21-0416 Provide Temperature and Humidity Controls - ADDENDUM 1 - Drawings.pdf
PDF 4 MB Posted
- Attached to
- Z1DA--SPD Storage Temp and Humidity Controls Project 541-21-101 Federal contract opportunity
- Solicitation number
- 36C25021B0017
About this file
This document provides details for a federal contract opportunity to provide temperature and humidity controls to the Sterile Processing Department storage area at the Louis Stokes Cleveland VA Medical Center. The contract is set aside for Service-Disabled Veteran Owned Small Businesses only. The purpose of the modification is to extend the project duration from 120 calendar days to 210 calendar days from notice to proceed. No other terms or conditions were changed. Questions must be emailed by the specified date and include the project number in the subject line. This is a presolicitation notice only and no solicitation is currently available.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract Provide Temp and Humidity Controls CLE VAMC.pdf | ||
| Bid Opening Attendance Roster Provide Temp and Humidity Controls.pdf | ||
| 36C25021B0017 0005.docx | DOCX document | |
| 36C25021B0017 0004.docx | DOCX document | |
| 541-21-101 Bid Opening Instructions - Revised.pdf | ||
| 013526_Safety Requirements 2020 Update ADD 1.pdf | ||
| 36C25021B0017 0003.docx | DOCX document | |
| Sign-in Sheet - Site Visit - Provide Temperature and Humidity Controls to SPD Storage.pdf | ||
| 36C25021B0017 0002.docx | DOCX document | |
| 541-21-101 Bid Opening Instructions.pdf | ||
| Mechanical Drawings.pdf | ||
| 36C25021B0017 0001.docx | DOCX document | |
| VHA DIRECTIVE 1192.01.pdf | ||
| Site Visit - 10701 East Blvd - Google Maps.pdf | ||
| Technical Specifications.pdf | ||
| 36C25021B0017_1.docx | DOCX document | |
| Architectural Drawings.pdf | ||
| Wage Determination 02.2021.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2F180A
2F179A
2F178A
2F177A
2F176A
2F175A
2F174A
2F173A
2F172A
2F171A
2F170A
2F102A
2F104A
2F105A
2F106A
2F107A
2F108A
2F109A
2F110A
2F111A
2F112A
2F113A
2F114A
2F139A
2F138A
2F137A
2F136A
2F135A 2F134A
2F133A
2F131A
2B133A 2B135A
2D139A
/3
44"Ø
3"Ø MPS
2 1/2"Ø LPS
2 1/2"Ø LPR
2"Ø MPS
"Ø
H
PS
4"Ø CHWR
4"Ø CHWS
4"Ø CHWS
"Ø
C H W
R
66/38 OA
A
2D258
A B C D E F
GHIJKL
2B447
2E314A
2E321A
2E322A
2E323A
2E325A
2E327A
2E330A
2E333A
2E336A
2E339A
2E349A
2E351A
2E352A
2E362A 2E366A 2E367A
2E370A2E368A
16" X 21"
DIALYSIS
O2 CART
DIALYSIS
BIO-HAZARD
TRASH CAN
24 DIA.
DIALYSIS
BIO-HAZARD
TRASH CAN
24 DIA.
2'-0" X 4'-0"
DIALYSIS
CART
DIALYSIS
CART
2'-0" X 5'-0"
DIALYSIS
CART
2'-0" X 5'-0"
MO MV VSMO MV VSMO MV VSMO MV VS
PP
PP
PP
BS BS BS
PP
BED BED BED BED
COW COW
SUPPLY
CARTSUPPLY
CART
SUPPLY
CART
CRASH
CART
TOWEL
WARMER
DIA
DIA DIA DIA
DIA
EYEWASH
RO
DIA
RO
DIA
RO
DIA
RO
DIA
DIA
DIA DIA RO
RO
RO
RO
UTILITY
SINK
RO RO
SCALE
MFP
WORK DESK
PYXIS
REFRIG
22 x 28
MFP
36 x 30
PYXIS
29 x 23
CART
28 x 40
UVB PHOTO
THERAPY
HOUVA II
PATIENT
EQUIP.
UVA PHOTO
THERAPY -
SELLAMED
UVA HOUVA
HAND/ FOOT
LIGHT THERAPY
30 x 21
48 Dia
24 x 26
FOTOFINDER
MOLE MAPPER
OMNILUX
REVIVIE PHOTO
THERAPY
28 x 32
LIQUID
NITROGEN
DUSA BLUE
LIGHT HEAD
THERAPY
40 X 28
MOLE
MAPPING
TOWEL
WARMER
C-LOCKER
BATTERY
CABINET
NO.1
UPS
CABINET
NO.1
UPS
CABINET
NO.2
BATTERY
CABINET
NO.2
UTS
NO.1
UTS
NO.2
RSP
NO.1
RSP
NO.2
COW
2'-0" X 4'-0"
SUPPLY
CART
2'-0" X 4'-0"
SUPPLY
CART
2'-0" X 4'-0"
SUPPLY
CART
WORK
CART
PED TABLE
HEAD
WOW
VO VSVO SV
V OSV
HEAD
2ND FLOOR - EXISTING
CONDITIONS/LIFE SAFETY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD. CLEVELAND, OHIO
541-21-101
NICK CARROZZA
CJK DAKRevisions: Date:
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
ATE
I
T C
J.
O
O
FO
H
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOGGS LANE, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.2107
HAZ. MATERIALS ASSESSMENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
MECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE. SUITE 1162
CLEVELAND, OH 44115
P. 216.862.5846
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558 LS-102
FINAL CDs SUBMISSION
11.17.20
65% CD'S SUBMISSION 8.25.20
1" = 30'-0"
EX. CONDITIONS/LIFE SAFETY PLAN
2ND FLOOR
NORTH
2D117
ROOM PERIMETER
WALLS: UNRATED
PARTITIONS
(NOTE: 2 HR FIRE
BARRIERS @ FIRE
STAIR)
2D169
ROOM PERIMETER
WALLS:
NORTH/EAST/SOUTH:
1 HR FIRE
BARRIERS
WEST: 2 HR FIRE
BARRIER
2F202
ROOM PERIMETER
WALLS:
WEST/NORTH/EAST:
1 HR FIRE
BARRIERS
SOUTH: 2 HR FIRE
BARRIER
2E334
ROOM PERIMETER
WALLS: 1 HR FIRE
BARRIERS
2C150
ROOM PERIMETER
WALLS: 0 HR
SMOKE
PARTITIONS
2C437
ROOM PERIMETER
WALLS: UNRATED
PARTITIONS
ROOM PERIMETER
WALLS: 1 HR FIRE
BARRIERS
2D254A
ROOM PERIMETER
WALLS:
NORTH/SOUTH:
UNRATED PARTITION
EAST: 0 HR SMOKE
PARTITION
WEST: 1 HR SMOKE
BARRIER
ROOM PERIMETER
WALLS: 1 HR
BARRIERS (NOTE:
2 HR FIRE
BARRIERS @ ELEV.
SHAFT)
2C330A
ROOM PERIMETER
WALLS: 1 HR FIRE
BARRIERS
2B435
ROOM PERIMETER
WALLS: 1 HR FIRE
BARRIERS
2A124
ROOM PERIMETER
WALLS: UNRATED
PARTITIONS
2A159
ROOM PERIMETER
WALLS: 1 HR FIRE
BARRIERS
100% CD'S SUBMISSION 10.19.20
LIFE SAFETY LEGEND
PROJECT SCOPE BOUNDARY
EXISTING 2 HOUR SMOKE BARRIER
EXISTING 2 HOUR FIRE BARRIER
EXISTING 1 HOUR FIRE BARRIER
EXISTING 1 HOUR SMOKE BARRIER
LIFE SAFETY GENERAL NOTES
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS
CLASSIFIED AS AN "EXISTING HEALTHCARE OCCUPANCY" PER NFPA 101 2018
4. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY.
CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED
OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWING
5. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE TO
CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS (TYP. OF ALL
EXIT SIGNS IN OR BEYOND PROJECT AREA)
6. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY
MEASURES. COORDINATE WITH VA
7. EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE
DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING
RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION
LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE
COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES
DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB
FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB
UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL
PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING.
8. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND
EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY
WITH THE REQUIRED BARRIER RATINGS. PROVIDE FIRESTOPPING AROUND
TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)
PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH
REQUIRED RATING NOT ASSOCIATED WITH NEW WORK. LARGER OPENINGS
SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL
LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE
MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATED BARRIER AND
ARE IN COMPLIANCE WITH THE OPENING SIZE AS DICTATED BY THE
ASSEMBLY.
9. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE
TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE
CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM
DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT
DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE
BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA
ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT
FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE
WITH SAFETY STANDARDS.
2. LIFE SAFETY PLANS ARE INTENDED TO BE PARTIAL ONLY, AND INDICATE
ONLY THE RATINGS OF THE PARTITIONS OF THE PERIMETER WALLS AND
ROOMS ADJACENT TO THE SPD STORAGE ROOMS IN THE SCOPE OF WORK
3. AS WORK IS LIMITED TO THE SPD STORAGE ROOMS ONLY, EXISTING EGRESS
PATHS WILL NOT BE BLOCKED AS A PART OF CONSTRUCTION. THE
CONTRACTOR IS RESPONSIBLE FOR SEALING AND PROTECTING THE ENTRY
DOORS OF THE ROOMS IN THE SCOPE OF WORK TO MITIGATE ALL
DUST/DEBRIS FROM THE CONSTRUCTION AREA
HAZARDOUS ROOM
EXISTING 0 HOUR SMOKE PARTITION
HAZARDOUS MATERIALS
ABATEMENT:
NOTE: REFER TO REFERENCE CEILING PLAN DRAWINGS AS-C-1 THRU AS-C-4 FOR
ENLARGED LIFE SAFETY CONDITIONS AND ALL FIRE RATED ASSEMBLIES
1. THE USEPA NESHAP (NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR
POLLUTANTS) (40 CFR PART 61) DEFINES “ASBESTOS CONTAINING
MATERIALS (ACM)” AS MATERIALS THAT CONTAIN MORE THAN 1% ASBESTOS SO ANY
MATERIAL CONTAINING LESS THAN 1% ASBESTOS IS NOT, BY REGULATOR
DEFINITION, AN ASBESTOS CONTAINING MATERIAL. NESHAP FURTHER DEFINES
REGULATED ACM (RACM) AS FRIABLE ACM, CATEGORY 1 NONFRIABLE THAT BECOMES
FRIABLE AND CATEGORY ACM THAT HAS A HIGH PROBABILITY OF BECOMING FRIABLE.
2. OSHA DOES NOT REGULATE WHAT ASBESTOS MUST BE REMOVED DURING
DEMOLITION OR RENOVATION BUT STRICTLY REGULATES THE PROCEDURES THAT
MUST BE FOLLOWED FOR WORKER PROTECTION FROM ASBESTOS EXPOSURE.
3. SOME OF THE ORIGINAL PLASTER ON METAL LATH CONTAINING LESS THAN 1%
ASBESTOS WAS OBSERVED IN ROOMS 2059, 2C330A, 2C328, 2C437, 2E334, 3B133,
4A106, 4A128, 5A107, 6A138, AND ASSUMED BEHIND INACCESSIBLE WALLS AND
CEILINGS. THE FIREPROOFING IN ROOM 1B589A WAS REPORTED TO
CONTAIN <1% ASBESTOS. THESE MATERIALS ARE NOT CONSIDERED
ASBESTOS-CONTAINING MATERIALS WHICH ARE DEFINED AS MATERIAL “CONTAINING
MORE THAN 1% ASBESTOS” BY THE USEPA, NESHAPS. THE OSHA REQUIREMENTS
UNDER 29 CFR 1926.1101 FOR DISTURBING MATERIALS WITH 1% OR LESS ASBESTOS
SHOULD BE FOLLOWED. THESE REQUIREMENTS INCLUDE THE WET HANDLING,
PROMPT CLEAN-UP AND DISPOSAL OF WASTES IN LEAK TIGHT CONTAINERS, AND
EXPOSURE ASSESSMENT BY A COMPETENT PERSON. THE WALL PLASTER AND
FIREPROOFING WOULD BE CONSIDERED A NON-ACM OR NON-RACM MATERIAL THAT
DOES NOT REQUIRE REMOVAL OR ABATEMENT BUT IS SUBJECT TO CERTAIN OSHA
REQUIREMENTS THAT ARE NOT CONSIDERED CLASS I, CLASS II OR CLASS III
ABATEMENT WORK. CONTRACTOR TO PRICE AN AREA OF 1,000 SF OF PLASTER ON
METAL LATH TO BE REMOVED OR PROPERLY HANDLED ACCORDING TO THE OSHA
REQUIREMENTS UNDER 29CFR 1926.1101. THIS AMOUNT IS INTENDED TO COVER THE
ENTIRE PROJECT, NOT JUST THE FLOOR ON THIS DRAWING SHEET.
4. ALTHOUGH NO ASBESTOS-CONTAINING PIPE INSULATION JOINTS WERE OBSERVED
ON THE INSPECTION, IT IS POSSIBLE THAT ASBESTOS-CONTAINING PIPE INSULATION
JOINTS MAY BE PRESENT ABOVE PERMANENT CEILINGS. CONTRACTOR TO INCLUDE
THE COST FOR THE REMOVAL OF UP TO TWENTY (20) EACH ASBESTOS-CONTAINING
PIPE INSULATION JOINTS ABOVE INACCESSIBLE CEILINGS. THIS AMOUNT IS
INTENDED TO COVER THE ENTIRE PROJECT, NOT JUST THE FLOOR ON THIS DRAWING
SHEET.
5. ALTHOUGH NO ASBESTOS-CONTAINING RED DUCT MASTIC WAS NOTED ON THE
INSPECTION, IT IS POSSIBLE THAT SOME OF THE RED DUCT MASTIC MAY BE PRESENT
BELOW FIBERGLASS INSULATION ON OLD DUCTWORK IN THE PROJECT AREA. IF THE
CATEGORY 2 NON-FRIABLE ASBESTOS-CONTAINING DUCT MASTIC IS DISCOVERED
AND WILL BE DISTURBED DURING THE RENOVATION, CARE SHOULD BE EXERCISED
TO PREVENT SUBJECTING THE DUCT MASTIC TO CUTTING, GRINDING, SANDING, OR
ABRADING WHICH WOULD RENDER IT FRIABLE. DISPOSE OF ANY REMOVED
DUCTWORK WITH ASBESTOS-CONTAINING CATEGORY 2 NON-FRIABLE MASTIC AT AN
EPA APPROVED LANDFILL. CONTRACTOR TO INCLUDE THE COST FOR THE DISPOSAL
OF UP TO 100 LN FT OF DUCTWORK WITH ASBESTOS-CONTAINING MASTIC. THIS
AMOUNT IS INTENDED TO COVER THE ENTIRE PROJECT, NOT JUST THE FLOOR ON
THIS DRAWING SHEET.
FINAL CD'S SUBMISSION 11.17.20
DRAWINGS
EX. CLG. PLAN: AS-C-2
HVAC: 3/MD-102.1
10/MH-102.1
DRAWINGS
EX. CLG. PLAN: AS-C-2
HVAC: 11/MH-102.1
DRAWINGS
EX. CLG. PLAN: AS-C-2
HVAC: 4/MD-102.1
8/MH-102.1
DRAWINGS
EX. CLG. PLAN: AS-C-2
HVAC: 7/MD-102.1
9/MH-102.1
DRAWINGS
EX. CLG. PLAN: AS-C-2
HVAC: 2/MD-102.1
7/MH-102.1
DRAWINGS
EX. CLG. PLAN: AS-C-2
HVAC: 3/MH-102.2
DRAWINGS
EX. CLG. PLAN: AS-C-2
HVAC: 2/MH-102.2
DRAWINGS
EX. CLG. PLAN: AS-C-2
HVAC: 4/MD-102.2
4/MH-102.2
DRAWINGS
EX. CLG. PLAN: AS-C-3
HVAC: 8/MD-102.1
2/MH-102.1
DRAWINGS
EX. CLG. PLAN: AS-C-3
HVAC: 1/MD-102.1
1/MH-102.1
DRAWINGS
EX. CLG. PLAN: AS-C-3
HVAC: 5/MD-102.1
3/MH-102.1
DRAWINGS
EX. CLG. PLAN: AS-C-2
HVAC: 6/MH-102.1
DRAWINGS
EX. CLG. PLAN: AS-C-2
HVAC: 6/MD-102.1
4/MH-102.1
ADDENDUM 1 4.16.21
AutoCAD SHX Text
FEC
ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg AutoCAD SHX Text
CRASH
AutoCAD SHX Text
CRASH
AutoCAD SHX Text
NIC
AutoCAD SHX Text
NIC
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text V
AutoCAD SHX Text O
AutoCAD SHX Text V
AutoCAD SHX Text O
AutoCAD SHX Text V
AutoCAD SHX Text O
AutoCAD SHX Text V
AutoCAD SHX Text O
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text V
AutoCAD SHX Text S
AutoCAD SHX Text
6" HPS
AutoCAD SHX Text
6" HTWS
AutoCAD SHX Text
6" HTWR
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text
12" CHWR
AutoCAD SHX Text
Corridor
1B102
Seclusion
1B102I
Ante Room
1B102M
Soiled Utility
1B102D
Seclusion
1B102H
Holding
1B102G
Nurse Station
1B102F
Office
1B102K
Clean Utility
1B216
DS
SPECIAL NOTE: CONTRACTOR
SHALL BE AWARE THAT ROOMS
ASSOCIATED WITH 1B216 SCOPE
OCCUR IN A PSYCHIATRIC
EMERGENCY MEDICINE AREA OF
THE BUILDING. GC SHALL ENSURE
THAT COORDINATION WITH VA
AND STAFF IS PERFORMED
THROUGHOUT AND THAT
CONSTRUCTION AREAS ARE
PROPERLY VACATED AND
THOROUGHOLY CLEANED WHEN
NOT IN USE
Clean Utility
1AC275
Clean Linen
1AC266
ECG
1AC277
Corridor
1AC280
Exam 11
1AC257
Exam 10
1AC256
Corridor
1AC260
NOTE: DEDUCT ALTERNATE #1 SHALL ELIMINATE ALL SCOPE OF WORK IN 1AC75
DS
DS
Clean Utility
1A121
Exam/Treatment Room
1A122
Corridor
1A100A
Exam/Treatment Room
1A130
Exam/Treatment Room
1A129
NOTE: DEDUCT ALTERNATE #2 SHALL ELIMINATE ALL SCOPE OF WORK IN 1A121
DS
Corridor
C2D13
Clean Supply
2D169
Clean Linen
2D171
Corridor
C2D17
DS
DS
Nurse Station
2D166
Clean Utility/SPD
2D117
Stair 13
2D101
Medication Room
2D123
Administrative Center
2D118
Patient Room #9
2D116
DS
Anesthesia
OR-7
General
Corridor
2500B
Stretcher Storage
Corridor
2500J Corridor
2500H
DS
DS
ACCESS
PANEL
Sterile Storage
Pharmacy
Bed/ Treatment
Room
Dictation
Medication Prep Room
Corridor
2500G
Corridor
2500F
S
DS
ACCESS
PANEL
Storage
2D254A Corridor
2C280
Corridor
2D250A
Corridor
2D250
Storage
DS
DS
Oxygen Storage
2F202
Soiled Utility
2F201Staff Toilet
2F209
Clean Linen
2F208
Elec. Closet
2FLVC2
Corridor
2FC03
DS
Clean Supply
2E334 Nurses' Work
2E316B
Patient Lounge
2E332
Corridor
2E300D
Soiled Utility
2E335
Corridor
2E300H
DS
DS
Clean Utility
2C150
Soiled Utility
2C149
Holding
2C153
Corridor
2C157
Corridor
2C100C
Corridor
2C140
DS
Storage
2C437Holding
2C423
Exam Room
2C425
Passage
2C400F
G.U. Urology Clinic
2C420
G.I. Office
2C438
ICU
Cleveland
Clinic Resident
2C439
DS
PACU Clean
2C330A
PACU
Passage
2C323A
Elec. Closet
2C327
PACU
Cubicle 11
2C326E
Passage
2B330
PACU
Storage
2C328
PACU Toilet
2C322
PACU
Cubicle 14
2C326H
PACU
Cubicle 13
2C326G
PACU
Cubicle 12
2C326F
DS
GENERAL NOTES:
CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.
ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.
ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL
APPLICABLE CODES.
PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS. IN PARTICULAR, SEVERAL THERMOSTATS WILL BE REMOVED AS A PART OF THIS PROJECT. UPON REMOVAL, FORMER LOCATION SHALL BE PATCHED, REPAIRED, AND REPAINTED TO RESTORE WALL TO ORIGINAL
CONDITION. MATCH PAINT COLOR IN FIELD.
WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW TO MATCH
EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.
ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS REQUIRED.
NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED BY THE
OWNER UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY
POINTS.
CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND
01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO
VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.
THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE PROJECT
AREA DURING THE ENTIRE CONSTRUCTION PHASE.
FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.
WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO
MATCH EXISTING.
ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.
DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR
ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.
ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS
OTHERWISE APPROVED BY THE COR.
EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU- SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED BY THE COR.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
CEILING SYMBOL LEGEND:
EXISTING TILE CEILING AREAS TO REMAIN. REFER TO HVAC DWGS. FOR EXISTING
DIFFUSER LOCATIONS THAT ARE TO BE REMOVED AS A PART OF THIS SCOPE.
WHERE DIFFUSERS ARE REMOVED AND NOT REPLACED IN THE SAME LOCATION,
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING A NEW CEILING TILE
MATCHING EXISTING SPEC AT SUCH LOCATIONS. VERIFY EXTENT IN FIELD
EX. GYPSUM BOARD CEILING/SOFFIT TO REMAIN. REFER TO HVAC DWGS. FOR ALL WORK TO
OCCUR ABOVE EXISTING GYPSUM BOARD CEILINGS. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PATCHING, REPAIRING, AND REPAINTING ALL REMOVED GYP. BD. IN THE SCOPE OF THIS
PROJECT, INCLUDING LOCATIONS THAT ARE TEMPORARILY REMOVED TO GAIN ACCESS TO
PLENUM ABOVE. CONTRACTOR SHALL PATCH AND REPAIR ALL REMOVED CONDITIONS TO FULLY
RESTORE THEM TO THEIR ORIGINAL CONDITION. MATCH PAINT COLORS IN FIELD
2 X 4 LIGHT FIXTURE
2 X 2 LIGHT FIXTURE
RETURN AIR DIFFUSERS
SUPPLY AIR DIFFUSERS
SECURITY CAMERA
S RECESSED SPEAKER
EX. LIGHTS, DIFFUSERS, SPEAKERS, AND CAMERAS TO REMAIN (U.N.O.). REFER TO HVAC DWGS. FOR ALL WORK.
ITEMS INDICATED BUT NOT LIMITED TO ELEMENTS LISTED BELOW MAY REQUIRE TEMPORARY REMOVAL TO ACCOMMODATE CONSTRUCTION. SUCH REMOVAL SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE DETERMINED IN FIELD AS REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFE, TEMPORARY REMOVAL (INCLUDING ANY SHUTDOWNS THAT ARE REQ'D.) AND SHALL REINSTALL ALL ELEMENTS UPON COMPLETION OF CONSTRUCTION. REPORT TO THE COR ANY UNSUPPORTED CONDUIT, LOOSE FITTINGS
AND ANY OTHER CODE VIOLATIONS DISCOVERED UPON OPENING OF THE CEILING.
TEMPORARY REMOVAL: WHERE REMOVAL OF EXISTING CEILING ITEMS (LIGHTS, DIFFUSERS, CAMERAS, SPEAKERS, ETC.) IS REQUIRED FOR INSTALLATION OF NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES.
CAREFULLY REMOVE AND STORE LIGHT FIXTURES, OCCUPANCY SENSORS, SPEAKERS, ACCESS POINTS AND ANY OTHER ELECTRICAL DEVICE FROM CEILINGS THAT ARE REQUIRED TO BE REMOVED FOR INSTALLATION OF MECHANICAL WORK. FIRE ALARM DEVICES AS SMOKE DETECTORS SHALL BE COVERED WHERE THEY NEED TO BE MAINTAINED IN PLACE DURING CONSTRUCTION. ALL ITEMS SHALL BE CLEANED AND REINSTALLED AFTER MECHANICAL CONSTRUCTION ABOVE THE CEILING IS COMPLETE. PROVIDE ALL REQUIRED MOUNTING HARDWARE FOR LIGHT FIXTURES TO PERMANENTLY CONNECT TO THE CEILING GRID. CONTRACTOR SHALL ENSURE THAT LIGHTS ARE PROPERLY SECURED TO THE CEILING GRID AND/OR SLAB ABOVE TO ENSURE LIGHTS CANNOT FALL
OUT OF THE CEILING UPON COMPLETION OF WORK.
TEMPORARY PROTECTION:
EXISTING 2 HOUR RATED
FIRE BARRIER
EXISTING 1 HOUR RATED
FIRE BARRIER
EXISTING 1 HOUR RATED SMOKE BARRIER
EXISTING 0 HOUR RATED SMOKE PARTITION
EXISTING FIRE-RESISTANCE RATED CONSTRUCTION ASSEMBLIES: ALL EXISTING FIRE-RATED WALLS ARE INDICATED ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FIRESTOP AND/OR CAULK ALL NEW PENETRATIONS INDICATED ON THE HVAC DRAWINGS WITH A THRU-WALL FIRESTOP ASSEMBLY EQUIVALENT TO THE RATING OF THE ASSEMBLY AND TESTED PER UL OR SIMILAR TESTING AGENCY. AT 0 HR RATED SMOKE PARTITIONS, PENETRATIONS SHALL BE PERMITTED TO BE CAULKED ONLY TO PREVENT THE
PASSAGE OF SMOKE
TEMPORARY PROTECTION DURING CONSTRUCTION: PRIOR TO CONSTRUCTION IN SPACES, THE CONTRACTOR SHALL COORD. WITH THE VA FOR TEMPORARY REMOVAL OF ALL EXISTING FURNITURE, MOBILE EQUIPMENT, OR MEDICAL DEVICES THAT MAY BE LOCATED IN SPACES (REMOVAL SHALL BE COMPLETED BY THE VA). FOR ALL ITEMS THAT ARE TO REMAIN IN THE SPACE, THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE TEMPORARY
PROTECTION OF SUCH ITEMS TO PREVENT THE SPREAD OF DUST AND DEBRIS.
EXISTING DOORS INTO ROOMS AFFECTED ARE PERMITTED TO BE USED BUT SHALL BE PROTECTED THROUGHOUT CONSTRUCTION. DURING CONSTRUCTION ACTIVITIES IN THE SPACE, SUCH DOORS SHALL BE PROPERLY SEALED BY THE CONTRACTOR TO PREVENT THE SPREAD OF DUST AND DEBRIS TO SURROUNDING, ADJACENT AREAS.
SPECIAL NOTE: WHERE NEW CONSTRUCTION ACTIVITIES OCCUR OUTSIDE OF THE STORAGE
ROOMS IN THE SCOPE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO CORRIDORS,
OFFICES/OTHER STAFF SPACES AND PATIENT BED AREAS, TEMPORARY CONST. BARRIERS
MUST BE PROVIDED TO SEPARATE THE CONSTRUCTION AREA FROM SUCH SPACES. REFER
TO HVAC DRAWINGS FOR THE FULL SCOPE OF SURROUNDING ROOMS THAT WILL BE
AFFECTED. GC SHALL BE RESPONSIBLE FOR COORDINATING LOCATIONS OF TEMP. BARRIERS
IN SUCH SPACES. WHERE CONSTRUCTION IS LIMITED TO 8 HRS OR LESS PER SHIFT, ZIPWALLS
SHALL BE PERMITTED TO BE EMPLOYED FOR TEMPORARY BARRIERS. WORK EXCEEDING 8
HRS SHALL BE ENCLOSED WITH TEMPORARY PARTITION WALL. SEE TYPICAL DETAIL.
SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER
NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC SHALL
COORDINATE ALL ABOVE-CEILING WORK AND TEMPORARY BARRIER CONSTRUCTION WITH VA
AND STAFF
ZIPWALL
TEMP.
PARTITION/DOOR
FIRE-RESISTANCE RATED ASSEMBLIES:
DOOR ASSEMBLIES:
DOOR SEALS: EXISTING ENTRY DOOR TO RECEIVE NEW FRAME GASKETING AND BOTTOM SWEEP.
VERIFY DOOR SIZES IN FIELD
DS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
MECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE., SUITE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS ASSESSMENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
K V
A C
L E
V E
L A
N D
\T E
M P
E R
A T
U R
E
H U
M
ID
IT
Y
C O
N T
R O
L S
\R E
V
IT
\T e m p H u m id it y A
R C
H .r v t
/1
/2
:4
:0
A
M
ADDENDUM 1
AS-C-2
EXISTING REFERENCE CEILING PLANS &
GENERAL NOTES
PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD. CLEVELAND, OH 44106
541-21-101
11.17.20 CJK DAK
SCALE: 3/16" = 1'-0"
1ST FLOOR - 1B216
NORTH
SCALE: 3/16" = 1'-0"
1ST FLOOR - 1AC275
NORTH
SCALE: 3/16" = 1'-0"
1ST FLOOR - 1A121
NORTH
SCALE: 3/16" = 1'-0"
2ND FLOOR - 2D169
NORTH
SCALE: 3/16" = 1'-0"
2ND FLOOR - 2D117
NORTH
SCALE: 3/16" = 1'-0"
2ND FLOOR - 2503
NORTH
SCALE: 3/16" = 1'-0"
2ND FLOOR - 2540
NORTH
SCALE: 3/16" = 1'-0"
2ND FLOOR - 2D254A
NORTH
SCALE: 3/16" = 1'-0"
2ND FLOOR - 2F202
NORTH
SCALE: 3/16" = 1'-0"
2ND FLOOR - 2E334
NORTH
SCALE: 3/16" = 1'-0"
2ND FLOOR - 2C150
NORTH
SCALE: 3/16" = 1'-0"
2ND FLOOR - 2C437
NORTH
SCALE: 3/16" = 1'-0"
2ND FLOOR - 2C330A
NORTH
Revisions: Date:
65% CDs SUBMISSION 8.5.20
100% CDs SUBMISSION 10.19.20
FINAL CDs SUBMISSION 11.17.20
ADDENDUM 1 4.16.21
2C326J
2C328
2C330A 2C327
2C322
T
12x10
8ø
8ø
EX-SD
ø
24x12
EX-RG
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Departm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 W EST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
MECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE STE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIMATING:
MCGUINESS UNLIM ITED, INC.
15724 STILLW OOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. M ATERIALS ASSESSM ENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
W ESTLAKE, OH 44145
P. 216.781.0060
FINAL CD's SUBMISSION
C
B
IM
\M o d e l\
-0
-M
E P
-C e n tr a l_
B E
S H
E L L h e a p y .c o m
.r v t
/1
/2
:1
:5
A M
MD-102.2
PARTIAL SECOND FLOOR PLAN - DEMOLITION PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD CLEVELAND, OHIO
541-21-101
11.17.20 BRB SMP
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2C-330A PCU - DEMOLITION
NOTES
1 OBTAIN MAXIMUM AND MINIMUM AIRFLOW SETTINGS FOR VAV BOX. PROVIDE PRE-CONSTRUCTION AIR
SURVEY FOR ALL CONNECTED SPACES.
2 REMOVE DIFFUSER AND BRANCH RUNOUT BACK TO MAIN. CAP DUCT AT MAIN. SEAL AND INSULATE DUCT
PER SPECIFICATION FOR NEW W ORK.
GENERAL NOTES
A. REFER TO SHEET M-001 FOR LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERAL NOTES.
B. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, P IPE AND EQUIPMENT SIZES, SERVICES AND
LOCATIONS PRIOR TO PERFORMING W ORK.
C. ALL ABANDONED EXTRANEOUS PIPING, DUCTW ORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.
D. ALL EXISTING DUCTW ORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOW N ON REMOVAL PLAN(S) SHALL BE
REMOVED. THE MAJORITY OF W ORK TO BE REMOVED IS SHOW N. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTW ORK, PIPING, ETC. THAT MAY NOT BE SHOW N BUT IS ASSOCIATED W ITH THE REMOVAL
W ORK.
E. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS INDICATING LOCATIONS OF ALL ROOMS
INCLUDED IN SCOPE.
F. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.
G. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS
NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.
H. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE
PERFORMING ANY W ORK.
I. ALL EXISTING DUCT SHALL BE TEMPORARILY SEALED BETW EEN DEMOLITION AND NEW W ORK.
Revisions: Date:
65% CD'S SUBMISSION 8.5.20
100% CD'S SUBMISSION 10.19.20
FINAL CDs SUBMISSION 11.17.20
BS BS
MOMV VSMOMV VS
BED
COW COW
SUPPLY CART
CRASH
CART
DIAEYEWASH
RO
DIA
RO
DIA
DIA
RO
UTILITY SINK
RO
MFP
PYXIS
REFRIG
2500G
T SH
2500J
2502 2503
T H
2C326J
2C328
2C330A 2C327
2C322
T T H
10x8
22x10 x1 x1 x1 x1
10ø
EX-SD
200 CFM
12x12
100 CFM
EX-RG
10ø
EX-SD
200 CFM
14x1012x8 x8
12x8
12x6
10x10
18ø
EX-SD
125 CFM
24x24
200 CFM
EX-RG
18ø
EX-SD
125 CFM
14x12 x8 x1 x1 x1
8ø
12x10 ø
24x12
EX-RG
2-10
10ø
CD1
200 CFM
8ø 12x10
VAV
BO X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Departm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 W EST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
MECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE STE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIMATING:
MCGUINESS UNLIM ITED, INC.
15724 STILLW OOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. M ATERIALS ASSESSM ENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
W ESTLAKE, OH 44145
P. 216.781.0060
FINAL CD's SUBMISSION
C
B
IM
\M o d e l\
-0
-M
E P
-C e n tr a l_
B E
S H
E L L h e a p y .c o m
.r v t
/1
/2
:1
:5
A M
MH-102.2
PARTIAL SECOND FLOOR PLAN - NEW WORK PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD CLEVELAND, OHIO
541-21-101
11.17.20 BRB SMP
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2540 CLEAN SUPPORT/ OR - NEW DUCTWORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2503 ANESTHESIA - NEW DUCTWORK
SCALE: 1/4" = 1'-0"
MAIN BLDG - 2C-330A PCU - NEW WORK
NOTES
1 ADJUST AIR TERMINAL UNIT FLOW TO OBTAIN DESIRED PRESSURE RELATIONSHIP OF +0.02" W .G. ADJUST
HOT W ATER VALVE FLOW AS NECESSARY TO MAINTAIN ROOM TEMPERATURE.
2 PROVIDE NEW BALL-IN-W ALL VISUAL PRESSURE INDICATOR IN THIS APPROXIMATE LOCATION. SUBMIT
INDICATOR TO ENGINEER FOR REVIEW AND APPROVAL.
3 PROVIDE W ALL-MOUNTED DIGITAL ROOM PRESSURE MONITOR NEXT TO DOOR. PROVIDE BAS INTERFACE TO SEND ALARM W HEN ROOM PRESSURE FALLS OUTSIDE OF THE SPECIFIED RANGE. ALLOW ANCES SHALL BE MADET O PREVENT NUISANCE ALARMS OF THE MONITORING EQUIPMENT. ROOM PRESSURE SETPOINT
SHALL BE +0.02" W .G.
4 EXISTING ABOVE CEILING PENETRATIONS SHALL BE SEALED AIR-TIGHT. ALLOW FOR SEALING SIX
PENETRATION OF DUCT, PIPE AND CONDUIT PER ROOM FOR A TOTAL OF 18 PENTRATIONS.
5 REBALANCE AIRFLOW TO FLOW INDICATED ON PLANS. PROVIDE NEW BALANCE DAMPER IN DUCT, AS
REQUIRED.
6 REBALANCE AIR TERMINAL UNIT TO NEW CFM EQUAL TO ORIGINAL BOX CFM MINUS SPS ROOM CFM.
OBTAINED IN PRE-TAB AIR SURVEY.
7 RELOCATED THERMOSTAT FOR ASSOCIATED VAV BOX. PROVIDE NEW BACKBOX, CONDUIT, AND CABLING/ TUBING TO EXISTING VAV BOX PER SPECIFICATION 23 06 23 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC.
8. ADJUST SUPPLY AND RETURN AIRFLOW IN ORDER TO ACHIEVE REQUIRED PRESSURE RELATIONSHIP.
PROVIDE BALANCE DAMPERS IN THE RETURN AIR, AS REQUIRED.
A. INCLUDE AN ADDITIONAL 300' OF BRANCH CIRCUITRY ROUTING, ASSUME 3-#12,#12 GRD. IN 0.75"C. FIELD
VERIFY LOCATIONS W HERE NEW DUCTW ORK, PIPING, ETC. NECESSITATE THIS W ORK.
B. ALL AIR FLOW S ARE INITIAL AND SHALL BE ADJUSTED ACCORDINGLY TO OBTAIN ROOM PRESSURES.
C. ALL W IR ING SHALL BE FISHED THRU EXISTING W ALLS.
D. REFER TO SHEET M-001 SIMILAR TO DEMO SHEETS.REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL
FLOOR PLANS INDICATING LOCATIONS OF ALL ROOMS INCLUDED IN SCOPE.
E. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.
F. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS
NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.
G. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE
PERFORMING ANY W ORK.
GENERAL NOTES
Revisions: Date:
65% CD'S SUBMISSION 8.5.20
100% CD'S SUBMISSION 10.19.20
FINAL CDs SUBMISSION 11.17.20
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Departm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 W EST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
MECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE STE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIMATING:
MCGUINESS UNLIM ITED, INC.
15724 STILLW OOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. M ATERIALS ASSESSM ENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
W ESTLAKE, OH 44145
P. 216.781.0060
FINAL CD's SUBMISSION
C
B
IM
\M o d e l\
-0
-M
E P
-C e n tr a l_
B E
S H
E L L h e a p y .c o m
.r v t
/1
/2
:1
:4
A M
M-601
SCHEDULES PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD CLEVELAND, OHIO
541-21-101
11.17.20 BRB SMP
DUCT CONSTRUCTION, SEALING, AND INSULATION
GENERAL NOTES:
A. REFER TO SPECIFICATIONS FOR DUCT CONSTRUCTION:
SHEET M ETAL DUCT; INTERIOR LINING; EXTERIOR
INSULATION; FIBERGLASS DUCTBOARD; ETC.
B. DUCT CONSTRUCTION AND SEALING SHALL BE PER
LATEST S.M .A.C.N.A. STANDARDS.
NOTES:
1. ROUND SHEET M ETAL RUN-OUTS TO AIR DEVICES DOW NSTREAM OF VAV BOXES SHALL BE EXTERNALLY INSULATED.
DUCT SYSTEM
S.P. CON-
STRUCT.
SEAL
CLASS
LEAKAGE
CLASS
S.M.A.C.N.A. CLASS.
INTERNALLY
LINED
EXTERNAL
INSULATION
NOT
INSULATED
SEE
NOTE
DOUBLE
W ALL
INSULATEDRECT RND
-4" A 8
+1" 16
16 8
A
A
A
SUPPLY DUCTW ORK UPSTREAM OF
VAV BOXES
SUPPLY DUCTW ORK DOW NSTREAM OF
VAV BOXES
RETURN DUCTW ORK -2"
TOILET OR GENERAL EXHAUST
DUCTW ORK
-1" 16 -
HVAC DESIGN DATA
GENERAL NOTES:
A. OUTDOOR DESIGN CONDITIONS:
89.4°F DB SUM MER
73.7°F W B SUM MER
-2.0°F DB W INTER
NOTES:
1. LISTED RH IS M AXIM UM ANTICIPATED AT LISTED
DB TEMPERATURE.
2. MINIM UM TOTAL AIR CHANGE RATE IS TO BE BASED
ON SUPPLY CFM FOR POSITIVE AND NEUTRAL
SPACES, EXHAUST/RETURN CFM FOR NEGATIVE
SPACES.
SPACE NAM E / TYPE °F DB
INTERIOR DESIGN DATA
SEE NOTE
SPS ROOM S 2
SUMM ER W INTER
% RH
(NOTE 1,3) °F DB
% RH
(NOTE 1,3)
70 60 70 20
B. DESIGN ALTITUDE: 804FT.
MINIMUM
TOTAL AIR
CHANGES
(NOTE 2)
DESIGN
PRESSURE
RELATIONSHIP
(NOTE 4)
POS
(+0.02 W G)
3. "FLOATING" M EANS THERE IS NO ACTIVE CONTROL.
4. W HEN A NUM ERIC VALUE IS G IVEN, THAT IS THE
VALUE FROM THE VA HVAC DESIGN GUIDE.
NOTES:
1. VAV BOX IS EXISTING-TO-REMAIN. REBALANCE TO
AIRFLOW INDICATED IN SCHEDULE.
GENERAL NOTES:
A. TYPES: "V.V." - VARIABLE VOLUME;
"V.V.R." - VARIABLE VOLUME REHEAT;
"C.V.R." - CONSTANT VOLUME REHEAT;
"V.V.E." - VARIABLE VOLUME EXHAUST;
"C.V.E." - CONSTANT VOLUME EXHAUST.
B. 1.0 MAX. S.P. DROP THRU UNIT & COIL
AT MAX. CFM.
C. REHEAT COIL CAPACITIES BASED ON HEATING
MAX. CFM, 55°F ENT. AIR & 180°F ENT. WATER, AND
MAX. 10 FT. HD. W.P.D.
D. AUTO VALVES SHALL BE 2-WAY TYPE UNLESS
NOTED OTHERWISE.
E. WHEN APPLICABLE, REFER TO SPECIFICATIONS
FOR SEISMIC RESTRAINT REQUIREMENTS.
F. WHEN PICV IS INDICATED, MINIMUM REQUIRED
INLET PRESSURE SHALL NOT EXCEED 5 PSIG.
G. IF REHEAT COIL IS FURNISHED SEPARATELY FROM
TERMINAL UNIT, PROVIDE DUCT TRANSITION AS
REQUIRED BETWEEN TERMINAL UNIT AND COIL.
AIR TERMINAL UNITS - HOT WATER HEAT
M A
R K
T Y
P E
MIN.
INLET
SIZE CFM REHEAT COIL
Auto Valve
Cv
SEISMIC
RESTRAINTS
R E
F E
R T
O N
O T
E
D
IA
M E
T E
R
C O
O L
IN
G M
A X
IM
U
M
D E
A D
B A
N D
M
IN
IM
U
M
R E
H E
A T
M A
X
IM
U M
H E
A T
IN
G
M A
X
IM
U M
M B
H
G P
M
P
IP
E R
U N
O U
T S
IZ
E
R
Q U
IR
E
D
I M
P O
R T
A N
C E
F A
C T
O
A-01 10" - - 1
B-01 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - - 1
B-02 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - - 1
B-03 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
B-04 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
B-05 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
B-06 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
1-01 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
1-03 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
1-04 C.V.R. 6" 250 250 250 250 3.3 0.4 0.75" .2 - -
1-06 C.V.R. 6" 300 300 300 300 4.9 0.5 0.75" .1 - -
1-08 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -
1-09 C.V.R. 8" 200 200 200 200 3.3 0.4 0.75" .1 - -
2-01 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
2-02 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -
2-03 C.V.R. 6" 250 250 250 250 4.1 0.5 0.75" .2 - - 1
2-04 C.V.R. 6" 200 200 200 200 4.7 0.5 0.75" .2 - -
2-06 C.V.R. 7" 450 450 450 450 7.4 0.8 0.75" .3 - -
2-09 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
2-10 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
2-11 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
2-12 C.V.R. 6" 200 200 200 200 3.6 0.4 0.75" .1 - -
2-13 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
2-14 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
3-01 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - - 1
3-02 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
3-03 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
3-04 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
4-01 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - - 1
4-02 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -
4-03 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -
4-04 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
4-05 C.V.R. 6" 200 200 200 200 4.9 0.5 0.75" .2 - -
4-06 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -
4-07 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
5-01 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - - 1
5-02 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
5-03 C.V.R. 6" 300 300 300 300 4.9 0.5 0.75" .2 - -
5-04 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -
6-01 C.V.R. 9" 300 300 300 300 4.9 0.5 0.75" .2 - -
6-02 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -
6-03 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -
NOTES:
1.
GENERAL NOTES:
A. ALL LAY-IN AIR DEVICES SHALL FIT IN 24"X24" LAY-IN
CLG SYSTEM. VERIFY GRID TYPE AND COORDINATE
AIR DEVICE COMPATIBILITY.
B. FINISH KEY: "W.B.E." - WHITE BAKED ENAMEL;
"E.C.L." - ETCHED CLEAR LACQUER OR ANODIZED;
"C.C.B.A." - CUSTOM COLOR SELECTED BY
ARCHITECT.
C. SUPPLY AIR DIFFUSERS SHALL BE 4-WAY BLOW,
UNLESS INDICATED OTHERWISE ON DRAWINGS.
D. PROVIDE AUX. FRAMES FOR AIR DEVICES IN
PLASTER, GYPSUM BOARD, TILE OR OTHER
HARD SURFACES.
AIR DISTRIBUTION DEVICES
M A
R K
DESCRIPTION
MOUNTING TYPE MATERIAL FINISH
O P
P O
S E
D B
L A
D E
D A
M P
E R
S Q
-T O
-R D
N E
C K
A D
A P
T
S
E N
O T
E
L A
Y -I
N
S U
R F
A C
E
D U
C T
S P
L
IN
E
S N
A P
-I N
S T
E E
L
A L
U M
IN
U
M
S T
A
IN
L E
S S
S T
E E
L
W .B
.E
E .C
.L
C .C
.B .A
CD1 STANDARD SQ. CONE CEILING
DIFFUSER RND. NECK
CD2 STANDARD SQ. CONE CEILING
DIFFUSER RND. NECK
CG1 RETURN GRILLE ● ● ●
NOTES:
1.
GENERAL NOTES:
A. TYPES - "V.V.", VARIABLE VOLUME;
"C.V.", CONSTANT VOLUME.
B. 1" MAXIMUM STATIC PRESSURE DROP
THRU UNIT AT MAXIMUM CFM.
C. PROVIDE VELOCITY SENSOR ON HOT AND
COLD DECK INLETS (EACH).
D. WHEN APPLICABLE, REFER TO SPECIFICATIONS
FOR SEISMIC RESTRAINT REQUIREMENTS.
AIR TERMINAL UNITS - DUAL DUCT
M A
R K
T Y
P E
MINIMUM
INLET DIA. COOLING CFM HEATING CFM
D E
A D
B A
N D
M
IN
IM
U
M C
F M
SEISMIC
RESTRAINTS
S E
E N
O T
E
C O
L D
H O
T
M A
X
IM
U M
M
IN
IM
U
M
M A
X
IM
U M
M
IN
IM
U
M
R E
Q U
IR
E
D
I M
P O
R T
A N
C E
F A
C T
1-05 C.V. 6" 6" 200 200 100 55 200 - - AHU-15
C.V.R. 200 200 200 200 3.3 0.4 0.75" .1
Revisions: Date:
65% CD'S SUBMISSION 8.5.20
100% CD'S SUBMISSION 10.19.20
FINAL CDs SUBMISSION 11.17.20
AI
AO
BI
BO
PI
OAT
MAT
RAT
SAT
CCAT
HCAT
OAHY
RAH
SAH
NC
NO
L
H
C
XX-01
LEGEND-
AUTOMATIC TEMPERATURE CONTROLS
CONTROL POINT - SEE POINTS SCHEDULE
ANALOG INPUT
ANALOG OUTPUT
BINARY INPUT
BINARY OUTPUT
PULSED INPUT
OUTSIDE AIR TEMPERATURE
MIXED AIR TEMPERATURE
RETURN AIR TEMPERATURE
SUPPLY AIR TEMPERATURE
COOLING COIL LEAVING AIR TEMPERATURE
HEATING COIL LEAVING AIR TEMPERATURE
OUTSIDE AIR HUMID ITY
RETURN AIR HUMIDITY
SUPPLY AIR HUMIDITY
NORMALLY CLOSED (CLOSES ON LOSS OF POW ER)
NORMALLY OPEN (OPENS ON LOSS OF POW ER)
LOW
HIGH
COMMON
2-W AY AUTOMATIC 2-POSITION CONTROL VALVE
3-W AY AUTOMATIC 2-POSITION CONTROL VALVE
2-W AY AUTOMATIC MODULATING CONTROL VALVE
3-W AY AUTOMATIC MODULATING CONTROL VALVE
DIFFERENTIAL PRESSURE SENSOR
DIFFERENTIAL PRESSURE SW ITCH
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
CURRENT SENSOR TRANSMITTER
ELECTRONIC TO PNEUMATIC TRANSDUCER
FLOW METER TRANSMITTER
HUMIDITY SENSOR
LEVEL CONTROLLER
LEVEL TRANSMITTER
PRESSURE SENSOR
STATIC PRESSURE SENSOR
TEMPERATURE SENSOR
W ATER FLOW SENSOR
W ATER LEVEL SENSOR
CURRENT SW ITCH
END SW ITCH
FLOW SW ITCH
HUMIDISTAT
OCCUPANCY SENSOR
TEMPERATURE LOW LIMIT (FREEZE STAT)
ROOM THERMOSTAT
LOCAL TEMPERATURE CONTROL PANEL
PRESSURE SAFETY - HIGH
PRESSURE SAFETY - LOW
SMOKE DETECTOR
DAMPER OR VALVE ACTUATOR - MODULATING
DAMPER OR VALVE ACTUATOR - 2-POSITION
RELAY
COOLING COIL
HEATING COIL
W ALL MOUNTED DEVICE
DUCT INSERTION DEVICE
PIPE INSERTION OR IMMERSION DEVICE W ITH W ELL
AVERAGING SENSOR OR DEVICE
OUTDOOR SENSOR OR DEVICE, SHIELDED
FAN ARRAY, "X" FANS VERTICAL x "Y" FANS HORIZONTAL
GENERAL NOTES-
AUTOMATIC TEMPERATURE CONTROLS
A A COMPLETE SYSTEM OF AUTOMATIC TEMPERATURE CONTROLS SHALL BE INSTALLED
AS REQUIRED TO ACCOMPLISH THE SEQUENCE OF CONTROL FOR VARIOUS ITEMS OF
EQUIPMENT AND SYSTEMS DESCRIBED HEREINAFTER. THE SYSTEM SHALL BE A DIRECT
DIGITAL CONTROL SYSTEM UTILIZING ELECTRIC OR PNEUMATIC ACTUATION AS
DEFINED IN THE SPECIFICATIONS.
B THE CONTROL DIAGRAMS AND INFORMATION CONTAINED W ITHIN ARE TO SHOW DESIGN
INTENT. IT IS THE CONTROL SYSTEM SUPPLIERS RESPONSIBILITY TO DEVELOP
DETAILED AND COMPLETE CONTROL DIAGRAMS AND SHOP DRAW INGS TO ACCOMPLISH
THE SPECIFIED SEQUENCES.
C THE POINTS LIST IS SHOW N AS AN AID TO THE CONTRACTOR INDICATING THE MINIMUM
POINTS REQUIRED FOR CONTROL, AND MONITORING. ALL INPUT AND OUTPUT POINTS,
AND THEIR REQUIRED INTERFACE AND ACCESSORY HARDW ARE, SHALL BE PROVIDED
FOR A COMPLETE AND FUNCTIONAL CONTROL SYSTEM. IF OR W HEN ADDITIONAL
POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL SPECIFIED,
THESE POINTS, ALONG W ITH ADDITIONAL DIRECT DIGITAL CONTROL PANE(S) (IF
REQUIRED), SHALL ALSO BE PROVIDED.
D BULB W ELLS FOR TEMPERATURE SENSING AS INDICATED SHALL BE PROVIDED BY THE
HVAC CONTRACT. PIPING W ORK SHALL INCLUDE PROPERLY SIZED W ELDOLET OR
THREADOLET FITTINGS PLACED AS DIRECTED BY THE CONTROL SYSTEM SUPPLIER.
E ANDOVER CONTROLS TO BE UTILIZED FOR ALL FRONT-END COMMUNICATION W ITH
BUILDING AUTOMATION SYSTEM AND ASSOCIATED AHU CONTROLLERS. VAV
CONTROLLERS CAN BE OPEN-SOURCE PROTOCOL.
F. W ITHIN THE ANDOVER SYSTEM,PROVIDE A LIST OF SPS SPACES INVOLVED IN THIS
PROJECT AND A GRAPHIC SHOW ING THE NEW ROOMS' TEMPERATURE AND HUMIDITY
STATUS ALARMS FOR GOING OUT OF RANGE. PROVIDE A 60-SECOND (ADJ.) TIME-DELAY
ON THE DOOR SW ITCHH TO PREVENT NUISANCE ALARMS.
M
M
M
M
DPH
L
DP
H
L
C
CO
CS
EPT
FM
H
LC
LT
P
SP
T
W F
W L
CS
ES
FS
H
OS
T
LL
T
LEGEND-
AUTOMATIC TEMPERATURE CONTROLS
TCP
SD
M
M
X
X
X
X
X
X
X
X
X
X
R
3 x 1X x Y
PSH
PSL
AIR TERMINAL UNIT ATC DIAGRAM - H.W. REHEAT
SCALE: NONE
TO SPACE
AIR TERMINAL UNIT - H.W. REHEAT
POINTS LIST SCHEDULE
NOTES:
1. CONNECT DP FLOW SENSOR PROVIDED W ITH AIR TERMINAL UNIT.
2. REFER TO HVAC DESIGN DATA SCHEDULE ON M602 FOR H IGH/LOW LIMITS.
3. REFER TO FLOOR PLANS FOR ROOM PRESSURE SETPOINTS.
POINT NO.
TYPE
NOTES
POINT
NAME
ALARM
VAV-1 VAV-2
AI
D A
M P
E R
A C
T U
A T
O R
A
IR
F
LO
W
GENERAL NOTES:
A. THE FOLLOW ING LIST SHALL BE THE MINIMUM POINTS REQUIRED OF THE
DIRECT DIGITAL CONTROL SYSTEM (BUILDING AUTOMATION SYSTEM). IT IS
NOT THE INTENT TO SHOW ALL REQUIRED POINTS. IF OR W HEN ADDITIONAL
POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL
SPECIFIED, THOSE POINTS SHALL ALSO BE PROVIDED.
AO
SUPPLY AIR
VAV-6
SETPOINT ADJ.
VAV-3 VAV-4
V A
V S
U P
P
LY
A
IR
T
M
P E
R A
TU
R
E
AI
R E
H E
A T
C O
IL
C
O N
TR
O
L V
A
LV
E
AO
H
IG
H T
E M
P
LO
W
T E
M P
VAV-5
Z O
N E
S E
N S
O R
AI
REHEAT
COIL
M
VAV-3
RE-HEAT VALVE
VAV-1
AIRFLOW
VAV-2
DAMPER ACTUATOR
VAV-4
SUPPLY AIR
TEMPERATURE
T
M
T
2 OR 3-W AY PER SCHEDULE
AIR TERMINAL UNIT CONTROL SEQUENCE
PROVIDE ALL EQUIPMENT (VALVES, DAMPERS, ACTUATORS, CONTROLLERS, ETC.) REQUIRED TO PERFORM THE FUNCTIONS SPECIFIED UNLESS NOTED HEREIN OR ELSEW HERE IN THESE CONTRACT DOCUMENTS.
ALL DDC SYSTEM CONTROL POINTS SHALL HAVE A DEFAULT VALUE IN CASE OF SENSOR FAILURE OR LOGIC ERROR. ALL CONTROLLED DEVICES SHALL FAIL SAFE ON LOSS OF CONTROL. ALL SETPOINTS AND PARAMETERS
SHALL BE FULLY ADJUSTABLE FROM THE END USER / OW NER INTERFACE.
VAV BOXES (AIR TERMINAL UNITS)
1. THE VAV BOX MANUFACTURER SHALL PROVIDE THE BOX W ITH VELOCITY SENSOR AND AIR FLOW TAPS FOR
USE IN THE TEMPERATURE CONTROLS. PROVIDE ALL OTHER CONTROL COMPONENTS. REHEAT BOXES SHALL BE PROVIDED W ITH A 2-W AY / 3-W AY MODULATING HOT W ATER VALVE AS INDICATED ON THE DRAW INGS. ALSO REFER TO DRAW INGS FOR LISTED CFM SET POINTS / AND LISTED DISCHARGE AIR TEMPERATURE SET POINTS AS DESCRIBED BELOW . PROVIDE AUTO ZEROING FUNCTION TO ADJUST THE
ZERO CALIBRATION POINT OF THE PRESSURE OR VELOCITY TRANSDUCER. VAV BOX CONTROL
SEQUENCES SHALL BE ACTIVE W HEN THE ASSOCIATED AHU SUPPLY FAN IS “ON”.
2. ZONE HEATING AND COOLING SETPOINTS:
A. ZONE HEATING AND COOLING SETPOINTS SHALL BE INITIALLY SET AS SHOW N ON THE HVAC DESIGN
DATA SCHEDULE. ALL SETPOINTS SHALL BE ADJUSTABLE BY USER.
3. CONSTANT VOLUME HOT W ATER REHEAT CONTROL:
A. THE BOX DAMPER SHALL BE CONTROLLED TO MAINTAIN THE LISTED CONSTANT VOLUME CFM, AND THE
REHEAT VALVE SHALL BE MODULATED TO MAINTAIN THE SPACE TEMPERATURE SET POINT.
4. CONSTANT VOLUME DUAL DUCT BOX CONTROL: THE BOX DAMPERS SHALL BE CONTROLLED TO MAINTAIN THE LISTED CONSTANT VOLUME CFM.. THE HEATING AND COOLING AIRFLOW DAMPERS SHALL MODULATE
TO MAINTAIN THE SPACE TEMPERATURE SETPOINT.
ZONE SENSOR
VAV-5
VAV-6
S E
T P
O
IN
T A
D
JU
S T
M E
N T
AI
ROOM LEVEL CONTROL SEQUENCES AND EXISTING AIR
HANDLING UNIT CONTROL OVERRIDES
1. EXISTING AIR HANDLING UNIT(S) CONTROL SEQUENCE OVERRIDE
A. DISCHARGE AIR TEMPERATURE RESET
a. THE TEMPERATURE AND HUMIDITY OF EACH ROOM SERVED FROM NEW VAV BOXES SHALL BE
MONITORED BY THE BAS. THE ACCEPTABLE RANGES FOR TEMPERATURE AND HUMIDITY ARE
LISTED ON THE HVAC DESIGN DATA SCHEDULE ON SHEET M602. IF THE ROOM TEMPERATURE IS W ITHIN ONE (1) DEGREE OF THE UPPER OR LOW ER LIMIT OF THE ACCETABLE RANGE, THE RESET SEQUENCE ON THE EXISTING AIR HANDLING UNIT SHALL BE DISABLED. IF THE ROOM RELATIVE HUMIDITY IS W ITHIN FIVE (5) PERCENT OF THE UPPER OR LOW ER LIMIT OF THE ACCETABLE RANGE, THE RESET SEQUENCE ON THE EXISTING AIR HANDLING UNIT SHALL BE DISABLED.
b. A TOTAL OF 20 AIR-HANDLERS PROVIDE AIR TO THE VARIOUS SPACES.
B. ROOM HUMIDITY CONTROL
a. THE ROOM TEMPERATURE SETPOINT SHALL BE AUTOMATICALLY ADJUSTED TO MAINTAIN ROOM RELATIVE HUMIDITY (RH). IF THE ROOM RH FALLS TO W ITHIN 5% OF THE MINIMUM ACCEPTABLE RH, RESET THE TEMPERATURE SETPOINT TO THE LOW EST ACCEPTABLE TEMPERATURE FOR THAT
SPACE. IF THE ROOM RH RISES TO W ITHIN 5% OF THE MAXIMUM ACCEPTABLE RH, RESET THE
TEMPERATURE SETPOINT TO THE HIGHEST ACCEPTABLE TEMPERATURE FOR THAT SPACE.
C. ROOM PRESSURE
a. ROOM PRESSURE SHALL BE MONITORED VIA A DIGITAL ROOM PRESSURE MONITORING SYSTEM.
PROVIDE AN ALARM TO THE BAS W HENEVER THE ROOM PRESSURE SETPOINT IS NOT BEING MET.
PROVIDE A DOOR SW ITCH TO AVOID NUISANCE ALARMS W HEN THE DOOR IS OPENED.
VAV-8
SETPOINT ADJ.
H
ZONE SENSOR
VAV-7
H
IG
H R
H
LO
W
R H
VAV-7
Z O
N E
S E
N S
O R
AI
VAV-8
S E
T P
O
IN
T A
D
JU
S T
M E
N T
AI
2 2
VAV-9
ROOM SENSOR
P
H
IG
H /L
W
P
E
S S
U R
E
VAV-9
R O
O M
P R
E S
S U
R E
S E
N S
O R
AI
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Departm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 W EST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
MECHANICAL ENGINEERING:
HEAPY
1422 EUCLID AVE STE 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIMATING:
MCGUINESS UNLIM ITED, INC.
15724 STILLW OOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. M ATERIALS ASSESSM ENT:
STEPHEN J. SEBESTA & ASSOC., INC.
30628 DETROIT RD. #258
W ESTLAKE, OH 44145
P. 216.781.0060
FINAL CD's SUBMISSION
C
B
IM
\M o d e l\
-0
-M
E P
-C e n tr a l_
B E
S H
E L L h e a p y .c o m
.r v t
/1
/2
:1
:5
A M
M-901
CONTROLS PROVIDE TEMPERATURE AND
HUMIDITY CONTROLS TO SPD
STORAGE
10701 EAST BLVD CLEVELAND, OHIO
541-21-101
11.17.20 BRB SMP
NOTES:
1.
GENERAL NOTES:
A. CONNECTED AHU INFORMATION
FOR EACH VAV BOX WAS OBRAINED
FROM BUILDING HISTORICAL
DOCUMENTATION AND MAY HAVE
BEEN UPDATED SINCE. FIELD-
VERIFY ALL COMMUNICATION
NETWORKS AND REQUIRED
CONNECTIONS PRIOR TO
PERFORMING ANY WORK.
VAV/AHU BAS CONNECTION
SCHEDULE
MARK H_SpaceGUID
CONNECTED
AHU
AHU BAS
CONTROL
NETWORK
2-12 2-B435 (MOD. J) AHU-20 ANDOVER
2-13 2A-124 (MOD. C & D) AHU-52 ANDOVER
2-14 2A-159 (MOD. E & F) AHU-51 ANDOVER
3-01 3F-207 AHU-61 ANDOVER
3-02 3-B133 (HOSPICE/TCU) AHU-12 ANDOVER
3-03 3AC-232 (EYE CLINIC) AHU-54 ANDOVER
3-04 3A-104 AHU-18 ANDOVER
4-01 4F-207 AHU-61 ANDOVER
4-02 4B-125 AHU-17 ANDOVER
4-03 4B-104 (OMNICEL CABINET) AHU-17 ANDOVER
4-04 4A-106 (OMNICEL CABINET) AHU-18 ANDOVER
4-05 4A-108 AHU-18 ANDOVER
4-06 4AC-347 (DENTAL CLINIC) AHU-55 ANDOVER
4-07 4A-128 AHU-18 ANDOVER
5-01 5F-207 AHU-61 ANDOVER
5-02 5B-129 AHU-18 ANDOVER
5-03 5A-107 AHU-18 ANDOVER
5-04 5A-129 AHU-17 ANDOVER
6-01 6F-202 AHU-61 ANDOVER
6-02 6B-122 AHU-17…