Mechanical Drawings.pdf

PDF 10 MB Posted

Attached to
Z1DA--SPD Storage Temp and Humidity Controls Project 541-21-101 Federal contract opportunity
Solicitation number
36C25021B0017
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document provides notice of a modification to a pre-solicitation for temperature and humidity controls at a Sterile Processing Department storage facility. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is seeking these services from a service-disabled veteran owned small business. The duration of the project has been increased from 120 to 210 calendar days from notice to proceed. All other terms and conditions remain unchanged. Questions regarding the opportunity should be emailed to the specified contact by the stated deadline.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--SPD Storage Temp and Humidity Controls Project 541-21-101, newest first.
File Type Posted
Bid Opening Attendance Roster Provide Temp and Humidity Controls.pdf PDF
36C25021B0017 0005.docx DOCX document
Bid Abstract Provide Temp and Humidity Controls CLE VAMC.pdf PDF
36C25021B0017 0004.docx DOCX document
541-21-101 Bid Opening Instructions - Revised.pdf PDF
013526_Safety Requirements 2020 Update ADD 1.pdf PDF
21-0416 Provide Temperature and Humidity Controls - ADDENDUM 1 - Drawings.pdf PDF
36C25021B0017 0003.docx DOCX document
36C25021B0017 0002.docx DOCX document
541-21-101 Bid Opening Instructions.pdf PDF
Sign-in Sheet - Site Visit - Provide Temperature and Humidity Controls to SPD Storage.pdf PDF
36C25021B0017 0001.docx DOCX document
Site Visit - 10701 East Blvd - Google Maps.pdf PDF
Technical Specifications.pdf PDF
36C25021B0017_1.docx DOCX document
Architectural Drawings.pdf PDF
Wage Determination 02.2021.pdf PDF
VHA DIRECTIVE 1192.01.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE: ALL SYMBOLS AND ABBREVIATIONS

ARE SUBJECT TO MODIFICATIONS

ON OTHER DRAWINGS.

ALL SYMBOLS OR ABBREVIATIONS

MIGHT NOT NECESSARILY BE USED ON

THIS PROJECT.

ABBREVIATIONS

AC - AIR COMPRESSOR OR AIR CONDITIONER

ACCU - AIR COOLED CONDENSING UNIT

AD - ACCESS DOOR OR AREA DRAIN

ADJ - ADJUSTABLE

AFF - ABOVE FINISHED FLOOR

AFG - ABOVE FINISHED GRADE

AFMS - AIR FLOW MEASURING STATION

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

ATC - AUTOMATIC TEMPERATURE CONTROL

(SYNONYMOUS W ITH BAS)

BAS - BUILD ING AUTOMATION SYSTEM

BDD - BACK DRAFT DAMPER

BFP - BACKFLOW PREVENTER

BLDG - BUILD ING

BOB - BOTTOM OF BEAM

BOD - BOTTOM OF DUCT

BOE - BOTTOM OF EQUIPMENT

BOF - BOTTOM OF FOOTING

BOG - BOTTOM OF GRILLE

BOP - BOTTOM OF PIPE

BOT - BOTTOM

BTU - BRITISH THERMAL UNIT

BTUH - BRITISH THERMAL UNIT PER HOUR

CBD - COUNTER BALANCED BACKDRAFT DAMPER

CFCI - CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

CFM - CUBIC FEET PER MINUTE

CHS - CHILLED W ATER SUPPLY

CHR - CHILLED W ATER RETURN

CHGR - CHILLED W ATER GLYCOL SOLUTION RETURN

CHGS - CHILLED W ATER GLYCOL SOLUTION SUPPLY

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CO - CLEAN OUT

COR - CONTRACTING OFFICERS REPRESENTATIVE

CO2 - CARBON DIOXIDE

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

CTR - CENTER

CU - COPPER

CW - COLD W ATER

CW R - CONDENSER W ATER RETURN

CW S - CONDENSER W ATER SUPPLY

D - DRAIN LINE

DB - DRY BULB

DDC - D IRECT D IGITAL CONTROLS

DI - DEIONIZED W ATER

DIA - D IAMETER

DIM - D IMENSION

DN - DOW N

DW G - DRAW ING

EA - EACH OR EXHAUST AIR

EAT - ENTERING AIR TEMPERATURE

E - ELECTRICAL (DIVISION 26)

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATOR

EQUIP - EQUIPMENT

ET - EXPANSION TANK

ETR - EXISTING TO REMAIN

EQS - EQUIPMENT SUPPLIER

EW T - ENTERING W ATER TEMPERATURE

EXH - EXHAUST

EXP - EXPANSION

EXT - EXTERIOR

EX - EXISTING

FD - FLOOR DRAIN

FF - FINISHED FLOOR ELEVATION

FLR - FLOOR

FOB - FLAT ON BOTTOM

FOF - FUEL OIL FLOW

FOG - FUEL OIL GAUGE

FOR - FUEL OIL RETURN

FOS - FUEL OIL SUPPLY

FOT - FLAT ON TOP

FPM - FEET PER MINUTE

FSC - FIRE SUPPRESSION (DIVISION 21)

FT - FEET

FTG - FOOTING

G - GAS OR NATURAL GAS

GA - GAUGE

GAL - GALLON

GALV - GALVANIZED

GC - GENERAL TRADES

GPM - GALLONS PER MINUTE

HB - HOSE BIBB

H - HVAC (DIVISION 23)

HD - HUB DRAIN

HG - REFRIGERANT HOT GAS

HP - HORSEPOW ER

HPC - H IGH PRESSURE CONDENSATE RETURN

HPS - H IGH PRESSURE STEAM SUPPLY

HR - HOUR

HT - HEAT TRACE

HTR - HEATER

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

HW - HOT W ATER

HW R - HEATING HOT W ATER RETURN

HW S - HEATING HOT W ATER SUPPLY

ID - INSIDE DIAMETER

INV - INVERT ELEVATION

IN - INCHES

KE - KITCHEN EQUIPMENT

L - LENGTH

LAT - LEAVING AIR TEMPERATURE

LAV - LAVATORY

LBS - POUNDS

LPC - LOW PRESSURE CONDENSATE RETURN

LPS - LOW PRESSURE STEAM SUPPLY

LW T - LEAVING W ATER TEMPERATURE

MAX - MAXIMUM

MDD - MOTORIZED DAMPER

MEZZ - MEZZANINE

MFR - MANUFACTURER

MH - MANHOLE

MIN - MIN IMUM OR MINUTE

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

MPC - MEDIUM PRESSURE CONDENSATE

RETURN

MPS - MEDIUM PRESSURE STEAM SUPPLY

MU - W ATER MAKE-UP

N/C - NORMALLY CLOSED

NIC - NOT IN CONTRACT

N/O - NORMALLY OPEN

NOM - NOMINAL

NPT - NATIONAL PIPE THREAD

NTS - NOT TO SCALE

OA - OUTDOOR AIR

OBD - OPPOSED BLADE DAMPER

OD - OUTSIDE DIAMETER

OFCI - OW NER FURNISHED CONTRACTOR

INSTALLED

OFOI - OW NER FURNISHED OW NER INSTALLED

P - PROPANE GAS

PC - PLUMBING (DIVISION 22)

OR PUMPED CONDENSATE RETURN

PLBG - PLUMBING

PRESS - PRESSURE

PRV - PRESSURE REGULATING VALVE

PSF - POUNDS PER SQUARE FOOT

PSI - POUNDS PER SQUARE INCH

PSIG - POUNDS PER SQUARE INCH GAUGE

RA - RETURN AIR

RAD - RADIUS

RCP - REFLECTED CEILING PLAN

RD - ROOF DRAIN

REC - RECESSED

REQD - REQUIRED

RI - ROUGH IN

RL - REFRIGERANT LIQUID

ROS - REVERSE OSMOSIS W ATER SUPPLY

ROR - REVERSE OSMOSIS W ATER RETURN

RPM - REVOLUTIONS PER MINUTE

RS - REFRIGERANT SUCTIO N

S - SPRINKLER (W ET)

SA - SUPPLY AIR

SAN - SANITARY OR SANITARY DRAIN

SCH - SCHEDULE

SCW - SOFT COLD W ATER

SHT - SHEET

SPEC - SPECIFICATIONS

SQ - SQUARE

SR - SUPPLY RISER

SRV - SAFETY RELIEF VALVE

SS - STAINLESS STEEL

STD - STANDARD

STM - STORM OR STORM DRAINAGE

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TEMP - TEMPERATURE

TOB - TOP OF BEAM

TOD - TOP OF DUCT

TOE - TOP OF EQUIPMENT

TOF - TOP OF FOOTING

TOJ - TOP OF JOIST

TOP - TOP OF PIPE

TOS - TOP OF SLAB OR TOP OF STEEL

TYP - TYPICAL

UNO - UNLESS NOTED OTHERW ISE

V - VENT

VAC - VACUUM

VAV - VARIABLE AIR VOLUME

VEL - VELO CITY

VIB - VALVE IN BOX

VOL - VOLUME

VTR - VENT THROUGH ROOF

VR - VENT RISER

W / - W ITH

W /O - W ITHOUT

W B - W ET BULB

W CO - W ALL CLEANOUT

GENERAL FLOOR PLAN NOTES

PLAN NOTE. APPLIES ONLY TO THE SHEET W HICH IT IS SHOW N UNLESS

NOTED OTHERW ISE.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

A1

EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER DESIGNATIONS

REFER TO SCHEDULES.

H1 H1OR

EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO

SCHEDULES.

H2

B

H2

RISER OR STACK NUMBER

DETAIL: B = DETAIL DESIGNATION

H2 = SHEET W HERE DETAIL IS LOCATED

SECTION: 1 = SECTION DESIGNATION

H2 = SHEET W HERE DETAIL IS LOCATED

A1 "UP TO" SYM BOL (ITEM ON FLOOR ABOVE)

APPROXIMATE DIMENSION ABOVE FIN ISHED FLOOR TO TOP OR BOTTOM OF

EQUIPMENT, UNLESS NOTED OTHERW ISE

10"

ELEV: 8' - 0"ELEV: 8' - 0"

TOD: 8' - 10"

BOD: 7' - 2"

20x20

20x20

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF

DUCTW ORK, UNLESS NOTED OTHERW ISE

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE OF PIPE,

UNLESS NOTED OTHERW ISE

DL-1

UC-X DOOR UNDERCUT. X = HEIGHT OF UNDERCUT IN INCHES; 0.75 INCH

UNDERCUT IF NO HEIGHT IS NOTED. COORDINATE W ITH GC.

DOOR LOUVER. 1 = SQUARE FEET OF LOUVER.

CONNECT TO EXISTING

HVAC PIPING DESIGNATIONS

CHILLED W ATER SUPPLY PIPECHS

CONDENSER W ATER SUPPLY PIPECW S

CONDENSER W ATER RETURN PIPECW R

DRAIN LINE. PITCH IN DIRECTION INDICATEDD

HEATING HOT W ATER SUPPLY PIPEHW S

HEATING HOT W ATER RETURN PIPEHW R

W ATER MAKE-UP PIPEMU

VENT PIPEV

REFRIGERANT LIQUID LINERL

REFRIGERANT SUCTION LINERS

EXPAN SION TAN K PIPEET

REFRIGERANT HOT GAS LINEHG

LOW PRESSURE CONDENSATE RETU RN PIPELPC

LOW PRESSURE STEAM SUPPLY PIPELPS

MEDIU M PRESSU RE CONDEN SATE RETUR N PIPEMPC

MEDIUM PRESSURE STEAM SUPPLY PIPEMPS

PUMPED CONDENSATE RETURN PIPEPC

HIGH PRESSURE CONDENSATE RETURN PIPEHPC

HIGH PRESSURE STEAM SUPPLY PIPEHPS

STEAM SUPPLY PIPE - NUMBER IND ICATES P.S.I.G.10

MISC SYMBOLS

DUCTWORK SYMBOLS

ROUND BRANCH DUCTW ORKCONICAL

FITTING

ACOUSTIC

FITTING

ACOUSTIC

FITTING

ADAD

D

R R

D

REC TANGULAR BR ANCH DUCTW ORK

SQUARE TEE W ITH TURNING VANES

NOTE: ALL SQUARE ELBOW S IN

RECTANGULAR AND ROUND / OVAL

DUCTW ORK SHALL BE PROVIDED W ITH

TURNING VANES. REFER TO

SPECIFICATIONS FOR ADDITIONAL DETAILS.

EXISTING DUCTW ORK TO REMOVED

RETURN AIR , RELIEF AIR, O R TRANSFER AIR

DUCTW ORK. (UP AND DOW N) RADIUSED

OR SQUARE W ITH TURNING VANES.

SUPPLY AIR OR OUTDOOR AIR DUCTW ORK.

(UP AND DOW N) RADIUSED OR SQUARE

W ITH TURNING VANES.

EXHAUST AIR DUCTW ORK. (UP AND DOW N)

RADIUSED OR SQUARE W ITH TURNING

VANES.

RECTANGULAR AND ROUND / OVAL

DUCTW ORK RISE / DROP W ITH 90° RADIUSED

OR SQUARE ELBOW S AND TURNING VANES.

RADIUS ELBOW

90° SQUARE ELBOW (W ITH TURNING VANES)

NOTE: ALL SQUARE ELBOW S IN

RECTANGULAR AND ROUND DUCTW ORK

SHALL BE PROVIDED W ITH TURNING VANES.

ACCESS DOOR OR PANEL

DUCTW ORK RISE IN DIRECTION OF AIR

FLOW

DUCTW ORK DROP IN DIRECTION OF AIR

FLOW

DUCTW ORK W ITH ACOUSTICAL LINER.

LISTED DUCT SIZES ARE INSIDE CLEAR

DIMENSIONS.

RECTANGULAR ROUND / OVAL

FLEXIBLE DUCTW ORK

FLEXIBLE CONNECTION

DUCTW ORK CONSTRUCTED OF SPECIAL

MATERIAL AS NOTED

DIRECTION OF PITCH

RECTANGULAR DUCTW ORK DIMENSIONS

(W x H)26x20

ROUND DUCTW ORK DIMENSIONS (DIA)26ø

OVAL DUCTW ORK DIMENSIONS (W x H)26x20 OV

DUCTWORK DEVICE SYMBOLS

W ALL OR DUCTW ORK MOUNTED AIR DEVICE. SG1 = DESIGNATION (REFER

TO AIR DEVICE SCHEDULE). 20x12 = DUCT CONNECTION SIZE (IN INCHES).

300 = REQUIRED CFM. 9'-0" = MOUNTING HEIGHT FROM FLOOR TO BOTTOM

OF GRILLE.

A3 10ø

MANUAL BALANCING DAMPER W ITH LOCKING DEVICE

BDD = BACK DRAFT DAMPER

CBD = COUNTER-BALANCED BACK DRAFT DAMPER

SD = SMOKE DAMPER

FS = COMBINATION FIRE - SMOKE DAMPER

MDD = MOTORIZED DAMPER

AFMS = AIR FLOW MEASURING STATION

DUCT MOUNTED SMOKE DETECTOR. COORDINATE LOCATION.

HUMIDITY SENSOR - DUCT MOUNTED

SG1

20x12

BOG : 9'-0"

XXX

A-D

XX

H

SD

SP

AIR DEVICE. A3 = DESIGNATION (REFER TO FLOOR PLANS AND AIR DEVIC E

SCH EDULE FOR VARIOUS DESIGNATION S).

10ø = NECK SIZE (IN INCHES). 300 = REQUIRED CFM. ALL AIR DEVICE

DISCHARGE 4-W AY UNLESS NOTED W ITH FLOW ARROW S. AIR DEVICE

SHOW N IS 2-W AY SIDE THROW . METHOD OF IDENTIFICATION ALSO APPLIES

TO OTHER CEILING MOUNTED AIR DEVICES.

FIRE DAMPER

A = TYPE (R EFER TO FLOOR PLANS FOR VARIOU S TYPES)

D OR S = DYNAMIC OR STATIC

STATIC PRESSU RE SENSOR - DUCT MOU NTED

C

CAR BON DIOXIDE SENSOR - DUCT MOUN TED

S

TEMPERATURE SEN SOR - DUCT MOU NTED

CHECK VALVE

T

P

FOB

FOT

SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR

REQUIRED TYPE BASED ON APPLICATIONS)

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

PRESSURE GAUGE

TEMPERATURE GAUGE OR THERMOMETER

COMBINATION SHUTOFF AND BALANCING VALVE

(REFER TO SPECIFICATIONS FOR REQUIRED

TYPE BASED ON APPLICATIONS)

BALL VALVE

BUTTER FLY VALVE

GATE VALVE

VALVES AND FITTINGS

DOUBLE LINE SINGLE LINE

10"

TOE: 3' - 0"

BOE: 0' - 6"

CHILLED W ATER GLYCOL SOLUTION RETUR N PIPECHGR

CHILLED W ATER GLYCOL SOLUTION SUPPLY PIPECHGS

CHILLED W ATER RETUR N PIPECHR

SQUARE THROAT / RADIUS HEEL

FITTINGS NOT ACCEPTABLE

PIPING SYMBOLS

DOUBLE LINE SINGLE LINE

BOTTOM CONNEC TION (45°)

BRANCH TEE CONNECTION (NOTE:

BULLHEAD TEE'S ARE NOT PERMITTED)

DIRECTION OF PITCH

DROP

ELBOW DOW N

ELBOW UP

EXISTING PIPE TO BE REMOVED

EXISTING PIPE TO REMAIN

FLOW DIRECTION DESIGNATION

PUMP

RISE

TOP C ONNECTION (45°)

TOP C ONNECTION (90°)

BOTTOM CONNEC TION (90°)

DD

RR

PIPE RISER

RAD IUS'D BRANCH

RAD IUS'D TEE

EXISTING DUCTW OR K TO REMAIN

UNLESS NOTED OTHERW ISE ON DRAW INGS,

15° MAX FOR DIVERGING, 30° MAX FOR

CONVERGING TRANSITION

EMER GENCY SHUTOFF STATION. 46" MOUNTING HEIGHT UNLESS NOTED OTHERW ISE.

SPACE TEMPERATURE SEN SOR / THERMOSTAT. W HEN W ALL MOUNTED, MOUNTING

HEIGHT 46" TO MEET ADA REQUIR EMENTS. W HEN MOUN TED NEXT TO W ALL SW ITCH

COORDINATE W ITH ARCH ITECT.

T

DP

DIFFERENTIAL PRESSURE SENSOR. W HEN W ALL MOUN TED, MOUNTING H EIGHT 46" TO

MEET ADA REQUIREMENTS. W H EN MOUNTED N EXT TO W ALL SW ITCH COORDINATE W ITH

ARC HITEC T.

H

HUMIDITY SENSOR. W HEN W ALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA

REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH ARCHITECT.

CARBON DIOXIDE SENSOR. W HEN W ALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA

REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH ARCHITECT.

C

CO

CAR BON MONOXID E SENSOR. W HEN W ALL MOUNTED, MOUNTING HEIGHT 46" TO MEET

ADA R EQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITC H C OORDINATE W ITH

ARC HITEC T.

TEMPERATURE SENSOR. W HEN W ALL MOUNTED, MOUN TING HEIGH T 46" TO MEET ADA

REQU IREMENTS. W H EN MOUN TED NEXT TO W ALL SW ITCH COORDINATE W ITH

ARC HITEC T.

S

S TEMPERATURE SENSOR MOUNTED IN CEILIN G PLENU M.

STATIC PRESSU RE SENSOR .SP

STRAINER W ITH A BLOW DOW N VALVE AND HOSE

CONNECTION

DRAIN VALVE W ITH H OSE END CONNECTION

AUTOMATIC FLOW CONTROLLER W ITH P/T PLUG IN

AND OUT

EXPANSION JOINT

MANUAL AIR VENT

AUTOMATIC AIR VENT

PRESSURE REDUCING VALVE

2 PORT AUTOMATIC CONTROL VALVE

3 PORT AUTOMATIC CONTROL VALVE

QUICK OPENING MANUAL VALVE

VACUUM BREAKER

NEEDLE VALVE

PRESSURE AND TEMPERATUR E TEST PLUG

VACUUM GAUGE W ITH STOP

END CAP

GLOBE VALVE

SHUTOFF VALVE AND BOX

SHUTOFF VALVE ON RISER

A

M

M

N

V

VB

SOLENOID VALVE

S

SAFETY RELIEF VALVE. FOR HYDRONIC SYSTEMS

PIPE DISCHARGE AIR GAPPED TO FLOOR DRAIN

UNLESS NOTED OTHERW ISE. FOR STEAM

SYSTEMS PIPE D ISCHARGE TO OUTDOORS.

W ATER METERM

PRESSURE G AUGE W ITH COCK AND SIPHON LOOP

BI-M ETALIC STEAM TRAP AND DRIP ASSEM BLY

THERMODYNAMIC STEAM TRAP AND DRIP

ASSEMBLY

INVERTED BUCKET STEAM TRAP AND DRIP

ASSEMBLY

FLOAT AND THERMOSTATIC STEAM TRAP AND

DRIP ASSEMBLY

TH ERM OSTATIC STEAM TRAP AND DRIP ASSEM BLY

BM

TD

IB

FT

TS

FLOW M ETER

F

UNION

CLEANOUT

STRAINER

AUTOMATIC PRESSURE INDEPENDENT CONTROL

VALVE

M

1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.

2. THE DRAW INGS AND SPECIFICATIONS SHALL BE CAREFULLY STUDIED DURING THE COURSE OF BIDDING AND CONSTRUCTION. ANY ERRORS, OMISSIONS OR DISCREPANCIES ENCOUNTERED SHALL BE REFERRED IMMEDIATELY TO THE ARCHITECT/ENGINEER FOR INTERPRETATION OR CORRECTION, SO THAT MISUNDERSTANDINGS AT A LATER DATE MAY BE AVOIDED.

3. SITE VISIT(S) SHALL BE AS OUTLINED IN PROJECT SPECIFICATIONS.

4. INCLUDE ALL W ORK NECESSARY TO ACCOMMODATE PHASING. REFER TO ARCHITECTURAL DRAW INGS AND GENERAL

REQUIREMENTS SECTION 01 00 00.

5. INSULATE DUCTW ORK AND PIPING W HERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED IN THE PERFORMANCE OF

W ORK IN THIS PROJECT.

6. REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAW INGS FOR DETAILS OF BUILDING CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT FOR W ORK. THE VARIOUS DRAW INGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE USED JOINTLY AT ALL TIMES. REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS INDICATED ON THE DRAW INGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOW ED TO EXECUTE THE W ORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE CONTRACTING OFFICERS REPRESENTATIVE (COR) THRU THE

CONTRACTING OFFICER FOR CLARIFICATION BEFORE PROCEEDING.

7. IN ACCORDANCE W ITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR W ILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE W ORK. THIS W ILL APPLY CONTINUOUSLY AND NOT BE LIM ITED TO NORMAL W ORKING HOURS. SEE SPECIFICATIONS FOR

MORE SPECIFIC DETAILS ON RESPONSIBILITIES.

8. ALL W ORK MUST BE COORDINATED W ITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.

9. COORDINATE ALL W ORK W ITH THE W ORK OF OTHERS. KEEP INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE W ORK OF OTHERS. COORDINATE AND EXPEDITE W ORK W ITH OTHERS SO THAT THE PROGRESS OF THE TOTAL W ORK SHALL BE KEPT

ON SCHEDULE.

10. ALL W ORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE W ITH ALL GOVERNING CODES AND STANDARDS.

11. EXISTING CONDITIONS SHOW N HAVE BEEN BASED UPON VISUAL OBSERVATION AND/OR AVAILABLE DRAW ING INFORMATION, AND MAY BE AT VARIANCE W ITH ACTUAL W ORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE W ORK. ANY DISCREPANCIES BETW EEN EXISTING CONDITIONS AND THE W ORK SHOW N ON THE CONTRACT DOCUMENTS W HICH MAY IMPACT THE PROGRESS OF THE W ORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN W RITING FOR RESOLUTION BEFORE PROCEEDING W ITH THE W ORK.

12. FITTING OR PLACING W ORK INTO OR ON THE W ORK OF OTHERS CONSTITUTES ACCEPTANCE OF THE SUITABILITY OF THE W ORK IN PLACE. IF THE W ORK OF OTHERS IS NOT ACCEPTABLE, NOTIFY THE CONTRACTING OFFICERS REPRESENTATIVE (COR) FOR THE W ORK TO BE CORRECTED. ANY NEW W ORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW W ORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING W ORK

INSTALLED IN UNSUITABLE EXISTING CONDITIONS W ILL BE CONSIDERED.

13. REFER TO ARCHITECTURAL SPECIFICATIONS FOR LOCATION OF ASBESTOS. ANY ASBESTOS W ORK PERFORMED AS PART OF THIS PROJECT SHALL BE COMPLETED PRIOR TO STARTING ANY OTHER PROJECT SITE W ORK. REFER TO ARCHITECTURAL SPECIFICATIONS

FOR ASBESTOS ABATEMENT.

14. IF, IN THE PERFORMANCE OF TH IS W ORK, MATERIALS ARE OBSERVED W HICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE COR. W ORK THAT W OULD EXPOSE W ORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. W ORK MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE

MATERIALS HAVE BEEN REMOVED OR ENCAPSULATED AND THE AREA DECLARED SAFE.

15. SOME AREAS MAY BE NOTED ON FLOOR PLANS THAT ASBESTOS IS PRESENT. CONTRACTORS SHALL TAKE SPECIAL CARE W HILE W ORKING ADJACENT TO ASBESTOS MATERIALS AND MUST BE PROPERLY PROTECTED W ITH CLOTHING, BREATHING APPARATUS, ETC. VERIFY REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT TEAM (ICRA) ARCHITECTURAL SPECIFICATIONS.

16. REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN(S) FOR LOCATIONS AND FIRE-RATINGS OF NEW AND EXISTING W ALL ASSEMBLIES. ALL PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED AS REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. COORDINATE W ITH ALL TRADES TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS AND

DETAILS ARE MET.

17. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED W ALLS & FLOORS SHALL BE SEALED TO RETARD PASSAGE OF

SMOKE.

18. ALL PIPING, DUCTS, CONDUITS, ETC. IN FINISHED ROOMS, CORRIDORS, ETC. SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE

THE SUSPENDED CEILING.

19. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOW N OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.

20. PROVIDE DUCT ACCESS PANELS AS REQUIRED BY 23 31 00 FOR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, SMOKE DETECTORS, AUTOMATIC CONTROL DAMPERS, AND HUMIDIFIER DISPERSION TUBES. REFER TO DETAIL ON SHEET 00. COORDINATE SIZES AND

LOCATIONS W ITH ACCESSORIES PROVIDED BY OTHER TRADES.

21. ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS SHALL BE PROVIDED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, FLOW METERS, CONTROLS, ETC. COORDINATE SIZES AND LOCATIONS W ITH OTHER TRADES.

22. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.

23. FOR TYPICAL STEAM, W ATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING

SCHEMATICS.

24. DIFFUSER SIZES SHOW N ON FLOOR PLANS ARE NECK SIZES. REGISTER AND GRILLE SIZES SHOW N ARE FACE SIZES.

25. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.

26. W HERE DUCTS OR PIPES ARE REMOVED THRU W ALL/FLOOR/ROOF THAT IS TO REMAIN, PATCH W ALL/FLOOR/ROOF OPENING TO

MATCH EXISTING W HERE OPENING IS NOT RE-USED.

27. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE

DISTURBED UNDER THIS W ORK TO MATCH EXISTING.

28. IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF STRUCTURE.

29. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE

PREMISES AND D ISPOSED OF PROPERLY BY THE CONTRACTOR.

30. THE CONTRACT DRAW INGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET W HICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE W ORK IN ADVANCE W ITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES

W HICH CAN BE ANTICIPATED.

31. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, P IPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO

PERFORMING W ORK.

32. ALL ABANDONED EXTRANEOUS PIPING, DUCTW ORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.

33. TERMINATE PIPING AND DUCTW ORK BELOW FLOORS, ABOVE CEILINGS, ETC., IN CONCEALED SPACES. ALL CUTTING AND PATCHING

SHALL MATCH EXISTING FINISHES.

34. W HERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO MAIN AND CAPPED; AND CONTROL

W IR ING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.

35. ALL EXISTING DUCTW ORK, P IPING, EQUIPMENT, CONTROLS, ETC. SHOW N ON REMOVAL PLAN(S) SHALL BE REMOVED. THE MAJORITY OF W ORK TO BE REMOVED IS SHOW N. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTW ORK, P IPING, ETC. THAT MAY NOT BE

SHOW N BUT IS ASSOCIATED W ITH THE REMOVAL W ORK.

36. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PORTABLE LADDERS OR PERMANENT PLATFORMS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIM ITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS, CONTROL DEVICES, ETC .

37. W HERE EXISTING HVAC UTILITIES IN SERVICE W ILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS W ORK SHALL BE PERFORMED ON W EEKENDS OR W EEK NIGHTS. DOW NTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND S

CHEDULED W ELL IN ADVANCE W ITH THE COR.

38. W HEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING DUCTW ORK, CLEAN BOTH NEW AND EXISTING DUCTW ORK BY MOPPING AND VACUUM CLEANING INSIDE AND OUTSIDE BEFORE OPERATION. CLEANING OF EXISTING DUCTW ORK SHALL BE LIM ITED TO THE IMMEDIATE AREA W ITHIN REACH OF THE OPEN END OF THE DUCT.

39. RUNOUT PIPING TO TERMINAL UNITS SHALL BE 0.75” SIZE UNLESS OTHERW ISE NOTED. REFER TO AIR TERMINAL UNIT SCHEDULE(S).

40. ALL INSULATED DUCTW ORK AND PIPING SHALL HAVE DAMPER/VALVE HANDLE EXTENSIONS.

41. CONTROL CONTRACTORS RESPONSIBILITES ARE LISTED IN SPECIFICATION SECTION 23 09 23, SECTION 1.1.

GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland VA Medical Center

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

M ECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIM ATING :

M CGUINESS UNLIM ITED, INC.

15724 STILLW O OD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOG GS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. M ATERIALS ASSESSM ENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

W ESTLAKE, OH 44145

P. 216.781.0060

FINAL CD's SUBMISSION

C

B

IM

\M o d e l\

-0

-M

E P

-C e n tr a l_ m k m o n a g h a n .r v t

/1

/2

:3

:2

P

M

M-001

MECHANICAL LEGEND, NOTES AND INDEX OF

DRAWINGS

PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD CLEVELAND, OHIO

541-21-101

11.17.20 BRB SMP

SHEET LIST - MECHANICAL LIST

SHEET NUMBER SHEET NAME

MH-104 PARTIAL FOURTH FLOOR PLAN - NEW WORK

MD-105 PARTIAL FIFTH FLOOR PLAN - DEMOLITION

MH-105 PARTIAL FIFTH FLOOR PLAN - NEW WORK

MD-106 PARTIAL SIXTH FLOOR PLAN - DEMOLITION

MH-106 PARTIAL SIXTH FLOOR PLAN - NEW WORK

M-501 DETAILS

M-601 SCHEDULES

M-901 CONTROLS

SHEET LIST - MECHANICAL LIST

SHEET NUMBER SHEET NAME

M-001 MECHANICAL LEGEND, NOTES AND INDEX OF DRAWINGS

MD-100B PARTIAL BASEMENT FLOOR PLAN - DEMOLITION

MH-100 PARTIAL SUB-BASEMENT AND BASEMENT FLOOR PLAN - NEW WORK

MD-101 PARTIAL FIRST FLOOR PLAN - DEMOLITION

MH-101 PARTIAL FIRST FLOOR PLAN - NEW WORK

MD-102.1 PARTIAL SECOND FLOOR PLAN - DEMOLITION

MH-102.1 PARTIAL SECOND FLOOR PLAN - NEW WORK

MD-102.2 PARTIAL SECOND FLOOR PLAN - DEMOLITION

MH-102.2 PARTIAL SECOND FLOOR PLAN - NEW WORK

MD-103 PARTIAL THIRD FLOOR PLAN - DEMOLITION

MH-103 PARTIAL THIRD FLOOR PLAN - NEW WORK

MD-104 PARTIAL FOURTH FLOOR PLAN - DEMOLITION

PROJECT SEQUENCING

A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING A SEQUENCING PLAN FOR THE ORDER IN W HICH THE SPACES IN THE PROJECT ARE ADDRESSED, AND SHALL SUBMIT SAME TO THE VA COR FOR REVIEW AND APPROVAL DURING THE PRE-CONSTRUCTION PHASE. IT IS NOT NECESSARILY A

REQUIREMENT THAT THE SPACES BE W ORKED ON ONE-BY-ONE IF THE CONTRACTOR OBTAINS

APPROVAL FROM THE VA COR TO W ORK ON MULTIPLE SPACES AT ONCE. REGARDLESS OF THE

APPROACH TAKEN, TOTAL CONSTRUCTION TIMELINE SHALL NOT EXCEED THE DURATION OUTLINED

BELOW .

B. PROJECT SCHEDULE SHALL INDICATE THE STARTING DATE AND DURATION OF W ORK FOR EACH

SPACE.

C. REFER TO 23 09 23 PARAGRAPH 1.1.L FOR COORDINATION OF W ORK BETW EEN CONTRACTOR AND ENGINEER-RETAINED, TH IRD-PARTY MASTER SYSTEM INTEGRATOR UNDER SEPARATE CONTRACT.

CONSTRUCTION PHASING

FOR EACH SPACE, THE GENERAL PHASING OF W ORK SHALL BE:

A. DETERMINE EXACT UPGRADES THAT ARE TO BE PERFORMED W ITHIN AND OUTSIDE OF SPACE.

B. SCHEDULE SHUTDOW N OF SPACE OR DETERMINE W HEN THE SPACE IS ABLE TO BE W ORKED

W ITHIN.

C. COORDINATE W ITH STAFF FOR LENGTH OF SHUTDOW N AND ANY TEMPORARY STORAGE THEY W ILL

NEED.

D. PERFORM ANY W ORK NOT REQUIRING SPACE SHUTDOW N, SUCH AS: CONTROLS, W IRING, OR

ABOVE-CEILING W ORK DONE OFF-HOURS.

E. BUILD ANY TEMPORARY CONSTRUCTION W ALLS.

F. PERFORM W ORK W ITHIN SPACE.

G. PERFORM CONTROLS W ORK AND PROGRAMMING FOR COMMUNICATION W ITH AHU’S AND BUILDING

AUTOMATION SYSTEM.

H. PERFORM TESTING, ADJUSTING AND BALANCING.

I. COORDINATE W ITH THIRD-PARTY MASTER SYSTEM INTEGRATOR (PROVIDED UNDER SEPARATE

CONTRACT) TO COMPLETE SUPERVISOR W ORK.

CONSTRUCTION TIMELINE

THE SCOPE OF W ORK DESCRIBED IN THIS DRAW ING PACKAGE REPRESENTS A PROJECT THAT MUST BE

UNDERTAKEN DURING FULL OCCUPANCY AND FUNCTIONALITY OF THE EXISTING HOSPITAL. THE

PROPOSED DURATION PLAN IS AS FOLLOW S:

PRE-CONSTRUCTION: 60 DAYS

CONSTRUCTION: 120 DAYS* (NOTE: CONTRACTOR SHALL ALLOW 2 DAYS PER SPACE

FOR VA 'S MASTER SYSTEM INTEGRATOR W ORK)

CLOSE OUT: 30 DAYS

TOTAL TIMEFRAME: 210 DAYS

THE FOLLOW ING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, W HEN NO INTERRUPTION TO OPERATION RESULTS. CONTRACTORS, HOW EVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AW AY DURING REGULAR SHIFT HOURS, AND

MUST COORDINATE SUCH ACTIVITIES W ITH STAFF AND VA COR.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS APPROVED BY VA COR, SHALL NOT APPLY TO W ORK SUCH AS:

• UTILITY SHUTDOW NS

• EXISTING MEP SYSTEM SHUTDOW NS

• W ORK IN PUBLIC CORRIDORS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• W ORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF

CEILING PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT

OF EXISTING FINISHES.

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS.

W ORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT OR ON W EEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEW ED AND APPROVED BY VA COR. REFER

TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS.

Revisions: Date:

65% CD'S SUBMISSION 8.5.20

100% CD'S SUBMISSION 10.19.20

FINAL CDs SUBMISSION 11.17.20

BAC250B

BAC250C

BAC251

BAC252

BAC253

BAC254

BAC255

BAC259

BAC256

T

BB210B

BB213

BB226

BB227

BB226C

BB226B

BB226A

T

BB560

BB581B

BB582A

BB561 BB563

T

BFC06

BFC06C

BFC06A

BF154A

BF153

8ø

8ø

8ø

EX-SD

8ø

8ø

8ø

12ø

8ø ø x1

8ø

EX-SD

8ø

EX-SD

8ø

EX-SD

6ø

EX-SD

6ø

EX-SD

8ø

8ø

EX-RG

8ø

EX-RG

8ø

EX-RG

8ø

EX-RG

x1

16x12

8ø

10ø ø x1

9ø

9ø

10ø

8ø

VAV BOXVAV BOX

x1

40x18

6ø ø

6ø

6ø

6ø

6ø

EX-SD

6ø

EX-SD

6ø

EX-SD

26x12

18x10

40x18

16x8 x1

VAV BOX

3" - HW R

3" - HW S

38x16

6ø

6ø

EX-RG

VAV BOX

2"

H W

S 2"

H

W R

12x10

18x10 x8 x1

6ø 10x6

8ø

EX-SD

8ø x1

18x14

10ø 16x10 x1 x1

10ø

VAV

BO X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes

Cleveland

VA Medical

Center

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

M ECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIM ATING :

M CGUINESS UNLIM ITED, INC.

15724 STILLW O OD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOG GS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. M ATERIALS ASSESSM ENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

W ESTLAKE, OH 44145

P. 216.781.0060

FINAL CD's SUBMISSION

C

B

IM

\M o d e l\

-0

-M

E P

-C e n tr a l_ m k m o n a g h a n .r v t

/1

/2

:3

:3

P

M

MD-100B

PARTIAL BASEMENT FLOOR PLAN -

DEMOLITION

PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD CLEVELAND, OHIO

541-21-101

11.17.20 BRB SMP

SCALE: 1/4" = 1'-0"

MAIN BLDG - BACK HALL EMPLOYEE HEALTH - DEMOLITION

SCALE: 1/4" = 1'-0"

MAIN BLDG - B-B226C RADIATION THERAPY - DEMOLITION

SCALE: 1/4" = 1'-0"

MAIN BLDG - B-B561 RADIOLOGY - DEMOLITION

SCALE: 1/4" = 1'-0"

CARES TOWER - BF-153 - DEMOLITION

NOTES

1 REMOVE DIFFUSER AND DUCT BACK TO POINT INDICATED FOR RECONNECTION IN

NEW WORK.

2 REMOVE GRILLE AND DUCT BACK TO POINT INDICATED. CAP AND SEAL DUCT

AIRTIGHT.

3 CAREFULLY REMOVE THERMOSTAT AND MAINTAIN FOR RELOCATION TO NEW.

4 REMOVE DIFFUSER AND BRANCH RUNOUT BACK TO MAIN. CAP DUCT AT MAIN. SEAL

AND INSULATE DUCT PER SPECIFICATION FOR NEW WORK.

5 OBTAIN MAXIMUM AND MINIMUM AIRFLOW SETTINGS FOR VAV BOX. PROVIDE

PRE-CONSTRUCTION AIR SURVEY FOR ALL CONNECTED SPACES. AIRFLOW TO BE

OBTAINED BY AABC-ACCREDITED AIR-BALANCE COMPANY.

A. REFER TO SHEET M-001 FOR LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERAL NOTES.

B. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, P IPE AND EQUIPMENT SIZES, SERVICES AND

LOCATIONS PRIOR TO PERFORMING W ORK.

C. ALL ABANDONED EXTRANEOUS PIPING, DUCTW ORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.

D. ALL EXISTING DUCTW ORK, P IPING, EQUIPMENT, CONTROLS, ETC. SHOW N ON REMOVAL PLAN(S) SHALL BE

REMOVED. THE MAJORITY OF W ORK TO BE REMOVED IS SHOW N. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTW ORK, PIP ING, ETC. THAT MAY NOT BE SHOW N BUT IS ASSOCIATED W ITH THE REMOVAL

W ORK.

E. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS IND ICATING LOCATIONS OF ALL ROOMS

INCLUDED IN SCOPE.

F. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.

G. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS

NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.

H. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE

PERFORMING ANY W ORK.

I. ALL EXISTING DUCT SHALL BE TEMPORARILY SEALED BETW EEN DEMOLITION AND NEW W ORK.

GENERAL NOTES

Revisions: Date:

65% CD'S SUBMISSION 8.5.20

BAC250B

BAC250C

BAC251

BAC252

BAC253

BAC254

BAC255

BAC259

BAC256T

BB213

BB226

BB227

BB226B

BB226A

T

TH

BB560

BB581B

BB582A

BB561 BB563

T H T

BC570

BC563

BC530

BC532

TH

BFC06

BFC06C

BFC06A

BF154A

H T

BFC09

BF208

BF209

S

T

H

BF212

T

S H

AF216

AF214

AF215

T

H x1 ø

8ø

9ø

9ø

12ø x1 ø x1

8x8

8ø

10ø

8ø

8ø

8ø

8ø

8ø

8ø

10ø

8ø

8ø

8ø

8ø

EX-SD

8ø

EX-SD

8ø

EX-SD

8ø

EX-SD

6ø

EX-SD

8ø

EX-RG

8ø

EX-RG

8ø

EX-RG

8ø

CD1

150 CFM

8ø

CG1

50 CFM

40x18

40x18 x1

38x28 ø

3"

6ø

6ø

EX-SD

6ø

EX-SD

50 CFM

B-05 10ø

CD1

200 CFM

x1

10ø

EX-RG

50 CFM

38x16

6ø

6ø

EX-RG

50 CFM

3 2

8ø

CD1

200 CFM2"

H W

R 2"

H

W S

12x10 x1

VAV

BO X

B-04

10x8 6ø

3 2

8ø

CD1

200 CFM B-03

10x10 x1 x1

3" - HW S

3" - HW R

6ø

18x10 x1 x1

10ø

10x6

16x10

3 29

B-06

8ø

CD1

200 CFM

10x10 x1

1"

H W

R 1"

H

W S x1

VAV

BO X

0.75"

0.75" ø

8ø x8

8ø 10 ø x8 x1 x1

8ø

6ø

8ø

8ø

EX-SD

8ø

EX-SD

200 CFM

8ø

EX-SD

B-02

22x14

8x4

24x20

18x12 x8

6ø

EX-SD

200 CFM

4ø

EX-SD

6ø

EX-EG

B-01

BF213

x1 x8

32x22 x6

36x20

8ø

EX-SD

8ø

EX-SD

A-01

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes

Cleveland

VA Medical

Center

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

M ECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIM ATING :

M CGUINESS UNLIM ITED, INC.

15724 STILLW O OD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOG GS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. M ATERIALS ASSESSM ENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

W ESTLAKE, OH 44145

P. 216.781.0060

FINAL CD's SUBMISSION

C

B

IM

\M o d e l\

-0

-M

E P

-C e n tr a l_ m k m o n a g h a n .r v t

/1

/2

:3

:0

P

M

MH-100

PARTIAL SUB-BASEMENT AND BASEMENT

FLOOR PLAN - NEW WORK

PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD CLEVELAND, OHIO

541-21-101

11.17.20 BRB SMP

SCALE: 1/4" = 1'-0"

MAIN BLDG - BACK OF HALLWAY EMPLOYEE HEALTH - NEW WORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - B-B226C RADIATION THERAPY - NEW WORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - B-B561 RADIOLOGY - NEW WORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - B-C532 NUCLEAR MED - NEW WORK

SCALE: 1/4" = 1'-0"

CARES TOWER - BF-153 - NEW WORK

SCALE: 1/4" = 1'-0"

CARES TOWER - BF-208 - NEW WORK

SCALE: 1/4" = 1'-0"

CARES TOWER - BF-213 - NEW WORK

NOTES

1 PROVIDE NEW HOT W ATER AIR TERMINAL UNIT. REW ORK EXISTING HOT W ATER PIPING AS REQUIRED TO ACCOMODATE NEW AIR TERMINAL UNIT AND ACCESSORIES PER DETAIL ON M501. PROVIDE TRANSITIONS TO

EXISTING DUCTW ORK AS REQUIRED.

2 PROVIDE NEW BALL-IN-W ALL VISUAL PRESSURE INDICATOR IN THIS APPROXIMATE LOCATION.

3 PROVIDE W ALL-MOUNTED DIGITAL ROOM PRESSURE MONITOR NEXT TO DOOR. PROVIDE BAS INTERFACE TO SEND ALARM W HEN ROOM PRESSURE FALLS OUTSIDE OF THE SPECIFIED RANGE. ALLOW ANCES SHALL BE MADE TO PREVENT NUISANCE ALARMS OF THE MONITORING EQUIPMENT. ROO M PRESSURE SETPOINT

SHALL BE +0.02" W .G.

4 REPLACE THERMOSTAT W ITH NEW CAPABLE OF SENSING HUMID ITY.

5 BALANCE TO INDICATED CFM. PROVIDE NEW BALANCE DAMPER IN DUCT, AS

REQUIRED.

6 REBALANCE AIR TERMINAL UNIT TO NEW CFM EQUAL TO ORIGINAL BOX CFM MINUS THE SPS ROOM CFM.

OBTAINED IN PRE-TAB AIR SURVEY.

7 RELOCATE THERMOSTAT FOR ASSOCIATED VAV BOX. PROVIDE NEW BACKBOX, CONDUIT, AND CABLING/ TUBING TO EXISTING VAV BOX PER SPECIFICATION 23 06 23 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC.

8 CONNECT TO NEAREST SUPPLY MAIN.

9 EXISTING ABOVE CEILING PENETRATIONS SHALL BE SEALED AIR-TIGHT. ALLOW FOR SEALING SIX PENETRATIONS EACH OF DUCT, P IPE AND CONDUIT PER ROOM FOR A TOTAL OF 18 PENETRATIONS.

10 PROVIDE NEW THERMOSTAT W ITH HUMIDITY-SENSING AND REPORTING CAPABILITY. VERIFY NECESSITY

PRIOR TO REPLACING.

SCALE: 1/4" = 1'-0"

CARES TOWER - AF-215 - NEW WORK

A. INCLUDE AN ADDITIONAL 300' OF BRANCH CIRCUITRY ROUTING, ASSUME 3-#12,#12 GRD. IN 0.75"C. FIELD

VERIFY LOCATIONS W HERE NEW DUCTW ORK, PIPING, ETC. NECESSITATE THIS W ORK.

B. ALL AIR FLOW S ARE INITIAL AND SHALL BE ADJUSTED ACCORDINGLY TO OBTAIN ROOM PRESSURES.

C. ALL W IR ING SHALL BE FISHED THRU EXISTING W ALLS.

D. REFER TO SHEET M-001 SIM ILAR TO DEMO SHEETS.

E. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS IND ICATING LOCATIONS OF ALL ROOMS

INCLUDED IN SCOPE.

F. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.

G. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS

NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.

H. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE

PERFORMING ANY W ORK.

GENERAL NOTES

Revisions: Date:

65% CD'S SUBMISSION 8.5.20

1A121

1A122

1A130

T

1AC280

1AC256

1AC257

1AC279

1AC275

1AC266

1AC268

1AC277

T

D

C

E

1B200A

1B218

1B214

1B213

1B215

1B216

1B217

1B218A

1B215C

Former Stair 10

T

T

1B513

1B521

1B523

1B527

1B524

T

T

1B589

1B566

1B549 1B552

1B554

1B589A

OIT Telecom/

Data Closet

1D100H

1D200A

1D211

1D215 1D137

T

STAT

AUTOMATED

LITHIUM OSMOMETER

STAINING

SPECIAL

STAINING

DATA PROCESSING

1F544

1F541

1F560 1F561

1F562

1F563

1F564

1F570

T

34x14

21x12

10ø

8ø

6ø

EX-SD

6ø

EX-SD

24x12

EX-RG

x8

6ø ø x8

16x12 x1

24x10

VAV BOX

1" - HW R

1" - HW S

x1

38x12 22x6

8ø

EX-SD

x8 x8

34x10

6ø x8

24x12

EX-RG

24x12

EX-RG

10x24

EX-RG

8ø

EX-SD

12x8

12x8

6ø

6ø

6ø

VAV BOX

2" - HWR

2" - HWS

VAV

BO X

6ø

EX-SD

6ø

EX-SD

20x20

6ø x1

DUAL

DUCT

BOX

DUAL

DUCT

BOX

DUAL

DUCT

BOX

x1

12x108ø

6ø6ø

8ø

EX-SD

6ø

EX-SD

6ø

6ø

EX-SD

6ø

6ø

EX-SD

8ø 8ø

EX-RG

6ø

EX-RG

6ø

EX-RG

6ø x1

VAV BOX

2.5" - HW S

2.5" - HW R

2.5" - HW R

x1 ø

12ø ø x8

8ø

EX-SD

6ø

EX-RG

8ø

EX-SD

6ø

EX-SD

8ø

EX-SD

6ø

20x20 x6

10x8 x1 x1

1"

H W

R 1"

H

W S

VAV BOX

6ø x8

8ø

EX-SD

9ø 12ø

8ø 6ø

8ø

EX-SD

12x6 x6

24x12

EX-RG

14x1016x1017x10 x6

24x12

EX-RG

x8

6ø

8ø 10ø12 x6 x6 x6

6ø

10x8

8ø EX-SD 12x8 x8 10x8

8ø

EX-SD

48x20

8ø x1

8ø x1

6ø

6ø

6ø ø

8ø

60x20

8ø

EX-SD

8ø

EX-SD

8ø

EX-SD

8ø

EX-SD

8ø

EX-SD

8ø

EX-SD

8ø

EX-SD

8ø

8ø

8ø

8ø

8ø

8ø

8ø ø

12ø

EX-RG

ø

10ø

EX-RG

1.5" - HW S

1.5" - HW R

VAV

BO X

2" - DHW R

2" - DHW

2" - DCW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes

Cleveland

VA Medical

Center

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

M ECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIM ATING :

M CGUINESS UNLIM ITED, INC.

15724 STILLW O OD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOG GS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. M ATERIALS ASSESSM ENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

W ESTLAKE, OH 44145

P. 216.781.0060

FINAL CD's SUBMISSION

C

B

IM

\M o d e l\

-0

-M

E P

-C e n tr a l_ m k m o n a g h a n .r v t

/1

/2

:3

:4

P

M

MD-101

PARTIAL FIRST FLOOR PLAN - DEMOLITION PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD CLEVELAND, OHIO

541-21-101

11.17.20 BRB SMP

SCALE: 1/4" = 1'-0"

ATRIUM - 1A-121 PRIMARY CARE - DEMOLITION

SCALE: 1/4" = 1'-0"

ATRIUM- 1-AC275 EMERGENCY DEPARTMENT - DEMOLITION

SCALE: 1/4" = 1'-0"

MAIN BLDG - 1-B216 PSYCH ER - DEMOLITION

SCALE: 1/4" = 1'-0"

ATRIUM - 1-B523 MRI - DEMOLITION

SCALE: 1/4" = 1'-0"

MAIN BLDG - 1-B589A WOMEN'S HEALTH - DEMOLITION

SCALE: 1/4" = 1'-0"

MAIN BLDG - 1-D215 MOD. G&H - DEMOLITION

SCALE: 1/4" = 1'-0"

MAIN BLDG - 1-F562 LAB - DEMOLITION

NOTES

1 REMOVE DIFFUSER AND BRANCH RUNOUT BACK TO MAIN. CAP DUCT AT MAIN. SEAL AND INSULATE DUCT

PER SPECIFICATION FOR NEW W ORK.

2 OBTAIN CURRENT, MAXIMUM, AND MINIMUM AIRFLOW SETTINGS FOR VAV BOX. PROVIDE PRE- CONSTRUCTION A IR SURVEY FOR ALL CONNECTED SPACES. AIRFLOW TO BE O BTAINED BY NEBB- OPR

AABC-A ACCREDITED AIR-BALANCE COMPANY.

3 CAREFULLY REMOVE THERMOSTAT AND MAINTAIN FOR RELOCATION TO NEW . PATCH AND PAINT W ALL TO

MATCH EXISTING.

4 REMOVE DIFFUSER AND ATTACHED FLEX DUCT. MAINTAIN DUCT FOR CONNECTION TO NEW .

A. REFER TO SHEET M-001 FOR LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERAL NOTES.

B. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, P IPE AND EQUIPMENT SIZES, SERVICES AND

LOCATIONS PRIOR TO PERFORMING W ORK.

C. ALL ABANDONED EXTRANEOUS PIPING, DUCTW ORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.

D. ALL EXISTING DUCTW ORK, P IPING, EQUIPMENT, CONTROLS, ETC. SHOW N ON REMOVAL PLAN(S) SHALL BE

REMOVED. THE MAJORITY OF W ORK TO BE REMOVED IS SHOW N. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTW ORK, PIP ING, ETC. THAT MAY NOT BE SHOW N BUT IS ASSOCIATED W ITH THE REMOVAL

W ORK.

E. DEDUCT ALTERNATE #1 - ELIMINATE W ORK ASSOCIATED W ITH "ATRIUM - 1AC-275 URGENT CARE" FROM

SCOPE OF W ORK.

F. DEDUCT ALTERNATE #2 - ELIMINATE W ORK ASSOCIATED W ITH "ATRIUM - 1A-121-FIRM A" FROM SCOPE OF

W ORK.

G. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS IND ICATING LOCATIONS OF ALL ROOMS

INCLUDED IN SCOPE.

H. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.

I. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS

NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.

J. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE

PERFORMING ANY W ORK.

K. ALL EXISTING DUCT SHALL BE TEMPORARILY SEALED BETW EEN DEMOLITION AND NEW W ORK.

GENERAL NOTES

Revisions: Date:

65% CD'S SUBMISSION 8.5.20

1A121

1A122

1A130

T H

T

1AC280

1AC257

1AC275

1AC268

T

TH

D

C

E

1B218

1B215

1B216

1B217

1B218A

1B215C

Former Stair 10

T

T

T

H

1B521

1B523

1B524

H

T

T

1B589

1B566

1B549 1B552

1B554

1B589A T

H

OIT Telecom/

Data Closet

1D100H

1D200A

1D211

1D137

T H

STAINING

SPECIAL

STAINING

DATA PROCESSING

1F544

1F560 1F561

1F564

1F570

H

T

T

34x14

21x12

12x814 x8 ø

16x12

20x14 x1

10ø8ø

24x10

6ø

EX-SD

24x12

EX-RG

8ø

EX-SD

8ø

CD1

200 CFM

1-04 x1

1" - HW R

1" - HW S

38x12 x1

34x10 x8

12x8

22x6 x8

6ø

24x12

EX-RG

24x12

EX-RG

10x24

150 CFM

EX-RG 8ø

EX-SD

1-06

10ø

CD1

300 CFM

BD

PROVIDE NEW BALANCE

DAMPER IN TAKEOFF

12x10

2" - HW R

2" - HW S

8ø

6ø

6ø

EX-SD

1-05

DUAL

DUCT

BOX

DUAL

DUCT

BOX

18x10 ø ø

6ø

4ø

8ø

8ø

4ø DUAL

DUCT

BOX

x1

12x108ø

6ø

6ø6ø

6ø6ø

8ø

6ø

EX-SD

6ø

EX-SD

6ø

EX-RG

6ø

EX-SD

6ø

EX-RG

8ø

EX-RG

50 CFM

1-01

12x10

8ø

CD1

200 CFM

2.

5"

H

W R

2.

5"

H

W R

2.

5"

H

W S x1 x8 x1 ø

8ø

EX-SD

6ø

EX-RG

8ø

EX-SD

8ø

EX-SD

1-03

8ø

CD1

200 CFM

ø

12x10

1"

H W

S 1"

H

W R

26x12

17x10 14x10 12x6

10ø8ø

12x6

12x8

10x810x8

9ø 12ø x8 x8

6ø

6ø 8ø

6ø

8ø

EX-SD

24x12

300 CFM

EX-RG

24x12

EX-RG

8ø

EX-SD

8ø

EX-SD

8ø

CD1

300 CFM

1-08

60x20 ø

6ø ø

8ø

EX-SD

8ø

EX-SD

12ø

EX-RG

10ø

EX-RG

50 CFM

8ø

CD1

200 CFM

1-09

8ø 8ø

0.

H W

R

0.

H W

S x1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes

Cleveland

VA Medical

Center

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

M ECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIM ATING :

M CGUINESS UNLIM ITED, INC.

15724 STILLW O OD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOG GS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. M ATERIALS ASSESSM ENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

W ESTLAKE, OH 44145

P. 216.781.0060

FINAL CD's SUBMISSION

C

B

IM

\M o d e l\

-0

-M

E P

-C e n tr a l_ m k m o n a g h a n .r v t

/1

/2

:3

:2

P

M

MH-101

PARTIAL FIRST FLOOR PLAN - NEW WORK PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD CLEVELAND, OHIO

541-21-101

11.17.20 BRB SMP

SCALE: 1/4" = 1'-0"

ATRIUM - 1A-121 PRIMARY CARE - NEW WORK

SCALE: 1/4" = 1'-0"

ATRIUM - 1AC-275 EMERGENCY DEPARTMENT - NEW WORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - 1B-216 PSYCH ER - NEW WORK

SCALE: 1/4" = 1'-0"

ATRIUM - 1B-523 MRI - NEW WORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - 1-B589 WOMENS HEALTH - NEW WORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - 1D- 215 MOD. G+H - NEW WORK

SCALE: 1/4" = 1'-0"

MIAN BLDG - 1F-562 LAB - NEW WORK

NOTES

1 PROVIDE NEW HOT W ATER AIR TERMINAL UNIT. REW ORK EXISTING HOT W ATER PIPING AS REQUIRED TO ACCOMODATE NEW AIR TERMINAL UNIT AND ACCESSORIES PER DETAIL ON M501. PROVIDE TRANSITIONS TO

EXISTING DUCTW ORK AS REQUIRED.

2 PROVIDE NEW BALL-IN-W ALL VISUAL PRESSURE INDICATOR IN THIS APPROXIMATE LOCATION.

3 PROVIDE W ALL-MOUNTED DIGITAL ROOM PRESSURE MONITOR NEXT TO DOOR. PROVIDE BAS INTERFACE TO SEND ALARM W HEN ROOM PRESSURE FALLS OUTSIDE OF THE SPECIFIED RANGE. ALLOW ANCES SHALL BE MADET O PREVENT NUISANCE ALARMS OF THE MONITORING EQUIPMENT. ROO M PRESSURE SETPOINT

SHALL BE +0.02" W .G.

4 PROVIDE A NEW CHECKPOINT SENSOR AND CAREFULLY PROTECT.

5 REBALANCE AIRFLOW TO FLOW INDICATED ON PLANS. PROVIDE NEW BALANCE DAMPER IN DUCT, AS

REQUIRED.

6 REBALANCE AIR TERMINAL UNIT TO NEW CFM EQUAL TO ORIGINAL BOX CFM MINUS THE SPS ROOM CFM.

OBTAINED IN PRE-TAB AIR SURVEY.

7 RELOCATE THERMOSTAT FOR ASSOCIATED VAV BOX. PROVIDE NEW BACKBOX, CONDUIT, AND CABLING/ TUBING TO EXISTING VAV BOX PER SPECIFICATION 23 06 23 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC.

8 EXISTING ABOVE CEILING PENETRATIONS SHALL BE SEALED AIR-TIGHT. ALLOW FOR SEALING SIX PENETRATIONS EACH OF DUCT, P IPE AND CONDUIT PER ROOM FOR A TOTAL OF 18 PENETRATIONS.

9 PROVIDE NEW DUCT RUNOUTS TO DUAL DUCT BO X. FIELD-VERIFY DUCT ROUTE. PATCH AND REPAIR CEILING

TO MATCH EXISTING.

10 PATCH/REPAIR CEILING IN THE AREA OF NEW W ORK TO MATCH EXISTING. PRO VIDE ACCESS PANELS FOR

ANY ITEMS REQUIRING FUTURE MAINTENANCE ACCESS, PER SPECIFICATION.

GENERAL NOTES

A. INCLUDE AN ADDITIONAL 300' OF BRANCH CIRCUITRY ROUTING, ASSUME 3-#12,#12 GRD. IN 0.75"C. FIELD

VERIFY LOCATIONS W HERE NEW DUCTW ORK, PIPING, ETC. NECESSITATE THIS W ORK.

B. ALL AIR FLOW S ARE INITIAL AND SHALL BE ADJUSTED ACCORDINGLY TO OBTAIN ROOM PRESSURES.

C. ALL W IR ING SHALL BE FISHED THRU EXISTING W ALLS.

D. REFER TO SHEET M-001 SIM ILAR TO DEMO SHEETS.

E. DEDUCT ALTERNATE #1 - ELIMINATE W ORK ASSOCIATED W ITH "ATRIUM - 1AC-275 EMERGENCY

DEPARTMENT" FROM SCOPE OF W ORK.

F. DEDUCT ALTERNATE #2 - ELIMINATE W ORK ASSOCIATED W ITH "ATRIUM - 1A-121-PR IMARY CARE" FROM

SCOPE OF W ORK.

G. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS IND ICATING LOCATIONS OF ALL ROOMS

INCLUDED IN SCOPE.

H. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.

I. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS

NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.

J. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE

PERFORMING ANY W ORK.

Revisions: Date:

65% CD'S SUBMISSION 8.5.20

2A100D 2A123

2A127

2A126

2A125

2A124

2A134

2A136

T

22 x 28

MFP

36 x 30

PYXIS

29 x 23

CART

28 x 40

UVA PHOTO

THERAPY -

SELLAMED

UVA HOUVA

HAND/ FOOT

LIGHT

THERAPY

30 x 21

OMNILUX

REVIVIE PHOTO

THERAPY

28 x 32

DUSA BLUE

LIGHT HEAD

THERAPY

40 X 28

MAPPING

TOWEL

WARMER

C-LOCKER

2A100L

2A158

2A156

2A160

2A159

2A170A

T

2B433

2B435 T

2C157

2C153 2C152

2C150

2S17

2D116

2D117

2D123

2D118

T

2D100K

2D100L

2D171

2D169 2D166

2D190

2D166A

T

PP

2'-0" X 4'-0"

DIALYSIS CART

DIALYSIS

CART

2'-0" X 5'-0"

DIALYSIS

CART

2'-0" X 5'-0"

2D254A

T

2E300D

2E332

2E334 2E335

T

14x8 ø

12x8

12ø10ø

6ø

EX-SD

8ø

EX-SD

6ø

EX-SD

VAV

BO X

25x12

20x12 x1

26x7

6ø

12x8

6ø

EX-SD

6ø

EX-SD

30x16

12x8 6ø x1

8ø

EX-SD

24x12

EX-RG

16x10

10x6 x6 x6

8ø

EX-SD

24x12

EX-RG

VAV BOX

x1

10ø

8ø

14x12.5

10ø

EX-SD

24x24

EX-RG

16x12

22x12

30x14

30x1

26x12

10x6

16x8 16x8 x1 x1

14x10

VAV

BO X

8ø

6ø

10ø

8ø

8ø ø

8ø

8ø

EX-SD

HW R

HW S

VAV

BO X

36x12

8x

6x

50/12 OV

6ø

EX-SD

10ø

EX-RG

6ø

EX-SD

10ø

EX-RG

VAV

BO X

3" - HW S

3" - HW R

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes

Cleveland

VA Medical

Center

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

M ECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIM ATING :

M CGUINESS UNLIM ITED, INC.

15724 STILLW O OD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOG GS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. M ATERIALS ASSESSM ENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

W ESTLAKE, OH 44145

P. 216.781.0060

FINAL CD's SUBMISSION

C

B

IM

\M o d e l\

-0

-M

E P

-C e n tr a l_ m k m o n a g h a n .r v t

/1

/2

:3

:4

P

M

MD-102.1

PARTIAL SECOND FLOOR PLAN - DEMOLITION PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD CLEVELAND, OHIO

541-21-101

11.17.20 BRB SMP

SCALE: 1/4" = 1'-0"

ATRIUM - 2A-124 MOD.C&D - DEMOLITION

SCALE: 1/4" = 1'-0"

ATRIUM - 2A-159 MOD. E&F - DEMOLITION

SCALE: 1/4" = 1'-0"

ATRIUM - 2B-435 MOD J - DEMOLITION

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2C-150 CATH LAB - DEMOLITION

SCALE: 1/4" = 1'-0"

SURGERY - 2-D117 - DEMOLITION

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2D-169 MICU - DEMOLITION

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2D-254A PRE-OP & RENAL - DEMOLITION

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2-E334 PACU - DEMOLITION

NOTES

1 OBTAIN CURRENT, MAXIMUM, AND MINIMUM AIRFLOW SETTINGS FOR VAV BOX. PROVIDE PRE- CONSTRUCTION AIR SURVEY FOR ALL CONNECTED SPACES AND SUBMIT TO CO R AND ENGINEER. A IRFLOW

TO BE OBTAINED BY ACCREDITED AIR -BALANCE COMPANY PER SPECIFICATION.

2 REMOVE DIFFUSER AND ATTACHED FLEX DUCT. MAINTAIN DUCT FOR CONNECTION TO NEW .

3 REMOVE VAV BOX AND TRANSITIONS. MAINTAIN DUCT FOR CONNECTION TO NEW .

4 REMOVE THERMOSTAT AND ALL ASSOCIATED W IRING/TUBING COMPLETE.

5 REMOVE DIFFUSER AND BRANCH RUNOUT BACK TO MAIN. CAP DUCT AT MAIN. SEAL AND INSULATE DUCT

PER SPECIFICATION FOR NEW W ORK.

6 REMOVE DIFFUSER AND DUCT BACK TO VAV BOX.

7 CAREFULLY REMOVE THERMOSTAT AND MAINTAIN FOR RELOCATION TO NEW .

GENERAL NOTES

A. REFER TO SHEET M-001 FOR LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERAL NOTES.

B. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, P IPE AND EQUIPMENT SIZES, SERVICES AND

LOCATIONS PRIOR TO PERFORMING W ORK.

C. ALL ABANDONED EXTRANEOUS PIPING, DUCTW ORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.

D. ALL EXISTING DUCTW ORK, P IPING, EQUIPMENT, CONTROLS, ETC. SHOW N ON REMOVAL PLAN(S) SHALL BE

REMOVED. THE MAJORITY OF W ORK TO BE REMOVED IS SHOW N. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTW ORK, PIP ING, ETC. THAT MAY NOT BE SHOW N BUT IS ASSOCIATED W ITH THE REMOVAL

W ORK.

E. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS IND ICATING LOCATIONS OF ALL ROOMS

INCLUDED IN SCOPE.

F. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.

G. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS

NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.

H. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE

PERFORMING ANY W ORK.

I. ALL EXISTING DUCT SHALL BE TEMPORARILY SEALED BETW EEN DEMOLITION AND NEW W ORK.

Revisions: Date:

65% CD'S SUBMISSION 8.5.20

2A100D 2A123

2A127

2A126

2A125

2A124

2A134

2A136

T H

T

22 x 28

MFP

36 x 30

PYXIS

29 x 23

CART

28 x 40

UVA PHOTO

THERAPY -

SELLAMED

UVA HOUVA

HAND/ FOOT

LIGHT

THERAPY

30 x 21

OMNILUX

REVIVIE PHOTO

THERAPY

28 x 32

DUSA BLUE

LIGHT HEAD

THERAPY

40 X 28

MAPPING

TOWEL

WARMER

C-LOCKER

2A158

2A156

2A160

2A159

2A170A

H

T

VO VS

2B433

2B435

H

T

T

2C157

2C153 2C152

2C150

T H

2C423

2C437

T

H

2S17

2D116

2D117

2D123

2D118

T

T

H

2D100K

2D171 2D166

2D190

2D166A

H T

PP

2'-0" X 4'-0"

DIALYSIS CART

DIALYSIS

CART

2'-0" X 5'-0"

DIALYSIS

CART

2'-0" X 5'-0"

2D254A

T

H

2E300D

2E332

2E334 2E335

T HT

2FC03

2FLVC2

2F201

2F202

TH

12x8

14x8 ø

10ø ø

8ø

EX-SD

6ø

EX-SD

2-13 8ø

CD1

200 CFM

12x10

26x7

20x12

25x12 x1

6ø

EX-SD

8ø

CD1

200 CFM

2-14 x1

12x8 x1

30x16

12x8 6ø x1

24x12

50 CFM

EX-RG

8ø

CD1

200 CFM

4"

H W

R 4"

H

W S

12x10

2-12

1 5

2-09

8ø

CD1

200 CFM

x1

16x10

16x10

10x6 x8 x6 12 x6

0 .75" - HW R

0.75" - HW S

17x4 ø x4

12ø

8ø

CD1 3

2-11 x1

28ø

10ø14x12.510ø

24x24

100 CFM

EX-RG

2-04

10ø

CD1

250 CFM

30x14

26x1

30x1

26x12 x6

22x12

16x12

24x12

100 CFM

EX-RG

24x24

EX-RG

24x24

EX-RG

2-02

2D169

6ø

CD1

300 CFM

6ø

8ø

10ø

8ø

8ø ø

8ø

24x12

8ø

CD1

200 CFM

2-06 x8

8ø

6 5

2-03

8x x1

50/12 OV

10ø

EX-RG

150 CFM10ø

CD1

300 CFM

VAV

BO X 9

3 2 2-01

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes

Cleveland

VA Medical

Center

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

M ECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIM ATING :

M CGUINESS UNLIM ITED, INC.

15724 STILLW O OD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOG GS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. M ATERIALS ASSESSM ENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

W ESTLAKE, OH 44145

P. 216.781.0060

FINAL CD's SUBMISSION

C

B

IM

\M o d e l\

-0

-M

E P

-C e n tr a l_ m k m o n a g h a n .r v t

/1

/2

:3

:3

P

M

MH-102.1

PARTIAL SECOND FLOOR PLAN - NEW WORK PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD CLEVELAND, OHIO

541-21-101

11.17.20 BRB SMP

SCALE: 1/4" = 1'-0"

ATRIUM - 2A-124 MOD. C & D - NEW WORK

SCALE: 1/4" = 1'-0"

ATRIUM - 2A-159 MOD. E & F - NEW WORK

SCALE: 1/4" = 1'-0"

ATRIUM - 2-B435 MOD J - NEW WORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2C-150 CATH LAB - NEW WORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2C-437 UROLOGY CLINIC - NEW WORK

SCALE: 1/4" = 1'-0"

SURGERY - 2-D117 - NEW WORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2D-169 MICU - NEW WORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2-D254A PRE-OP & RENAL - NEW WORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2-E334 PACU - NEW WORK

10 SCALE: 1/4" = 1'-0"

CARES TOWER - 2F-202 - NEW WORK

NOTES

1 PROVIDE NEW HOT W ATER AIR TERMINAL UNIT. REW ORK EXISTING HOT W ATER PIPING AS REQUIRED TO ACCOMODATE NEW AIR TERMINAL UNIT AND ACCESSORIES PER DETAIL ON M501. PROVIDE TRANSITIONS TO

EXISTING DUCTW ORK AS REQUIRED.

2 NEW BALL-IN-W ALL VISUAL PRESSURE INDICATOR IN THIS APPROXIMATE LOCATION.

3…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .