36C25019B0044-0002001.pdf

PDF 235 KB Posted

Attached to
552-19-203: Building 411 Renovation (VA-19-00068610)
Solicitation number
36C25019B0044
Issued by

About this file

36C25019B0044 0002 Lead Paint - Spec 02 83 33.pdf

View the file

Other files

File Type Posted
36C25019C0265-000.docx DOCX document
36C25019B0044-0003001.pdf PDF
36C25019B0044-0003000.docx DOCX document
36C25019B0044-0002002.pdf PDF
36C25019B0044-0002004.xlsx XLSX spreadsheet
36C25019B0044-0002005.pdf PDF
36C25019B0044-0002000.docx DOCX document
36C25019B0044-0002006.pdf PDF
36C25019B0044-0002003.pdf PDF
36C25019B0044-0001001.pdf PDF
36C25019B0044-0001000.docx DOCX document
36C25019B0044-002.pdf PDF
36C25019B0044-008.pdf PDF
36C25019B0044-007.pdf PDF
36C25019B0044-006.pdf PDF
36C25019B0044-004.pdf PDF
36C25019B0044-001.docx DOCX document
36C25019B0044-005.pdf PDF
36C25019B0044-003.pdf PDF
36C25019B0044-000.docx DOCX document
36C25019B0044-000.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORRECT DEFICIENCIES LEAD-BASED PAINT

PATIENT KITCHEN B411 REMOVAL AND DISPOSAL

VAMC DAYTON, OHIO 08-11

02 83 33.13 - 1

SECTION 02 83 33.13

LEAD-BASED PAINT REMOVAL AND DISPOSAL

PART 1 - GENERAL

1.1 DESCRIPTION

This section specifies abatement and disposal of lead-based paint (LBP) and controls needed to limit occupational and environmental exposure to lead hazards. LBP removal and surface preparation to be completed by the painting contractor in accordance with all applicable federal, state, and local regulations and these specifications.

1.1.1 EXTENT OF WORK

A. Below is a brief description of the materials assumed to be coated with LBP which are included in the scope of work. The Contractor shall satisfy himself as to actual quantities to be treated.

Nothing in this section may be interpreted as limiting the extent of work otherwise required by this contract and related documents.

1. Treatment and preparation of door and window components (both interior and exterior sides) and exterior metal grills which are indicated on architectural drawings to be repainted.

Loose/damaged paint on windows and associated components shall be properly scraped/sanded with use of hand tools and sanders for preparation of the subject surfaces to accept new paint coatings. This shall include feathering edges of sound paint to provide a smooth transition between the old and new paint.

2. This specification is applicable to all paint-coated components which may be disturbed by this project. This includes, but may not be limited to, demolition of painted walls and other painted building components designated for removal. This also includes new work elements such as drilling holes into existing painted substrates for new work. Refer to project drawings for removals and new work.

3. This scope also includes monitoring, and the proper clean-up and handling/storage/disposal of generated paint scrapings/chips/dust, lead-contaminated waste or debris, waste bags, waste containers, disposable equipment/materials, and lead-contaminated clothing/respirator filters/HEPA filters, etc. Representative wastes must be first tested for hazardous waste determination in accordance to applicable federal, state, and local regulations.

1.2 RELATED WORK

A. Sections 02 82 11, 02 82 13 13, and 02 82 13 19, ASBESTOS ABATEMENT.

B. Section 09 91 00, PAINTING.

1.3 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

B. Code of Federal Regulations (CFR):

CFR 29 Part 1910 ...................... Occupational Safety and Health Standards CFR 29 Part 1926 ...................... Safety and Health Regulations for Construction CFR 40 Part 148 ........................ Hazardous Waste Injection Restrictions CFR 40 Part 260 ........................ Hazardous Waste Management System: General CFR 40 Part 261 ........................ Identification and Listing of Hazardous Waste CFR 40 Part 262 ........................ Standards Applicable to Generators of Hazardous Waste CRF 40 Part 263 ........................ Standards Applicable to Transporters of Hazardous Waste CFR 40 Part 264 ........................ Standards for Owners and Operations of Hazardous Waste

Treatment, Storage, and Disposal Facilities

VAMC DAYTON, OHIO 08-11

02 83 33.13 - 2

CFR 40 Part 265 ........................ Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

CFR 40 Part 268 ........................ Land Disposal Restrictions CFR 49 Part 172 ........................ Hazardous Material Table, Special Provisions, Hazardous

Material Communications, Emergency Response Information, and Training Requirements

CFR 49 Part 178 ........................ Specifications for Packaging C. National Fire Protection Association (NFPA):

NFPA 701-2004 ......................... Methods of Fire Test for Flame-Resistant Textiles and Films D. National Institute for Occupational Safety And Health (NIOSH) NIOSH OSHA Booklet 3142…….Lead in Construction E. OSHA 29 CFR 1926.62…………..Lead in Construction F. Underwriters Laboratories (UL)

UL 586-1996 (Rev 2009) ........... High-Efficiency, Particulate, Air Filter Units G. American National Standards Institute

Z9.2-2006................................... Fundamentals Governing the Design and Operation of Local Exhaust Systems

Z88.6-2006................................. Respiratory Protection

1.4 DEFINITIONS

A. Action Level: Employee exposure, without regard to use of respirations, to an airborne concentration of lead of 30 micrograms per cubic meter of air averaged over an 8-hour period. As used in this section,”30 micrograms per cubic meter of air" refers to the action level.

B. Area Monitoring: Sampling of lead concentrations within the lead control area and inside the physical boundaries which is representative of the airborne lead concentrations which may reach the breathing zone of personnel potentially exposed to lead.

C. Physical Boundary: Area physically roped or partitioned off around an enclosed lead control area to limit unauthorized entry of personnel. As used in this section, "inside boundary" shall mean the same as "outside lead control area."

D. Certified Industrial Hygienist (CIH): As used in this section, refers to an Industrial Hygienist employed by the Contractor and is certified by the American Board of Industrial Hygiene in comprehensive practice.

E. Change Rooms and Shower Facilities: Rooms within the designated physical boundary around the lead control area equipped with separate storage facilities for clean protective work clothing and equipment and for street clothes which prevent cross-contamination.

F. Competent Person: A person capable of identifying lead hazards in the work area and is authorized by the contractor to take corrective action.

G. Decontamination Room: Room for removal of contaminated personal protective equipment

(PPE).

H. Eight-Hour Time Weighted Average (TWA): Airborne concentration of lead averaged over an 8-hour workday to which an employee is exposed.

I. High Efficiency Particulate Air (HEPA) Filter Equipment: HEPA filtered vacuuming equipment with a UL 586 filter system capable of collecting and retaining lead-contaminated paint dust. A high efficiency particulate filter means 99.97 percent efficient against 0.3 micron size particles.

J. Lead: Metallic lead, inorganic lead compounds, and organic lead soaps. Excluded from this definition are other organic lead compounds.

K. Lead Control Area: An enclosed area or structure with full containment to prevent the spread of lead dust, paint chips, or debris of lead-containing paint removal operations. The lead control area is isolated by physical boundaries to prevent unauthorized entry of personnel.

L. Lead Permissible Exposure Limit (PEL): Fifty micrograms per cubic meter of air as an 8-hour time weighted average as determined by 29 CFR 1910.1025. If an employee is exposed for more than 8 hours in a work day, the PEL shall be determined by the following formula. PEL (micrograms/cubic meter of air) = 400/No. of hrs worked per day

VAMC DAYTON, OHIO 08-11

02 83 33.13 - 3

M. Personnel Monitoring: Sampling of lead concentrations within the breathing zone of an employee to determine the 8-hour time weighted average concentration in accordance with 29 CFR

1910.1025. Samples shall be representative of the employee's work tasks. Breathing zone shall be considered an area within a hemisphere, forward of the shoulders, with a radius of 150 mm to 225 mm (6 to 9 inches) and the center at the nose or mouth of an employee.

1.5 QUALITY ASSURANCE

A. Before exposure to lead-contaminated dust, provide workers with a comprehensive medical examination as required by 29 CFR 1926.62 (I) (1) (i) & (ii). The examination shall not be required if adequate records show that employees have been examined as required by 29 CFR 1926.62(I) within the last year.

B. Medical Records: Maintain complete and accurate medical records of employees in accordance with 29 CFR 1910.20.

C. CIH Responsibilities: The Contractor shall employ a Certified Industrial Hygienist (CIH) who will be responsible for the following:

1. Certify Training.

2. Review and approve lead-containing paint removal and disposal plan for conformance to the applicable referenced standards.

3. Inspect lead-containing paint removal work for conformance with the approved plan.

4. Direct monitoring.

5. Ensure work is performed in strict accordance with specifications at all times.

6. Ensure hazardous exposure to personnel and to the environment is adequately controlled at all times.

7. Certify that air monitoring samples for the inside and outside of each lead control area are less than 30 micrograms per cubic meter of air, the respiratory protection for the employees was adequate, the work procedures were performed in accordance with 29 CFR 1926.62, and that there were no visible accumulations of lead-contaminated paint and dust, etc. on the worksite remaining after work scope completion.

D. Training: Train each employee performing paint removal, disposal, and air sampling operations prior to the time of initial job assignment, in accordance with 29 CFR 1926.62.

E. Training Certification: Submit certificates signed and dated by the CIH and by each employee stating that the employee has received training in accordance with 29 CFR 1926.62.

F. Respiratory Protection Program:

1. Furnish each employee required to wear a negative pressure respirator or other appropriate type with a respirator fit test at the time of initial fitting and at least every 6 months thereafter as required by 29 CFR 1926.62.

2. Establish and implement a respiratory protection program as required by 29 CFR 1910.134, 29 CFR 1910.1025, and 29 CFR 1926.62.

G. Hazard Communication Program: Establish and implement a Hazard Communication Program as required by 29 CFR 1910.1200 and 29 CFR 1926.62.

H. Hazardous Waste Management: The Hazardous Waste Management plan shall comply with applicable requirements of Federal, State, and local hazardous waste regulations and address:

1. Identification of hazardous wastes associated with the work (include any testing as necessary for hazardous or non-hazardous waste determination to comply with applicable disposal regulations; i.e. toxic characteristic leaching procedure {TCLP}).

2. Estimated quantities of wastes to be generated and disposed of.

3. Names and qualifications of each contractor that will be transporting, storing, treating, and disposing of the wastes. Include the facility location and a 24-hour point of contact. Furnish two copies of applicable EPA, state, and local hazardous waste permit applications and EPA Identification numbers.

4. Names and qualifications (experience and training documentation) of personnel who will be working on-site with hazardous wastes.

5. List of waste handling equipment to be used in performing the work, to include cleaning, volume reduction, and transport equipment.

VAMC DAYTON, OHIO 08-11

02 83 33.13 - 4

6. Spill prevention, containment, and cleanup contingency measures to be implemented.

7. Work plan and schedule for waste containment, removal and disposal. Wastes shall be cleaned up and containerized daily.

8. Cost for hazardous waste disposal according to this plan.

I. Safety and Health Compliance:

1. In addition to the detailed requirements of this specification, comply with laws, ordinances, rules, and regulations of federal, state, and local authorities regarding removing, handling, storing, transporting, and disposing of lead waste materials. Comply with the applicable requirements of 29 CFR 1910.1025 and 29 CFR 1926.62. Submit matters regarding interpretation of standards to the Contracting Officer for resolution before starting work.

2. Where specification requirements and the referenced documents vary, the most stringent requirements shall apply.

J. Pre-Construction Conference: Along with the CIH, meet with the Contracting Officer to discuss in detail the lead-containing paint removal work plan, including work procedures and precautions for the work plan.

1.6 SUBMITTALS

A. Submit the following in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Manufacturer's Catalog Data:

Vacuum filters Respirators C. Instructions: Paint removal materials. Include applicable material safety data sheets.

D. Statements Certifications and Statements:

1. Qualifications of CIH: Submit name, address, and telephone number of the CIH selected to perform responsibilities in paragraph entitled "CIH Responsibilities." Provide previous experience of the CIH. Submit proper documentation that the Industrial Hygienist is certified by the American Board of Industrial Hygiene in comprehensive practice, including certification number and date of certification/recertification.

2. Testing Laboratory: Submit the name, address, and telephone number of the testing laboratory selected to perform the monitoring, testing, and reporting of airborne concentrations of lead. Provide proper documentation that persons performing the analysis have been judged proficient by successful participation within the last year in the National Institute for Occupational Safety and Health (NIOSH) Proficiency Analytical Testing (PAT) Program. The laboratory shall be accredited by the American Industrial Hygiene Association (AIHA). Provide AIHA documentation along with date of accreditation/reaccreditation.

3. Lead-Containing Paint Removal Plan:

a. Submit a detailed job-specific plan of the work procedures to be used in the removal of lead-containing paint. The plan shall include a sketch showing the location, size, and details of lead control areas, location and details of decontamination rooms, change rooms, shower facilities, and mechanical ventilation system.

b. Include in the plan, eating, drinking, smoking and restroom procedures, interface of trades, sequencing of lead related work, collected wastewater and debris disposal plan, air sampling plan, respirators, protective equipment, and a detailed description of the method of containment of the operation to ensure that airborne lead concentrations of 30 micrograms per cubic meter of air are not exceeded outside of the lead control area.

c. Include air sampling, training and strategy, sampling methodology, frequency, duration of sampling, and qualifications of air monitoring personnel in the air sampling portion on the plan.

4. Field Test Reports: Monitoring Results: Submit air monitoring analytical results to the Contracting Officer within 3 working days; the results must be signed by employee that collected the samples, testing laboratory which performed the analysis, and by the CIH who reviewed the data.

VAMC DAYTON, OHIO 08-11

02 83 33.13 - 5

5. Records:

a. Completed and signed hazardous waste manifest from treatment or disposal facility.

b. Certification of Medical Examinations.

c. Employee training certification.

PART 2 PRODUCTS

PAINT REMOVAL PRODUCTS: Submit applicable Material Safety Data Sheets for paint removal products which may be used in paint removal work. Use the least toxic product, suitable for the job and acceptable to the CIH.

PART 3 EXECUTION

3.1 PROTECTION

A. Notification: Notify the Contracting Officer 10 business days prior to the start of any paint removal work.

B. Lead Control Area Requirements.

1. Establish a lead control area by completely enclosing the work area with the subject components to be treated by isolation using a minimum of one layer of 6-mil polyethylene sheeting where lead-containing paint removal operations will be performed indoors.

2. Cover surfaces which are not being treated inside of the work area, such as floor and walls, with a minimum of one layer of 6-mil polyethylene sheeting.

3. Contain removal operations by the use of a negative pressure full containment system (interior work areas) with at least one change room and with HEPA filtered exhaust (filtered air shall be exhausted outdoors).

C. Protection of Existing Work to Remain: Perform paint removal work without damage or contamination of adjacent areas. Where existing work is damaged or contaminated, restore work to its original condition.

D. Boundary Requirements: Provide physical boundaries in the form of at least one layer of 6-mil polyethylene sheeting (or thicker) around the lead control area [or providing portable 6-mil polyethylene-lined partitions (or thicker) or other similar enclosures to ensure that airborne concentrations of lead will not reach 30 micrograms per cubic meter of air outside of the lead control area. Warning signs shall be placed at boundaries as required by 29 CRF 1926.62 and item I below.

E. Heating, Ventilating and Air Conditioning (HVAC) Systems: Shut down, lock out, and isolate HVAC systems that supply, exhaust, or pass through the lead control areas. Seal intake and exhaust vents in the lead control area with at least two layers of 6-mil polyethylene sheeting and tape. Seal seams in HVAC components that pass through the lead control area.

F. Change Room and Shower Facilities/Hand Washing Facilities: Provide clean change rooms and shower facilities within the physical boundary around the designated lead control area in accordance with requirements of 29 CFR 1926.62.

G. Mechanical Ventilation System:

1. Use adequate ventilation to control personnel exposure to lead in accordance with 29 CFR

1926.57 and 29 CFR 1926.62.

2. To the extent feasible, use fixed local exhaust ventilation connected to HEPA filters or other collection systems, approved by the CIH. Local exhaust ventilation systems shall be designed, constructed, installed, and maintained in accordance with ANSI Z9.2.

3. Ventilation must be equipped with HEPA filtration (99.97%, 0.3 micron efficient) and exhausted outdoors. Air may be exhausted indoors only where exhaust to the outside is not feasible. If exhausted indoors due to feasibility issues, this setup must be first approved by the Contracting Officer and CIH at least 3 business days in advance.

H. Personnel Protection: Personnel shall wear and use protective clothing and equipment as specified herein and as required by 29 CFR 1926.62. Eating, smoking, or drinking is not permitted in the lead control area. No one will be permitted in the lead control area unless they have been given appropriate training and protective equipment.

VAMC DAYTON, OHIO 08-11

02 83 33.13 - 6

I. Warning Signs: Provide warning signs at approaches to lead control areas. Locate signs at such a distance that personnel may read the sign and take the necessary precautions before entering the area. Signs shall comply with the requirements of 29 CFR 1926.62.

3.2 WORK PROCEDURES

A. Perform removal of lead-containing paint in accordance with approved lead-containing paint removal plan. Use procedures and equipment required to limit occupational and environmental exposure to lead when lead-containing paint is removed in accordance with 29 CFR 1926.62, except as specified herein. Dispose of removed paint chips and associated waste in compliance with Environmental Protection Agency (EPA), federal, state, and local requirements.

B. Personnel Exiting Procedures:

1. Whenever personnel exit the lead-controlled area, they shall perform the following procedures and shall not leave the work place wearing any clothing or equipment worn during the work day:

a. HEPA vacuum themselves off.

b. Remove protective clothing in the decontamination room, and place them in an approved impermeable disposal bag.

c. Shower with soap

d. Change to clean clothes prior to leaving the physical boundary designated around the lead-contaminated job site.

C. Monitoring: Monitoring of airborne concentrations of lead shall be in accordance with 29 CFR

1910.1025, 29 CFR 1926.62 and as specified herein. Air monitoring, testing, and reporting shall be performed by a CIH or an Industrial Hygiene (IH) Technician who is under the direction of the

CIH:

1. The CIH or the IH Technician under the direction of the CIH shall be on the job site directing the monitoring, and inspecting the lead-containing paint removal work to ensure that the requirements of the Contract have been satisfied during the entire lead-containing paint removal operation.

2. Take personal air monitoring samples on employees who are anticipated to have the greatest risk of exposure as determined by the CIH. In addition, take air monitoring samples on at least 25 percent of the work crew or a minimum of two employees, whichever is greater, during each work shift.

3. Submit results of air monitoring samples, signed by the CIH, within 24 hours after the air samples are taken. Notify the Contracting Officer immediately of exposure to lead at or in excess of the action level of 30 micrograms per cubic meter of air outside of the lead control area.

D. Monitoring During Paint Removal Work:

1. Perform personal and area monitoring during the entire paint removal operation. Sufficient area monitoring shall be conducted at the physical boundary to ensure unprotected personnel are not exposed above 30 micrograms per cubic meter of air at all times. If the outside boundary lead levels are at or exceed 30 micrograms per cubic meter of air, work shall be stopped and the CIH shall immediately correct the condition(s) causing the increased levels and notify the Contracting Officer immediately.

2. The CIH shall review the sampling data collected on that day to determine if condition(s) requires any further change in work methods. Removal work shall resume when approval is given by the CIH. The Contractor shall control the lead level outside of the work boundary to less than 30 micrograms per cubic meter of air at all times. As a minimum, conduct area monitoring daily on each shift in which lead paint removal operations are performed in areas immediately adjacent to the lead control area.

3. For outdoor operations, at least one sample on each shift shall be taken on the downwind side of the lead control area. If adjacent areas are contaminated, clean and visually inspect contaminated areas. The CIH shall certify that the area has been cleaned of lead contamination.

VAMC DAYTON, OHIO 08-11

02 83 33.13 - 7

3.3 LEAD-CONTAINING PAINT REMOVAL

A. Remove paint within the areas designated under the project scope in order to completely expose the substrate. Take whatever precautions are necessary to minimize damage to the underlying substrate.

B. Indoor Lead Paint Removal: Select paint removal processes to minimize contamination of work areas with lead-contaminated dust or other lead-contaminated debris/waste. This paint removal process should be described in the lead-containing paint removal plan. Perform manual sanding and scraping to the maximum extent feasible.

C. Outside Lead Paint Removal: Select removal processes to minimize contamination of work areas with lead-contaminated dust or other lead-contaminated debris/waste. This paint removal process should be described in the lead-containing paint removal plan. Perform manual sanding and scraping to the maximum extent feasible.

3.4 SURFACE PREPARATIONS

Avoid flash rusting or other deterioration of the substrate. Provide surface preparations for painting in accordance with Section 09 91 00, PAINTING.

3.5 CLEANUP AND DISPOSAL

A. Cleanup: Maintain surfaces of the lead control area free of accumulations of paint chips and dust.

Restrict the spread of dust and debris; keep waste from being distributed over the work area. Do not dry sweep or use compressed air to clean up the area. At the end of each shift and when the paint removal operation has been completed, clean the area of visible lead paint contamination by vacuuming with a HEPA filtered vacuum cleaner, wet mopping, and second HEPA vacuuming of the area.

B. Certification: The CIH shall certify in writing that the inside and outside the lead control area air monitoring samples are less than 30 micrograms per cubic meter of air, the respiratory protection for the employees was adequate, the work procedures were performed in accordance with 29 CFR 1926.62, and that there were no visible accumulations of lead-contaminated paint and dust on the worksite. Do not remove the lead control area or and warning signs prior to the Contracting Officer's receipt of the CIH's certification. Reclean areas showing dust or residual paint chips.

C. Testing of lead-containing and lead-contaminated wastes in accordance with 40 CFR 261 for hazardous waste determination (toxic characteristic leaching procedure {TCLP}).

D. Disposal:

1. Collect lead-contaminated waste, scrap, debris, bags, containers, equipment, and lead-contaminated clothing which may produce airborne concentrations of lead particles.

Label the containers in accordance with 29 CFR 1926.62. Any wastes which is assumed as hazardous or tested and meets the definition of a hazardous waste by federal, state, or local regulations must be properly handled and disposed in accordance to those applicable regulations. Dispose of lead hazardous waste materials at an EPA and state approved hazardous waste treatment, storage, or disposal facility off Government property. Wastes that are determined by testing (TCLP) to be non-hazardous may be disposed in accordance to local, state, and federal regulations pertaining to construction and demolition debris.

2. Store waste materials in U.S. Department of Transportation (49 CFR 178) approved 55-gallon drums. Properly label each drum to identify the type of waste (49 CFR 172) and the date the drum was filled. The Contracting Officer or an authorized representative will assign an area for interim storage of waste-containing drums. Do not store hazardous waste drums in interim storage longer than 90 calendar days from the date affixed to each drum.

E. Handle, store, transport, and dispose lead or lead-contaminated waste in accordance with 40 CFR 260, 40 CFR 261, 40 CFR 262, 40 CFR 263, 40 CFR 264, and 40 CFR 265. Comply with land disposal restriction notification requirements as required by 40 CFR 268.E.

VAMC DAYTON, OHIO 08-11

02 83 33.13 - 8

F. Disposal Documentation for Hazardous Waste: Submit written evidence that the hazardous waste treatment, storage, or disposal (TSD) facility is approved for lead disposal by the EPA and state or local regulatory agencies. Submit one copy of the completed manifest, signed and dated by the initial transporter and TSD in accordance with 40 CFR 262. The copy must be returned to the Contracting Officer within 35 days from the day the waste was shipped to the TSD.

- - E N D SECTION 02 83 33.13 - -