36C25022B0037 0002.docx

DOCX document 103 KB Posted

Attached to
Z1DA--Replace Elevators Building 2, 7, 13, 39 & 82 515-21-103 Federal contract opportunity
Solicitation number
36C25022B0037
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document provides details for a federal contract opportunity to replace elevators at multiple buildings of the Veterans Affairs Medical Center in Battle Creek, Michigan. The scope of work involves removing existing elevators from Buildings 2, 7, 13, 39 and 82 and installing new elevators. The period of performance is 730 calendar days from notice to proceed. The NAICS code is 238990 with a small business size standard of $16.5 million. The estimated value is between $1-5 million. The contract type will be firm fixed price. The acquisition is reserved as a 100% set-aside for qualified Service-Disabled Veteran-Owned Small Businesses. The solicitation is expected to be issued on June 3, 2022 via beta.SAM.gov and all bids are due by the date specified in the solicitation. Questions must be submitted in writing by the deadline in the solicitation.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25022B0037 – P00002 – 515-21-103 – Replace Elevators Building 2, 7, 13, 39 & 82 – VAMC Battle Creek, MI

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

08-05-2022

515-21-103 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 6100 Oak Tree Blvd., Suite 400

Independence OH 44131

Same as #6

To all Offerors/Bidders

36C25022B0037 08-05-2022

X

The purpose of this Amendment is:

1. To change the Bid Opening date to August 16, 2022, at 3:00 PM EDT.

2. To provide Responses to all Request for Information (RFI's).

3. To provide the Pre-Bid Site Visit Attendance Log.

End of Amendment 0002.

SCOTT D. BRENNAN

Contract Specialist

NCO1115LE-0962

**HOUR & DATE for Receipt of Offer is: ***August 16, 2022, at 3:00pm*** 36C25022B0037 – P00002 – 515-21-103 – Replace Elevators Building 2, 7, 13, 39 & 82 – VAMC Battle Creek, MI

THE FOLLOWING ANSWERS TO REQUESTS FOR INFORMATION QUESTIONS ARE HEREBY PROVIDED TO CLARIFY, UPDATE, REVISE OR CORRECT CONTRACT SPECIFICATION AND/OR DRAWINGS.

QUESTION AND ANSWER 1

Specification and Section: Page 330, 14 24 10 – 20/39 2.20(A) Q1: Elevator P3 is increasing in rated capacity, which will increase the size of guide rail needed. In the above referenced section, it is stated "no additional structural points of rail attachment will be provided”. Will the VA provide engineered drawings that support this statement?

A1: The VA will not be providing engineered drawings. The successful Contractor shall provide a drawing showing the new bracket spacing. If additional rail attachments are required, the Contractor shall have the bracket spacing reviewed by a structural engineer and the information forwarded to the VA. The cost of the structural engineer and any additional rail attachments shall be included in the Contractor’s bid.

QUESTION AND ANSWER 2

Specification and Section: Page 312, 14 24 10 – 2/39 Q2: Will the VA please provide engineered drawings to support increasing the rated load of building 2, elevator P3 to 5500lbs.? This increase in rated load will require changes in the building structure at the pit level, increase in hydraulic jack hole size, casing and jack size, and hoist way structural changes.

A2: The VA will not be providing engineered drawings. Successful contractor shall only be responsible for providing the elevator design and reaction numbers. A/E will take design information and reaction numbers and do a structural analysis of the existing shafts and provide a bulletin if required for any additional structural support for the new elevator. For installation of secondary containment casing for the jack: Remove a 3’-0” square hole in the pit floor to facilitate installation of protective secondary containment casing. Fill hole with concrete after jack installation and seal pit with non-permeable epoxy.

QUESTION AND ANSWER 3

Specification and Section: Page 272, 14 21 10 – 2/40. Elevator Schedule for Building 82, Elevator 1.

Q3: Sheave diameter and width will be increased, and machine weight will also be increased to accommodate the requested increase in capacity. Load bearing structure (existing) for rails and rail brackets and supports should also be increased to accommodate increase in load capacity and seismic requirements. Would the VA Please provide dimension data on existing machine beams embedded in concrete and structural capabilities, which supports the specification to provide a clear inside platform dimension of 5’4” x 7’3” yet still accomplish the increase in capacity from 3500lbs. to 5500lbs.?

A3: The VA will not be providing engineered drawings. No existing As-builts are available, the contractor is to verify in field of existing conditions. Successful contractor shall only be responsible for providing the elevator design and reaction numbers. A/E will take design information and reaction numbers and do a structural analysis of the existing shafts and provide a bulletin if required for any additional structural support for the new elevator.

QUESTION AND ANSWER 4

Specification and Section: Page 290, 14 21 10 – 20/40 2.23(A) Q4: Would the VA Please provide engineered drawings showing the existing buildings pit, hoist way, and machine room can support the increased reactions that will be present when the elevator safety device sets? Due to the increased rated load from 3500lbs. to 5500lbs. for Building 82, Elevator #1, the reactions will be vastly different from the reactions the building was currently engineered to withstand.

A4: No existing As-Builts are available, contractor is to verify in field of existing conditions. The VA will not be providing engineered drawings. Successful contractor shall only be responsible for providing the elevator design and reaction numbers. A/E will take design information and reaction numbers and do a structural analysis of the existing shafts and provide a bulletin if required for any additional structural support for the new elevator.

QUESTION AND ANSWER 5

Specification and Section: Page 300, 14 21 10 – 30/40 2.45(A)

Q5: Existing hoist way dimensions will not accommodate the increased platform size required to increase the rated load from 3500lbs. to 5500lbs. on Building 82 Elevator #1. Would the VA Please provide engineering data on existing hoist way construction and load bearing capabilities of the existing hoist way and the engineering plan to increase the dimensions of the hoist way and Pit to accommodate the increased load capabilities on the car platform?

A5: No existing As-Builts are available, contractor is to verify in field of existing conditions. Platform size is to remain the same size as the existing car while increasing the weight limit of the elevator.

Successful contractor shall only be responsible for providing the elevator design and reaction numbers.

A/E will take design information and reaction numbers and do a structural analysis of the existing shafts and provide a bulletin if required for any additional structural support for the new elevator.

QUESTION AND ANSWER 6

Specification and Section: Page 292, 14 21 10 – 22/40 2.34(C) Q6: Are card readers required on each elevator, or only Building 82 elevator #1?

A6: All elevators are to receive card readers.

QUESTION AND ANSWER 7

Specification and Section: Page 288, 14 21 10 – 18/40 2.15(A) Q7: Would the VA please Provide engineered data of the existing building structure to show the existing machine beams supports are adequate for the increase in rated load for elevator from 3500lbs. to 5500lbs. for Building 82, Elevator #1? Sheave diameter and width will be increased, and machine weight will also be increased to accommodate the requested increase in capacity. Load bearing structure (existing) for rails and rail brackets and supports should also be increased to accommodate increase in load capacity and seismic requirements.

A7: No existing As-Builts are available, contractor is to verify in field of existing conditions. The VA will not be providing engineered drawings. Successful contractor shall only be responsible for providing the elevator design and reaction numbers. A/E will take design information and reaction numbers and do a structural analysis of the existing shafts and provide a bulletin if required for any additional structural support for the new elevator.

QUESTION AND ANSWER 8

Specification and Section: Page 290, 14 21 10 – 20/40 2.27(A)

Q8: Would the VA please provide engineered drawings of the existing hoist way supports and load bearing capabilities for increased rail and bracket sizes and quantities to accommodate requested increased capacity for elevator from 3500lbs. to 5500lbs. for Building 82, Elevator #1?

A8: No existing As-Builts are available, contractor is to verify in field of existing conditions. The VA will not be providing engineered drawings. Successful contractor shall only be responsible for providing the elevator design and reaction numbers. A/E will take design information and reaction numbers and do a structural analysis of the existing shafts and provide a bulletin if required for any additional structural support for the new elevator.

QUESTION AND ANSWER 9

Specification and Section: Page 290, 14 21 10 – 20/40 2.26 Q9: Would the VA please provide engineered drawings of the existing building hoist way structure, and pit structure, to show they can support the new increased weight on the counterweights (+ 40%) and that the dimensions of the hoist way will accommodate them, as there will be an increase in the length of counterweight frame, necessary overhead space, etc. to accomplish the increase of rated load from 3500lbs. to 5500lbs. for Building 82, Elevator #1?

A9: No existing As-Builts are available, contractor is to verify in field of existing conditions. The VA will not be providing engineered drawings. Successful contractor shall only be responsible for providing the elevator design and reaction numbers. A/E will take design information and reaction numbers and do a structural analysis of the existing shafts and provide a bulletin if required for any additional structural support for the new elevator.

QUESTION AND ANSWER 10

Q10: Will the VA allow the contractor to install roof access hatches in the roof of each traction elevator machine room, to accommodate removal and installation of new traction machines and equipment via crane?

A10: The following building will not require a roof access hatch: Building 2, 39 and 82. Attachment - Section 07 71 00 with all noted product submission will be required for approval, prior to installation. Contractor's desired location of hatch will need approval, prior to installation. Installation of roof hatch shall not void warranty of the existing roof.

End of RFI Questions and Answers for Amendment 0002

ATTACHMENT

See attached document: S04 - Pre-Bid Site Visit Attendance Log - 515-21-103.