This document is a Single-Line Diagram for Buildings 204 and 205 of a construction project for the U.S. Department of Veterans Affairs. The drawing, dated December 18, 2020, is part of 100% Construction Documents for the "Construct Replacement CLC - Long Term Rehab" project located in Lexington, Kentucky. The diagram illustrates the electrical distribution system including a 500 kVA pad-mount transformer (12.47 kV to 208Y/120V), a 400 kW diesel generator set, multiple automatic transfer switches (ATS) rated at 400A, 600A, and 800A with bypass isolation and open transition capabilities, and a comprehensive network of panelboards, disconnects, and protective devices. Key components include the 205 Main Distribution Panel (2000A), 205 Metering Panel (400A), 205 Normal Distribution Panel (600A), and 205 Equipment Distribution Panel (800A).

The system incorporates multiple load centers and branch circuits serving various building loads including elevator systems, air handling units, emergency generator hookups, and portable generator docking stations. Surge protective devices (SPD) are distributed throughout the system for equipment protection. The feeder schedule specifies cable sizes ranging from #2 copper for 100-amp circuits to 4-set configurations of 600 kCMIL copper for 2000-amp service. The fault current schedule documents available short-circuit amperage ratings at 45 reference points throughout the distribution system, with ratings ranging from 1,001 kAIC to 32,042 kAIC. The design includes grounding systems with main ground bars, water main connections, UFER foundation grounding, building steel integration, and lightning protection provisions. The project was prepared by Heapy, Inc., serving as consultant and architect/engineer of record, with project number 2019-05137.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E N E N E N E N

G

N

G

REMOVABLE

BUS LINK

SW BD

METERING

K

K

EN

M

A

M

G

GFP

K

VFD

E N

N

G

REMOVABLE

BUS LINK

SW BD

METERING

100A/3P 100A/3P

'GC1'

'1C3' '1N1' '1N2' '1N3' '1N4'

'GLS1'

100A/3P 100A/3P 100A/3P 100A/3P 100A/3P

'GEQ1'

'205 CDP', 400A, 208Y/120V, 3PH, 4W

'205 MDP', 2000A, 208Y/120V, 3PH, 4W

2000A/3P 225A/3P 400A/3P 600A/3P

500KVA

12.47kV -

208Y/120V-3PH

PAD-MOUNT TX

5.75%

'205-N-ATS'

600A - 208/120V - 4P

BYPASS ISOLATION

OPEN TRANSITION

400kW /500kVA 208/120V

DIESEL GEN-SET

1600A FEEDER

TAPPING W IREW AY

225A/3P

LSI

400A/3P

LSI

600A/3P

LSI

LOAD BANK

SPD

100% RATED

1600A 3P BREAKER

'205-CR-ATS'

400A - 208/120V - 4P

BYPASS ISOLATION

OPEN TRANSITION

'205-LS-ATS'

225A - 208/120V - 4P

BYPASS ISOLATION

OPEN TRANSITION

'1LS1' '1LS2'

'1C1'

'GN1'

'1EQ1'

SPD SPD SPD

SPD

SPD SPD

SPD SPD

60A/3P 60A/3P

8 8 8 8 8 8 8 8

100A/3P

'GN2'

100A/3P

4 98 19 20

6 7

MAIN GROUND BAR W ITH

STAND OFF ISOLATORS

W ATER

MAIN

UFER

FOUNDATION

GROUND

BUILDING

STEEL

LIGHTNING

PROTECTION

MAIN TR CLOSET

GROUND BAR

EXISTING PAD MOUNTED SWITCH

PRIMARY SW ITCH

EXISTING LOAD - 398kVA (32A AT 12.47kV) NEW LOAD - 375kVA (30A AT 12.47kV)

TOTAL - 773kVA (62A AT 12.47kV)

LSI

60A/3P

LSI

LSI LSI

50A/3P

MVP-1

60E

'205-EQ-ATS'

800A - 208/120V - 4P

BYPASS ISOLATION

OPEN TRANSITION

SPD

28 29

'205 NDP', 600A, 208Y/120V, 3PH, 4W

800A/3P

LSI

800A/3P

LSI

225A/3P 100A/3P

SPD

60A/3P

30 '205 EQDP', 800A, 208Y/120V, 3PH, 4W

ELEV-1

150A/3P

ACCU-205-G

175A/3P

ACCU-205-1

175A/3P

ACCU-204-1

0 0 0 0

PORTABLE

GENERATOR

PADMOUNT 1600A DUAL

PURPOSE DOCKING STATION

50A/3P

EHU-205-G

50A/3P 50A/3P

0 0 0

EHU-205-1 EHU-204-1

EXISTING FEED TO

BUILDING 201 & 202

13 15

18 22 23

24 25 26 27

33 34 35 36 37 38 39

50A/3P

AHU-205-G-RF

35A/3P

AHU-205-G-SF

50A/3P

AHU-205-1-RF

0 0 0

90A/3P

AHU-205-1-SF

50A/3P 90A/3P

0 0 0

AHU-204-1-RF AHU-204-1-SF

40 41 42 43 44 45

FROM EXISTING

TRANSFORMER PMT-9

N G

100% RATED

ELECTRICAL SINGLE-LINE LEGEND

TRANSFORMER

VOLTAGE TERMINATION - PRIMARY

SURGE PROTECTIVE DEVICE

AUTOMATIC TRANSFER SW ITCH

GENERATOR

ELECTRIC METER

EQUIPMENT GROUND

GROUND FAULT PROTECTOR

EQUIPMENT MULTIMETER

EQUIPMENT POTENTIAL TRANSFORMER

PANELBOARD BREAKER

DELTA SYMBOL

DISCONNECT

EQUIPMENT AMMETER

EQUIPMENT CURRENT TRANSFORMER

EQUIPMENT W YE SIDE OF TRANSFORMER W ITH GROUND

KEYED INTERLOCK

MOTOR

MOTOR STARTER

MOTOR STARTER AND DISCONNECT

PANELBOARD - MAIN LUG ONLY

PANELBOARD - DOUBLE SET OF LUGS

PANELBOARD - MAIN BREAKER

SHORT CIRCUIT FAULT LOCATION

VARIABLE FREQUENCY DRIVE

VOLTAGE TERMINATION - SECONDARY

AUTOMATIC TRANSFER SW ITCH - BYPASS

BUS LINK

OR

BUSSING

SW ITCHBOARD ENCLOSURE

INTEGRATED EQUIPMENT ENCLOSURE

EXISTING CONDUIT & W IRE TO REMAIN

CONDUIT & W IRE TO BE REMOVED

CONDUIT & W IRE

EQUIPMENT SW ITCHBOARD METER

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO. STATE COA FIRM NO.

SD SCHEMATIC DESIGN 07.31.2020

DD DESIGN DEVELOPMENT 09.30.2020

95% CONSTRUCTION DOCUMENTS 11.23.2020

100% CONSTRUCTION DOCUMENTS 12.18.2020

/1

/2

:4

:2

A

M

Construct Replacement CLC - Long Term Rehab

12.18.2020

SINGLE LINE

E300

W JFMSG

000-00-000

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

596-333

2019-05137 01528

SINGLE-LINE DIAGRAM - BUILDING 204 & 205

0 REFER TO MOTOR SCHEDULE OR PANEL SCHEDULE FOR FEEDER SIZE

1 15 KV EPR 3 - #2/0 CU., 1 - #1 CU. GND. 600V, IN 4" C.

2 2000A: 5 SETS 4 - 600 kCMIL CU., IN 4"C.

3 1600A: 4 SETS 4 - 600 kCMIL CU., 1 - #4/0 CU. GND., IN 4"C.

4 800A: 2 SETS OF 4 - 500 kCMIL CU., 1 - #1/0 CU. GND., IN 4"C.

5 600A: 2 SETS OF 4 - 350 kCMIL CU., 1 - #1 CU. GND., IN 3"C.

6 400A: 4 - 500kCMIL CU., 1 - #3 CU. GND., IN 4"C.

7 225A: 4 - #4/0 CU., 1 - #4 CU. GND., IN 2.5"C.

8 100A: 4 - #2 CU., 1 - #8 CU. GND., IN 1.25"C.

REF.

POINT DESCRIPTION

MIN. EQUIP.

RATING

AVAILABLE SHORT

CIRCUIT AMPS

1 EM BUSWAY 10kAIC 8,034

2 205 MDP 42kAIC 32,042

3 LATS-EM 42kAIC 7,536

4 LATS-NORM 42kAIC 24,834

5 GLS1 24kAIC 19,691

6 1LS1 10kAIC 8,986

7 1LS2 10kAIC 3,394

8 CATS-EM 42kAIC 7,805

9 CATS-NORM 42kAIC 28,643

10 CDP 42kAIC 25,790

11 GC1 24kAIC 17,222

13 1C1 24kAIC 10,510

15 1C3 10kAIC 3,508

18 MVP-1 10kAIC 5,344

19 N-ATS-EM 42kAIC 7,805

20 N-ATS-NORM 42kAIC 28,623

21 NDP 42kAIC 25,757

22 GN1 24kAIC 17,205

23 GN2 24kAIC 17,195

24 1N1 18kAIC 10,504

25 1N2 18kAIC 10,498

26 1N3 10kAIC 3,507

27 1N4 10kAIC 3,496

28 EQ-ATS-EM 42kAIC 7,898

29 EQ-ATS-NORM 42kAIC 29,895

30 EQDP 42kAIC 27,841

31 GEQ1 20kAIC 17,881

32 1EQ1 10kAIC 3,519

33 ELEV-1 10kAIC 6,222

34 ACCU-205-G 5kAIC 3,585

35 ACCU-205-1 5kAIC 3,578

36 ACCU-203-1 5kAIC 3,024

37 EHU-205-G 5kAIC 1,452

38 EHU-205-1 5kAIC 1,438

39 EHU-203-1 5kAIC 1,356

40 AHU-205-GRF 5kAIC 1,447

41 AHU-205-GSF 5kAIC 2,257

42 AHU-205-1RF 5kAIC 1,001

43 AHU-205-1SF 5kAIC 3,562

44 AHU-203-1RF 5kAIC 1,447

45 AHU-203-1SF 5kAIC 3,562

FEEDER SCHEDULEFAULT CURRENT SCHEDULE

NOTES:

1. PROVIDE NEW MEDIUM VOLTAGE FUSE IN EXISTING PAD-MOUNTED GEAR.

2. CONTACTS FOR LOAD BANK DUMP CIRCUITRY.

3. LOAD BANK DUMP BOX.

4. PROVIDE GROUNDING FOR SEPERATELY DERIVED SYSTEM.

Revisions Date

File details come from the government source that posted it. Updated .