S02-Price Schedule.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z1DA--36C249-21-AP-0982 Correct Plumbing Piping and Replace Fixtures
Solicitation number
36C24921R0062
Issued by

About this file

This document contains a price schedule and related federal contract opportunity notice. The price schedule outlines a base bid for correct plumbing work at the Memphis VA Medical Center, including general requirements, site work, finishes, conveyance equipment, fire suppression, HVAC, electrical, communications, electronic safety and security work. Line items list estimated costs for labor, materials, equipment and taxes. The related opportunity notice seeks a healthcare construction contractor to provide corrective plumbing, piping and fixture replacement at three Memphis VA facilities. The 100% SDVOSB set-aside contract value is estimated between $5-10 million. Interested parties must have experience with healthcare construction projects over $5 million in the past 5 years. Construction will take place in a medical environment requiring infection control and minimal disruptions. The response date is not applicable as this is a pre-solicitation notice, with solicitation expected to issue on or around March 23, 2021. The acquisition will be conducted using LPTA and awarded to one contractor by the Department of Veterans Affairs VHA VISN 9.

View the file

Other files

File Type Posted
S02-Price Schedule_5-6-2021.xlsx XLSX spreadsheet
36C24921R0062 0006.pdf PDF
Plumbing RFIs.docx DOCX document
36C24921R0062 0005.pdf PDF
Plumbing RFIs.docx DOCX document
01 33 23 - Shop Dwgs - PD - Samples.pdf PDF
36C24921R0062 0004.pdf PDF
RFIs Round 2.pdf PDF
Plumbing Solicitation_36C24921R0062.pdf PDF
36C24921R0062_Amendment_0003.pdf PDF
36C24921R0062_Amendment_0002.pdf PDF
Q-A RFIs 1.pdf PDF
36C24921R0062 Amendment 0001.pdf PDF
Specifications.pdf PDF
Drawings Part8.pdf PDF
Drawings Part4.pdf PDF
Drawings Part9.pdf PDF
S15-PPQ-Template.docx DOCX document
Drawings Part1.pdf PDF
Wage Rates_Shelby County.pdf PDF
Drawings Part6.pdf PDF
Drawings Part2.pdf PDF
Drawings Part3.pdf PDF
Drawings Part10.pdf PDF
Plumbing Solicitation_36C24921R0062.pdf PDF
S02-Price Schedule.xlsx XLSX spreadsheet
Drawings Part7.pdf PDF
Drawings Part5.pdf PDF
36C24921R0062.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Bid Item 1

JOB NAME: CORRECT PLUMBING LOCATION: MEMPHIS VAMCSolicitation Number: 36C24921R0062Project NumberProposal DateProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$0.00
10 14 00Signage$0.00$0.000.00$0.00
10 26 00Wall and Door Protection$0.00$0.000.00$0.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00Electric Traction Passenger Elevators P1-P4$0.00$0.00$0.00$0.00
14 21 20Electric Traction Passenger Elevators P7-P9$0.00$0.00$0.00$0.00
14 21 30Electric Traction Service Elevators S5-S6$0.00$0.00$0.00$0.00
14 21 90Passenger Elevators Data Connection P10-P12$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$0.00
23 05 11Common Work Results for HVAC$0.00$0.00$0.00$0.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT$0.00
$0.00
TOTAL SUB
DIVISION GRAND TOTALS$0
TAX FOR MATERIALS$0

SUBTOTAL $0

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $0

BOND/FEE0%$0
PERMITS/LICENSES$0
CLIN 0001: Base Bid Item 1:
GRAND TOTAL$0
Base Offer Item 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
The contractor shall provide all resources necessary to accomplish and furnish all labor, material, equipment, transportation and expert supervision necessary for project #614-18-106, Correct Plumbing, Piping & Repair Fixtures at the Memphis VA Medical Center.

The period of performance for the work in the base offer 588 calendar days from receipt of notice to proceed.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"PROJECT 614-18-106 &"-,Bold"CORRECT PLUMBING, PIPING & REPLACE FIXTURES &"-,Bold"MEMPHIS VA MEDICAL CENTER

Base Bid Item(s) 2 & 3

Offeror shall provide pricing for both bid items 2 and 3.

CLIN 0002: BASE BID ITEM NUMBER 2: All work described in Bid Item I, except deduct all work items for Building 1-AC. Contract duration will be 560 days.

Base Bid Item No. 2 GRAND TOTAL: __________________________________

All work described in Bid Item II, except deduct remaining items for Building 1-A. The clouded, noted areas specificed in the drawings for Building 1-A are to remain a part of Building 1 work and should be included in this bid item number. Contract duration will be 455 days.
CLIN 0003: BASE BID ITEM NUMBER 3:

Base Bid Item No. 3 GRAND TOTAL: __________________________________

Note:
****************The government reserves the right to award any or all base bid items and/or modify the resulting contract to only include bid items 2 and/or 3.******************************

File details come from the government source that posted it. Updated .