This document is a Single-Line Electrical Diagram for Buildings 204 and 205 of a construction project at a U.S. Department of Veterans Affairs facility in Lexington, Kentucky. The diagram illustrates the electrical distribution system for a Long-Term Rehab facility replacement, including power generation, transformation, distribution, and load management infrastructure.

The system includes a 500 KVA pad-mount transformer (12.47 kV to 208Y/120V, 3-phase), a 400 kW/500 kVA diesel generator set, and multiple automatic transfer switches (ATS) rated at 400A, 600A, and 800A with bypass isolation and open transition capability. The main distribution includes a 2000A main distribution panel (MDP), 205-MDP, and subsidiary distribution panels (NDP, CDP, EQDP) with ratings of 600A to 800A. The electrical infrastructure serves various loads including elevator systems (ELEV-1, 150A), equipment hookups (EHU units), air handling units (AHU units), and accumulators (ACCU units). The diagram specifies feeder cable requirements ranging from #2 copper conductors for smaller loads up to 5 sets of 600 kCMIL copper for the 2000A main feed, all installed in conduit. A comprehensive fault current schedule identifies 45 reference points with available short-circuit amperage ratings from 1,001 to 42,000 kAIC, and grounding provisions include water main connections, UFER foundation ground, building steel, and lightning protection. This is a 100% Construction Documents phase drawing dated December 18, 2020, prepared by Heapy Architects/Engineers for the VA Office of Construction and Facilities Management.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E N E N E N E N

G

N

G

REMOVABLE

BUS LINK

SW BD

METERING

K

K

EN

M

A

M

G

GFP

K

VFD

E N

N

G

REMOVABLE

BUS LINK

SW BD

METERING

100A/3P 100A/3P

'GC1'

'1C3' '1N1' '1N2' '1N3' '1N4'

'GLS1'

100A/3P 100A/3P 100A/3P 100A/3P 100A/3P

'GEQ1'

'205 CDP', 400A, 208Y/120V, 3PH, 4W

'205 MDP', 2000A, 208Y/120V, 3PH, 4W

2000A/3P 225A/3P 400A/3P 600A/3P

500KVA

12.47kV -

208Y/120V-3PH

PAD-MOUNT TX

5.75%

'205-N-ATS'

600A - 208/120V - 4P

BYPASS ISOLATION

OPEN TRANSITION

400kW /500kVA 208/120V

DIESEL GEN-SET

1600A FEEDER

TAPPING W IREW AY

225A/3P

LSI

400A/3P

LSI

600A/3P

LSI

LOAD BANK

SPD

100% RATED

1600A 3P BREAKER

'205-CR-ATS'

400A - 208/120V - 4P

BYPASS ISOLATION

OPEN TRANSITION

'205-LS-ATS'

225A - 208/120V - 4P

BYPASS ISOLATION

OPEN TRANSITION

'1LS1' '1LS2'

'1C1'

'GN1'

'1EQ1'

SPD SPD SPD

SPD

SPD SPD

SPD SPD

60A/3P 60A/3P

8 8 8 8 8 8 8 8

100A/3P

'GN2'

100A/3P

4 98 19 20

6 7

MAIN GROUND BAR W ITH

STAND OFF ISOLATORS

W ATER

MAIN

UFER

FOUNDATION

GROUND

BUILDING

STEEL

LIGHTNING

PROTECTION

MAIN TR CLOSET

GROUND BAR

EXISTING PAD MOUNTED SWITCH

PRIMARY SW ITCH

EXISTING LOAD - 398kVA (32A AT 12.47kV) NEW LOAD - 375kVA (30A AT 12.47kV)

TOTAL - 773kVA (62A AT 12.47kV)

LSI

60A/3P

LSI

LSI LSI

50A/3P

MVP-1

60E

'205-EQ-ATS'

800A - 208/120V - 4P

BYPASS ISOLATION

OPEN TRANSITION

SPD

28 29

'205 NDP', 600A, 208Y/120V, 3PH, 4W

800A/3P

LSI

800A/3P

LSI

225A/3P 100A/3P

SPD

60A/3P

30 '205 EQDP', 800A, 208Y/120V, 3PH, 4W

ELEV-1

150A/3P

ACCU-205-G

175A/3P

ACCU-205-1

175A/3P

ACCU-204-1

0 0 0 0

PORTABLE

GENERATOR

PADMOUNT 1600A DUAL

PURPOSE DOCKING STATION

50A/3P

EHU-205-G

50A/3P 50A/3P

0 0 0

EHU-205-1 EHU-204-1

EXISTING FEED TO

BUILDING 201 & 202

13 15

18 22 23

24 25 26 27

33 34 35 36 37 38 39

50A/3P

AHU-205-G-RF

35A/3P

AHU-205-G-SF

50A/3P

AHU-205-1-RF

0 0 0

90A/3P

AHU-205-1-SF

50A/3P 90A/3P

0 0 0

AHU-204-1-RF AHU-204-1-SF

40 41 42 43 44 45

FROM EXISTING

TRANSFORMER PMT-9

N G

100% RATED

ELECTRICAL SINGLE-LINE LEGEND

TRANSFORMER

VOLTAGE TERMINATION - PRIMARY

SURGE PROTECTIVE DEVICE

AUTOMATIC TRANSFER SW ITCH

GENERATOR

ELECTRIC METER

EQUIPMENT GROUND

GROUND FAULT PROTECTOR

EQUIPMENT MULTIMETER

EQUIPMENT POTENTIAL TRANSFORMER

PANELBOARD BREAKER

DELTA SYMBOL

DISCONNECT

EQUIPMENT AMMETER

EQUIPMENT CURRENT TRANSFORMER

EQUIPMENT W YE SIDE OF TRANSFORMER W ITH GROUND

KEYED INTERLOCK

MOTOR

MOTOR STARTER

MOTOR STARTER AND DISCONNECT

PANELBOARD - MAIN LUG ONLY

PANELBOARD - DOUBLE SET OF LUGS

PANELBOARD - MAIN BREAKER

SHORT CIRCUIT FAULT LOCATION

VARIABLE FREQUENCY DRIVE

VOLTAGE TERMINATION - SECONDARY

AUTOMATIC TRANSFER SW ITCH - BYPASS

BUS LINK

OR

BUSSING

SW ITCHBOARD ENCLOSURE

INTEGRATED EQUIPMENT ENCLOSURE

EXISTING CONDUIT & W IRE TO REMAIN

CONDUIT & W IRE TO BE REMOVED

CONDUIT & W IRE

EQUIPMENT SW ITCHBOARD METER

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO. STATE COA FIRM NO.

SD SCHEMATIC DESIGN 07.31.2020

DD DESIGN DEVELOPMENT 09.30.2020

95% CONSTRUCTION DOCUMENTS 11.23.2020

100% CONSTRUCTION DOCUMENTS 12.18.2020

/1

/2

:4

:2

A

M

Construct Replacement CLC - Long Term Rehab

12.18.2020

SINGLE LINE

E300

W JFMSG

000-00-000

Lexington, Kentucky

204 & 205

100% CONSTRUCTION

DOCUMENTS

596-333

2019-05137 01528

SINGLE-LINE DIAGRAM - BUILDING 204 & 205

0 REFER TO MOTOR SCHEDULE OR PANEL SCHEDULE FOR FEEDER SIZE

1 15 KV EPR 3 - #2/0 CU., 1 - #1 CU. GND. 600V, IN 4" C.

2 2000A: 5 SETS 4 - 600 kCMIL CU., IN 4"C.

3 1600A: 4 SETS 4 - 600 kCMIL CU., 1 - #4/0 CU. GND., IN 4"C.

4 800A: 2 SETS OF 4 - 500 kCMIL CU., 1 - #1/0 CU. GND., IN 4"C.

5 600A: 2 SETS OF 4 - 350 kCMIL CU., 1 - #1 CU. GND., IN 3"C.

6 400A: 4 - 500kCMIL CU., 1 - #3 CU. GND., IN 4"C.

7 225A: 4 - #4/0 CU., 1 - #4 CU. GND., IN 2.5"C.

8 100A: 4 - #2 CU., 1 - #8 CU. GND., IN 1.25"C.

REF.

POINT DESCRIPTION

MIN. EQUIP.

RATING

AVAILABLE SHORT

CIRCUIT AMPS

1 EM BUSWAY 10kAIC 8,034

2 205 MDP 42kAIC 32,042

3 LATS-EM 42kAIC 7,536

4 LATS-NORM 42kAIC 24,834

5 GLS1 24kAIC 19,691

6 1LS1 10kAIC 8,986

7 1LS2 10kAIC 3,394

8 CATS-EM 42kAIC 7,805

9 CATS-NORM 42kAIC 28,643

10 CDP 42kAIC 25,790

11 GC1 24kAIC 17,222

13 1C1 24kAIC 10,510

15 1C3 10kAIC 3,508

18 MVP-1 10kAIC 5,344

19 N-ATS-EM 42kAIC 7,805

20 N-ATS-NORM 42kAIC 28,623

21 NDP 42kAIC 25,757

22 GN1 24kAIC 17,205

23 GN2 24kAIC 17,195

24 1N1 18kAIC 10,504

25 1N2 18kAIC 10,498

26 1N3 10kAIC 3,507

27 1N4 10kAIC 3,496

28 EQ-ATS-EM 42kAIC 7,898

29 EQ-ATS-NORM 42kAIC 29,895

30 EQDP 42kAIC 27,841

31 GEQ1 20kAIC 17,881

32 1EQ1 10kAIC 3,519

33 ELEV-1 10kAIC 6,222

34 ACCU-205-G 5kAIC 3,585

35 ACCU-205-1 5kAIC 3,578

36 ACCU-203-1 5kAIC 3,024

37 EHU-205-G 5kAIC 1,452

38 EHU-205-1 5kAIC 1,438

39 EHU-203-1 5kAIC 1,356

40 AHU-205-GRF 5kAIC 1,447

41 AHU-205-GSF 5kAIC 2,257

42 AHU-205-1RF 5kAIC 1,001

43 AHU-205-1SF 5kAIC 3,562

44 AHU-203-1RF 5kAIC 1,447

45 AHU-203-1SF 5kAIC 3,562

FEEDER SCHEDULEFAULT CURRENT SCHEDULE

NOTES:

1. PROVIDE NEW MEDIUM VOLTAGE FUSE IN EXISTING PAD-MOUNTED GEAR.

2. CONTACTS FOR LOAD BANK DUMP CIRCUITRY.

3. LOAD BANK DUMP BOX.

4. PROVIDE GROUNDING FOR SEPERATELY DERIVED SYSTEM.