S02-Price Schedule.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 36C24921R0062
About this file
This document contains a price schedule template and related federal contract opportunity notice. The price schedule template outlines a base bid item for correct plumbing work at the Memphis VAMC, including general requirements, site work, finishes, conveyance equipment, fire suppression, HVAC, electrical, communications, electronic safety and security work. Labor, material, equipment, and total costs are to be provided for each line item. The related opportunity notice is for project 614-18-106 to correct plumbing, piping and replace fixtures at the Memphis VAMC. The 100% SDVOSB set-aside contract valued between $5-10 million requires coordination of plumbing, mechanical, electrical and other trades. The lowest price technically acceptable source selection process will award a contract to one contractor to conduct the work while the hospital remains operational.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02-Price Schedule_5-6-2021.xlsx | XLSX spreadsheet | |
| 36C24921R0062 0006.pdf | ||
| Plumbing RFIs.docx | DOCX document | |
| 36C24921R0062 0005.pdf | ||
| Plumbing RFIs.docx | DOCX document | |
| 01 33 23 - Shop Dwgs - PD - Samples.pdf | ||
| 36C24921R0062 0004.pdf | ||
| RFIs Round 2.pdf | ||
| Plumbing Solicitation_36C24921R0062.pdf | ||
| 36C24921R0062_Amendment_0003.pdf | ||
| 36C24921R0062_Amendment_0002.pdf | ||
| S02-Price Schedule.xlsx | XLSX spreadsheet | |
| Q-A RFIs 1.pdf | ||
| 36C24921R0062 Amendment 0001.pdf | ||
| Specifications.pdf | ||
| Drawings Part8.pdf | ||
| Drawings Part4.pdf | ||
| Drawings Part9.pdf | ||
| S15-PPQ-Template.docx | DOCX document | |
| Drawings Part1.pdf | ||
| Wage Rates_Shelby County.pdf | ||
| Drawings Part6.pdf | ||
| Drawings Part2.pdf | ||
| Drawings Part3.pdf | ||
| Drawings Part10.pdf | ||
| Plumbing Solicitation_36C24921R0062.pdf | ||
| Drawings Part7.pdf | ||
| Drawings Part5.pdf | ||
| 36C24921R0062.docx | DOCX document |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Bid Item 1
| JOB NAME: CORRECT PLUMBING LOCATION: MEMPHIS VAMC | Solicitation Number: 36C24921R0062 | Project Number | Proposal Date | Proposal Date | ||
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | LINE TOTALS | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| Infection Control Walls | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Submittal Process | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Supervision | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Demolition | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Dumpsters | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Job-site Office Equipment | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Safety & First Aid-ICRA | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Final Cleaning | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Punchlist/Closeout | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DIVISION 2 | SITE WORK | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | ||||
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 | ||||
| 06 06 00 | Translucent Resin Panel System | $0.00 | $0.00 | $ - 0 | $0.00 | |
| 06 20 00 | Finish Carpentry | |||||
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 72 00 | Roof Accessories | |||||
| 07 84 00 | Firestopping | |||||
| 07 92 00 | Joint Sealants | |||||
| DIVISION 9 | FINISHES | $0.00 | ||||
| 09 06 00 | Schedule for Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 51 00 | Acoustical Ceilings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 16 | Resilient Sheet Flooring | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 19 | Resilient Tile Flooring | $0.00 | $0.00 | $0.00 | ||
| 09 91 00 | Painting | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 10 | ACCESSORIES | $0.00 | ||||
| 10 14 00 | Signage | $0.00 | $0.00 | 0.00 | $0.00 | |
| 10 26 00 | Wall and Door Protection | $0.00 | $0.00 | 0.00 | $0.00 | |
| DIVISION 14 | CONVEYING EQUIPMENT | $0.00 | ||||
| 14 21 00 | Electric Traction Passenger Elevators P1-P4 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 14 21 20 | Electric Traction Passenger Elevators P7-P9 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 14 21 30 | Electric Traction Service Elevators S5-S6 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 14 21 90 | Passenger Elevators Data Connection P10-P12 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 21 | FIRE SUPPRESSION | $0.00 | ||||
| 21 13 13 | Wet-Pipe Sprinkler Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 23 | HEATING, VENTILATING AND AIR CONDITIONING (HVAC) | $0.00 | ||||
| 23 05 11 | Common Work Results for HVAC | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 07 11 | HVAC and Boiler Plant Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 23 00 | Refrigerant Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 81 00 | Decentralized VRF Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 26 | ELECTRICAL | $0.00 | ||||
| 26 05 11 | Requirements for Electrical Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 33 | Raceways and Boxes for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 24 16 | Panelboards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 27 26 | Wiring Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 27 | COMMUNICATIONS | $0.00 | ||||
| 27 05 11 | Requirements for Communications Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 26 | Grounding and Bonding for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 33 | Raceways and Boxes for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 | ||||
| 28 31 00 | Fire Detection and Alarm | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS
TOTAL LABOR $0.00
TOTAL MATERIALS $0.00
TAX FOR MATERIALS 6% $0.00
| TOTAL EQUIPMENT | $0.00 | |
| $0.00 | ||
| TOTAL SUB |
| DIVISION GRAND TOTALS | $0 |
| TAX FOR MATERIALS | $0 |
SUBTOTAL $0
| OVERHEAD | 0% | $0 |
| PROFIT | 0% | $0 |
SUBTOTAL $0
| BOND/FEE | 0% | $0 |
| PERMITS/LICENSES | $0 |
| CLIN 0001: Base Bid Item 1: | ||
| GRAND TOTAL | $0 |
| Base Offer Item 1 | INSTRUCTIONS |
| 1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror. | |
| The contractor shall provide all resources necessary to accomplish and furnish all labor, material, equipment, transportation and expert supervision necessary for project #614-18-106, Correct Plumbing, Piping & Repair Fixtures at the Memphis VA Medical Center. |
The period of performance for the work in the base offer 588 calendar days from receipt of notice to proceed.
2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;
3. Divisions must still be listed even if not applicable to the construction requirement;
4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.
&"-,Bold"PROJECT 614-18-106 &"-,Bold"CORRECT PLUMBING, PIPING & REPLACE FIXTURES &"-,Bold"MEMPHIS VA MEDICAL CENTER
Base Bid Item(s) 2 & 3
Offeror shall provide pricing for both bid items 2 and 3.
CLIN 0002: BASE BID ITEM NUMBER 2: All work described in Bid Item I, except deduct all work items for Building 1-AC. Contract duration will be 560 days.
Base Bid Item No. 2 GRAND TOTAL: __________________________________
| All work described in Bid Item II, except deduct remaining items for Building 1-A. The clouded, noted areas specificed in the drawings for Building 1-A are to remain a part of Building 1 work and should be included in this bid item number. Contract duration will be 455 days. | |
| CLIN 0003: BASE BID ITEM NUMBER 3: |
Base Bid Item No. 3 GRAND TOTAL: __________________________________
| Note: |
| ****************The government reserves the right to award any or all base bid items and/or modify the resulting contract to only include bid items 2 and/or 3.****************************** |
File details come from the government source that posted it. Updated .