Mechanical Drawings.pdf
PDF 10 MB Posted
- Attached to
- Z1DA--SPD Storage Temp and Humidity Controls Project 541-21-101 Federal contract opportunity
- Solicitation number
- 36C25021B0017
About this file
This document provides notice of a modification to a pre-solicitation for temperature and humidity controls at a Sterile Processing Department storage facility. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is seeking these services from a service-disabled veteran owned small business. The duration of the project has been increased from 120 to 210 calendar days from notice to proceed. All other terms and conditions remain unchanged. Questions regarding the opportunity should be emailed to the specified contact by the stated deadline.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Attendance Roster Provide Temp and Humidity Controls.pdf | ||
| 36C25021B0017 0005.docx | DOCX document | |
| Bid Abstract Provide Temp and Humidity Controls CLE VAMC.pdf | ||
| 36C25021B0017 0004.docx | DOCX document | |
| 541-21-101 Bid Opening Instructions - Revised.pdf | ||
| 013526_Safety Requirements 2020 Update ADD 1.pdf | ||
| 21-0416 Provide Temperature and Humidity Controls - ADDENDUM 1 - Drawings.pdf | ||
| 36C25021B0017 0003.docx | DOCX document | |
| 36C25021B0017 0002.docx | DOCX document | |
| 541-21-101 Bid Opening Instructions.pdf | ||
| Sign-in Sheet - Site Visit - Provide Temperature and Humidity Controls to SPD Storage.pdf | ||
| 36C25021B0017 0001.docx | DOCX document | |
| Site Visit - 10701 East Blvd - Google Maps.pdf | ||
| Technical Specifications.pdf | ||
| 36C25021B0017_1.docx | DOCX document | |
| Architectural Drawings.pdf | ||
| Wage Determination 02.2021.pdf | ||
| VHA DIRECTIVE 1192.01.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE: ALL SYMBOLS AND ABBREVIATIONS
ARE SUBJECT TO MODIFICATIONS
ON OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS
MIGHT NOT NECESSARILY BE USED ON
THIS PROJECT.
ABBREVIATIONS
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
AFMS - AIR FLOW MEASURING STATION
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
ATC - AUTOMATIC TEMPERATURE CONTROL
(SYNONYMOUS W ITH BAS)
BAS - BUILD ING AUTOMATION SYSTEM
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILD ING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CFCI - CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CFM - CUBIC FEET PER MINUTE
CHS - CHILLED W ATER SUPPLY
CHR - CHILLED W ATER RETURN
CHGR - CHILLED W ATER GLYCOL SOLUTION RETURN
CHGS - CHILLED W ATER GLYCOL SOLUTION SUPPLY
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
COR - CONTRACTING OFFICERS REPRESENTATIVE
CO2 - CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
CTR - CENTER
CU - COPPER
CW - COLD W ATER
CW R - CONDENSER W ATER RETURN
CW S - CONDENSER W ATER SUPPLY
D - DRAIN LINE
DB - DRY BULB
DDC - D IRECT D IGITAL CONTROLS
DI - DEIONIZED W ATER
DIA - D IAMETER
DIM - D IMENSION
DN - DOW N
DW G - DRAW ING
EA - EACH OR EXHAUST AIR
EAT - ENTERING AIR TEMPERATURE
E - ELECTRICAL (DIVISION 26)
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
EQS - EQUIPMENT SUPPLIER
EW T - ENTERING W ATER TEMPERATURE
EXH - EXHAUST
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
FD - FLOOR DRAIN
FF - FINISHED FLOOR ELEVATION
FLR - FLOOR
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FSC - FIRE SUPPRESSION (DIVISION 21)
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES
GPM - GALLONS PER MINUTE
HB - HOSE BIBB
H - HVAC (DIVISION 23)
HD - HUB DRAIN
HG - REFRIGERANT HOT GAS
HP - HORSEPOW ER
HPC - H IGH PRESSURE CONDENSATE RETURN
HPS - H IGH PRESSURE STEAM SUPPLY
HR - HOUR
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
HW - HOT W ATER
HW R - HEATING HOT W ATER RETURN
HW S - HEATING HOT W ATER SUPPLY
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
KE - KITCHEN EQUIPMENT
L - LENGTH
LAT - LEAVING AIR TEMPERATURE
LAV - LAVATORY
LBS - POUNDS
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LW T - LEAVING W ATER TEMPERATURE
MAX - MAXIMUM
MDD - MOTORIZED DAMPER
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MIN IMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE
RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - W ATER MAKE-UP
N/C - NORMALLY CLOSED
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NOM - NOMINAL
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OA - OUTDOOR AIR
OBD - OPPOSED BLADE DAMPER
OD - OUTSIDE DIAMETER
OFCI - OW NER FURNISHED CONTRACTOR
INSTALLED
OFOI - OW NER FURNISHED OW NER INSTALLED
P - PROPANE GAS
PC - PLUMBING (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PLBG - PLUMBING
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSIG - POUNDS PER SQUARE INCH GAUGE
RA - RETURN AIR
RAD - RADIUS
RCP - REFLECTED CEILING PLAN
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS W ATER SUPPLY
ROR - REVERSE OSMOSIS W ATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTIO N
S - SPRINKLER (W ET)
SA - SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD W ATER
SHT - SHEET
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SRV - SAFETY RELIEF VALVE
SS - STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TYP - TYPICAL
UNO - UNLESS NOTED OTHERW ISE
V - VENT
VAC - VACUUM
VAV - VARIABLE AIR VOLUME
VEL - VELO CITY
VIB - VALVE IN BOX
VOL - VOLUME
VTR - VENT THROUGH ROOF
VR - VENT RISER
W / - W ITH
W /O - W ITHOUT
W B - W ET BULB
W CO - W ALL CLEANOUT
GENERAL FLOOR PLAN NOTES
PLAN NOTE. APPLIES ONLY TO THE SHEET W HICH IT IS SHOW N UNLESS
NOTED OTHERW ISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
A1
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER DESIGNATIONS
REFER TO SCHEDULES.
H1 H1OR
EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO
SCHEDULES.
H2
B
H2
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
H2 = SHEET W HERE DETAIL IS LOCATED
SECTION: 1 = SECTION DESIGNATION
H2 = SHEET W HERE DETAIL IS LOCATED
A1 "UP TO" SYM BOL (ITEM ON FLOOR ABOVE)
APPROXIMATE DIMENSION ABOVE FIN ISHED FLOOR TO TOP OR BOTTOM OF
EQUIPMENT, UNLESS NOTED OTHERW ISE
10"
ELEV: 8' - 0"ELEV: 8' - 0"
TOD: 8' - 10"
BOD: 7' - 2"
20x20
20x20
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF
DUCTW ORK, UNLESS NOTED OTHERW ISE
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE OF PIPE,
UNLESS NOTED OTHERW ISE
DL-1
UC-X DOOR UNDERCUT. X = HEIGHT OF UNDERCUT IN INCHES; 0.75 INCH
UNDERCUT IF NO HEIGHT IS NOTED. COORDINATE W ITH GC.
DOOR LOUVER. 1 = SQUARE FEET OF LOUVER.
CONNECT TO EXISTING
HVAC PIPING DESIGNATIONS
CHILLED W ATER SUPPLY PIPECHS
CONDENSER W ATER SUPPLY PIPECW S
CONDENSER W ATER RETURN PIPECW R
DRAIN LINE. PITCH IN DIRECTION INDICATEDD
HEATING HOT W ATER SUPPLY PIPEHW S
HEATING HOT W ATER RETURN PIPEHW R
W ATER MAKE-UP PIPEMU
VENT PIPEV
REFRIGERANT LIQUID LINERL
REFRIGERANT SUCTION LINERS
EXPAN SION TAN K PIPEET
REFRIGERANT HOT GAS LINEHG
LOW PRESSURE CONDENSATE RETU RN PIPELPC
LOW PRESSURE STEAM SUPPLY PIPELPS
MEDIU M PRESSU RE CONDEN SATE RETUR N PIPEMPC
MEDIUM PRESSURE STEAM SUPPLY PIPEMPS
PUMPED CONDENSATE RETURN PIPEPC
HIGH PRESSURE CONDENSATE RETURN PIPEHPC
HIGH PRESSURE STEAM SUPPLY PIPEHPS
STEAM SUPPLY PIPE - NUMBER IND ICATES P.S.I.G.10
MISC SYMBOLS
DUCTWORK SYMBOLS
ROUND BRANCH DUCTW ORKCONICAL
FITTING
ACOUSTIC
FITTING
ACOUSTIC
FITTING
ADAD
D
R R
D
REC TANGULAR BR ANCH DUCTW ORK
SQUARE TEE W ITH TURNING VANES
NOTE: ALL SQUARE ELBOW S IN
RECTANGULAR AND ROUND / OVAL
DUCTW ORK SHALL BE PROVIDED W ITH
TURNING VANES. REFER TO
SPECIFICATIONS FOR ADDITIONAL DETAILS.
EXISTING DUCTW ORK TO REMOVED
RETURN AIR , RELIEF AIR, O R TRANSFER AIR
DUCTW ORK. (UP AND DOW N) RADIUSED
OR SQUARE W ITH TURNING VANES.
SUPPLY AIR OR OUTDOOR AIR DUCTW ORK.
(UP AND DOW N) RADIUSED OR SQUARE
W ITH TURNING VANES.
EXHAUST AIR DUCTW ORK. (UP AND DOW N)
RADIUSED OR SQUARE W ITH TURNING
VANES.
RECTANGULAR AND ROUND / OVAL
DUCTW ORK RISE / DROP W ITH 90° RADIUSED
OR SQUARE ELBOW S AND TURNING VANES.
RADIUS ELBOW
90° SQUARE ELBOW (W ITH TURNING VANES)
NOTE: ALL SQUARE ELBOW S IN
RECTANGULAR AND ROUND DUCTW ORK
SHALL BE PROVIDED W ITH TURNING VANES.
ACCESS DOOR OR PANEL
DUCTW ORK RISE IN DIRECTION OF AIR
FLOW
DUCTW ORK DROP IN DIRECTION OF AIR
FLOW
DUCTW ORK W ITH ACOUSTICAL LINER.
LISTED DUCT SIZES ARE INSIDE CLEAR
DIMENSIONS.
RECTANGULAR ROUND / OVAL
FLEXIBLE DUCTW ORK
FLEXIBLE CONNECTION
DUCTW ORK CONSTRUCTED OF SPECIAL
MATERIAL AS NOTED
DIRECTION OF PITCH
RECTANGULAR DUCTW ORK DIMENSIONS
(W x H)26x20
ROUND DUCTW ORK DIMENSIONS (DIA)26ø
OVAL DUCTW ORK DIMENSIONS (W x H)26x20 OV
DUCTWORK DEVICE SYMBOLS
W ALL OR DUCTW ORK MOUNTED AIR DEVICE. SG1 = DESIGNATION (REFER
TO AIR DEVICE SCHEDULE). 20x12 = DUCT CONNECTION SIZE (IN INCHES).
300 = REQUIRED CFM. 9'-0" = MOUNTING HEIGHT FROM FLOOR TO BOTTOM
OF GRILLE.
A3 10ø
MANUAL BALANCING DAMPER W ITH LOCKING DEVICE
BDD = BACK DRAFT DAMPER
CBD = COUNTER-BALANCED BACK DRAFT DAMPER
SD = SMOKE DAMPER
FS = COMBINATION FIRE - SMOKE DAMPER
MDD = MOTORIZED DAMPER
AFMS = AIR FLOW MEASURING STATION
DUCT MOUNTED SMOKE DETECTOR. COORDINATE LOCATION.
HUMIDITY SENSOR - DUCT MOUNTED
SG1
20x12
BOG : 9'-0"
XXX
A-D
XX
H
SD
SP
AIR DEVICE. A3 = DESIGNATION (REFER TO FLOOR PLANS AND AIR DEVIC E
SCH EDULE FOR VARIOUS DESIGNATION S).
10ø = NECK SIZE (IN INCHES). 300 = REQUIRED CFM. ALL AIR DEVICE
DISCHARGE 4-W AY UNLESS NOTED W ITH FLOW ARROW S. AIR DEVICE
SHOW N IS 2-W AY SIDE THROW . METHOD OF IDENTIFICATION ALSO APPLIES
TO OTHER CEILING MOUNTED AIR DEVICES.
FIRE DAMPER
A = TYPE (R EFER TO FLOOR PLANS FOR VARIOU S TYPES)
D OR S = DYNAMIC OR STATIC
STATIC PRESSU RE SENSOR - DUCT MOU NTED
C
CAR BON DIOXIDE SENSOR - DUCT MOUN TED
S
TEMPERATURE SEN SOR - DUCT MOU NTED
CHECK VALVE
T
P
FOB
FOT
SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
PRESSURE GAUGE
TEMPERATURE GAUGE OR THERMOMETER
COMBINATION SHUTOFF AND BALANCING VALVE
(REFER TO SPECIFICATIONS FOR REQUIRED
TYPE BASED ON APPLICATIONS)
BALL VALVE
BUTTER FLY VALVE
GATE VALVE
VALVES AND FITTINGS
DOUBLE LINE SINGLE LINE
10"
TOE: 3' - 0"
BOE: 0' - 6"
CHILLED W ATER GLYCOL SOLUTION RETUR N PIPECHGR
CHILLED W ATER GLYCOL SOLUTION SUPPLY PIPECHGS
CHILLED W ATER RETUR N PIPECHR
SQUARE THROAT / RADIUS HEEL
FITTINGS NOT ACCEPTABLE
PIPING SYMBOLS
DOUBLE LINE SINGLE LINE
BOTTOM CONNEC TION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOW N
ELBOW UP
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REMAIN
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP C ONNECTION (45°)
TOP C ONNECTION (90°)
BOTTOM CONNEC TION (90°)
DD
RR
PIPE RISER
RAD IUS'D BRANCH
RAD IUS'D TEE
EXISTING DUCTW OR K TO REMAIN
UNLESS NOTED OTHERW ISE ON DRAW INGS,
15° MAX FOR DIVERGING, 30° MAX FOR
CONVERGING TRANSITION
EMER GENCY SHUTOFF STATION. 46" MOUNTING HEIGHT UNLESS NOTED OTHERW ISE.
SPACE TEMPERATURE SEN SOR / THERMOSTAT. W HEN W ALL MOUNTED, MOUNTING
HEIGHT 46" TO MEET ADA REQUIR EMENTS. W HEN MOUN TED NEXT TO W ALL SW ITCH
COORDINATE W ITH ARCH ITECT.
T
DP
DIFFERENTIAL PRESSURE SENSOR. W HEN W ALL MOUN TED, MOUNTING H EIGHT 46" TO
MEET ADA REQUIREMENTS. W H EN MOUNTED N EXT TO W ALL SW ITCH COORDINATE W ITH
ARC HITEC T.
H
HUMIDITY SENSOR. W HEN W ALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH ARCHITECT.
CARBON DIOXIDE SENSOR. W HEN W ALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH ARCHITECT.
C
CO
CAR BON MONOXID E SENSOR. W HEN W ALL MOUNTED, MOUNTING HEIGHT 46" TO MEET
ADA R EQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITC H C OORDINATE W ITH
ARC HITEC T.
TEMPERATURE SENSOR. W HEN W ALL MOUNTED, MOUN TING HEIGH T 46" TO MEET ADA
REQU IREMENTS. W H EN MOUN TED NEXT TO W ALL SW ITCH COORDINATE W ITH
ARC HITEC T.
S
S TEMPERATURE SENSOR MOUNTED IN CEILIN G PLENU M.
STATIC PRESSU RE SENSOR .SP
STRAINER W ITH A BLOW DOW N VALVE AND HOSE
CONNECTION
DRAIN VALVE W ITH H OSE END CONNECTION
AUTOMATIC FLOW CONTROLLER W ITH P/T PLUG IN
AND OUT
EXPANSION JOINT
MANUAL AIR VENT
AUTOMATIC AIR VENT
PRESSURE REDUCING VALVE
2 PORT AUTOMATIC CONTROL VALVE
3 PORT AUTOMATIC CONTROL VALVE
QUICK OPENING MANUAL VALVE
VACUUM BREAKER
NEEDLE VALVE
PRESSURE AND TEMPERATUR E TEST PLUG
VACUUM GAUGE W ITH STOP
END CAP
GLOBE VALVE
SHUTOFF VALVE AND BOX
SHUTOFF VALVE ON RISER
A
M
M
N
V
VB
SOLENOID VALVE
S
SAFETY RELIEF VALVE. FOR HYDRONIC SYSTEMS
PIPE DISCHARGE AIR GAPPED TO FLOOR DRAIN
UNLESS NOTED OTHERW ISE. FOR STEAM
SYSTEMS PIPE D ISCHARGE TO OUTDOORS.
W ATER METERM
PRESSURE G AUGE W ITH COCK AND SIPHON LOOP
BI-M ETALIC STEAM TRAP AND DRIP ASSEM BLY
THERMODYNAMIC STEAM TRAP AND DRIP
ASSEMBLY
INVERTED BUCKET STEAM TRAP AND DRIP
ASSEMBLY
FLOAT AND THERMOSTATIC STEAM TRAP AND
DRIP ASSEMBLY
TH ERM OSTATIC STEAM TRAP AND DRIP ASSEM BLY
BM
TD
IB
FT
TS
FLOW M ETER
F
UNION
CLEANOUT
STRAINER
AUTOMATIC PRESSURE INDEPENDENT CONTROL
VALVE
M
1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.
2. THE DRAW INGS AND SPECIFICATIONS SHALL BE CAREFULLY STUDIED DURING THE COURSE OF BIDDING AND CONSTRUCTION. ANY ERRORS, OMISSIONS OR DISCREPANCIES ENCOUNTERED SHALL BE REFERRED IMMEDIATELY TO THE ARCHITECT/ENGINEER FOR INTERPRETATION OR CORRECTION, SO THAT MISUNDERSTANDINGS AT A LATER DATE MAY BE AVOIDED.
3. SITE VISIT(S) SHALL BE AS OUTLINED IN PROJECT SPECIFICATIONS.
4. INCLUDE ALL W ORK NECESSARY TO ACCOMMODATE PHASING. REFER TO ARCHITECTURAL DRAW INGS AND GENERAL
REQUIREMENTS SECTION 01 00 00.
5. INSULATE DUCTW ORK AND PIPING W HERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED IN THE PERFORMANCE OF
W ORK IN THIS PROJECT.
6. REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAW INGS FOR DETAILS OF BUILDING CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT FOR W ORK. THE VARIOUS DRAW INGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE USED JOINTLY AT ALL TIMES. REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS INDICATED ON THE DRAW INGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOW ED TO EXECUTE THE W ORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE CONTRACTING OFFICERS REPRESENTATIVE (COR) THRU THE
CONTRACTING OFFICER FOR CLARIFICATION BEFORE PROCEEDING.
7. IN ACCORDANCE W ITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR W ILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE W ORK. THIS W ILL APPLY CONTINUOUSLY AND NOT BE LIM ITED TO NORMAL W ORKING HOURS. SEE SPECIFICATIONS FOR
MORE SPECIFIC DETAILS ON RESPONSIBILITIES.
8. ALL W ORK MUST BE COORDINATED W ITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.
9. COORDINATE ALL W ORK W ITH THE W ORK OF OTHERS. KEEP INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE W ORK OF OTHERS. COORDINATE AND EXPEDITE W ORK W ITH OTHERS SO THAT THE PROGRESS OF THE TOTAL W ORK SHALL BE KEPT
ON SCHEDULE.
10. ALL W ORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE W ITH ALL GOVERNING CODES AND STANDARDS.
11. EXISTING CONDITIONS SHOW N HAVE BEEN BASED UPON VISUAL OBSERVATION AND/OR AVAILABLE DRAW ING INFORMATION, AND MAY BE AT VARIANCE W ITH ACTUAL W ORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE W ORK. ANY DISCREPANCIES BETW EEN EXISTING CONDITIONS AND THE W ORK SHOW N ON THE CONTRACT DOCUMENTS W HICH MAY IMPACT THE PROGRESS OF THE W ORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN W RITING FOR RESOLUTION BEFORE PROCEEDING W ITH THE W ORK.
12. FITTING OR PLACING W ORK INTO OR ON THE W ORK OF OTHERS CONSTITUTES ACCEPTANCE OF THE SUITABILITY OF THE W ORK IN PLACE. IF THE W ORK OF OTHERS IS NOT ACCEPTABLE, NOTIFY THE CONTRACTING OFFICERS REPRESENTATIVE (COR) FOR THE W ORK TO BE CORRECTED. ANY NEW W ORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW W ORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING W ORK
INSTALLED IN UNSUITABLE EXISTING CONDITIONS W ILL BE CONSIDERED.
13. REFER TO ARCHITECTURAL SPECIFICATIONS FOR LOCATION OF ASBESTOS. ANY ASBESTOS W ORK PERFORMED AS PART OF THIS PROJECT SHALL BE COMPLETED PRIOR TO STARTING ANY OTHER PROJECT SITE W ORK. REFER TO ARCHITECTURAL SPECIFICATIONS
FOR ASBESTOS ABATEMENT.
14. IF, IN THE PERFORMANCE OF TH IS W ORK, MATERIALS ARE OBSERVED W HICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE COR. W ORK THAT W OULD EXPOSE W ORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. W ORK MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE
MATERIALS HAVE BEEN REMOVED OR ENCAPSULATED AND THE AREA DECLARED SAFE.
15. SOME AREAS MAY BE NOTED ON FLOOR PLANS THAT ASBESTOS IS PRESENT. CONTRACTORS SHALL TAKE SPECIAL CARE W HILE W ORKING ADJACENT TO ASBESTOS MATERIALS AND MUST BE PROPERLY PROTECTED W ITH CLOTHING, BREATHING APPARATUS, ETC. VERIFY REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT TEAM (ICRA) ARCHITECTURAL SPECIFICATIONS.
16. REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN(S) FOR LOCATIONS AND FIRE-RATINGS OF NEW AND EXISTING W ALL ASSEMBLIES. ALL PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED AS REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. COORDINATE W ITH ALL TRADES TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS AND
DETAILS ARE MET.
17. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED W ALLS & FLOORS SHALL BE SEALED TO RETARD PASSAGE OF
SMOKE.
18. ALL PIPING, DUCTS, CONDUITS, ETC. IN FINISHED ROOMS, CORRIDORS, ETC. SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE
THE SUSPENDED CEILING.
19. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOW N OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
20. PROVIDE DUCT ACCESS PANELS AS REQUIRED BY 23 31 00 FOR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, SMOKE DETECTORS, AUTOMATIC CONTROL DAMPERS, AND HUMIDIFIER DISPERSION TUBES. REFER TO DETAIL ON SHEET 00. COORDINATE SIZES AND
LOCATIONS W ITH ACCESSORIES PROVIDED BY OTHER TRADES.
21. ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS SHALL BE PROVIDED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, FLOW METERS, CONTROLS, ETC. COORDINATE SIZES AND LOCATIONS W ITH OTHER TRADES.
22. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.
23. FOR TYPICAL STEAM, W ATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING
SCHEMATICS.
24. DIFFUSER SIZES SHOW N ON FLOOR PLANS ARE NECK SIZES. REGISTER AND GRILLE SIZES SHOW N ARE FACE SIZES.
25. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
26. W HERE DUCTS OR PIPES ARE REMOVED THRU W ALL/FLOOR/ROOF THAT IS TO REMAIN, PATCH W ALL/FLOOR/ROOF OPENING TO
MATCH EXISTING W HERE OPENING IS NOT RE-USED.
27. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE
DISTURBED UNDER THIS W ORK TO MATCH EXISTING.
28. IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF STRUCTURE.
29. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE
PREMISES AND D ISPOSED OF PROPERLY BY THE CONTRACTOR.
30. THE CONTRACT DRAW INGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET W HICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE W ORK IN ADVANCE W ITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES
W HICH CAN BE ANTICIPATED.
31. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, P IPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO
PERFORMING W ORK.
32. ALL ABANDONED EXTRANEOUS PIPING, DUCTW ORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.
33. TERMINATE PIPING AND DUCTW ORK BELOW FLOORS, ABOVE CEILINGS, ETC., IN CONCEALED SPACES. ALL CUTTING AND PATCHING
SHALL MATCH EXISTING FINISHES.
34. W HERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO MAIN AND CAPPED; AND CONTROL
W IR ING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.
35. ALL EXISTING DUCTW ORK, P IPING, EQUIPMENT, CONTROLS, ETC. SHOW N ON REMOVAL PLAN(S) SHALL BE REMOVED. THE MAJORITY OF W ORK TO BE REMOVED IS SHOW N. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTW ORK, P IPING, ETC. THAT MAY NOT BE
SHOW N BUT IS ASSOCIATED W ITH THE REMOVAL W ORK.
36. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PORTABLE LADDERS OR PERMANENT PLATFORMS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIM ITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS, CONTROL DEVICES, ETC .
37. W HERE EXISTING HVAC UTILITIES IN SERVICE W ILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS W ORK SHALL BE PERFORMED ON W EEKENDS OR W EEK NIGHTS. DOW NTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND S
CHEDULED W ELL IN ADVANCE W ITH THE COR.
38. W HEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING DUCTW ORK, CLEAN BOTH NEW AND EXISTING DUCTW ORK BY MOPPING AND VACUUM CLEANING INSIDE AND OUTSIDE BEFORE OPERATION. CLEANING OF EXISTING DUCTW ORK SHALL BE LIM ITED TO THE IMMEDIATE AREA W ITHIN REACH OF THE OPEN END OF THE DUCT.
39. RUNOUT PIPING TO TERMINAL UNITS SHALL BE 0.75” SIZE UNLESS OTHERW ISE NOTED. REFER TO AIR TERMINAL UNIT SCHEDULE(S).
40. ALL INSULATED DUCTW ORK AND PIPING SHALL HAVE DAMPER/VALVE HANDLE EXTENSIONS.
41. CONTROL CONTRACTORS RESPONSIBILITES ARE LISTED IN SPECIFICATION SECTION 23 09 23, SECTION 1.1.
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland VA Medical Center
U.S. Departm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 W EST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
M ECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE STE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIM ATING :
M CGUINESS UNLIM ITED, INC.
15724 STILLW O OD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOG GS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. M ATERIALS ASSESSM ENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
W ESTLAKE, OH 44145
P. 216.781.0060
FINAL CD's SUBMISSION
C
B
IM
\M o d e l\
-0
-M
E P
-C e n tr a l_ m k m o n a g h a n .r v t
/1
/2
:3
:2
P
M
M-001
MECHANICAL LEGEND, NOTES AND INDEX OF
DRAWINGS
PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD CLEVELAND, OHIO
541-21-101
11.17.20 BRB SMP
SHEET LIST - MECHANICAL LIST
SHEET NUMBER SHEET NAME
MH-104 PARTIAL FOURTH FLOOR PLAN - NEW WORK
MD-105 PARTIAL FIFTH FLOOR PLAN - DEMOLITION
MH-105 PARTIAL FIFTH FLOOR PLAN - NEW WORK
MD-106 PARTIAL SIXTH FLOOR PLAN - DEMOLITION
MH-106 PARTIAL SIXTH FLOOR PLAN - NEW WORK
M-501 DETAILS
M-601 SCHEDULES
M-901 CONTROLS
SHEET LIST - MECHANICAL LIST
SHEET NUMBER SHEET NAME
M-001 MECHANICAL LEGEND, NOTES AND INDEX OF DRAWINGS
MD-100B PARTIAL BASEMENT FLOOR PLAN - DEMOLITION
MH-100 PARTIAL SUB-BASEMENT AND BASEMENT FLOOR PLAN - NEW WORK
MD-101 PARTIAL FIRST FLOOR PLAN - DEMOLITION
MH-101 PARTIAL FIRST FLOOR PLAN - NEW WORK
MD-102.1 PARTIAL SECOND FLOOR PLAN - DEMOLITION
MH-102.1 PARTIAL SECOND FLOOR PLAN - NEW WORK
MD-102.2 PARTIAL SECOND FLOOR PLAN - DEMOLITION
MH-102.2 PARTIAL SECOND FLOOR PLAN - NEW WORK
MD-103 PARTIAL THIRD FLOOR PLAN - DEMOLITION
MH-103 PARTIAL THIRD FLOOR PLAN - NEW WORK
MD-104 PARTIAL FOURTH FLOOR PLAN - DEMOLITION
PROJECT SEQUENCING
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING A SEQUENCING PLAN FOR THE ORDER IN W HICH THE SPACES IN THE PROJECT ARE ADDRESSED, AND SHALL SUBMIT SAME TO THE VA COR FOR REVIEW AND APPROVAL DURING THE PRE-CONSTRUCTION PHASE. IT IS NOT NECESSARILY A
REQUIREMENT THAT THE SPACES BE W ORKED ON ONE-BY-ONE IF THE CONTRACTOR OBTAINS
APPROVAL FROM THE VA COR TO W ORK ON MULTIPLE SPACES AT ONCE. REGARDLESS OF THE
APPROACH TAKEN, TOTAL CONSTRUCTION TIMELINE SHALL NOT EXCEED THE DURATION OUTLINED
BELOW .
B. PROJECT SCHEDULE SHALL INDICATE THE STARTING DATE AND DURATION OF W ORK FOR EACH
SPACE.
C. REFER TO 23 09 23 PARAGRAPH 1.1.L FOR COORDINATION OF W ORK BETW EEN CONTRACTOR AND ENGINEER-RETAINED, TH IRD-PARTY MASTER SYSTEM INTEGRATOR UNDER SEPARATE CONTRACT.
CONSTRUCTION PHASING
FOR EACH SPACE, THE GENERAL PHASING OF W ORK SHALL BE:
A. DETERMINE EXACT UPGRADES THAT ARE TO BE PERFORMED W ITHIN AND OUTSIDE OF SPACE.
B. SCHEDULE SHUTDOW N OF SPACE OR DETERMINE W HEN THE SPACE IS ABLE TO BE W ORKED
W ITHIN.
C. COORDINATE W ITH STAFF FOR LENGTH OF SHUTDOW N AND ANY TEMPORARY STORAGE THEY W ILL
NEED.
D. PERFORM ANY W ORK NOT REQUIRING SPACE SHUTDOW N, SUCH AS: CONTROLS, W IRING, OR
ABOVE-CEILING W ORK DONE OFF-HOURS.
E. BUILD ANY TEMPORARY CONSTRUCTION W ALLS.
F. PERFORM W ORK W ITHIN SPACE.
G. PERFORM CONTROLS W ORK AND PROGRAMMING FOR COMMUNICATION W ITH AHU’S AND BUILDING
AUTOMATION SYSTEM.
H. PERFORM TESTING, ADJUSTING AND BALANCING.
I. COORDINATE W ITH THIRD-PARTY MASTER SYSTEM INTEGRATOR (PROVIDED UNDER SEPARATE
CONTRACT) TO COMPLETE SUPERVISOR W ORK.
CONSTRUCTION TIMELINE
THE SCOPE OF W ORK DESCRIBED IN THIS DRAW ING PACKAGE REPRESENTS A PROJECT THAT MUST BE
UNDERTAKEN DURING FULL OCCUPANCY AND FUNCTIONALITY OF THE EXISTING HOSPITAL. THE
PROPOSED DURATION PLAN IS AS FOLLOW S:
PRE-CONSTRUCTION: 60 DAYS
CONSTRUCTION: 120 DAYS* (NOTE: CONTRACTOR SHALL ALLOW 2 DAYS PER SPACE
FOR VA 'S MASTER SYSTEM INTEGRATOR W ORK)
CLOSE OUT: 30 DAYS
TOTAL TIMEFRAME: 210 DAYS
THE FOLLOW ING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:
CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, W HEN NO INTERRUPTION TO OPERATION RESULTS. CONTRACTORS, HOW EVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AW AY DURING REGULAR SHIFT HOURS, AND
MUST COORDINATE SUCH ACTIVITIES W ITH STAFF AND VA COR.
THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS APPROVED BY VA COR, SHALL NOT APPLY TO W ORK SUCH AS:
• UTILITY SHUTDOW NS
• EXISTING MEP SYSTEM SHUTDOW NS
• W ORK IN PUBLIC CORRIDORS
• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING
• W ORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF
CEILING PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT
OF EXISTING FINISHES.
• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS.
W ORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT OR ON W EEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEW ED AND APPROVED BY VA COR. REFER
TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS.
Revisions: Date:
65% CD'S SUBMISSION 8.5.20
100% CD'S SUBMISSION 10.19.20
FINAL CDs SUBMISSION 11.17.20
BAC250B
BAC250C
BAC251
BAC252
BAC253
BAC254
BAC255
BAC259
BAC256
T
BB210B
BB213
BB226
BB227
BB226C
BB226B
BB226A
T
BB560
BB581B
BB582A
BB561 BB563
T
BFC06
BFC06C
BFC06A
BF154A
BF153
8ø
8ø
8ø
EX-SD
8ø
8ø
8ø
12ø
8ø ø x1
8ø
EX-SD
8ø
EX-SD
8ø
EX-SD
6ø
EX-SD
6ø
EX-SD
8ø
8ø
EX-RG
8ø
EX-RG
8ø
EX-RG
8ø
EX-RG
x1
16x12
8ø
10ø ø x1
9ø
9ø
10ø
8ø
VAV BOXVAV BOX
x1
40x18
6ø ø
6ø
6ø
6ø
6ø
EX-SD
6ø
EX-SD
6ø
EX-SD
26x12
18x10
40x18
16x8 x1
VAV BOX
3" - HW R
3" - HW S
38x16
6ø
6ø
EX-RG
VAV BOX
2"
H W
S 2"
H
W R
12x10
18x10 x8 x1
6ø 10x6
8ø
EX-SD
8ø x1
18x14
10ø 16x10 x1 x1
10ø
VAV
BO X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Departm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 W EST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
M ECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE STE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIM ATING :
M CGUINESS UNLIM ITED, INC.
15724 STILLW O OD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOG GS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. M ATERIALS ASSESSM ENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
W ESTLAKE, OH 44145
P. 216.781.0060
FINAL CD's SUBMISSION
C
B
IM
\M o d e l\
-0
-M
E P
-C e n tr a l_ m k m o n a g h a n .r v t
/1
/2
:3
:3
P
M
MD-100B
PARTIAL BASEMENT FLOOR PLAN -
DEMOLITION
PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD CLEVELAND, OHIO
541-21-101
11.17.20 BRB SMP
SCALE: 1/4" = 1'-0"
MAIN BLDG - BACK HALL EMPLOYEE HEALTH - DEMOLITION
SCALE: 1/4" = 1'-0"
MAIN BLDG - B-B226C RADIATION THERAPY - DEMOLITION
SCALE: 1/4" = 1'-0"
MAIN BLDG - B-B561 RADIOLOGY - DEMOLITION
SCALE: 1/4" = 1'-0"
CARES TOWER - BF-153 - DEMOLITION
NOTES
1 REMOVE DIFFUSER AND DUCT BACK TO POINT INDICATED FOR RECONNECTION IN
NEW WORK.
2 REMOVE GRILLE AND DUCT BACK TO POINT INDICATED. CAP AND SEAL DUCT
AIRTIGHT.
3 CAREFULLY REMOVE THERMOSTAT AND MAINTAIN FOR RELOCATION TO NEW.
4 REMOVE DIFFUSER AND BRANCH RUNOUT BACK TO MAIN. CAP DUCT AT MAIN. SEAL
AND INSULATE DUCT PER SPECIFICATION FOR NEW WORK.
5 OBTAIN MAXIMUM AND MINIMUM AIRFLOW SETTINGS FOR VAV BOX. PROVIDE
PRE-CONSTRUCTION AIR SURVEY FOR ALL CONNECTED SPACES. AIRFLOW TO BE
OBTAINED BY AABC-ACCREDITED AIR-BALANCE COMPANY.
A. REFER TO SHEET M-001 FOR LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERAL NOTES.
B. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, P IPE AND EQUIPMENT SIZES, SERVICES AND
LOCATIONS PRIOR TO PERFORMING W ORK.
C. ALL ABANDONED EXTRANEOUS PIPING, DUCTW ORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.
D. ALL EXISTING DUCTW ORK, P IPING, EQUIPMENT, CONTROLS, ETC. SHOW N ON REMOVAL PLAN(S) SHALL BE
REMOVED. THE MAJORITY OF W ORK TO BE REMOVED IS SHOW N. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTW ORK, PIP ING, ETC. THAT MAY NOT BE SHOW N BUT IS ASSOCIATED W ITH THE REMOVAL
W ORK.
E. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS IND ICATING LOCATIONS OF ALL ROOMS
INCLUDED IN SCOPE.
F. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.
G. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS
NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.
H. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE
PERFORMING ANY W ORK.
I. ALL EXISTING DUCT SHALL BE TEMPORARILY SEALED BETW EEN DEMOLITION AND NEW W ORK.
GENERAL NOTES
Revisions: Date:
65% CD'S SUBMISSION 8.5.20
BAC250B
BAC250C
BAC251
BAC252
BAC253
BAC254
BAC255
BAC259
BAC256T
BB213
BB226
BB227
BB226B
BB226A
T
TH
BB560
BB581B
BB582A
BB561 BB563
T H T
BC570
BC563
BC530
BC532
TH
BFC06
BFC06C
BFC06A
BF154A
H T
BFC09
BF208
BF209
S
T
H
BF212
T
S H
AF216
AF214
AF215
T
H x1 ø
8ø
9ø
9ø
12ø x1 ø x1
8x8
8ø
10ø
8ø
8ø
8ø
8ø
8ø
8ø
10ø
8ø
8ø
8ø
8ø
EX-SD
8ø
EX-SD
8ø
EX-SD
8ø
EX-SD
6ø
EX-SD
8ø
EX-RG
8ø
EX-RG
8ø
EX-RG
8ø
CD1
150 CFM
8ø
CG1
50 CFM
40x18
40x18 x1
38x28 ø
3"
6ø
6ø
EX-SD
6ø
EX-SD
50 CFM
B-05 10ø
CD1
200 CFM
x1
10ø
EX-RG
50 CFM
38x16
6ø
6ø
EX-RG
50 CFM
3 2
8ø
CD1
200 CFM2"
H W
R 2"
H
W S
12x10 x1
VAV
BO X
B-04
10x8 6ø
3 2
8ø
CD1
200 CFM B-03
10x10 x1 x1
3" - HW S
3" - HW R
6ø
18x10 x1 x1
10ø
10x6
16x10
3 29
B-06
8ø
CD1
200 CFM
10x10 x1
1"
H W
R 1"
H
W S x1
VAV
BO X
0.75"
0.75" ø
8ø x8
8ø 10 ø x8 x1 x1
8ø
6ø
8ø
8ø
EX-SD
8ø
EX-SD
200 CFM
8ø
EX-SD
B-02
22x14
8x4
24x20
18x12 x8
6ø
EX-SD
200 CFM
4ø
EX-SD
6ø
EX-EG
B-01
BF213
x1 x8
32x22 x6
36x20
8ø
EX-SD
8ø
EX-SD
A-01
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Departm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 W EST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
M ECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE STE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIM ATING :
M CGUINESS UNLIM ITED, INC.
15724 STILLW O OD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOG GS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. M ATERIALS ASSESSM ENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
W ESTLAKE, OH 44145
P. 216.781.0060
FINAL CD's SUBMISSION
C
B
IM
\M o d e l\
-0
-M
E P
-C e n tr a l_ m k m o n a g h a n .r v t
/1
/2
:3
:0
P
M
MH-100
PARTIAL SUB-BASEMENT AND BASEMENT
FLOOR PLAN - NEW WORK
PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD CLEVELAND, OHIO
541-21-101
11.17.20 BRB SMP
SCALE: 1/4" = 1'-0"
MAIN BLDG - BACK OF HALLWAY EMPLOYEE HEALTH - NEW WORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - B-B226C RADIATION THERAPY - NEW WORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - B-B561 RADIOLOGY - NEW WORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - B-C532 NUCLEAR MED - NEW WORK
SCALE: 1/4" = 1'-0"
CARES TOWER - BF-153 - NEW WORK
SCALE: 1/4" = 1'-0"
CARES TOWER - BF-208 - NEW WORK
SCALE: 1/4" = 1'-0"
CARES TOWER - BF-213 - NEW WORK
NOTES
1 PROVIDE NEW HOT W ATER AIR TERMINAL UNIT. REW ORK EXISTING HOT W ATER PIPING AS REQUIRED TO ACCOMODATE NEW AIR TERMINAL UNIT AND ACCESSORIES PER DETAIL ON M501. PROVIDE TRANSITIONS TO
EXISTING DUCTW ORK AS REQUIRED.
2 PROVIDE NEW BALL-IN-W ALL VISUAL PRESSURE INDICATOR IN THIS APPROXIMATE LOCATION.
3 PROVIDE W ALL-MOUNTED DIGITAL ROOM PRESSURE MONITOR NEXT TO DOOR. PROVIDE BAS INTERFACE TO SEND ALARM W HEN ROOM PRESSURE FALLS OUTSIDE OF THE SPECIFIED RANGE. ALLOW ANCES SHALL BE MADE TO PREVENT NUISANCE ALARMS OF THE MONITORING EQUIPMENT. ROO M PRESSURE SETPOINT
SHALL BE +0.02" W .G.
4 REPLACE THERMOSTAT W ITH NEW CAPABLE OF SENSING HUMID ITY.
5 BALANCE TO INDICATED CFM. PROVIDE NEW BALANCE DAMPER IN DUCT, AS
REQUIRED.
6 REBALANCE AIR TERMINAL UNIT TO NEW CFM EQUAL TO ORIGINAL BOX CFM MINUS THE SPS ROOM CFM.
OBTAINED IN PRE-TAB AIR SURVEY.
7 RELOCATE THERMOSTAT FOR ASSOCIATED VAV BOX. PROVIDE NEW BACKBOX, CONDUIT, AND CABLING/ TUBING TO EXISTING VAV BOX PER SPECIFICATION 23 06 23 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC.
8 CONNECT TO NEAREST SUPPLY MAIN.
9 EXISTING ABOVE CEILING PENETRATIONS SHALL BE SEALED AIR-TIGHT. ALLOW FOR SEALING SIX PENETRATIONS EACH OF DUCT, P IPE AND CONDUIT PER ROOM FOR A TOTAL OF 18 PENETRATIONS.
10 PROVIDE NEW THERMOSTAT W ITH HUMIDITY-SENSING AND REPORTING CAPABILITY. VERIFY NECESSITY
PRIOR TO REPLACING.
SCALE: 1/4" = 1'-0"
CARES TOWER - AF-215 - NEW WORK
A. INCLUDE AN ADDITIONAL 300' OF BRANCH CIRCUITRY ROUTING, ASSUME 3-#12,#12 GRD. IN 0.75"C. FIELD
VERIFY LOCATIONS W HERE NEW DUCTW ORK, PIPING, ETC. NECESSITATE THIS W ORK.
B. ALL AIR FLOW S ARE INITIAL AND SHALL BE ADJUSTED ACCORDINGLY TO OBTAIN ROOM PRESSURES.
C. ALL W IR ING SHALL BE FISHED THRU EXISTING W ALLS.
D. REFER TO SHEET M-001 SIM ILAR TO DEMO SHEETS.
E. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS IND ICATING LOCATIONS OF ALL ROOMS
INCLUDED IN SCOPE.
F. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.
G. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS
NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.
H. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE
PERFORMING ANY W ORK.
GENERAL NOTES
Revisions: Date:
65% CD'S SUBMISSION 8.5.20
1A121
1A122
1A130
T
1AC280
1AC256
1AC257
1AC279
1AC275
1AC266
1AC268
1AC277
T
D
C
E
1B200A
1B218
1B214
1B213
1B215
1B216
1B217
1B218A
1B215C
Former Stair 10
T
T
1B513
1B521
1B523
1B527
1B524
T
T
1B589
1B566
1B549 1B552
1B554
1B589A
OIT Telecom/
Data Closet
1D100H
1D200A
1D211
1D215 1D137
T
STAT
AUTOMATED
LITHIUM OSMOMETER
STAINING
SPECIAL
STAINING
DATA PROCESSING
1F544
1F541
1F560 1F561
1F562
1F563
1F564
1F570
T
34x14
21x12
10ø
8ø
6ø
EX-SD
6ø
EX-SD
24x12
EX-RG
x8
6ø ø x8
16x12 x1
24x10
VAV BOX
1" - HW R
1" - HW S
x1
38x12 22x6
8ø
EX-SD
x8 x8
34x10
6ø x8
24x12
EX-RG
24x12
EX-RG
10x24
EX-RG
8ø
EX-SD
12x8
12x8
6ø
6ø
6ø
VAV BOX
2" - HWR
2" - HWS
VAV
BO X
6ø
EX-SD
6ø
EX-SD
20x20
6ø x1
DUAL
DUCT
BOX
DUAL
DUCT
BOX
DUAL
DUCT
BOX
x1
12x108ø
6ø6ø
8ø
EX-SD
6ø
EX-SD
6ø
6ø
EX-SD
6ø
6ø
EX-SD
8ø 8ø
EX-RG
6ø
EX-RG
6ø
EX-RG
6ø x1
VAV BOX
2.5" - HW S
2.5" - HW R
2.5" - HW R
x1 ø
12ø ø x8
8ø
EX-SD
6ø
EX-RG
8ø
EX-SD
6ø
EX-SD
8ø
EX-SD
6ø
20x20 x6
10x8 x1 x1
1"
H W
R 1"
H
W S
VAV BOX
6ø x8
8ø
EX-SD
9ø 12ø
8ø 6ø
8ø
EX-SD
12x6 x6
24x12
EX-RG
14x1016x1017x10 x6
24x12
EX-RG
x8
6ø
8ø 10ø12 x6 x6 x6
6ø
10x8
8ø EX-SD 12x8 x8 10x8
8ø
EX-SD
48x20
8ø x1
8ø x1
6ø
6ø
6ø ø
8ø
60x20
8ø
EX-SD
8ø
EX-SD
8ø
EX-SD
8ø
EX-SD
8ø
EX-SD
8ø
EX-SD
8ø
EX-SD
8ø
8ø
8ø
8ø
8ø
8ø
8ø ø
12ø
EX-RG
ø
10ø
EX-RG
1.5" - HW S
1.5" - HW R
VAV
BO X
2" - DHW R
2" - DHW
2" - DCW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Departm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 W EST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
M ECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE STE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIM ATING :
M CGUINESS UNLIM ITED, INC.
15724 STILLW O OD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOG GS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. M ATERIALS ASSESSM ENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
W ESTLAKE, OH 44145
P. 216.781.0060
FINAL CD's SUBMISSION
C
B
IM
\M o d e l\
-0
-M
E P
-C e n tr a l_ m k m o n a g h a n .r v t
/1
/2
:3
:4
P
M
MD-101
PARTIAL FIRST FLOOR PLAN - DEMOLITION PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD CLEVELAND, OHIO
541-21-101
11.17.20 BRB SMP
SCALE: 1/4" = 1'-0"
ATRIUM - 1A-121 PRIMARY CARE - DEMOLITION
SCALE: 1/4" = 1'-0"
ATRIUM- 1-AC275 EMERGENCY DEPARTMENT - DEMOLITION
SCALE: 1/4" = 1'-0"
MAIN BLDG - 1-B216 PSYCH ER - DEMOLITION
SCALE: 1/4" = 1'-0"
ATRIUM - 1-B523 MRI - DEMOLITION
SCALE: 1/4" = 1'-0"
MAIN BLDG - 1-B589A WOMEN'S HEALTH - DEMOLITION
SCALE: 1/4" = 1'-0"
MAIN BLDG - 1-D215 MOD. G&H - DEMOLITION
SCALE: 1/4" = 1'-0"
MAIN BLDG - 1-F562 LAB - DEMOLITION
NOTES
1 REMOVE DIFFUSER AND BRANCH RUNOUT BACK TO MAIN. CAP DUCT AT MAIN. SEAL AND INSULATE DUCT
PER SPECIFICATION FOR NEW W ORK.
2 OBTAIN CURRENT, MAXIMUM, AND MINIMUM AIRFLOW SETTINGS FOR VAV BOX. PROVIDE PRE- CONSTRUCTION A IR SURVEY FOR ALL CONNECTED SPACES. AIRFLOW TO BE O BTAINED BY NEBB- OPR
AABC-A ACCREDITED AIR-BALANCE COMPANY.
3 CAREFULLY REMOVE THERMOSTAT AND MAINTAIN FOR RELOCATION TO NEW . PATCH AND PAINT W ALL TO
MATCH EXISTING.
4 REMOVE DIFFUSER AND ATTACHED FLEX DUCT. MAINTAIN DUCT FOR CONNECTION TO NEW .
A. REFER TO SHEET M-001 FOR LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERAL NOTES.
B. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, P IPE AND EQUIPMENT SIZES, SERVICES AND
LOCATIONS PRIOR TO PERFORMING W ORK.
C. ALL ABANDONED EXTRANEOUS PIPING, DUCTW ORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.
D. ALL EXISTING DUCTW ORK, P IPING, EQUIPMENT, CONTROLS, ETC. SHOW N ON REMOVAL PLAN(S) SHALL BE
REMOVED. THE MAJORITY OF W ORK TO BE REMOVED IS SHOW N. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTW ORK, PIP ING, ETC. THAT MAY NOT BE SHOW N BUT IS ASSOCIATED W ITH THE REMOVAL
W ORK.
E. DEDUCT ALTERNATE #1 - ELIMINATE W ORK ASSOCIATED W ITH "ATRIUM - 1AC-275 URGENT CARE" FROM
SCOPE OF W ORK.
F. DEDUCT ALTERNATE #2 - ELIMINATE W ORK ASSOCIATED W ITH "ATRIUM - 1A-121-FIRM A" FROM SCOPE OF
W ORK.
G. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS IND ICATING LOCATIONS OF ALL ROOMS
INCLUDED IN SCOPE.
H. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.
I. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS
NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.
J. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE
PERFORMING ANY W ORK.
K. ALL EXISTING DUCT SHALL BE TEMPORARILY SEALED BETW EEN DEMOLITION AND NEW W ORK.
GENERAL NOTES
Revisions: Date:
65% CD'S SUBMISSION 8.5.20
1A121
1A122
1A130
T H
T
1AC280
1AC257
1AC275
1AC268
T
TH
D
C
E
1B218
1B215
1B216
1B217
1B218A
1B215C
Former Stair 10
T
T
T
H
1B521
1B523
1B524
H
T
T
1B589
1B566
1B549 1B552
1B554
1B589A T
H
OIT Telecom/
Data Closet
1D100H
1D200A
1D211
1D137
T H
STAINING
SPECIAL
STAINING
DATA PROCESSING
1F544
1F560 1F561
1F564
1F570
H
T
T
34x14
21x12
12x814 x8 ø
16x12
20x14 x1
10ø8ø
24x10
6ø
EX-SD
24x12
EX-RG
8ø
EX-SD
8ø
CD1
200 CFM
1-04 x1
1" - HW R
1" - HW S
38x12 x1
34x10 x8
12x8
22x6 x8
6ø
24x12
EX-RG
24x12
EX-RG
10x24
150 CFM
EX-RG 8ø
EX-SD
1-06
10ø
CD1
300 CFM
BD
PROVIDE NEW BALANCE
DAMPER IN TAKEOFF
12x10
2" - HW R
2" - HW S
8ø
6ø
6ø
EX-SD
1-05
DUAL
DUCT
BOX
DUAL
DUCT
BOX
18x10 ø ø
6ø
4ø
8ø
8ø
4ø DUAL
DUCT
BOX
x1
12x108ø
6ø
6ø6ø
6ø6ø
8ø
6ø
EX-SD
6ø
EX-SD
6ø
EX-RG
6ø
EX-SD
6ø
EX-RG
8ø
EX-RG
50 CFM
1-01
12x10
8ø
CD1
200 CFM
2.
5"
H
W R
2.
5"
H
W R
2.
5"
H
W S x1 x8 x1 ø
8ø
EX-SD
6ø
EX-RG
8ø
EX-SD
8ø
EX-SD
1-03
8ø
CD1
200 CFM
ø
12x10
1"
H W
S 1"
H
W R
26x12
17x10 14x10 12x6
10ø8ø
12x6
12x8
10x810x8
9ø 12ø x8 x8
6ø
6ø 8ø
6ø
8ø
EX-SD
24x12
300 CFM
EX-RG
24x12
EX-RG
8ø
EX-SD
8ø
EX-SD
8ø
CD1
300 CFM
1-08
60x20 ø
6ø ø
8ø
EX-SD
8ø
EX-SD
12ø
EX-RG
10ø
EX-RG
50 CFM
8ø
CD1
200 CFM
1-09
8ø 8ø
0.
H W
R
0.
H W
S x1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Departm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 W EST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
M ECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE STE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIM ATING :
M CGUINESS UNLIM ITED, INC.
15724 STILLW O OD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOG GS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. M ATERIALS ASSESSM ENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
W ESTLAKE, OH 44145
P. 216.781.0060
FINAL CD's SUBMISSION
C
B
IM
\M o d e l\
-0
-M
E P
-C e n tr a l_ m k m o n a g h a n .r v t
/1
/2
:3
:2
P
M
MH-101
PARTIAL FIRST FLOOR PLAN - NEW WORK PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD CLEVELAND, OHIO
541-21-101
11.17.20 BRB SMP
SCALE: 1/4" = 1'-0"
ATRIUM - 1A-121 PRIMARY CARE - NEW WORK
SCALE: 1/4" = 1'-0"
ATRIUM - 1AC-275 EMERGENCY DEPARTMENT - NEW WORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - 1B-216 PSYCH ER - NEW WORK
SCALE: 1/4" = 1'-0"
ATRIUM - 1B-523 MRI - NEW WORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - 1-B589 WOMENS HEALTH - NEW WORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - 1D- 215 MOD. G+H - NEW WORK
SCALE: 1/4" = 1'-0"
MIAN BLDG - 1F-562 LAB - NEW WORK
NOTES
1 PROVIDE NEW HOT W ATER AIR TERMINAL UNIT. REW ORK EXISTING HOT W ATER PIPING AS REQUIRED TO ACCOMODATE NEW AIR TERMINAL UNIT AND ACCESSORIES PER DETAIL ON M501. PROVIDE TRANSITIONS TO
EXISTING DUCTW ORK AS REQUIRED.
2 PROVIDE NEW BALL-IN-W ALL VISUAL PRESSURE INDICATOR IN THIS APPROXIMATE LOCATION.
3 PROVIDE W ALL-MOUNTED DIGITAL ROOM PRESSURE MONITOR NEXT TO DOOR. PROVIDE BAS INTERFACE TO SEND ALARM W HEN ROOM PRESSURE FALLS OUTSIDE OF THE SPECIFIED RANGE. ALLOW ANCES SHALL BE MADET O PREVENT NUISANCE ALARMS OF THE MONITORING EQUIPMENT. ROO M PRESSURE SETPOINT
SHALL BE +0.02" W .G.
4 PROVIDE A NEW CHECKPOINT SENSOR AND CAREFULLY PROTECT.
5 REBALANCE AIRFLOW TO FLOW INDICATED ON PLANS. PROVIDE NEW BALANCE DAMPER IN DUCT, AS
REQUIRED.
6 REBALANCE AIR TERMINAL UNIT TO NEW CFM EQUAL TO ORIGINAL BOX CFM MINUS THE SPS ROOM CFM.
OBTAINED IN PRE-TAB AIR SURVEY.
7 RELOCATE THERMOSTAT FOR ASSOCIATED VAV BOX. PROVIDE NEW BACKBOX, CONDUIT, AND CABLING/ TUBING TO EXISTING VAV BOX PER SPECIFICATION 23 06 23 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC.
8 EXISTING ABOVE CEILING PENETRATIONS SHALL BE SEALED AIR-TIGHT. ALLOW FOR SEALING SIX PENETRATIONS EACH OF DUCT, P IPE AND CONDUIT PER ROOM FOR A TOTAL OF 18 PENETRATIONS.
9 PROVIDE NEW DUCT RUNOUTS TO DUAL DUCT BO X. FIELD-VERIFY DUCT ROUTE. PATCH AND REPAIR CEILING
TO MATCH EXISTING.
10 PATCH/REPAIR CEILING IN THE AREA OF NEW W ORK TO MATCH EXISTING. PRO VIDE ACCESS PANELS FOR
ANY ITEMS REQUIRING FUTURE MAINTENANCE ACCESS, PER SPECIFICATION.
GENERAL NOTES
A. INCLUDE AN ADDITIONAL 300' OF BRANCH CIRCUITRY ROUTING, ASSUME 3-#12,#12 GRD. IN 0.75"C. FIELD
VERIFY LOCATIONS W HERE NEW DUCTW ORK, PIPING, ETC. NECESSITATE THIS W ORK.
B. ALL AIR FLOW S ARE INITIAL AND SHALL BE ADJUSTED ACCORDINGLY TO OBTAIN ROOM PRESSURES.
C. ALL W IR ING SHALL BE FISHED THRU EXISTING W ALLS.
D. REFER TO SHEET M-001 SIM ILAR TO DEMO SHEETS.
E. DEDUCT ALTERNATE #1 - ELIMINATE W ORK ASSOCIATED W ITH "ATRIUM - 1AC-275 EMERGENCY
DEPARTMENT" FROM SCOPE OF W ORK.
F. DEDUCT ALTERNATE #2 - ELIMINATE W ORK ASSOCIATED W ITH "ATRIUM - 1A-121-PR IMARY CARE" FROM
SCOPE OF W ORK.
G. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS IND ICATING LOCATIONS OF ALL ROOMS
INCLUDED IN SCOPE.
H. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.
I. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS
NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.
J. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE
PERFORMING ANY W ORK.
Revisions: Date:
65% CD'S SUBMISSION 8.5.20
2A100D 2A123
2A127
2A126
2A125
2A124
2A134
2A136
T
22 x 28
MFP
36 x 30
PYXIS
29 x 23
CART
28 x 40
UVA PHOTO
THERAPY -
SELLAMED
UVA HOUVA
HAND/ FOOT
LIGHT
THERAPY
30 x 21
OMNILUX
REVIVIE PHOTO
THERAPY
28 x 32
DUSA BLUE
LIGHT HEAD
THERAPY
40 X 28
MAPPING
TOWEL
WARMER
C-LOCKER
2A100L
2A158
2A156
2A160
2A159
2A170A
T
2B433
2B435 T
2C157
2C153 2C152
2C150
2S17
2D116
2D117
2D123
2D118
T
2D100K
2D100L
2D171
2D169 2D166
2D190
2D166A
T
PP
2'-0" X 4'-0"
DIALYSIS CART
DIALYSIS
CART
2'-0" X 5'-0"
DIALYSIS
CART
2'-0" X 5'-0"
2D254A
T
2E300D
2E332
2E334 2E335
T
14x8 ø
12x8
12ø10ø
6ø
EX-SD
8ø
EX-SD
6ø
EX-SD
VAV
BO X
25x12
20x12 x1
26x7
6ø
12x8
6ø
EX-SD
6ø
EX-SD
30x16
12x8 6ø x1
8ø
EX-SD
24x12
EX-RG
16x10
10x6 x6 x6
8ø
EX-SD
24x12
EX-RG
VAV BOX
x1
10ø
8ø
14x12.5
10ø
EX-SD
24x24
EX-RG
16x12
22x12
30x14
30x1
26x12
10x6
16x8 16x8 x1 x1
14x10
VAV
BO X
8ø
6ø
10ø
8ø
8ø ø
8ø
8ø
EX-SD
HW R
HW S
VAV
BO X
36x12
8x
6x
50/12 OV
6ø
EX-SD
10ø
EX-RG
6ø
EX-SD
10ø
EX-RG
VAV
BO X
3" - HW S
3" - HW R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Departm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 W EST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
M ECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE STE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIM ATING :
M CGUINESS UNLIM ITED, INC.
15724 STILLW O OD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOG GS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. M ATERIALS ASSESSM ENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
W ESTLAKE, OH 44145
P. 216.781.0060
FINAL CD's SUBMISSION
C
B
IM
\M o d e l\
-0
-M
E P
-C e n tr a l_ m k m o n a g h a n .r v t
/1
/2
:3
:4
P
M
MD-102.1
PARTIAL SECOND FLOOR PLAN - DEMOLITION PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD CLEVELAND, OHIO
541-21-101
11.17.20 BRB SMP
SCALE: 1/4" = 1'-0"
ATRIUM - 2A-124 MOD.C&D - DEMOLITION
SCALE: 1/4" = 1'-0"
ATRIUM - 2A-159 MOD. E&F - DEMOLITION
SCALE: 1/4" = 1'-0"
ATRIUM - 2B-435 MOD J - DEMOLITION
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2C-150 CATH LAB - DEMOLITION
SCALE: 1/4" = 1'-0"
SURGERY - 2-D117 - DEMOLITION
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2D-169 MICU - DEMOLITION
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2D-254A PRE-OP & RENAL - DEMOLITION
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2-E334 PACU - DEMOLITION
NOTES
1 OBTAIN CURRENT, MAXIMUM, AND MINIMUM AIRFLOW SETTINGS FOR VAV BOX. PROVIDE PRE- CONSTRUCTION AIR SURVEY FOR ALL CONNECTED SPACES AND SUBMIT TO CO R AND ENGINEER. A IRFLOW
TO BE OBTAINED BY ACCREDITED AIR -BALANCE COMPANY PER SPECIFICATION.
2 REMOVE DIFFUSER AND ATTACHED FLEX DUCT. MAINTAIN DUCT FOR CONNECTION TO NEW .
3 REMOVE VAV BOX AND TRANSITIONS. MAINTAIN DUCT FOR CONNECTION TO NEW .
4 REMOVE THERMOSTAT AND ALL ASSOCIATED W IRING/TUBING COMPLETE.
5 REMOVE DIFFUSER AND BRANCH RUNOUT BACK TO MAIN. CAP DUCT AT MAIN. SEAL AND INSULATE DUCT
PER SPECIFICATION FOR NEW W ORK.
6 REMOVE DIFFUSER AND DUCT BACK TO VAV BOX.
7 CAREFULLY REMOVE THERMOSTAT AND MAINTAIN FOR RELOCATION TO NEW .
GENERAL NOTES
A. REFER TO SHEET M-001 FOR LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERAL NOTES.
B. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, P IPE AND EQUIPMENT SIZES, SERVICES AND
LOCATIONS PRIOR TO PERFORMING W ORK.
C. ALL ABANDONED EXTRANEOUS PIPING, DUCTW ORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.
D. ALL EXISTING DUCTW ORK, P IPING, EQUIPMENT, CONTROLS, ETC. SHOW N ON REMOVAL PLAN(S) SHALL BE
REMOVED. THE MAJORITY OF W ORK TO BE REMOVED IS SHOW N. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTW ORK, PIP ING, ETC. THAT MAY NOT BE SHOW N BUT IS ASSOCIATED W ITH THE REMOVAL
W ORK.
E. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS IND ICATING LOCATIONS OF ALL ROOMS
INCLUDED IN SCOPE.
F. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.
G. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS
NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.
H. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE
PERFORMING ANY W ORK.
I. ALL EXISTING DUCT SHALL BE TEMPORARILY SEALED BETW EEN DEMOLITION AND NEW W ORK.
Revisions: Date:
65% CD'S SUBMISSION 8.5.20
2A100D 2A123
2A127
2A126
2A125
2A124
2A134
2A136
T H
T
22 x 28
MFP
36 x 30
PYXIS
29 x 23
CART
28 x 40
UVA PHOTO
THERAPY -
SELLAMED
UVA HOUVA
HAND/ FOOT
LIGHT
THERAPY
30 x 21
OMNILUX
REVIVIE PHOTO
THERAPY
28 x 32
DUSA BLUE
LIGHT HEAD
THERAPY
40 X 28
MAPPING
TOWEL
WARMER
C-LOCKER
2A158
2A156
2A160
2A159
2A170A
H
T
VO VS
2B433
2B435
H
T
T
2C157
2C153 2C152
2C150
T H
2C423
2C437
T
H
2S17
2D116
2D117
2D123
2D118
T
T
H
2D100K
2D171 2D166
2D190
2D166A
H T
PP
2'-0" X 4'-0"
DIALYSIS CART
DIALYSIS
CART
2'-0" X 5'-0"
DIALYSIS
CART
2'-0" X 5'-0"
2D254A
T
H
2E300D
2E332
2E334 2E335
T HT
2FC03
2FLVC2
2F201
2F202
TH
12x8
14x8 ø
10ø ø
8ø
EX-SD
6ø
EX-SD
2-13 8ø
CD1
200 CFM
12x10
26x7
20x12
25x12 x1
6ø
EX-SD
8ø
CD1
200 CFM
2-14 x1
12x8 x1
30x16
12x8 6ø x1
24x12
50 CFM
EX-RG
8ø
CD1
200 CFM
4"
H W
R 4"
H
W S
12x10
2-12
1 5
2-09
8ø
CD1
200 CFM
x1
16x10
16x10
10x6 x8 x6 12 x6
0 .75" - HW R
0.75" - HW S
17x4 ø x4
12ø
8ø
CD1 3
2-11 x1
28ø
10ø14x12.510ø
24x24
100 CFM
EX-RG
2-04
10ø
CD1
250 CFM
30x14
26x1
30x1
26x12 x6
22x12
16x12
24x12
100 CFM
EX-RG
24x24
EX-RG
24x24
EX-RG
2-02
2D169
6ø
CD1
300 CFM
6ø
8ø
10ø
8ø
8ø ø
8ø
24x12
8ø
CD1
200 CFM
2-06 x8
8ø
6 5
2-03
8x x1
50/12 OV
10ø
EX-RG
150 CFM10ø
CD1
300 CFM
VAV
BO X 9
3 2 2-01
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Departm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 W EST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
M ECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE STE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIM ATING :
M CGUINESS UNLIM ITED, INC.
15724 STILLW O OD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOG GS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. M ATERIALS ASSESSM ENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
W ESTLAKE, OH 44145
P. 216.781.0060
FINAL CD's SUBMISSION
C
B
IM
\M o d e l\
-0
-M
E P
-C e n tr a l_ m k m o n a g h a n .r v t
/1
/2
:3
:3
P
M
MH-102.1
PARTIAL SECOND FLOOR PLAN - NEW WORK PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD CLEVELAND, OHIO
541-21-101
11.17.20 BRB SMP
SCALE: 1/4" = 1'-0"
ATRIUM - 2A-124 MOD. C & D - NEW WORK
SCALE: 1/4" = 1'-0"
ATRIUM - 2A-159 MOD. E & F - NEW WORK
SCALE: 1/4" = 1'-0"
ATRIUM - 2-B435 MOD J - NEW WORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2C-150 CATH LAB - NEW WORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2C-437 UROLOGY CLINIC - NEW WORK
SCALE: 1/4" = 1'-0"
SURGERY - 2-D117 - NEW WORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2D-169 MICU - NEW WORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2-D254A PRE-OP & RENAL - NEW WORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2-E334 PACU - NEW WORK
10 SCALE: 1/4" = 1'-0"
CARES TOWER - 2F-202 - NEW WORK
NOTES
1 PROVIDE NEW HOT W ATER AIR TERMINAL UNIT. REW ORK EXISTING HOT W ATER PIPING AS REQUIRED TO ACCOMODATE NEW AIR TERMINAL UNIT AND ACCESSORIES PER DETAIL ON M501. PROVIDE TRANSITIONS TO
EXISTING DUCTW ORK AS REQUIRED.
2 NEW BALL-IN-W ALL VISUAL PRESSURE INDICATOR IN THIS APPROXIMATE LOCATION.
3…
This is the start of the file's text. The full file is on GovTribe.