This document provides details for a federal contract opportunity to provide temperature and humidity controls to the Sterile Processing Department storage area at the Louis Stokes Cleveland VA Medical Center. The contract is set aside for Service-Disabled Veteran Owned Small Businesses only. The purpose of the modification is to extend the project duration from 120 calendar days to 210 calendar days from notice to proceed. No other terms or conditions were changed. Questions must be emailed by the specified date and include the project number in the subject line. This is a presolicitation notice only and no solicitation is currently available.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--SPD Storage Temp and Humidity Controls Project 541-21-101, newest first.
File Type Posted
Bid Abstract Provide Temp and Humidity Controls CLE VAMC.pdf PDF
Bid Opening Attendance Roster Provide Temp and Humidity Controls.pdf PDF
36C25021B0017 0005.docx DOCX document
36C25021B0017 0004.docx DOCX document
541-21-101 Bid Opening Instructions - Revised.pdf PDF
013526_Safety Requirements 2020 Update ADD 1.pdf PDF
36C25021B0017 0003.docx DOCX document
Sign-in Sheet - Site Visit - Provide Temperature and Humidity Controls to SPD Storage.pdf PDF
36C25021B0017 0002.docx DOCX document
541-21-101 Bid Opening Instructions.pdf PDF
Mechanical Drawings.pdf PDF
36C25021B0017 0001.docx DOCX document
VHA DIRECTIVE 1192.01.pdf PDF
Site Visit - 10701 East Blvd - Google Maps.pdf PDF
Technical Specifications.pdf PDF
36C25021B0017_1.docx DOCX document
Architectural Drawings.pdf PDF
Wage Determination 02.2021.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2F180A

2F179A

2F178A

2F177A

2F176A

2F175A

2F174A

2F173A

2F172A

2F171A

2F170A

2F102A

2F104A

2F105A

2F106A

2F107A

2F108A

2F109A

2F110A

2F111A

2F112A

2F113A

2F114A

2F139A

2F138A

2F137A

2F136A

2F135A 2F134A

2F133A

2F131A

2B133A 2B135A

2D139A

/3

44"Ø

3"Ø MPS

2 1/2"Ø LPS

2 1/2"Ø LPR

2"Ø MPS

"Ø

H

PS

4"Ø CHWR

4"Ø CHWS

4"Ø CHWS

"Ø

C H W

R

66/38 OA

A

2D258

A B C D E F

GHIJKL

2B447

2E314A

2E321A

2E322A

2E323A

2E325A

2E327A

2E330A

2E333A

2E336A

2E339A

2E349A

2E351A

2E352A

2E362A 2E366A 2E367A

2E370A2E368A

16" X 21"

DIALYSIS

O2 CART

DIALYSIS

BIO-HAZARD

TRASH CAN

24 DIA.

DIALYSIS

BIO-HAZARD

TRASH CAN

24 DIA.

2'-0" X 4'-0"

DIALYSIS

CART

DIALYSIS

CART

2'-0" X 5'-0"

DIALYSIS

CART

2'-0" X 5'-0"

MO MV VSMO MV VSMO MV VSMO MV VS

PP

PP

PP

BS BS BS

PP

BED BED BED BED

COW COW

SUPPLY

CARTSUPPLY

CART

SUPPLY

CART

CRASH

CART

TOWEL

WARMER

DIA

DIA DIA DIA

DIA

EYEWASH

RO

DIA

RO

DIA

RO

DIA

RO

DIA

DIA

DIA DIA RO

RO

RO

RO

UTILITY

SINK

RO RO

SCALE

MFP

WORK DESK

PYXIS

REFRIG

22 x 28

MFP

36 x 30

PYXIS

29 x 23

CART

28 x 40

UVB PHOTO

THERAPY

HOUVA II

PATIENT

EQUIP.

UVA PHOTO

THERAPY -

SELLAMED

UVA HOUVA

HAND/ FOOT

LIGHT THERAPY

30 x 21

48 Dia

24 x 26

FOTOFINDER

MOLE MAPPER

OMNILUX

REVIVIE PHOTO

THERAPY

28 x 32

LIQUID

NITROGEN

DUSA BLUE

LIGHT HEAD

THERAPY

40 X 28

MOLE

MAPPING

TOWEL

WARMER

C-LOCKER

BATTERY

CABINET

NO.1

UPS

CABINET

NO.1

UPS

CABINET

NO.2

BATTERY

CABINET

NO.2

UTS

NO.1

UTS

NO.2

RSP

NO.1

RSP

NO.2

COW

2'-0" X 4'-0"

SUPPLY

CART

2'-0" X 4'-0"

SUPPLY

CART

2'-0" X 4'-0"

SUPPLY

CART

WORK

CART

PED TABLE

HEAD

WOW

VO VSVO SV

V OSV

HEAD

2ND FLOOR - EXISTING

CONDITIONS/LIFE SAFETY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD. CLEVELAND, OHIO

541-21-101

NICK CARROZZA

CJK DAKRevisions: Date:

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

ATE

I

T C

J.

O

O

FO

H

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LANE, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.2107

HAZ. MATERIALS ASSESSMENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

WESTLAKE, OH 44145

P. 216.781.0060

MECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE. SUITE 1162

CLEVELAND, OH 44115

P. 216.862.5846

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558 LS-102

FINAL CDs SUBMISSION

11.17.20

65% CD'S SUBMISSION 8.25.20

1" = 30'-0"

EX. CONDITIONS/LIFE SAFETY PLAN

2ND FLOOR

NORTH

2D117

ROOM PERIMETER

WALLS: UNRATED

PARTITIONS

(NOTE: 2 HR FIRE

BARRIERS @ FIRE

STAIR)

2D169

ROOM PERIMETER

WALLS:

NORTH/EAST/SOUTH:

1 HR FIRE

BARRIERS

WEST: 2 HR FIRE

BARRIER

2F202

ROOM PERIMETER

WALLS:

WEST/NORTH/EAST:

1 HR FIRE

BARRIERS

SOUTH: 2 HR FIRE

BARRIER

2E334

ROOM PERIMETER

WALLS: 1 HR FIRE

BARRIERS

2C150

ROOM PERIMETER

WALLS: 0 HR

SMOKE

PARTITIONS

2C437

ROOM PERIMETER

WALLS: UNRATED

PARTITIONS

ROOM PERIMETER

WALLS: 1 HR FIRE

BARRIERS

2D254A

ROOM PERIMETER

WALLS:

NORTH/SOUTH:

UNRATED PARTITION

EAST: 0 HR SMOKE

PARTITION

WEST: 1 HR SMOKE

BARRIER

ROOM PERIMETER

WALLS: 1 HR

BARRIERS (NOTE:

2 HR FIRE

BARRIERS @ ELEV.

SHAFT)

2C330A

ROOM PERIMETER

WALLS: 1 HR FIRE

BARRIERS

2B435

ROOM PERIMETER

WALLS: 1 HR FIRE

BARRIERS

2A124

ROOM PERIMETER

WALLS: UNRATED

PARTITIONS

2A159

ROOM PERIMETER

WALLS: 1 HR FIRE

BARRIERS

100% CD'S SUBMISSION 10.19.20

LIFE SAFETY LEGEND

PROJECT SCOPE BOUNDARY

EXISTING 2 HOUR SMOKE BARRIER

EXISTING 2 HOUR FIRE BARRIER

EXISTING 1 HOUR FIRE BARRIER

EXISTING 1 HOUR SMOKE BARRIER

LIFE SAFETY GENERAL NOTES

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS

CLASSIFIED AS AN "EXISTING HEALTHCARE OCCUPANCY" PER NFPA 101 2018

4. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY.

CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED

OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWING

5. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE TO

CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS (TYP. OF ALL

EXIT SIGNS IN OR BEYOND PROJECT AREA)

6. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY

MEASURES. COORDINATE WITH VA

7. EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE

DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING

RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION

LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE

COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES

DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB

FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB

UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL

PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING.

8. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND

EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY

WITH THE REQUIRED BARRIER RATINGS. PROVIDE FIRESTOPPING AROUND

TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH

REQUIRED RATING NOT ASSOCIATED WITH NEW WORK. LARGER OPENINGS

SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL

LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE

MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATED BARRIER AND

ARE IN COMPLIANCE WITH THE OPENING SIZE AS DICTATED BY THE

ASSEMBLY.

9. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE

TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE

CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM

DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT

DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE

BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA

ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT

FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE

WITH SAFETY STANDARDS.

2. LIFE SAFETY PLANS ARE INTENDED TO BE PARTIAL ONLY, AND INDICATE

ONLY THE RATINGS OF THE PARTITIONS OF THE PERIMETER WALLS AND

ROOMS ADJACENT TO THE SPD STORAGE ROOMS IN THE SCOPE OF WORK

3. AS WORK IS LIMITED TO THE SPD STORAGE ROOMS ONLY, EXISTING EGRESS

PATHS WILL NOT BE BLOCKED AS A PART OF CONSTRUCTION. THE

CONTRACTOR IS RESPONSIBLE FOR SEALING AND PROTECTING THE ENTRY

DOORS OF THE ROOMS IN THE SCOPE OF WORK TO MITIGATE ALL

DUST/DEBRIS FROM THE CONSTRUCTION AREA

HAZARDOUS ROOM

EXISTING 0 HOUR SMOKE PARTITION

HAZARDOUS MATERIALS

ABATEMENT:

NOTE: REFER TO REFERENCE CEILING PLAN DRAWINGS AS-C-1 THRU AS-C-4 FOR

ENLARGED LIFE SAFETY CONDITIONS AND ALL FIRE RATED ASSEMBLIES

1. THE USEPA NESHAP (NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR

POLLUTANTS) (40 CFR PART 61) DEFINES “ASBESTOS CONTAINING

MATERIALS (ACM)” AS MATERIALS THAT CONTAIN MORE THAN 1% ASBESTOS SO ANY

MATERIAL CONTAINING LESS THAN 1% ASBESTOS IS NOT, BY REGULATOR

DEFINITION, AN ASBESTOS CONTAINING MATERIAL. NESHAP FURTHER DEFINES

REGULATED ACM (RACM) AS FRIABLE ACM, CATEGORY 1 NONFRIABLE THAT BECOMES

FRIABLE AND CATEGORY ACM THAT HAS A HIGH PROBABILITY OF BECOMING FRIABLE.

2. OSHA DOES NOT REGULATE WHAT ASBESTOS MUST BE REMOVED DURING

DEMOLITION OR RENOVATION BUT STRICTLY REGULATES THE PROCEDURES THAT

MUST BE FOLLOWED FOR WORKER PROTECTION FROM ASBESTOS EXPOSURE.

3. SOME OF THE ORIGINAL PLASTER ON METAL LATH CONTAINING LESS THAN 1%

ASBESTOS WAS OBSERVED IN ROOMS 2059, 2C330A, 2C328, 2C437, 2E334, 3B133,

4A106, 4A128, 5A107, 6A138, AND ASSUMED BEHIND INACCESSIBLE WALLS AND

CEILINGS. THE FIREPROOFING IN ROOM 1B589A WAS REPORTED TO

CONTAIN <1% ASBESTOS. THESE MATERIALS ARE NOT CONSIDERED

ASBESTOS-CONTAINING MATERIALS WHICH ARE DEFINED AS MATERIAL “CONTAINING

MORE THAN 1% ASBESTOS” BY THE USEPA, NESHAPS. THE OSHA REQUIREMENTS

UNDER 29 CFR 1926.1101 FOR DISTURBING MATERIALS WITH 1% OR LESS ASBESTOS

SHOULD BE FOLLOWED. THESE REQUIREMENTS INCLUDE THE WET HANDLING,

PROMPT CLEAN-UP AND DISPOSAL OF WASTES IN LEAK TIGHT CONTAINERS, AND

EXPOSURE ASSESSMENT BY A COMPETENT PERSON. THE WALL PLASTER AND

FIREPROOFING WOULD BE CONSIDERED A NON-ACM OR NON-RACM MATERIAL THAT

DOES NOT REQUIRE REMOVAL OR ABATEMENT BUT IS SUBJECT TO CERTAIN OSHA

REQUIREMENTS THAT ARE NOT CONSIDERED CLASS I, CLASS II OR CLASS III

ABATEMENT WORK. CONTRACTOR TO PRICE AN AREA OF 1,000 SF OF PLASTER ON

METAL LATH TO BE REMOVED OR PROPERLY HANDLED ACCORDING TO THE OSHA

REQUIREMENTS UNDER 29CFR 1926.1101. THIS AMOUNT IS INTENDED TO COVER THE

ENTIRE PROJECT, NOT JUST THE FLOOR ON THIS DRAWING SHEET.

4. ALTHOUGH NO ASBESTOS-CONTAINING PIPE INSULATION JOINTS WERE OBSERVED

ON THE INSPECTION, IT IS POSSIBLE THAT ASBESTOS-CONTAINING PIPE INSULATION

JOINTS MAY BE PRESENT ABOVE PERMANENT CEILINGS. CONTRACTOR TO INCLUDE

THE COST FOR THE REMOVAL OF UP TO TWENTY (20) EACH ASBESTOS-CONTAINING

PIPE INSULATION JOINTS ABOVE INACCESSIBLE CEILINGS. THIS AMOUNT IS

INTENDED TO COVER THE ENTIRE PROJECT, NOT JUST THE FLOOR ON THIS DRAWING

SHEET.

5. ALTHOUGH NO ASBESTOS-CONTAINING RED DUCT MASTIC WAS NOTED ON THE

INSPECTION, IT IS POSSIBLE THAT SOME OF THE RED DUCT MASTIC MAY BE PRESENT

BELOW FIBERGLASS INSULATION ON OLD DUCTWORK IN THE PROJECT AREA. IF THE

CATEGORY 2 NON-FRIABLE ASBESTOS-CONTAINING DUCT MASTIC IS DISCOVERED

AND WILL BE DISTURBED DURING THE RENOVATION, CARE SHOULD BE EXERCISED

TO PREVENT SUBJECTING THE DUCT MASTIC TO CUTTING, GRINDING, SANDING, OR

ABRADING WHICH WOULD RENDER IT FRIABLE. DISPOSE OF ANY REMOVED

DUCTWORK WITH ASBESTOS-CONTAINING CATEGORY 2 NON-FRIABLE MASTIC AT AN

EPA APPROVED LANDFILL. CONTRACTOR TO INCLUDE THE COST FOR THE DISPOSAL

OF UP TO 100 LN FT OF DUCTWORK WITH ASBESTOS-CONTAINING MASTIC. THIS

AMOUNT IS INTENDED TO COVER THE ENTIRE PROJECT, NOT JUST THE FLOOR ON

THIS DRAWING SHEET.

FINAL CD'S SUBMISSION 11.17.20

DRAWINGS

EX. CLG. PLAN: AS-C-2

HVAC: 3/MD-102.1

10/MH-102.1

DRAWINGS

EX. CLG. PLAN: AS-C-2

HVAC: 11/MH-102.1

DRAWINGS

EX. CLG. PLAN: AS-C-2

HVAC: 4/MD-102.1

8/MH-102.1

DRAWINGS

EX. CLG. PLAN: AS-C-2

HVAC: 7/MD-102.1

9/MH-102.1

DRAWINGS

EX. CLG. PLAN: AS-C-2

HVAC: 2/MD-102.1

7/MH-102.1

DRAWINGS

EX. CLG. PLAN: AS-C-2

HVAC: 3/MH-102.2

DRAWINGS

EX. CLG. PLAN: AS-C-2

HVAC: 2/MH-102.2

DRAWINGS

EX. CLG. PLAN: AS-C-2

HVAC: 4/MD-102.2

4/MH-102.2

DRAWINGS

EX. CLG. PLAN: AS-C-3

HVAC: 8/MD-102.1

2/MH-102.1

DRAWINGS

EX. CLG. PLAN: AS-C-3

HVAC: 1/MD-102.1

1/MH-102.1

DRAWINGS

EX. CLG. PLAN: AS-C-3

HVAC: 5/MD-102.1

3/MH-102.1

DRAWINGS

EX. CLG. PLAN: AS-C-2

HVAC: 6/MH-102.1

DRAWINGS

EX. CLG. PLAN: AS-C-2

HVAC: 6/MD-102.1

4/MH-102.1

ADDENDUM 1 4.16.21

AutoCAD SHX Text

FEC

ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg ftp://adeskftp.autodesk.com/pointa/generalsymbolscatalog/COPY_MACHINE.dwg AutoCAD SHX Text

CRASH

AutoCAD SHX Text

CRASH

AutoCAD SHX Text

NIC

AutoCAD SHX Text

NIC

AutoCAD SHX Text W

AutoCAD SHX Text V

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text V

AutoCAD SHX Text S

AutoCAD SHX Text

6" HPS

AutoCAD SHX Text

6" HTWS

AutoCAD SHX Text

6" HTWR

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text

12" CHWR

AutoCAD SHX Text

Corridor

1B102

Seclusion

1B102I

Ante Room

1B102M

Soiled Utility

1B102D

Seclusion

1B102H

Holding

1B102G

Nurse Station

1B102F

Office

1B102K

Clean Utility

1B216

DS

SPECIAL NOTE: CONTRACTOR

SHALL BE AWARE THAT ROOMS

ASSOCIATED WITH 1B216 SCOPE

OCCUR IN A PSYCHIATRIC

EMERGENCY MEDICINE AREA OF

THE BUILDING. GC SHALL ENSURE

THAT COORDINATION WITH VA

AND STAFF IS PERFORMED

THROUGHOUT AND THAT

CONSTRUCTION AREAS ARE

PROPERLY VACATED AND

THOROUGHOLY CLEANED WHEN

NOT IN USE

Clean Utility

1AC275

Clean Linen

1AC266

ECG

1AC277

Corridor

1AC280

Exam 11

1AC257

Exam 10

1AC256

Corridor

1AC260

NOTE: DEDUCT ALTERNATE #1 SHALL ELIMINATE ALL SCOPE OF WORK IN 1AC75

DS

DS

Clean Utility

1A121

Exam/Treatment Room

1A122

Corridor

1A100A

Exam/Treatment Room

1A130

Exam/Treatment Room

1A129

NOTE: DEDUCT ALTERNATE #2 SHALL ELIMINATE ALL SCOPE OF WORK IN 1A121

DS

Corridor

C2D13

Clean Supply

2D169

Clean Linen

2D171

Corridor

C2D17

DS

DS

Nurse Station

2D166

Clean Utility/SPD

2D117

Stair 13

2D101

Medication Room

2D123

Administrative Center

2D118

Patient Room #9

2D116

DS

Anesthesia

OR-7

General

Corridor

2500B

Stretcher Storage

Corridor

2500J Corridor

2500H

DS

DS

ACCESS

PANEL

Sterile Storage

Pharmacy

Bed/ Treatment

Room

Dictation

Medication Prep Room

Corridor

2500G

Corridor

2500F

S

DS

ACCESS

PANEL

Storage

2D254A Corridor

2C280

Corridor

2D250A

Corridor

2D250

Storage

DS

DS

Oxygen Storage

2F202

Soiled Utility

2F201Staff Toilet

2F209

Clean Linen

2F208

Elec. Closet

2FLVC2

Corridor

2FC03

DS

Clean Supply

2E334 Nurses' Work

2E316B

Patient Lounge

2E332

Corridor

2E300D

Soiled Utility

2E335

Corridor

2E300H

DS

DS

Clean Utility

2C150

Soiled Utility

2C149

Holding

2C153

Corridor

2C157

Corridor

2C100C

Corridor

2C140

DS

Storage

2C437Holding

2C423

Exam Room

2C425

Passage

2C400F

G.U. Urology Clinic

2C420

G.I. Office

2C438

ICU

Cleveland

Clinic Resident

2C439

DS

PACU Clean

2C330A

PACU

Passage

2C323A

Elec. Closet

2C327

PACU

Cubicle 11

2C326E

Passage

2B330

PACU

Storage

2C328

PACU Toilet

2C322

PACU

Cubicle 14

2C326H

PACU

Cubicle 13

2C326G

PACU

Cubicle 12

2C326F

DS

GENERAL NOTES:

CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.

ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.

ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL

APPLICABLE CODES.

PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS. IN PARTICULAR, SEVERAL THERMOSTATS WILL BE REMOVED AS A PART OF THIS PROJECT. UPON REMOVAL, FORMER LOCATION SHALL BE PATCHED, REPAIRED, AND REPAINTED TO RESTORE WALL TO ORIGINAL

CONDITION. MATCH PAINT COLOR IN FIELD.

WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW TO MATCH

EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.

ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS REQUIRED.

NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED BY THE

OWNER UNLESS NOTED OTHERWISE.

CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY

POINTS.

CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND

01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO

VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.

THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE PROJECT

AREA DURING THE ENTIRE CONSTRUCTION PHASE.

FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO

MATCH EXISTING.

ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR

ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.

ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS

OTHERWISE APPROVED BY THE COR.

EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU- SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED BY THE COR.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

CEILING SYMBOL LEGEND:

EXISTING TILE CEILING AREAS TO REMAIN. REFER TO HVAC DWGS. FOR EXISTING

DIFFUSER LOCATIONS THAT ARE TO BE REMOVED AS A PART OF THIS SCOPE.

WHERE DIFFUSERS ARE REMOVED AND NOT REPLACED IN THE SAME LOCATION,

THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING A NEW CEILING TILE

MATCHING EXISTING SPEC AT SUCH LOCATIONS. VERIFY EXTENT IN FIELD

EX. GYPSUM BOARD CEILING/SOFFIT TO REMAIN. REFER TO HVAC DWGS. FOR ALL WORK TO

OCCUR ABOVE EXISTING GYPSUM BOARD CEILINGS. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR PATCHING, REPAIRING, AND REPAINTING ALL REMOVED GYP. BD. IN THE SCOPE OF THIS

PROJECT, INCLUDING LOCATIONS THAT ARE TEMPORARILY REMOVED TO GAIN ACCESS TO

PLENUM ABOVE. CONTRACTOR SHALL PATCH AND REPAIR ALL REMOVED CONDITIONS TO FULLY

RESTORE THEM TO THEIR ORIGINAL CONDITION. MATCH PAINT COLORS IN FIELD

2 X 4 LIGHT FIXTURE

2 X 2 LIGHT FIXTURE

RETURN AIR DIFFUSERS

SUPPLY AIR DIFFUSERS

SECURITY CAMERA

S RECESSED SPEAKER

EX. LIGHTS, DIFFUSERS, SPEAKERS, AND CAMERAS TO REMAIN (U.N.O.). REFER TO HVAC DWGS. FOR ALL WORK.

ITEMS INDICATED BUT NOT LIMITED TO ELEMENTS LISTED BELOW MAY REQUIRE TEMPORARY REMOVAL TO ACCOMMODATE CONSTRUCTION. SUCH REMOVAL SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE DETERMINED IN FIELD AS REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFE, TEMPORARY REMOVAL (INCLUDING ANY SHUTDOWNS THAT ARE REQ'D.) AND SHALL REINSTALL ALL ELEMENTS UPON COMPLETION OF CONSTRUCTION. REPORT TO THE COR ANY UNSUPPORTED CONDUIT, LOOSE FITTINGS

AND ANY OTHER CODE VIOLATIONS DISCOVERED UPON OPENING OF THE CEILING.

TEMPORARY REMOVAL: WHERE REMOVAL OF EXISTING CEILING ITEMS (LIGHTS, DIFFUSERS, CAMERAS, SPEAKERS, ETC.) IS REQUIRED FOR INSTALLATION OF NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES.

CAREFULLY REMOVE AND STORE LIGHT FIXTURES, OCCUPANCY SENSORS, SPEAKERS, ACCESS POINTS AND ANY OTHER ELECTRICAL DEVICE FROM CEILINGS THAT ARE REQUIRED TO BE REMOVED FOR INSTALLATION OF MECHANICAL WORK. FIRE ALARM DEVICES AS SMOKE DETECTORS SHALL BE COVERED WHERE THEY NEED TO BE MAINTAINED IN PLACE DURING CONSTRUCTION. ALL ITEMS SHALL BE CLEANED AND REINSTALLED AFTER MECHANICAL CONSTRUCTION ABOVE THE CEILING IS COMPLETE. PROVIDE ALL REQUIRED MOUNTING HARDWARE FOR LIGHT FIXTURES TO PERMANENTLY CONNECT TO THE CEILING GRID. CONTRACTOR SHALL ENSURE THAT LIGHTS ARE PROPERLY SECURED TO THE CEILING GRID AND/OR SLAB ABOVE TO ENSURE LIGHTS CANNOT FALL

OUT OF THE CEILING UPON COMPLETION OF WORK.

TEMPORARY PROTECTION:

EXISTING 2 HOUR RATED

FIRE BARRIER

EXISTING 1 HOUR RATED

FIRE BARRIER

EXISTING 1 HOUR RATED SMOKE BARRIER

EXISTING 0 HOUR RATED SMOKE PARTITION

EXISTING FIRE-RESISTANCE RATED CONSTRUCTION ASSEMBLIES: ALL EXISTING FIRE-RATED WALLS ARE INDICATED ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FIRESTOP AND/OR CAULK ALL NEW PENETRATIONS INDICATED ON THE HVAC DRAWINGS WITH A THRU-WALL FIRESTOP ASSEMBLY EQUIVALENT TO THE RATING OF THE ASSEMBLY AND TESTED PER UL OR SIMILAR TESTING AGENCY. AT 0 HR RATED SMOKE PARTITIONS, PENETRATIONS SHALL BE PERMITTED TO BE CAULKED ONLY TO PREVENT THE

PASSAGE OF SMOKE

TEMPORARY PROTECTION DURING CONSTRUCTION: PRIOR TO CONSTRUCTION IN SPACES, THE CONTRACTOR SHALL COORD. WITH THE VA FOR TEMPORARY REMOVAL OF ALL EXISTING FURNITURE, MOBILE EQUIPMENT, OR MEDICAL DEVICES THAT MAY BE LOCATED IN SPACES (REMOVAL SHALL BE COMPLETED BY THE VA). FOR ALL ITEMS THAT ARE TO REMAIN IN THE SPACE, THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE TEMPORARY

PROTECTION OF SUCH ITEMS TO PREVENT THE SPREAD OF DUST AND DEBRIS.

EXISTING DOORS INTO ROOMS AFFECTED ARE PERMITTED TO BE USED BUT SHALL BE PROTECTED THROUGHOUT CONSTRUCTION. DURING CONSTRUCTION ACTIVITIES IN THE SPACE, SUCH DOORS SHALL BE PROPERLY SEALED BY THE CONTRACTOR TO PREVENT THE SPREAD OF DUST AND DEBRIS TO SURROUNDING, ADJACENT AREAS.

SPECIAL NOTE: WHERE NEW CONSTRUCTION ACTIVITIES OCCUR OUTSIDE OF THE STORAGE

ROOMS IN THE SCOPE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO CORRIDORS,

OFFICES/OTHER STAFF SPACES AND PATIENT BED AREAS, TEMPORARY CONST. BARRIERS

MUST BE PROVIDED TO SEPARATE THE CONSTRUCTION AREA FROM SUCH SPACES. REFER

TO HVAC DRAWINGS FOR THE FULL SCOPE OF SURROUNDING ROOMS THAT WILL BE

AFFECTED. GC SHALL BE RESPONSIBLE FOR COORDINATING LOCATIONS OF TEMP. BARRIERS

IN SUCH SPACES. WHERE CONSTRUCTION IS LIMITED TO 8 HRS OR LESS PER SHIFT, ZIPWALLS

SHALL BE PERMITTED TO BE EMPLOYED FOR TEMPORARY BARRIERS. WORK EXCEEDING 8

HRS SHALL BE ENCLOSED WITH TEMPORARY PARTITION WALL. SEE TYPICAL DETAIL.

SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER

NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC SHALL

COORDINATE ALL ABOVE-CEILING WORK AND TEMPORARY BARRIER CONSTRUCTION WITH VA

AND STAFF

ZIPWALL

TEMP.

PARTITION/DOOR

FIRE-RESISTANCE RATED ASSEMBLIES:

DOOR ASSEMBLIES:

DOOR SEALS: EXISTING ENTRY DOOR TO RECEIVE NEW FRAME GASKETING AND BOTTOM SWEEP.

VERIFY DOOR SIZES IN FIELD

DS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

MECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE., SUITE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. MATERIALS ASSESSMENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

WESTLAKE, OH 44145

P. 216.781.0060

K V

A C

L E

V E

L A

N D

\T E

M P

E R

A T

U R

E

H U

M

ID

IT

Y

C O

N T

R O

L S

\R E

V

IT

\T e m p H u m id it y A

R C

H .r v t

/1

/2

:4

:0

A

M

ADDENDUM 1

AS-C-2

EXISTING REFERENCE CEILING PLANS &

GENERAL NOTES

PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD. CLEVELAND, OH 44106

541-21-101

11.17.20 CJK DAK

SCALE: 3/16" = 1'-0"

1ST FLOOR - 1B216

NORTH

SCALE: 3/16" = 1'-0"

1ST FLOOR - 1AC275

NORTH

SCALE: 3/16" = 1'-0"

1ST FLOOR - 1A121

NORTH

SCALE: 3/16" = 1'-0"

2ND FLOOR - 2D169

NORTH

SCALE: 3/16" = 1'-0"

2ND FLOOR - 2D117

NORTH

SCALE: 3/16" = 1'-0"

2ND FLOOR - 2503

NORTH

SCALE: 3/16" = 1'-0"

2ND FLOOR - 2540

NORTH

SCALE: 3/16" = 1'-0"

2ND FLOOR - 2D254A

NORTH

SCALE: 3/16" = 1'-0"

2ND FLOOR - 2F202

NORTH

SCALE: 3/16" = 1'-0"

2ND FLOOR - 2E334

NORTH

SCALE: 3/16" = 1'-0"

2ND FLOOR - 2C150

NORTH

SCALE: 3/16" = 1'-0"

2ND FLOOR - 2C437

NORTH

SCALE: 3/16" = 1'-0"

2ND FLOOR - 2C330A

NORTH

Revisions: Date:

65% CDs SUBMISSION 8.5.20

100% CDs SUBMISSION 10.19.20

FINAL CDs SUBMISSION 11.17.20

ADDENDUM 1 4.16.21

2C326J

2C328

2C330A 2C327

2C322

T

12x10

8ø

8ø

EX-SD

ø

24x12

EX-RG

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes

Cleveland

VA Medical

Center

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

MECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIMATING:

MCGUINESS UNLIM ITED, INC.

15724 STILLW OOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. M ATERIALS ASSESSM ENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

W ESTLAKE, OH 44145

P. 216.781.0060

FINAL CD's SUBMISSION

C

B

IM

\M o d e l\

-0

-M

E P

-C e n tr a l_

B E

S H

E L L h e a p y .c o m

.r v t

/1

/2

:1

:5

A M

MD-102.2

PARTIAL SECOND FLOOR PLAN - DEMOLITION PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD CLEVELAND, OHIO

541-21-101

11.17.20 BRB SMP

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2C-330A PCU - DEMOLITION

NOTES

1 OBTAIN MAXIMUM AND MINIMUM AIRFLOW SETTINGS FOR VAV BOX. PROVIDE PRE-CONSTRUCTION AIR

SURVEY FOR ALL CONNECTED SPACES.

2 REMOVE DIFFUSER AND BRANCH RUNOUT BACK TO MAIN. CAP DUCT AT MAIN. SEAL AND INSULATE DUCT

PER SPECIFICATION FOR NEW W ORK.

GENERAL NOTES

A. REFER TO SHEET M-001 FOR LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERAL NOTES.

B. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, P IPE AND EQUIPMENT SIZES, SERVICES AND

LOCATIONS PRIOR TO PERFORMING W ORK.

C. ALL ABANDONED EXTRANEOUS PIPING, DUCTW ORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.

D. ALL EXISTING DUCTW ORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOW N ON REMOVAL PLAN(S) SHALL BE

REMOVED. THE MAJORITY OF W ORK TO BE REMOVED IS SHOW N. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTW ORK, PIPING, ETC. THAT MAY NOT BE SHOW N BUT IS ASSOCIATED W ITH THE REMOVAL

W ORK.

E. REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL FLOOR PLANS INDICATING LOCATIONS OF ALL ROOMS

INCLUDED IN SCOPE.

F. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.

G. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS

NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.

H. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE

PERFORMING ANY W ORK.

I. ALL EXISTING DUCT SHALL BE TEMPORARILY SEALED BETW EEN DEMOLITION AND NEW W ORK.

Revisions: Date:

65% CD'S SUBMISSION 8.5.20

100% CD'S SUBMISSION 10.19.20

FINAL CDs SUBMISSION 11.17.20

BS BS

MOMV VSMOMV VS

BED

COW COW

SUPPLY CART

CRASH

CART

DIAEYEWASH

RO

DIA

RO

DIA

DIA

RO

UTILITY SINK

RO

MFP

PYXIS

REFRIG

2500G

T SH

2500J

2502 2503

T H

2C326J

2C328

2C330A 2C327

2C322

T T H

10x8

22x10 x1 x1 x1 x1

10ø

EX-SD

200 CFM

12x12

100 CFM

EX-RG

10ø

EX-SD

200 CFM

14x1012x8 x8

12x8

12x6

10x10

18ø

EX-SD

125 CFM

24x24

200 CFM

EX-RG

18ø

EX-SD

125 CFM

14x12 x8 x1 x1 x1

8ø

12x10 ø

24x12

EX-RG

2-10

10ø

CD1

200 CFM

8ø 12x10

VAV

BO X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes

Cleveland

VA Medical

Center

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

MECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIMATING:

MCGUINESS UNLIM ITED, INC.

15724 STILLW OOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. M ATERIALS ASSESSM ENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

W ESTLAKE, OH 44145

P. 216.781.0060

FINAL CD's SUBMISSION

C

B

IM

\M o d e l\

-0

-M

E P

-C e n tr a l_

B E

S H

E L L h e a p y .c o m

.r v t

/1

/2

:1

:5

A M

MH-102.2

PARTIAL SECOND FLOOR PLAN - NEW WORK PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD CLEVELAND, OHIO

541-21-101

11.17.20 BRB SMP

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2540 CLEAN SUPPORT/ OR - NEW DUCTWORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2503 ANESTHESIA - NEW DUCTWORK

SCALE: 1/4" = 1'-0"

MAIN BLDG - 2C-330A PCU - NEW WORK

NOTES

1 ADJUST AIR TERMINAL UNIT FLOW TO OBTAIN DESIRED PRESSURE RELATIONSHIP OF +0.02" W .G. ADJUST

HOT W ATER VALVE FLOW AS NECESSARY TO MAINTAIN ROOM TEMPERATURE.

2 PROVIDE NEW BALL-IN-W ALL VISUAL PRESSURE INDICATOR IN THIS APPROXIMATE LOCATION. SUBMIT

INDICATOR TO ENGINEER FOR REVIEW AND APPROVAL.

3 PROVIDE W ALL-MOUNTED DIGITAL ROOM PRESSURE MONITOR NEXT TO DOOR. PROVIDE BAS INTERFACE TO SEND ALARM W HEN ROOM PRESSURE FALLS OUTSIDE OF THE SPECIFIED RANGE. ALLOW ANCES SHALL BE MADET O PREVENT NUISANCE ALARMS OF THE MONITORING EQUIPMENT. ROOM PRESSURE SETPOINT

SHALL BE +0.02" W .G.

4 EXISTING ABOVE CEILING PENETRATIONS SHALL BE SEALED AIR-TIGHT. ALLOW FOR SEALING SIX

PENETRATION OF DUCT, PIPE AND CONDUIT PER ROOM FOR A TOTAL OF 18 PENTRATIONS.

5 REBALANCE AIRFLOW TO FLOW INDICATED ON PLANS. PROVIDE NEW BALANCE DAMPER IN DUCT, AS

REQUIRED.

6 REBALANCE AIR TERMINAL UNIT TO NEW CFM EQUAL TO ORIGINAL BOX CFM MINUS SPS ROOM CFM.

OBTAINED IN PRE-TAB AIR SURVEY.

7 RELOCATED THERMOSTAT FOR ASSOCIATED VAV BOX. PROVIDE NEW BACKBOX, CONDUIT, AND CABLING/ TUBING TO EXISTING VAV BOX PER SPECIFICATION 23 06 23 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC.

8. ADJUST SUPPLY AND RETURN AIRFLOW IN ORDER TO ACHIEVE REQUIRED PRESSURE RELATIONSHIP.

PROVIDE BALANCE DAMPERS IN THE RETURN AIR, AS REQUIRED.

A. INCLUDE AN ADDITIONAL 300' OF BRANCH CIRCUITRY ROUTING, ASSUME 3-#12,#12 GRD. IN 0.75"C. FIELD

VERIFY LOCATIONS W HERE NEW DUCTW ORK, PIPING, ETC. NECESSITATE THIS W ORK.

B. ALL AIR FLOW S ARE INITIAL AND SHALL BE ADJUSTED ACCORDINGLY TO OBTAIN ROOM PRESSURES.

C. ALL W IR ING SHALL BE FISHED THRU EXISTING W ALLS.

D. REFER TO SHEET M-001 SIMILAR TO DEMO SHEETS.REFER TO ARCHITECTURAL DRAW INGS FOR OVERALL

FLOOR PLANS INDICATING LOCATIONS OF ALL ROOMS INCLUDED IN SCOPE.

E. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES.

F. IN ALL SPACES, PATCH/REPAIR EXISTING CEILING OR PROVIDE NEW CEILING TILE W HERE NEW DIFFUSER IS

NOT GOING EXACTLY W HERE ORIGINAL D IFFUSER W AS LOCATED.

G. PATCH/REPAIR ANY W ALL DAMAGE DONE BY EQUIPMENT REMOVAL OR BY THIS CONTRACTOR W HILE

PERFORMING ANY W ORK.

GENERAL NOTES

Revisions: Date:

65% CD'S SUBMISSION 8.5.20

100% CD'S SUBMISSION 10.19.20

FINAL CDs SUBMISSION 11.17.20

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes

Cleveland

VA Medical

Center

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

MECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIMATING:

MCGUINESS UNLIM ITED, INC.

15724 STILLW OOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. M ATERIALS ASSESSM ENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

W ESTLAKE, OH 44145

P. 216.781.0060

FINAL CD's SUBMISSION

C

B

IM

\M o d e l\

-0

-M

E P

-C e n tr a l_

B E

S H

E L L h e a p y .c o m

.r v t

/1

/2

:1

:4

A M

M-601

SCHEDULES PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD CLEVELAND, OHIO

541-21-101

11.17.20 BRB SMP

DUCT CONSTRUCTION, SEALING, AND INSULATION

GENERAL NOTES:

A. REFER TO SPECIFICATIONS FOR DUCT CONSTRUCTION:

SHEET M ETAL DUCT; INTERIOR LINING; EXTERIOR

INSULATION; FIBERGLASS DUCTBOARD; ETC.

B. DUCT CONSTRUCTION AND SEALING SHALL BE PER

LATEST S.M .A.C.N.A. STANDARDS.

NOTES:

1. ROUND SHEET M ETAL RUN-OUTS TO AIR DEVICES DOW NSTREAM OF VAV BOXES SHALL BE EXTERNALLY INSULATED.

DUCT SYSTEM

S.P. CON-

STRUCT.

SEAL

CLASS

LEAKAGE

CLASS

S.M.A.C.N.A. CLASS.

INTERNALLY

LINED

EXTERNAL

INSULATION

NOT

INSULATED

SEE

NOTE

DOUBLE

W ALL

INSULATEDRECT RND

-4" A 8

+1" 16

16 8

A

A

A

SUPPLY DUCTW ORK UPSTREAM OF

VAV BOXES

SUPPLY DUCTW ORK DOW NSTREAM OF

VAV BOXES

RETURN DUCTW ORK -2"

TOILET OR GENERAL EXHAUST

DUCTW ORK

-1" 16 -

HVAC DESIGN DATA

GENERAL NOTES:

A. OUTDOOR DESIGN CONDITIONS:

89.4°F DB SUM MER

73.7°F W B SUM MER

-2.0°F DB W INTER

NOTES:

1. LISTED RH IS M AXIM UM ANTICIPATED AT LISTED

DB TEMPERATURE.

2. MINIM UM TOTAL AIR CHANGE RATE IS TO BE BASED

ON SUPPLY CFM FOR POSITIVE AND NEUTRAL

SPACES, EXHAUST/RETURN CFM FOR NEGATIVE

SPACES.

SPACE NAM E / TYPE °F DB

INTERIOR DESIGN DATA

SEE NOTE

SPS ROOM S 2

SUMM ER W INTER

% RH

(NOTE 1,3) °F DB

% RH

(NOTE 1,3)

70 60 70 20

B. DESIGN ALTITUDE: 804FT.

MINIMUM

TOTAL AIR

CHANGES

(NOTE 2)

DESIGN

PRESSURE

RELATIONSHIP

(NOTE 4)

POS

(+0.02 W G)

3. "FLOATING" M EANS THERE IS NO ACTIVE CONTROL.

4. W HEN A NUM ERIC VALUE IS G IVEN, THAT IS THE

VALUE FROM THE VA HVAC DESIGN GUIDE.

NOTES:

1. VAV BOX IS EXISTING-TO-REMAIN. REBALANCE TO

AIRFLOW INDICATED IN SCHEDULE.

GENERAL NOTES:

A. TYPES: "V.V." - VARIABLE VOLUME;

"V.V.R." - VARIABLE VOLUME REHEAT;

"C.V.R." - CONSTANT VOLUME REHEAT;

"V.V.E." - VARIABLE VOLUME EXHAUST;

"C.V.E." - CONSTANT VOLUME EXHAUST.

B. 1.0 MAX. S.P. DROP THRU UNIT & COIL

AT MAX. CFM.

C. REHEAT COIL CAPACITIES BASED ON HEATING

MAX. CFM, 55°F ENT. AIR & 180°F ENT. WATER, AND

MAX. 10 FT. HD. W.P.D.

D. AUTO VALVES SHALL BE 2-WAY TYPE UNLESS

NOTED OTHERWISE.

E. WHEN APPLICABLE, REFER TO SPECIFICATIONS

FOR SEISMIC RESTRAINT REQUIREMENTS.

F. WHEN PICV IS INDICATED, MINIMUM REQUIRED

INLET PRESSURE SHALL NOT EXCEED 5 PSIG.

G. IF REHEAT COIL IS FURNISHED SEPARATELY FROM

TERMINAL UNIT, PROVIDE DUCT TRANSITION AS

REQUIRED BETWEEN TERMINAL UNIT AND COIL.

AIR TERMINAL UNITS - HOT WATER HEAT

M A

R K

T Y

P E

MIN.

INLET

SIZE CFM REHEAT COIL

Auto Valve

Cv

SEISMIC

RESTRAINTS

R E

F E

R T

O N

O T

E

D

IA

M E

T E

R

C O

O L

IN

G M

A X

IM

U

M

D E

A D

B A

N D

M

IN

IM

U

M

R E

H E

A T

M A

X

IM

U M

H E

A T

IN

G

M A

X

IM

U M

M B

H

G P

M

P

IP

E R

U N

O U

T S

IZ

E

R

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

O

A-01 10" - - 1

B-01 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - - 1

B-02 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - - 1

B-03 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

B-04 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

B-05 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

B-06 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

1-01 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

1-03 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

1-04 C.V.R. 6" 250 250 250 250 3.3 0.4 0.75" .2 - -

1-06 C.V.R. 6" 300 300 300 300 4.9 0.5 0.75" .1 - -

1-08 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -

1-09 C.V.R. 8" 200 200 200 200 3.3 0.4 0.75" .1 - -

2-01 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

2-02 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -

2-03 C.V.R. 6" 250 250 250 250 4.1 0.5 0.75" .2 - - 1

2-04 C.V.R. 6" 200 200 200 200 4.7 0.5 0.75" .2 - -

2-06 C.V.R. 7" 450 450 450 450 7.4 0.8 0.75" .3 - -

2-09 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

2-10 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

2-11 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

2-12 C.V.R. 6" 200 200 200 200 3.6 0.4 0.75" .1 - -

2-13 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

2-14 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

3-01 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - - 1

3-02 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

3-03 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

3-04 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

4-01 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - - 1

4-02 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -

4-03 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -

4-04 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

4-05 C.V.R. 6" 200 200 200 200 4.9 0.5 0.75" .2 - -

4-06 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -

4-07 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

5-01 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - - 1

5-02 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

5-03 C.V.R. 6" 300 300 300 300 4.9 0.5 0.75" .2 - -

5-04 C.V.R. 6" 200 200 200 200 3.3 0.4 0.75" .1 - -

6-01 C.V.R. 9" 300 300 300 300 4.9 0.5 0.75" .2 - -

6-02 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -

6-03 C.V.R. 6" 300 300 300 300 5.0 0.5 0.75" .2 - -

NOTES:

1.

GENERAL NOTES:

A. ALL LAY-IN AIR DEVICES SHALL FIT IN 24"X24" LAY-IN

CLG SYSTEM. VERIFY GRID TYPE AND COORDINATE

AIR DEVICE COMPATIBILITY.

B. FINISH KEY: "W.B.E." - WHITE BAKED ENAMEL;

"E.C.L." - ETCHED CLEAR LACQUER OR ANODIZED;

"C.C.B.A." - CUSTOM COLOR SELECTED BY

ARCHITECT.

C. SUPPLY AIR DIFFUSERS SHALL BE 4-WAY BLOW,

UNLESS INDICATED OTHERWISE ON DRAWINGS.

D. PROVIDE AUX. FRAMES FOR AIR DEVICES IN

PLASTER, GYPSUM BOARD, TILE OR OTHER

HARD SURFACES.

AIR DISTRIBUTION DEVICES

M A

R K

DESCRIPTION

MOUNTING TYPE MATERIAL FINISH

O P

P O

S E

D B

L A

D E

D A

M P

E R

S Q

-T O

-R D

N E

C K

A D

A P

T

S

E N

O T

E

L A

Y -I

N

S U

R F

A C

E

D U

C T

S P

L

IN

E

S N

A P

-I N

S T

E E

L

A L

U M

IN

U

M

S T

A

IN

L E

S S

S T

E E

L

W .B

.E

E .C

.L

C .C

.B .A

CD1 STANDARD SQ. CONE CEILING

DIFFUSER RND. NECK

CD2 STANDARD SQ. CONE CEILING

DIFFUSER RND. NECK

CG1 RETURN GRILLE ● ● ●

NOTES:

1.

GENERAL NOTES:

A. TYPES - "V.V.", VARIABLE VOLUME;

"C.V.", CONSTANT VOLUME.

B. 1" MAXIMUM STATIC PRESSURE DROP

THRU UNIT AT MAXIMUM CFM.

C. PROVIDE VELOCITY SENSOR ON HOT AND

COLD DECK INLETS (EACH).

D. WHEN APPLICABLE, REFER TO SPECIFICATIONS

FOR SEISMIC RESTRAINT REQUIREMENTS.

AIR TERMINAL UNITS - DUAL DUCT

M A

R K

T Y

P E

MINIMUM

INLET DIA. COOLING CFM HEATING CFM

D E

A D

B A

N D

M

IN

IM

U

M C

F M

SEISMIC

RESTRAINTS

S E

E N

O T

E

C O

L D

H O

T

M A

X

IM

U M

M

IN

IM

U

M

M A

X

IM

U M

M

IN

IM

U

M

R E

Q U

IR

E

D

I M

P O

R T

A N

C E

F A

C T

1-05 C.V. 6" 6" 200 200 100 55 200 - - AHU-15

C.V.R. 200 200 200 200 3.3 0.4 0.75" .1

Revisions: Date:

65% CD'S SUBMISSION 8.5.20

100% CD'S SUBMISSION 10.19.20

FINAL CDs SUBMISSION 11.17.20

AI

AO

BI

BO

PI

OAT

MAT

RAT

SAT

CCAT

HCAT

OAHY

RAH

SAH

NC

NO

L

H

C

XX-01

LEGEND-

AUTOMATIC TEMPERATURE CONTROLS

CONTROL POINT - SEE POINTS SCHEDULE

ANALOG INPUT

ANALOG OUTPUT

BINARY INPUT

BINARY OUTPUT

PULSED INPUT

OUTSIDE AIR TEMPERATURE

MIXED AIR TEMPERATURE

RETURN AIR TEMPERATURE

SUPPLY AIR TEMPERATURE

COOLING COIL LEAVING AIR TEMPERATURE

HEATING COIL LEAVING AIR TEMPERATURE

OUTSIDE AIR HUMID ITY

RETURN AIR HUMIDITY

SUPPLY AIR HUMIDITY

NORMALLY CLOSED (CLOSES ON LOSS OF POW ER)

NORMALLY OPEN (OPENS ON LOSS OF POW ER)

LOW

HIGH

COMMON

2-W AY AUTOMATIC 2-POSITION CONTROL VALVE

3-W AY AUTOMATIC 2-POSITION CONTROL VALVE

2-W AY AUTOMATIC MODULATING CONTROL VALVE

3-W AY AUTOMATIC MODULATING CONTROL VALVE

DIFFERENTIAL PRESSURE SENSOR

DIFFERENTIAL PRESSURE SW ITCH

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

CURRENT SENSOR TRANSMITTER

ELECTRONIC TO PNEUMATIC TRANSDUCER

FLOW METER TRANSMITTER

HUMIDITY SENSOR

LEVEL CONTROLLER

LEVEL TRANSMITTER

PRESSURE SENSOR

STATIC PRESSURE SENSOR

TEMPERATURE SENSOR

W ATER FLOW SENSOR

W ATER LEVEL SENSOR

CURRENT SW ITCH

END SW ITCH

FLOW SW ITCH

HUMIDISTAT

OCCUPANCY SENSOR

TEMPERATURE LOW LIMIT (FREEZE STAT)

ROOM THERMOSTAT

LOCAL TEMPERATURE CONTROL PANEL

PRESSURE SAFETY - HIGH

PRESSURE SAFETY - LOW

SMOKE DETECTOR

DAMPER OR VALVE ACTUATOR - MODULATING

DAMPER OR VALVE ACTUATOR - 2-POSITION

RELAY

COOLING COIL

HEATING COIL

W ALL MOUNTED DEVICE

DUCT INSERTION DEVICE

PIPE INSERTION OR IMMERSION DEVICE W ITH W ELL

AVERAGING SENSOR OR DEVICE

OUTDOOR SENSOR OR DEVICE, SHIELDED

FAN ARRAY, "X" FANS VERTICAL x "Y" FANS HORIZONTAL

GENERAL NOTES-

AUTOMATIC TEMPERATURE CONTROLS

A A COMPLETE SYSTEM OF AUTOMATIC TEMPERATURE CONTROLS SHALL BE INSTALLED

AS REQUIRED TO ACCOMPLISH THE SEQUENCE OF CONTROL FOR VARIOUS ITEMS OF

EQUIPMENT AND SYSTEMS DESCRIBED HEREINAFTER. THE SYSTEM SHALL BE A DIRECT

DIGITAL CONTROL SYSTEM UTILIZING ELECTRIC OR PNEUMATIC ACTUATION AS

DEFINED IN THE SPECIFICATIONS.

B THE CONTROL DIAGRAMS AND INFORMATION CONTAINED W ITHIN ARE TO SHOW DESIGN

INTENT. IT IS THE CONTROL SYSTEM SUPPLIERS RESPONSIBILITY TO DEVELOP

DETAILED AND COMPLETE CONTROL DIAGRAMS AND SHOP DRAW INGS TO ACCOMPLISH

THE SPECIFIED SEQUENCES.

C THE POINTS LIST IS SHOW N AS AN AID TO THE CONTRACTOR INDICATING THE MINIMUM

POINTS REQUIRED FOR CONTROL, AND MONITORING. ALL INPUT AND OUTPUT POINTS,

AND THEIR REQUIRED INTERFACE AND ACCESSORY HARDW ARE, SHALL BE PROVIDED

FOR A COMPLETE AND FUNCTIONAL CONTROL SYSTEM. IF OR W HEN ADDITIONAL

POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL SPECIFIED,

THESE POINTS, ALONG W ITH ADDITIONAL DIRECT DIGITAL CONTROL PANE(S) (IF

REQUIRED), SHALL ALSO BE PROVIDED.

D BULB W ELLS FOR TEMPERATURE SENSING AS INDICATED SHALL BE PROVIDED BY THE

HVAC CONTRACT. PIPING W ORK SHALL INCLUDE PROPERLY SIZED W ELDOLET OR

THREADOLET FITTINGS PLACED AS DIRECTED BY THE CONTROL SYSTEM SUPPLIER.

E ANDOVER CONTROLS TO BE UTILIZED FOR ALL FRONT-END COMMUNICATION W ITH

BUILDING AUTOMATION SYSTEM AND ASSOCIATED AHU CONTROLLERS. VAV

CONTROLLERS CAN BE OPEN-SOURCE PROTOCOL.

F. W ITHIN THE ANDOVER SYSTEM,PROVIDE A LIST OF SPS SPACES INVOLVED IN THIS

PROJECT AND A GRAPHIC SHOW ING THE NEW ROOMS' TEMPERATURE AND HUMIDITY

STATUS ALARMS FOR GOING OUT OF RANGE. PROVIDE A 60-SECOND (ADJ.) TIME-DELAY

ON THE DOOR SW ITCHH TO PREVENT NUISANCE ALARMS.

M

M

M

M

DPH

L

DP

H

L

C

CO

CS

EPT

FM

H

LC

LT

P

SP

T

W F

W L

CS

ES

FS

H

OS

T

LL

T

LEGEND-

AUTOMATIC TEMPERATURE CONTROLS

TCP

SD

M

M

X

X

X

X

X

X

X

X

X

X

R

3 x 1X x Y

PSH

PSL

AIR TERMINAL UNIT ATC DIAGRAM - H.W. REHEAT

SCALE: NONE

TO SPACE

AIR TERMINAL UNIT - H.W. REHEAT

POINTS LIST SCHEDULE

NOTES:

1. CONNECT DP FLOW SENSOR PROVIDED W ITH AIR TERMINAL UNIT.

2. REFER TO HVAC DESIGN DATA SCHEDULE ON M602 FOR H IGH/LOW LIMITS.

3. REFER TO FLOOR PLANS FOR ROOM PRESSURE SETPOINTS.

POINT NO.

TYPE

NOTES

POINT

NAME

ALARM

VAV-1 VAV-2

AI

D A

M P

E R

A C

T U

A T

O R

A

IR

F

LO

W

GENERAL NOTES:

A. THE FOLLOW ING LIST SHALL BE THE MINIMUM POINTS REQUIRED OF THE

DIRECT DIGITAL CONTROL SYSTEM (BUILDING AUTOMATION SYSTEM). IT IS

NOT THE INTENT TO SHOW ALL REQUIRED POINTS. IF OR W HEN ADDITIONAL

POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL

SPECIFIED, THOSE POINTS SHALL ALSO BE PROVIDED.

AO

SUPPLY AIR

VAV-6

SETPOINT ADJ.

VAV-3 VAV-4

V A

V S

U P

P

LY

A

IR

T

M

P E

R A

TU

R

E

AI

R E

H E

A T

C O

IL

C

O N

TR

O

L V

A

LV

E

AO

H

IG

H T

E M

P

LO

W

T E

M P

VAV-5

Z O

N E

S E

N S

O R

AI

REHEAT

COIL

M

VAV-3

RE-HEAT VALVE

VAV-1

AIRFLOW

VAV-2

DAMPER ACTUATOR

VAV-4

SUPPLY AIR

TEMPERATURE

T

M

T

2 OR 3-W AY PER SCHEDULE

AIR TERMINAL UNIT CONTROL SEQUENCE

PROVIDE ALL EQUIPMENT (VALVES, DAMPERS, ACTUATORS, CONTROLLERS, ETC.) REQUIRED TO PERFORM THE FUNCTIONS SPECIFIED UNLESS NOTED HEREIN OR ELSEW HERE IN THESE CONTRACT DOCUMENTS.

ALL DDC SYSTEM CONTROL POINTS SHALL HAVE A DEFAULT VALUE IN CASE OF SENSOR FAILURE OR LOGIC ERROR. ALL CONTROLLED DEVICES SHALL FAIL SAFE ON LOSS OF CONTROL. ALL SETPOINTS AND PARAMETERS

SHALL BE FULLY ADJUSTABLE FROM THE END USER / OW NER INTERFACE.

VAV BOXES (AIR TERMINAL UNITS)

1. THE VAV BOX MANUFACTURER SHALL PROVIDE THE BOX W ITH VELOCITY SENSOR AND AIR FLOW TAPS FOR

USE IN THE TEMPERATURE CONTROLS. PROVIDE ALL OTHER CONTROL COMPONENTS. REHEAT BOXES SHALL BE PROVIDED W ITH A 2-W AY / 3-W AY MODULATING HOT W ATER VALVE AS INDICATED ON THE DRAW INGS. ALSO REFER TO DRAW INGS FOR LISTED CFM SET POINTS / AND LISTED DISCHARGE AIR TEMPERATURE SET POINTS AS DESCRIBED BELOW . PROVIDE AUTO ZEROING FUNCTION TO ADJUST THE

ZERO CALIBRATION POINT OF THE PRESSURE OR VELOCITY TRANSDUCER. VAV BOX CONTROL

SEQUENCES SHALL BE ACTIVE W HEN THE ASSOCIATED AHU SUPPLY FAN IS “ON”.

2. ZONE HEATING AND COOLING SETPOINTS:

A. ZONE HEATING AND COOLING SETPOINTS SHALL BE INITIALLY SET AS SHOW N ON THE HVAC DESIGN

DATA SCHEDULE. ALL SETPOINTS SHALL BE ADJUSTABLE BY USER.

3. CONSTANT VOLUME HOT W ATER REHEAT CONTROL:

A. THE BOX DAMPER SHALL BE CONTROLLED TO MAINTAIN THE LISTED CONSTANT VOLUME CFM, AND THE

REHEAT VALVE SHALL BE MODULATED TO MAINTAIN THE SPACE TEMPERATURE SET POINT.

4. CONSTANT VOLUME DUAL DUCT BOX CONTROL: THE BOX DAMPERS SHALL BE CONTROLLED TO MAINTAIN THE LISTED CONSTANT VOLUME CFM.. THE HEATING AND COOLING AIRFLOW DAMPERS SHALL MODULATE

TO MAINTAIN THE SPACE TEMPERATURE SETPOINT.

ZONE SENSOR

VAV-5

VAV-6

S E

T P

O

IN

T A

D

JU

S T

M E

N T

AI

ROOM LEVEL CONTROL SEQUENCES AND EXISTING AIR

HANDLING UNIT CONTROL OVERRIDES

1. EXISTING AIR HANDLING UNIT(S) CONTROL SEQUENCE OVERRIDE

A. DISCHARGE AIR TEMPERATURE RESET

a. THE TEMPERATURE AND HUMIDITY OF EACH ROOM SERVED FROM NEW VAV BOXES SHALL BE

MONITORED BY THE BAS. THE ACCEPTABLE RANGES FOR TEMPERATURE AND HUMIDITY ARE

LISTED ON THE HVAC DESIGN DATA SCHEDULE ON SHEET M602. IF THE ROOM TEMPERATURE IS W ITHIN ONE (1) DEGREE OF THE UPPER OR LOW ER LIMIT OF THE ACCETABLE RANGE, THE RESET SEQUENCE ON THE EXISTING AIR HANDLING UNIT SHALL BE DISABLED. IF THE ROOM RELATIVE HUMIDITY IS W ITHIN FIVE (5) PERCENT OF THE UPPER OR LOW ER LIMIT OF THE ACCETABLE RANGE, THE RESET SEQUENCE ON THE EXISTING AIR HANDLING UNIT SHALL BE DISABLED.

b. A TOTAL OF 20 AIR-HANDLERS PROVIDE AIR TO THE VARIOUS SPACES.

B. ROOM HUMIDITY CONTROL

a. THE ROOM TEMPERATURE SETPOINT SHALL BE AUTOMATICALLY ADJUSTED TO MAINTAIN ROOM RELATIVE HUMIDITY (RH). IF THE ROOM RH FALLS TO W ITHIN 5% OF THE MINIMUM ACCEPTABLE RH, RESET THE TEMPERATURE SETPOINT TO THE LOW EST ACCEPTABLE TEMPERATURE FOR THAT

SPACE. IF THE ROOM RH RISES TO W ITHIN 5% OF THE MAXIMUM ACCEPTABLE RH, RESET THE

TEMPERATURE SETPOINT TO THE HIGHEST ACCEPTABLE TEMPERATURE FOR THAT SPACE.

C. ROOM PRESSURE

a. ROOM PRESSURE SHALL BE MONITORED VIA A DIGITAL ROOM PRESSURE MONITORING SYSTEM.

PROVIDE AN ALARM TO THE BAS W HENEVER THE ROOM PRESSURE SETPOINT IS NOT BEING MET.

PROVIDE A DOOR SW ITCH TO AVOID NUISANCE ALARMS W HEN THE DOOR IS OPENED.

VAV-8

SETPOINT ADJ.

H

ZONE SENSOR

VAV-7

H

IG

H R

H

LO

W

R H

VAV-7

Z O

N E

S E

N S

O R

AI

VAV-8

S E

T P

O

IN

T A

D

JU

S T

M E

N T

AI

2 2

VAV-9

ROOM SENSOR

P

H

IG

H /L

W

P

E

S S

U R

E

VAV-9

R O

O M

P R

E S

S U

R E

S E

N S

O R

AI

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes

Cleveland

VA Medical

Center

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

MECHANICAL ENGINEERING:

HEAPY

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

P. 216.862.5846

COST ESTIMATING:

MCGUINESS UNLIM ITED, INC.

15724 STILLW OOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

ELECTRICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. M ATERIALS ASSESSM ENT:

STEPHEN J. SEBESTA & ASSOC., INC.

30628 DETROIT RD. #258

W ESTLAKE, OH 44145

P. 216.781.0060

FINAL CD's SUBMISSION

C

B

IM

\M o d e l\

-0

-M

E P

-C e n tr a l_

B E

S H

E L L h e a p y .c o m

.r v t

/1

/2

:1

:5

A M

M-901

CONTROLS PROVIDE TEMPERATURE AND

HUMIDITY CONTROLS TO SPD

STORAGE

10701 EAST BLVD CLEVELAND, OHIO

541-21-101

11.17.20 BRB SMP

NOTES:

1.

GENERAL NOTES:

A. CONNECTED AHU INFORMATION

FOR EACH VAV BOX WAS OBRAINED

FROM BUILDING HISTORICAL

DOCUMENTATION AND MAY HAVE

BEEN UPDATED SINCE. FIELD-

VERIFY ALL COMMUNICATION

NETWORKS AND REQUIRED

CONNECTIONS PRIOR TO

PERFORMING ANY WORK.

VAV/AHU BAS CONNECTION

SCHEDULE

MARK H_SpaceGUID

CONNECTED

AHU

AHU BAS

CONTROL

NETWORK

2-12 2-B435 (MOD. J) AHU-20 ANDOVER

2-13 2A-124 (MOD. C & D) AHU-52 ANDOVER

2-14 2A-159 (MOD. E & F) AHU-51 ANDOVER

3-01 3F-207 AHU-61 ANDOVER

3-02 3-B133 (HOSPICE/TCU) AHU-12 ANDOVER

3-03 3AC-232 (EYE CLINIC) AHU-54 ANDOVER

3-04 3A-104 AHU-18 ANDOVER

4-01 4F-207 AHU-61 ANDOVER

4-02 4B-125 AHU-17 ANDOVER

4-03 4B-104 (OMNICEL CABINET) AHU-17 ANDOVER

4-04 4A-106 (OMNICEL CABINET) AHU-18 ANDOVER

4-05 4A-108 AHU-18 ANDOVER

4-06 4AC-347 (DENTAL CLINIC) AHU-55 ANDOVER

4-07 4A-128 AHU-18 ANDOVER

5-01 5F-207 AHU-61 ANDOVER

5-02 5B-129 AHU-18 ANDOVER

5-03 5A-107 AHU-18 ANDOVER

5-04 5A-129 AHU-17 ANDOVER

6-01 6F-202 AHU-61 ANDOVER

6-02 6B-122 AHU-17…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .