36C25019B0044-008.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25019B0044
About this file
36C25019B0044 Drawings - Vol 5.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019C0265-000.docx | DOCX document | |
| 36C25019B0044-0003001.pdf | ||
| 36C25019B0044-0003000.docx | DOCX document | |
| 36C25019B0044-0002001.pdf | ||
| 36C25019B0044-0002002.pdf | ||
| 36C25019B0044-0002004.xlsx | XLSX spreadsheet | |
| 36C25019B0044-0002005.pdf | ||
| 36C25019B0044-0002000.docx | DOCX document | |
| 36C25019B0044-0002006.pdf | ||
| 36C25019B0044-0002003.pdf | ||
| 36C25019B0044-0001001.pdf | ||
| 36C25019B0044-0001000.docx | DOCX document | |
| 36C25019B0044-002.pdf | ||
| 36C25019B0044-007.pdf | ||
| 36C25019B0044-006.pdf | ||
| 36C25019B0044-004.pdf | ||
| 36C25019B0044-001.docx | DOCX document | |
| 36C25019B0044-005.pdf | ||
| 36C25019B0044-003.pdf | ||
| 36C25019B0044-000.docx | DOCX document | |
| 36C25019B0044-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP4
Inventory Controller's Office
Dry Storage
Corridor C-G-2
Mechanical
Air Conditioning and Refrigeration Shop
CCTV Room
CHS
CHR
411-AHU4
HWS
HWR
HWS
HWR
2"2"
2"2"
2.5"2.5"
Drawing Title
Approved: Service Chief Location
Building Number
Project Title
Checked Drawn
Date
Project No.
Drawing Number
Dwg. of on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h on e in ch o ne f oo t on e an d on e-ha lf in ch es th re e in ch es o ne f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
FULLY SUPPRESSED
Professional Seal
Approved: Project Manager
RENOVATE BUILDING 411
06/25/2019
LOWER LEVEL PLAN - PIPING
411MP100
PCWPCW
552-19-502
VA MEDICAL CENTER DAYTON, OHIO
B411
N Scale: 1/4" = 1'-0"
LOWER LEVEL PLAN - PIPING
NOTES
1 EXISTING PIPING TO REMAIN.
2 EXISTING AIR HANDLING UNIT TO REMAIN.
3 REWORK EXISTING SPRINKLER LINE BLOCKING ACCESS TO DUCT CONNECTION.
4 HEATING HOT WATER PIPES UP TO FLOOR ABOVE. REFER TO SHEET 411MP101 FOR
CONTINUATION.
5 EXTEND FULL SIZE DRAIN PIPE TO FLOOR DRAIN. REFER TO AIR HANDLING UNIT TRAP
DETAIL ON SHEET 411M503.
6 1.25" HEATING HOT WATER PIPES DOWN TO SERVE 411-PH3
7 REMOVE BRANCH HEATING HOT WATER PIPING AND ASSOCIATED HYDRONIC
SPECIALTIES, COIL RE-CIRC PUMP, CONTROL WIRING, ETC.
8 EXTEND NEW HEATING HOT WATER PIPING TO SERVE 411-AHU4. RELOCATE ASSOCIATED
CONTROLS, HYDRONIC SPECIALTIES, COIL RE-CIRC PUMP, WIRING, HANGERS, ETC. PIPE
PER DETAIL ON SHEET 411M502.
9 REMOVE STEAM SUPPLY AND CONDENSATE RETURN PIPING AND ALL NECESSARY
COMPONENTS FOR INSTALLATION OF NEW AHU AND DUCTWORK.
10 EXTEND NEW STEAM AND CONDENSATE RETURN PIPING TO EXISTING PIPING SERVING
411-AHU4.
11 PROVIDE BRANCH PIPING FROM DOMESTIC HOT WATER, DOMESTIC COLD WATER,
DOMESTIC HOT WATER RETURN, WASTE PIPE AND VENT PIPING MAINS TO SERVE THE
NEW RESTROOM FIXTURES ABOVE.
GENERAL NOTES
A REFER TO SHEET 411M001 FOR LEGEND, ABBREVIATIONS AND ADDITIONAL GENERAL
NOTES.
Revisions Date
411HWFT1
411HWFT1
411HWFT1 411HWFT1
411HWPR2
411CUH1
2"2"
4-5
4-2
4-6
1.25"1.25"
HW
S
HW
R
4-9
.75"
.75"
1"
1.25"
1.25"
HW
S
HAC
Tech. Closet
CLASSROOM
Women's Locker Room 126A
Vestibule
Vestibule
Men's Locker Room 116A
Kitchen Staff Break Room
Vestibule 118A
Mech.
Staff Comp.
Office
Corridor C-1-6
CORRIDOR
411VRF1
Women's Restroom 126B
Corridor C-1-5
Men's Restroom 116B
Elec. Cl.
4-5
4-6
4-9
2"
P103
P418
P608
3 4
3 43 4
OFFICE
CONSULT ROOM
TOILET
TOILET
RECEPTION
ENTRY
Drawing Title
Approved: Service Chief Location
Building Number
Project Title
Checked Drawn
Date
Project No.
Drawing Number
Dwg. of on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h on e in ch o ne f oo t on e an d on e-ha lf in ch es th re e in ch es o ne f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
FULLY SUPPRESSED
Professional Seal
Approved: Project Manager
RENOVATE BUILDING 411
06/25/2019
FIRST FLOOR PLAN - PIPING
411MP101
PCWPCW
552-19-502
VA MEDICAL CENTER DAYTON, OHIO
B411
N Scale: 1/4" = 1'-0"
FIRST FLOOR PLAN - PIPING
NOTES
1 EXISTING PIPING TO REMAIN.
2 PROVIDE BRANCH PIPING, DRAINS, VENTS, ETC. TO FIXTURE FROM MAINS BELOW.
3 INTEGRATE CONTROL OF HOT WATER PANEL RADIATOR INTO THE ASSOCIATED AIR
TERMINAL UNIT CONTROL. REFER TO CONTROL DIAGRAM/SEQUENCE ON SHEET 411M701
FOR ADDITIONAL INFORMATION.
4 HEATING HOT WATER PIPES FROM FLOOR BELOW. REFER TO SHEET 411MP100 FOR
CONTINUATION.
5 PROVIDE VALVED PIPE STUBS FULL SIZE OF MAIN FOR FUTURE CONNECTION.
GENERAL NOTES
A REFER TO SHEET 411M001 FOR LEGEND, ABBREVIATIONS AND ADDITIONAL GENERAL
NOTES.
Revisions Date
| Sheet - 411MP100 - LOWER LEVEL PLAN - PIPING |
| Sheets |
| 411M001 - LEGEND, INDEX AND GENERAL NOTES |
| 411M501 - DETAILS |
| 411M502 - DETAILS |
| 411M601 - SCHEDULES |
| 411M701 - CONTROLS AND AUTOMATION |
| 411MH100 - LOWER LEVEL PLAN - DUCTWORK |
| 411MH101 - FIRST FLOOR PLAN - DUCTWORK |
| 411MP100 - LOWER LEVEL PLAN - PIPING |
| 411MP101 - FIRST FLOOR PLAN - PIPING |
| Sheet - 411MP101 - FIRST FLOOR PLAN - PIPING |
| Sheets |
| 411M001 - LEGEND, INDEX AND GENERAL NOTES |
| 411M501 - DETAILS |
| 411M502 - DETAILS |
| 411M601 - SCHEDULES |
| 411M701 - CONTROLS AND AUTOMATION |
| 411MH100 - LOWER LEVEL PLAN - DUCTWORK |
| 411MH101 - FIRST FLOOR PLAN - DUCTWORK |
| 411MP100 - LOWER LEVEL PLAN - PIPING |
| 411MP101 - FIRST FLOOR PLAN - PIPING |
| 0029 MOVE CLASS ELEC LIGHTING |
| 0029 MOVE CLASS ELEC POWER |
File details come from the government source that posted it.