36C25021B0017 0002.docx
DOCX document 24 KB Posted
- Attached to
- Z1DA--SPD Storage Temp and Humidity Controls Project 541-21-101 Federal contract opportunity
- Solicitation number
- 36C25021B0017
About this file
This document contains an amendment to a federal solicitation and related federal contract opportunity. The amendment provides notice that the duration of the project to provide temperature and humidity controls for a sterile processing department storage facility has been extended from 120 to 210 calendar days from notice to proceed. It attaches the questions and answers from a pre-bid site visit, the site visit sign-in sheet, and bid opening instructions. The opportunity is set aside for service-disabled veteran owned small businesses and is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 for the temperature and humidity controls project numbered 541-21-101.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Attendance Roster Provide Temp and Humidity Controls.pdf | ||
| 36C25021B0017 0005.docx | DOCX document | |
| Bid Abstract Provide Temp and Humidity Controls CLE VAMC.pdf | ||
| 36C25021B0017 0004.docx | DOCX document | |
| 541-21-101 Bid Opening Instructions - Revised.pdf | ||
| 013526_Safety Requirements 2020 Update ADD 1.pdf | ||
| 21-0416 Provide Temperature and Humidity Controls - ADDENDUM 1 - Drawings.pdf | ||
| 36C25021B0017 0003.docx | DOCX document | |
| 541-21-101 Bid Opening Instructions.pdf | ||
| Sign-in Sheet - Site Visit - Provide Temperature and Humidity Controls to SPD Storage.pdf | ||
| Mechanical Drawings.pdf | ||
| 36C25021B0017 0001.docx | DOCX document | |
| Site Visit - 10701 East Blvd - Google Maps.pdf | ||
| Technical Specifications.pdf | ||
| 36C25021B0017_1.docx | DOCX document | |
| Architectural Drawings.pdf | ||
| Wage Determination 02.2021.pdf | ||
| VHA DIRECTIVE 1192.01.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 04-13-2021 541-21-1-5986-0023 541-21-101 Department of Veterans Affairs Network Contracting Office (NCO) 10 3140 Governor’s Place Blvd. Suite 210 Kettering OH 45409-1337 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 Governor's Place Blvd. Suite 210 Kettering OH 45409-1337 To all Offerors/Bidders
36C25021B0017 04-13-2021
X X X N/A X The purpose of this amendment is to provide the following information for Solicitation #36C25021B0017:
1. See attached RFI Q&A;
2. See attached Sign-in Sheet from the Site Visit held on 04/09/2021;
3. See attached Bid Opening Instructions; and
4. All terms and conditions remain unchanged and in ful l effect.
Angie Carpenter Contract Specialist
Provide Temperature and Humidity Controls to SPS Storage Project #541-21-101 Request for Information Q&A
1. Is the VA or the GC responsible for commissioning?
The prime contractor is responsible for the commissioning per spec section 230800(1.1)(D). Please refer to this specification section for further explanation.
See attached document: Sign-in Sheet - Site Visit - Provide Temperature and Humidity Controls to SPD Storage.
See attached document: 541-21-101 Bid Opening Instructions.
File details come from the government source that posted it. Updated .