CO
NS
TR
UC
TI
ON
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C:
\R ev it\2
0\2
5_ Ar ch _M eli ss a.N ap pi.
rvt
/13
/20
2:
:48 P
M
A-110
DETAILS, INTERIOR ELEVATIONS,
AND SCHEDULES
REPLACE ELEVATORS BUILDINGS
2, 7, 13, 39, 82
BATTLE CREEK, MI
515-21-103
B2,B7,B13,B39,B82
13DEC2021 KJH CA / MRB
100% BID DOCUMENTS200115
3/8" = 1'-0"2 STANDARD ELEVATOR INTERIOR - SIDE 1
3/8" = 1'-0"1 STANDARD ELEVATOR INTERIOR - FRONT
3/8" = 1'-0"3 STANDARD ELEVATOR INTERIOR - BACK
3/8" = 1'-0"4 STANDARD ELEVATOR INTERIOR - SIDE 2
ROOM FINISH SCHEDULE
ROOM NO.
ROOM
NAME
FLOOR WALL CEILING FINISH
NOTESFINISH BASE NORTH SOUTH EAST WEST FINISH
BUILDING 2
E1 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1
E2 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1
E3 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1
BUILDING 7
E1 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1
BUILDING 13
E1 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1
BUILDING 39
S7 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1
BUILDING 82
E1 ELEV RF-1 RB-1 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 WP-1, WP-2 ACP-1 HDR-1
ABBREVIATIONS - INTERIORS
ABBREV. FULL TEXT
ACP ACOUSTICAL CEILING PANEL
HDR HANDRAIL
P PAINT
RF RESILIENT FLOORING
SS STAINLESS STEEL
WP WALL PROTECTION
MATERIALS SCHEDULE
CODE USE MANUFACTURER STYLE SIZE PATTERN AND COLOR NOTES
ACOUSTICAL CEILING PANEL
ACP-1 ACOUSTICAL CEILING PANEL USG USG FISSURED BASIC PANELS, SLT, 506 2'x2'x5/8" WHITE PANEL, WHITE GRID --
RESILIENT BASE
RB-1 STAINLESS STEEL TOE KICK -- TOE KICK WITH INTEGRATED VENTILATION
SLOTS
4" H STAINLESS STEEL, NO. 4 FINISH --
RESILIENT
RF-1 LUXURY VINYL TILE MANNINGTON AMTICO - WOOD W/ UNBEVELED EDGES 4.5" X 36" X 0.098” (2.5 MM) TH, 40 MIL SPALTED BEECH AROW7480 1/3 STAGGERED INSTALL
PAINT
P-1 HOISTWAY PAINT SHERWIN WILLIAMS -- -- SW 7006, EXTRA WHITE ALL HOISTWAYS TO BE PAINTED
MISCELLANEOUS
HDR-1 STAINLESS STEEL HANDRAIL -- DOUBLE HANDRAIL VARIES STAINLESS STEEL, NO. 4 FINISH -- WP-1 WALL PROTECTION CS GROUP .040 ACROVYN WALL COVERING VARIES COLOR TO BE DETERMINED BY VA FROM
MANUFACTURER'S FULL RANGE
WP-2 WALL PROTECTION CS GROUP .040 ACROVYN WALL COVERING -- COLOR TO BE DETERMINED BY VA FROM
MANUFACTURER'S FULL RANGE
N.T.S.Scale:
PROJECT CONSTRUCTION SIGN
N.T.S.Scale:
PROJECT SAFETY SIGN
N.T.S.Scale:
COMBINATION LANTERN / HALL POSITIONER
N.T.S.Scale:
ACCESS STATION
N.T.S.Scale:
MAIN LANDING HALL STATION
N.T.S.Scale:
TYPICAL HALL STATIONS
3/8" = 1'-0"5 REFLECTED CEILING PLAN - STANDARD ELEVATOR CAR
E2E1
E3
DEDUCTIVE ALTERNATE 2
E2E1
E3
DEDUCTIVE ALTERNATE 2
ELEVATOR MACHINE ROOM
DEDUCTIVE ALTERNATE 2
E2E1
E3
DEDUCTIVE ALTERNATE 2
N
NOT TO SCALE
CAMPUS MAP KEY PLAN
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by VA Chief Engineer:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FO
R
CO
NS
TR
UC
TI
ON
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C:
\R ev it\2
0\2
5_ Ar ch _M eli ss a.N ap pi.
rvt
/13
/20
2:
:25 P
M
02_A-002
OVERALL PLANS - AREA OF
WORK
REPLACE ELEVATORS BUILDINGS
2, 7, 13, 39, 82
BATTLE CREEK, MI
515-21-103
B2
13DEC2021 KJH MRB / MN
100% BID DOCUMENTS200115
1" = 20'-0"
OVERALL PLAN - FIRST LEVEL
1" = 20'-0"
OVERALL PLAN - GROUND LEVEL
1" = 20'-0"
OVERALL PLAN - ATTIC LEVEL
1" = 20'-0"
OVERALL PLAN - SECOND LEVEL
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by VA Chief Engineer:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FO
R
CO
NS
TR
UC
TI
ON
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C:
\R ev it\2
0\2
5_ Ar ch _M eli ss a.N ap pi.
rvt
/13
/20
2:
:33 P
M
02_A-003
ELEVATOR PHOTOS REPLACE ELEVATORS BUILDINGS
2, 7, 13, 39, 82
BATTLE CREEK, MI
515-21-103
B2
13DEC2021 KJH MJZ
100% BID DOCUMENTS200115
ELEVATOR 1 SHAFT
ELEVATOR 2 SHAFT
ELEVATOR 3 SHAFT
ELEVATOR 1 SHAFT
ELEVATOR 2 SHAFT
ELEVATOR 3 SHAFT
ELEVATOR 1 INDICATOR PANEL
ELEVATOR 2 INTERIOR
ELEVATOR 3 INTERIORFIRST FLOOR ELEVATOR 3 CORRIDOR
FIRST FLOOR ELEVATOR 2 CORRIDOR
FIRST FLOOR ELEVATOR 1 CORRIDOR ELEVATOR 1 INDICATOR PANELELEVATOR 1 INTERIOR
DEDUCTIVE ALTERNATE 2 - BUILDING 2, ELEVATOR 3
GROUND FLOOR ELEVATOR 3 CORRIDOR
GROUND FLOOR ELEVATOR 2 CORRIDOR
GROUND FLOOR ELEVATOR 1 CORRIDOR
SECOND FLOOR ELEVATOR 2 CORRIDOR
CAMPUS - SITE
LEVEL
920' - 1"
B02 - GROUND
FLOOR
918' - 7"
B02 - FIRST FLOOR
928' - 7"
B02 - SECOND
FLOOR
940' - 7"
B02 - FOUNDATION
915' - 9"
B02 - ROOF
952' - 6"
0" V
IF
4'
- 0
" V .I.F
9' - 7" VIF
ELEV
E1
3131 3232 3333 3434 3535
3636 3737 3838 3939
CAMPUS - SITE
LEVEL
920' - 1"
B02 - GROUND
FLOOR
918' - 7"
B02 - FIRST FLOOR
928' - 7"
B02 - SECOND
FLOOR
940' - 7"
B02 - FOUNDATION
915' - 9"
B02 - ROOF
952' - 6"
0" V
IF
4'
- 0
" V .I.F
10' - 7" VIF
ELEV
E2
3131 3232 3333 3434 3535
3636 3737 3838 3939
1. SUB-CONTRACTORS ARE TO COORDINATE WORK WITH ALL OTHER TRADES.
2. CONFLICTS BETWEEN NOTES, DETAILS, SPECIFICATIONS, ETC., SHALL BE
VERIFIED WITH THE OWNER'S REPRESENTATIVE OR THE MOST STRINGENT
PROVISIONS SHALL GOVERN.
3. DETAILS OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE SAME
NATURE AS SHOWN FOR SIMILAR CONDITIONS. ANY UNCLEAR CONDITIONS
SHALL BE VERIFIED WITH OWNER'S REPRESENTATIVE PRIOR TO
CONSTRUCTION OF THAT AREA.
4. DRAWINGS ARE NOT TO BE SCALED. ANY UNCLEAR DIMENSIONS OR
DIMENSIONAL DISCREPANCIES SHALL BE VERIFIED WITH OWNER'S
REPRESENTATIVE.
5. ALL EXISTING CONDITIONS AND ALL RELATED DIMENSIONS INDICATED IN THE
CONTRACT DOCUMENTS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION,
ERECTION, AND/OR CONSTRUCTION. ANY CONDITIONS THAT DIFFER FROM THAT
INDICATED IN THE CONTRACT DOCUMENTS SHALL BE SUBMITTED TO THE
OWNER'S REPRESENTATIVE FOR REVIEW PRIOR TO FABRICATION, ERECTION,
AND/OR CONSTRUCTION.
6. CONSTRUCTION MANAGER (CM) / GENERAL CONTRACTOR (GC) TO REVIEW
ENTIRE SET OF CONSTRUCTION DOCUMENTS AND SHALL COORDINATE WORK
BETWEEN ALL TRADES. IF CONFLICTS ARISE DUE TO COORDINATION OF
TRADES, CM / GC IS TO VERIFY CONFLICT WITH OWNER'S REPRESENTATIVE
PRIOR TO CONSTRUCTION / INSTALLATION OF CONFLICTING ITEMS.
7. PATCH ALL EXPOSED INTERIOR AND EXTERIOR WALLS WHERE ATTACHED OR
IMBEDDED ITEMS WERE REMOVED.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATIONS OF THE
FLOORS, WALLS, AND CEILINGS FOR NEW FINISHES.
9. MAINTAIN FIRE RATING AT ALL ASSEMBLIES WHERE OPENINGS PENETRATIONS,
EMBEDMENT, RECESSED EQUIPMENT, ACCESSORIES, ETC. DISRUPT THE
CONTINUITY OF THE RATING
10. REMOVE ADHESIVE/OR MORTAR LEFT FROM THE REMOVAL OF EXISTING FLOOR
COVERING AND PREP FLOOR W/CONCRETE (OR FLORSTONE) AS NECESSARY TO
ACCOMMODATE NEW FLOOR COVERINGS.
11. ALL DIMENSIONS ARE FROM FACE OF STUD, C.M.U., OR CONCRETE , U.N.O.
12. PROVIDE ISOLATION MATERIAL BETWEEN DISSIMILAR MATERIALS THAT ARE IN
CONTACT WITH ONE ANOTHER
13. PATCH & REPAIR ALL MAJOR & MINOR BLEMISHES AS REQ'D. DUE TO
DEMOLITION WORK. MATCH ADJACENT MATERIAL & COLOR.
14. PROVIDE SOLID, CONTINUOUS, NON COMBUSTIBLE BLOCKING AT LOCATIONS
WHERE MILLWORK, PLUMBING FIXTURES, EQUIP., ETC. ATTACH TO WALL OR
CEILING.
GENERAL NOTES:
02_A-101
02_A-101
2-3
2-1-A
2-C-1.8 2-E-1
PROVIDE TEMPORARY
PROTECTIVE PLASTIC
BARRIER WITH ZIPPERED
ENTRY FROM FLOOR TO THE
BOTTOM OF THE CEILING
PROVIDE WALK
OFF MATS DURING
CONSTRUCTION
DO NOT FASTEN
TEMPORARY PARTITION TO
EXISTING FINISHED FLOOR
050501012121 21212525 2525
2222 2222
7'
- 9
" V
IF
9'
- 7
" V
IF
5' - 8" VIF
7' - 5" VIF
5' - 2" VIF
7' - 7" VIF
8'
- 4
" V
IF
7" V
IF
ELEV
E1
ELEV
E2
ELEVATOR
MECHANICAL
1119E
2828 2828
02_A-101
02_A-101
2-3
2-1-A
2-C-1.8 2-E-1
PROVIDE TEMPORARY
PROTECTIVE PLASTIC
BARRIER WITH ZIPPERED
ENTRY FROM FLOOR TO THE
BOTTOM OF THE CEILING
PROVIDE WALK
OFF MATS DURING
CONSTRUCTION
DO NOT FASTEN
TEMPORARY PARTITION TO
EXISTING FINISHED FLOOR
0404 0505
040405050101
2121 21212525 2525
42422222 42422222
7'
- 9
" V
IF
9'
- 7
" V
IF
5' - 8" VIF
7' - 5" VIF
5' - 2" VIF
7' - 7" VIF
8'
- 4
" V
IF
7" V
IF
ELEV
E1
ELEVATOR
EQUIP
018E
ELEV
E2
2828 2828
02_A-101
02_A-101
2-3
2-1-A
2-C-1.8 2-E-1
ELEVATOR
EQUIP
02_A-101
02_A-101
2-3
2-1-A
2-C-1.8 2-E-1
PROVIDE TEMPORARY
PROTECTIVE PLASTIC
BARRIER WITH ZIPPERED
ENTRY FROM FLOOR TO THE
BOTTOM OF THE CEILING
PROVIDE WALK
OFF MATS DURING
CONSTRUCTION
DO NOT FASTEN
TEMPORARY PARTITION TO
EXISTING FINISHED FLOOR
050501012121 21212525 2525
0808 0808
3131 3232
3333 3434
3535 3636
3737 3838
3131 3232
3333 3434
3535 3636
3737 3838
5' - 8" VIF
7' - 5" VIF
7'
- 9
" V
IF
9'
- 7
" V
IF
8'
- 4
" V
IF
7" V
IF
5' - 2" VIF
7' - 7" VIF
ELEV
E1
STORAGE
2225A
ELEV
E2
2828 2828
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
TYPE OF CONSTRUCTION / PROJECT ACTIVITY TABLE
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES, BUT IS NOT LIMITED TO:
- REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 20 LN FT TILE PER 160 SQ. FT. SPACE.
- PAINTING (BUT NOT SANDING)
- WALLCOVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH NO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION
- PATCHING WALLS - NOT EXCEEDING 8 SQ FT
TYPE
A
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST
INCLUDES, BUT IS NOT LIMITED TO:
- INSTALLATION OF TELEPHONE AND COMPUTER CABLING
- ACCESS TO CHASE SPACES
- CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED
- PATCHING WALLS - EXCEEDING 8 SQ FT
TYPE
B
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY
FIXED BUILDING COMPONENTS AND ASSEMBLIES OR NEW CONSTRUCTION
INCLUDES, BUT IS NOT LIMITED TO:
- SANDING OF WALLS FOR PAINTING OR WALL COVERING EXCEEDING 32 SQ. FT., OR VACANT AREAS
- REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK
- NEW WALL CONSTRUCTION
- UNCONTAINED DUCT, HVAC OR ELECTRICAL WORK ABOVE CEILINGS
- MAJOR CABLING ACTIVITIES
- ANY OTHER PROJECT WHERE HIGH LEVELS OR DUST ARE GENERATED
TYPE
C
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT IS NOT LIMITED TO:
- ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS
- REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM
- NEW CONSTRUCTION
TYPE
D
PATIENT RISK GROUP TABLE
- ADMINISTRATIVE OFFICES
- PUBLIC CORRIDORS
- ELEVATORS
- DAY ROOMS
- CANTEEN RETAIL STORE
- VACANT WARDS OR VACANT
ICU'S ETC.
GROUP 1
LOW RISK
- OUTPATIENT, URGENT CARE &
PRIMARY CARE CLINICS
- LABORATORY
- CARDIOLOGY
- ECHOCARDIOGRAPHY
- ENDOSCOPY
- FOOD SERVICES
- INTERIM CARE & MEDICAL
UNITS
- NUCLEAR MEDICINE
- PHARMACY
- PHYSICAL THERAPY
- RADIOLOGY & NUCLEAR
MEDICINE
- RESPIRATORY THERAPY
GROUP 2
MEDIUM RISK
- CCU
- EMERGENCY ROOM
- LABORATORY
- OUTPATIENT SURGERY
- PHARMACY
- POST ANESTHESIA CARE UNIT
- SURGICAL UNITS
GROUP 3
HIGH RISK
- ANY AREA CARING FOR
IMMUNICOMPROMISED
PATIENTS
- SPD STORAGE / STERILIZATION
- INTENSIVE CARE UNITS
- TB NEGATIVE PRESSURE
ISOLATION ROOMS
- OPERATING ROOM
GROUP 4
HIGHEST RISK
INFECTION CONTROL MATRIX - CLASS OF PRECAUTIONS:
CONSTRUCTION PROJECT BY PATIENT RISK
PATIENT RISK GROUP
CONSTRUCTION PROJECT TYPE
TYPE A
LOW RISK GROUP 1
MEDIUM RISK GROUP 2
HIGH RISK GROUP 3
HIGHEST RISK GROUP 4
TYPE B TYPE C TYPE D
I II II III / IV
I II II IV
I II III / IV IV
II III / IV III / IV IV
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY
AND RISK LEVEL INDICATE THAT CLASS III OR IV CONTROL PROCEDURES ARE NECESSARY
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION
CONTROL PRECAUTIONS DEPENDING UPON
THE AREA CLASS DESIGNATION
DURING CONSTRUCTION PROJECT
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING
DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED
FOR VISUAL INSPECTIONS.CL
AS
S
I
UPON COMPLETION OF PROJECT
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE
CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK
IS BEING PERFORMED.
CL
AS
S
II
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
3. WIPE WORK SURFACES WITH DISINFECTANT, WET MOP AND /
OR VACUUM WITH HEPA VACUUM BEFORE LEAVING WORK
AREA.
4. REMOVE ISOLATION OF HVAC.
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS
BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK,
PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE
COVERING UNLESS SOLID LID.
CL
AS
S
III
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
COMPLETED PROJECT IS INSPECTED BY THE ENVIRONMENTAL
HEALTH AND SAFETY AND INFECTION CONTROL AND
THOROUGHLY CLEANED BY ENVIRONMENTAL SANITATION
SECTION.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
4. WET MOP AREA WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
1. OBTAIN INFECTION CONTROL PERMIT BEFORE
CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING
DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL
CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
5. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES
APPROPRIATELY.
6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO
PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING
A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR
THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO
WEAR SHOE COVERS.
CL
AS
S
IV
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
COMPLETED PROJECT IS THOROUGHLY CLEANED BY
ENVIRONMENTAL MANAGEMENT.
2. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
3. WET MOP AREA WITH DISINFECTANT.
4. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
6. COVER TRANSPORT RECEPTACLES OR CARTS, TAPE
COVERING.
7. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
1. VA PREFERS THE USE OF HARD WALL PARTITIONS OVER THE
USE OF PLASTIC SHEETING FOR SEPARATION BETWEEN
CONSTRUCTION AND EXISTING SPACES TO REMAIN
FUNCTIONING. CONTRACTOR TO SUBMIT PROPOSED PLAN
FOR TEMPORARY CONSTRUCTION PARTITION LOCATIONS
FOR COR APPROVAL. TEMPORARY PARTITION LOCATIONS
SHOWN HERE ARE RECOMMENDED LOCATIONS BASED ON
WORK NEEDING TO BE COMPLETED, BUT DOES NOT
CONSTITUTE FINAL LOCATIONS OR QUANITITIES.
2. PROVIDE WALK-OFF MATS DURING CONSTRUCTION,
LOCATIONS ARE SUGGESTED, CONTRACTOR TO PROVIDE
FINAL LOCATION.
ICRA GENERAL NOTES
TEMPORARY CONSTRUCTION
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by VA Chief Engineer:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FO
R
CO
NS
TR
UC
TI
ON
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C:
\R ev it\2
0\2
5_ Ar ch _M eli ss a.N ap pi.
rvt
/13
/20
2:
:34 P
M
02_A-101
FLOOR PLANS AND SECTIONS -
E1 & E2
REPLACE ELEVATORS BUILDINGS
2, 7, 13, 39, 82
BATTLE CREEK, MI
515-21-103
B2
13DEC2021 KJH MRB
100% BID DOCUMENTS200115
1/4" = 1'-0"02_A-101
1 ELEVATOR SECTION - E1 & E2
1/4" = 1'-0"02_A-101
2 ELEVATOR SECTION - E1 & E2
CAR NOTES
ID NOTE
31 REMOVE AND REPLACE ENTIRE CAR FINISHES WITH NEW.
32 REMOVE AND REPLACE EXISTING HANDRAILS WITH NEW DOUBLE SET OF
STAINLESS STEEL HANDRAILS.
33 REMOVE AND REPLACE CAR OPERATING PANEL WITH NEW. MOUNTING
HEIGHT TO COMPLY WITH REQUIREMENTS LISTED WITHIN THE
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS).
34 REMOVE, SALVAGE AND REINSTALL EXISTING WALL MOUNTED ADVERTISING
FRAME. EACH ELEVATOR CAR TO HAVE 3-4 FRAMES, LOCATIONS TO MATCH
EXISTING.
35 REMOVE, SALVAGE AND REINSTALL EXISTING CAR SIGNAGE. LOCATION TO
MATCH EXISTING.
36 REMOVE AND REPLACE CAR DOOR OPERATOR WITH NEW.
37 REMOVE AND REPLACE CAR POSITION INDICATORS WITH NEW.
38 REMOVE SLIDE GUIDES AND REPLACE WITH ROLLER GUIDE ASSEMBLIES.
39 EXISTING CAR PLATFORM AND FRAME TO REMAIN. CONTRACTOR TO ASSESS
CAR PLATFORM AND ADD REINFORCEMENT AS REQ'D.
1/4" = 1'-0"
FLOOR PLAN - FIRST LEVEL - E1 & E2
1/4" = 1'-0"
FLOOR PLAN - GROUND LEVEL - E1 & E2
1/4" = 1'-0"
FLOOR PLAN - ATTIC LEVEL - E1 & E2
1/4" = 1'-0"
FLOOR PLAN - SECOND LEVEL - E1 & E2
CORRIDOR NOTES
ID NOTE
01 REMOVE DUAL RISER HALL STATIONS AND REPLACE WITH A SINGLE RISER
HALL STATION TO CONTROL BOTH ELEVATOR 1 AND 2. HALL STATION LOCATED
AT ELEVATOR 1 IS TO BE REMOVED IN ITS ENTIRETY. HALL STATION LOCATED
IN THE CENTER OF ELEVATOR 1 AND 2 IS TO REUSE FIXTURE BOX IF POSSIBLE.
PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO
MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW
FINISHES.
02 REMOVE AND REPLACE SINGLE RISER HALL STATION WITH NEW LOCATED
WITHIN EXISTING FIXTURE BOX, REPLACE EXISTING FIXTURE BOX AS
REQUIRED TO ACCOMODATE NEW HALL STATION. PATCH AND REPAIR
ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING
AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
03 REMOVE AND REPLACE SINGLE RISER HALL STATION AND FIXTURE BOX WITH
NEW. MOUNTING HEIGHT TO COMPLY WITH REQUIREMENTS LISTED WITHIN
THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS).
PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO
MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW
FINISHES.
04 REMOVE HALL LANTERNS IN ITS ENTIRETY.
05 REMOVE AND REPLACE HALL POSITION INDICATORS WITH NEW COMBINATION
LANTERN/POSITION INDICATOR.
06 REMOVE, SALVAGE AND REINSTALL EXISTING SIGNAGE AS REQ'D TO INSTALL
NEW HALL STATIONS, HALL LANTERNS, HALL POSITION INDICATERS, ETC.
LOCATION AND MOUNTING HEIGHT TO COMPLY WITH REQUIREMENTS LISTED
WITHIN THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD
(ABAAS). PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF
REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR PROPER
INSTALLATION OF NEW FINISHES.
07 REMOVE FIRE DEPARTMENT EMERGENCY LIGHT INDICATOR IN ITS ENTIRETY.
08 PROVIDE ACCESS STATION, CENTER TO KEYSWITCH TO BE MOUNTED 72"
A.F.F.
09 PATCH AND REPAIR WALL(S) AS REQ'D TO MATCH EXISTING AND MAKE LIKE
NEW AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES. PROVIDE
SEALANT AROUND ALL DISSIMILAR MATERIALS. PROVIDE WALL COVERING OR
PAINT TO MATCH EXISTING. SEE PLAN FOR EXTENTS OF AREA OF WORK.
EQUIPMENT NOTES
ID NOTES
40 REMOVE EXISTING CONTROLLER AND INSTALL NEW, LOCATION TO BE
DETERMINED BY ELEVATOR CONTRACTOR.
41 REMOVE AND REPLACE EXISTING PUMP UNIT WITH NEW, INCLUDING TANK,
VALVES, PUMP, MOTOR, AND MUFFLER.
42 CONTRACTOR TO PROVIDE MEANS TO COLLECT OIL AT EXISTING CYLINDER
AND RETURN AUTOMATICALLY TO EXISTING OIL RESERVOIR.
43 REMOVE AND REPLACE EXISTING TRACTION MACHINE WITH NEW. INCLUDE
BEDPLATE MOUNTED DEFLECTOR SHEAVE, DRIVE MOTOR AND STEEL HOIST
ROPES.
44 REMOVE AND REPLACE EXISTING GOVERNOR ASSEMBLY AND GOVERNOR
TAIL SHEAVE WITH NEW.
HOISTWAY NOTES
ID NOTE
20 REMOVE AND REPLACE HOISTWAY STAINLESS STEEL DOOR FRAME, DOOR
PANELS, DOOR SILL, AND DOOR EQUIPMENT WITH NEW.
21 POLISH EXISTING HOISTWAY STAINLESS STEEL DOOR FRAMES AND DOOR
PANELS. EXISTING DOOR SILLS TO BE CLEANED AND SECURELY TIGHTENED
AND RETAINED.
22 CLEAN EXISTING HOISTWAY, RAILS AND TOP OF ELEVATOR CAB. PATCH AND
REPAIR WALL SURFACES TO MATCH EXISTING AND/OR AS REQUIRED FOR
PROPER INSTALLATION OF NEW FINISHES. REFER TO MATERIAL SELECTION
SCHEDULE.
23 CLEAN EXISTING HOISTWAY. PATCH AND REPAIR WALL SURFACES TO MATCH
EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW
FINISHES. REFER TO MATERIAL SELECTION SCHEDULE.
24 REMOVE AND REPLACE EXISTING IN-GROUND HYDRAULIC CYLINDER WITH
NEW.
25 REMOVE EXISTING FLOOR LANDING IDENTIFICATION LOCATED ON THE JAMBS
AT HOISTWAY ENTRANCES. PREPARE SURFACE FOR NEW FLOOR LANDING
IDENTIFICATION.
26 PROVIDE FLOOR LANDING IDENTIFICATION TO BE LOCATED ON THE JAMBS AT
HOISTWAY ENTRANCES.
27 REMOVE AND SALVAGE FOR REINSTALLATION ELEVATOR NUMBER
IDENTIFICATION SIGN LOCATED ON HOISTWAY DOOR FRAME.
28 REMOVE SURFACE APPLIED GRAPHIC FROM EXISTING HOISTWAY STAINLESS
STEEL DOOR PANELS.
29 PROVIDE ELEVATOR NUMBER IDENTIFICATION SIGN TO BE LOCATED CENTER
ON HOISTWAY DOOR FRAME. MATCH BUILDING 2 SIGNAGE.
Revisions: Date:
ASBESTOS NOTES
ID NOTES
50 EXISTING FLOORING AND/OR MASTIC CONTAINS ASBESTOS PER THE
ASBESTOS SURVEY PROVIDED BY THE VA. ASBESTOS CONTAINING
MATERIALS TO BE REMOVED PER THE SPECIFICATIONS AND REGULATIONS.
02_A-102
2-3
2-A
2-A1
DO NOT FASTEN
TEMPORARY PARTITION TO
EXISTING FINISHED FLOOR
ELEC
1192E
PROVIDE TEMPORARY PROTECTIVE
PLASTIC BARRIER WITH ZIPPERED
ENTRY FROM FLOOR TO THE BOTTOM
OF THE CEILING
PROVIDE WALK
OFF MATS DURING
CONSTRUCTION
09092323
ELEV
E35'
- 9 " V
IF
7'
- 5
" V
IF
7' - 9" VIF
9' - 8" VIF
02_A-102
2-3
2-A
2-A1
PROVIDE TEMPORARY PROTECTIVE
PLASTIC BARRIER WITH ZIPPERED
ENTRY FROM FLOOR TO THE BOTTOM
OF THE CEILING
PROVIDE WALK
OFF MATS DURING
CONSTRUCTION
DO NOT FASTEN
TEMPORARY PARTITION TO
EXISTING FINISHED FLOOR
DISBATCH
09092323 2424 4242
ELEV
E35'
- 9 " V
IF
7'
- 5
" V
IF
7' - 9" VIF
9' - 8" VIF
02_A-102
2-3
2-A
2-A1
DO NOT FASTEN
TEMPORARY PARTITION TO
EXISTING FINISHED FLOOR
ELEVATOR
EQUIP
2273A
STORAGE
PPROVIDE TEMPORARY PROTECTIVE
PLASTIC BARRIER WITH ZIPPERED
ENTRY FROM FLOOR TO THE BOTTOM
OF THE CEILING
PROVIDE WALK
OFF MATS DURING
CONSTRUCTION
27273030
7' - 9" VIF
9' - 8" VIF
5'
- 9
" V
IF
7'
- 5
" V
IF
ELEV
E3
CAMPUS - SITE
LEVEL
920' - 1"
B02 - GROUND
FLOOR
918' - 7"
B02 - FIRST FLOOR
928' - 7"
B02 - SECOND
FLOOR
940' - 7"
B02 - FOUNDATION
915' - 9"
B02 - ROOF
952' - 6"
7" V
IF
4'
- 0
" V
IF
ELEV
E3
2424 4242
1. SUB-CONTRACTORS ARE TO COORDINATE WORK WITH ALL OTHER TRADES.
2. CONFLICTS BETWEEN NOTES, DETAILS, SPECIFICATIONS, ETC., SHALL BE
VERIFIED WITH THE OWNER'S REPRESENTATIVE OR THE MOST STRINGENT
PROVISIONS SHALL GOVERN.
3. DETAILS OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE SAME
NATURE AS SHOWN FOR SIMILAR CONDITIONS. ANY UNCLEAR CONDITIONS
SHALL BE VERIFIED WITH OWNER'S REPRESENTATIVE PRIOR TO
CONSTRUCTION OF THAT AREA.
4. DRAWINGS ARE NOT TO BE SCALED. ANY UNCLEAR DIMENSIONS OR
DIMENSIONAL DISCREPANCIES SHALL BE VERIFIED WITH OWNER'S
REPRESENTATIVE.
5. ALL EXISTING CONDITIONS AND ALL RELATED DIMENSIONS INDICATED IN THE
CONTRACT DOCUMENTS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION,
ERECTION, AND/OR CONSTRUCTION. ANY CONDITIONS THAT DIFFER FROM THAT
INDICATED IN THE CONTRACT DOCUMENTS SHALL BE SUBMITTED TO THE
OWNER'S REPRESENTATIVE FOR REVIEW PRIOR TO FABRICATION, ERECTION,
AND/OR CONSTRUCTION.
6. CONSTRUCTION MANAGER (CM) / GENERAL CONTRACTOR (GC) TO REVIEW
ENTIRE SET OF CONSTRUCTION DOCUMENTS AND SHALL COORDINATE WORK
BETWEEN ALL TRADES. IF CONFLICTS ARISE DUE TO COORDINATION OF
TRADES, CM / GC IS TO VERIFY CONFLICT WITH OWNER'S REPRESENTATIVE
PRIOR TO CONSTRUCTION / INSTALLATION OF CONFLICTING ITEMS.
7. PATCH ALL EXPOSED INTERIOR AND EXTERIOR WALLS WHERE ATTACHED OR
IMBEDDED ITEMS WERE REMOVED.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATIONS OF THE
FLOORS, WALLS, AND CEILINGS FOR NEW FINISHES.
9. MAINTAIN FIRE RATING AT ALL ASSEMBLIES WHERE OPENINGS PENETRATIONS,
EMBEDMENT, RECESSED EQUIPMENT, ACCESSORIES, ETC. DISRUPT THE
CONTINUITY OF THE RATING
10. REMOVE ADHESIVE/OR MORTAR LEFT FROM THE REMOVAL OF EXISTING FLOOR
COVERING AND PREP FLOOR W/CONCRETE (OR FLORSTONE) AS NECESSARY TO
ACCOMMODATE NEW FLOOR COVERINGS.
11. ALL DIMENSIONS ARE FROM FACE OF STUD, C.M.U., OR CONCRETE , U.N.O.
12. PROVIDE ISOLATION MATERIAL BETWEEN DISSIMILAR MATERIALS THAT ARE IN
CONTACT WITH ONE ANOTHER
13. PATCH & REPAIR ALL MAJOR & MINOR BLEMISHES AS REQ'D. DUE TO
DEMOLITION WORK. MATCH ADJACENT MATERIAL & COLOR.
14. PROVIDE SOLID, CONTINUOUS, NON COMBUSTIBLE BLOCKING AT LOCATIONS
WHERE MILLWORK, PLUMBING FIXTURES, EQUIP., ETC. ATTACH TO WALL OR
CEILING.
GENERAL NOTES:
architecture · engineering
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by VA Chief Engineer:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FO
R
CO
NS
TR
UC
TI
ON
ENGINEERS · SURVEYORS · CONSULTANTS ·
LANDSCAPE ARCHITECTS · LAND PLANNERS
298 VETERANS DRIVE
FOWLERVILLE,
MICHIGAN 48836
(OFFICE) 517-223-3512
(FAX) 517-223-9987
211 E. Water Street, Suite 213L
Kalamazoo, MI 49007 269.216.0222
VA STATION
Battle Creek VA Medical Center
5500 Armstrong Road
Battle Creek, MI 49037
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
C:
\R ev it\2
0\2
5_ Ar ch _M eli ss a.N ap pi.
rvt
/13
/20
2:
:35 P
M
02_A-102
FLOOR PLANS AND SECTIONS -
E3
REPLACE ELEVATORS BUILDINGS
2, 7, 13, 39, 82
BATTLE CREEK, MI
515-21-103
B2
13DEC2021 KJH MRB
100% BID DOCUMENTS200115
1/4" = 1'-0"
FLOOR PLAN - FIRST LEVEL - E3
1/4" = 1'-0"
FLOOR PLAN - GROUND LEVEL - E3
1/4" = 1'-0"
FLOOR PLAN - SECOND LEVEL - E3
1/4" = 1'-0"02_A-102
1 ELEVATOR SECTION - E3
DEDUCTIVE ALTERNATE 2 - BUILDING 2, ELEVATOR 3
Revisions: Date:
CAR NOTES
ID NOTE
30 REMOVE EXISTING CAR IN ITS ENTIRETY AND PROVIDE NEW CAR IN ITS
ENTIRETY. INCLUDING NEW PLATFORM, CAR ROLLER GUIDES, CAR DOOR
PANELS WITH PROTECTION DEVICE, CAR OPERATING PANEL, CAR SHELL WITH
NEW FINISHES, DOUBLE SET OF STAINLESS STEEL HANDRAILS, CAR SIGNAGE,
(4) WALL MOUNTED ADVERTISING FRAMES, AND ALL OTHER ASSOCIATED
PARTS AND PIECES RELATED TO A NEW INSTALL.
CORRIDOR NOTES
ID NOTE
01 REMOVE DUAL RISER HALL STATIONS AND REPLACE WITH A SINGLE RISER
HALL STATION TO CONTROL BOTH ELEVATOR 1 AND 2. HALL STATION LOCATED
AT ELEVATOR 1 IS TO BE REMOVED IN ITS ENTIRETY. HALL STATION LOCATED
IN THE CENTER OF ELEVATOR 1 AND 2 IS TO REUSE FIXTURE BOX IF POSSIBLE.
PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO
MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW
FINISHES.
02 REMOVE AND REPLACE SINGLE RISER HALL STATION WITH NEW LOCATED
WITHIN EXISTING FIXTURE BOX, REPLACE EXISTING FIXTURE BOX AS
REQUIRED TO ACCOMODATE NEW HALL STATION. PATCH AND REPAIR
ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING
AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
03 REMOVE AND REPLACE SINGLE RISER HALL STATION AND FIXTURE BOX WITH
NEW. MOUNTING HEIGHT TO COMPLY WITH REQUIREMENTS LISTED WITHIN
THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS).
PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF REMOVAL TO
MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW
FINISHES.
04 REMOVE HALL LANTERNS IN ITS ENTIRETY.
05 REMOVE AND REPLACE HALL POSITION INDICATORS WITH NEW COMBINATION
LANTERN/POSITION INDICATOR.
06 REMOVE, SALVAGE AND REINSTALL EXISTING SIGNAGE AS REQ'D TO INSTALL
NEW HALL STATIONS, HALL LANTERNS, HALL POSITION INDICATERS, ETC.
LOCATION AND MOUNTING HEIGHT TO COMPLY WITH REQUIREMENTS LISTED
WITHIN THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD
(ABAAS). PATCH AND REPAIR ADJACENT WALL SURFACES AT AREAS OF
REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR PROPER
INSTALLATION OF NEW FINISHES.
07 REMOVE FIRE DEPARTMENT EMERGENCY LIGHT INDICATOR IN ITS ENTIRETY.
08 PROVIDE ACCESS STATION, CENTER TO KEYSWITCH TO BE MOUNTED 72"
A.F.F.
09 PATCH AND REPAIR WALL(S) AS REQ'D TO MATCH EXISTING AND MAKE LIKE
NEW AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES. PROVIDE
SEALANT AROUND ALL DISSIMILAR MATERIALS. PROVIDE WALL COVERING OR
PAINT TO MATCH EXISTING. SEE PLAN FOR EXTENTS OF AREA OF WORK.
EQUIPMENT NOTES
ID NOTES
40 REMOVE EXISTING CONTROLLER AND INSTALL NEW, LOCATION TO BE
DETERMINED BY ELEVATOR CONTRACTOR.
41 REMOVE AND REPLACE EXISTING PUMP UNIT WITH NEW, INCLUDING TANK,
VALVES, PUMP, MOTOR, AND MUFFLER.
42 CONTRACTOR TO PROVIDE MEANS TO COLLECT OIL AT EXISTING CYLINDER
AND RETURN AUTOMATICALLY TO EXISTING OIL RESERVOIR.
43 REMOVE AND REPLACE EXISTING TRACTION MACHINE WITH NEW. INCLUDE
BEDPLATE MOUNTED DEFLECTOR SHEAVE, DRIVE MOTOR AND STEEL HOIST
ROPES.
44 REMOVE AND REPLACE EXISTING GOVERNOR ASSEMBLY AND GOVERNOR
TAIL SHEAVE WITH NEW.
HOISTWAY NOTES
ID NOTE
20 REMOVE AND REPLACE HOISTWAY STAINLESS STEEL DOOR FRAME, DOOR
PANELS, DOOR SILL, AND DOOR EQUIPMENT WITH NEW.
21 POLISH EXISTING HOISTWAY STAINLESS STEEL DOOR FRAMES AND DOOR
PANELS. EXISTING DOOR SILLS TO BE CLEANED AND SECURELY TIGHTENED
AND RETAINED.
22 CLEAN EXISTING HOISTWAY, RAILS AND TOP OF ELEVATOR CAB. PATCH AND
REPAIR WALL SURFACES TO MATCH EXISTING AND/OR AS REQUIRED FOR
PROPER INSTALLATION OF NEW FINISHES. REFER TO MATERIAL SELECTION
SCHEDULE.
23 CLEAN EXISTING HOISTWAY. PATCH AND REPAIR WALL SURFACES TO MATCH
EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW
FINISHES. REFER TO MATERIAL SELECTION SCHEDULE.
24 REMOVE AND REPLACE EXISTING IN-GROUND HYDRAULIC CYLINDER WITH