This notice provides details for a federal contract opportunity to correct plumbing, piping and replace fixtures at the Memphis Veterans Affairs Medical Center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 seeks a healthcare construction contractor to provide all labor, materials, equipment and supervision needed for the project per the statement of work, specifications and drawings. The project magnitude is between $5,000,000 to $10,000,000 and is set aside for a 100% Service-Disabled Veteran-Owned Small Business concern. Interested parties must have experience coordinating multiple trades in a hospital environment and performing similar alteration, repair and renovation projects over $5,000,000 in the past five years. Work will require planning utility interruptions to minimize disruptions to ongoing hospital operations. A formal solicitation for this acquisition will be issued on or around March 23, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02-Price Schedule_5-6-2021.xlsx | XLSX spreadsheet | |
| 36C24921R0062 0006.pdf | ||
| Plumbing RFIs.docx | DOCX document | |
| 36C24921R0062 0005.pdf | ||
| Plumbing RFIs.docx | DOCX document | |
| 01 33 23 - Shop Dwgs - PD - Samples.pdf | ||
| 36C24921R0062 0004.pdf | ||
| RFIs Round 2.pdf | ||
| Plumbing Solicitation_36C24921R0062.pdf | ||
| 36C24921R0062_Amendment_0003.pdf | ||
| 36C24921R0062_Amendment_0002.pdf | ||
| S02-Price Schedule.xlsx | XLSX spreadsheet | |
| Q-A RFIs 1.pdf | ||
| 36C24921R0062 Amendment 0001.pdf | ||
| Specifications.pdf | ||
| Drawings Part8.pdf | ||
| Drawings Part4.pdf | ||
| Drawings Part9.pdf | ||
| S15-PPQ-Template.docx | DOCX document | |
| Wage Rates_Shelby County.pdf | ||
| Drawings Part6.pdf | ||
| Drawings Part2.pdf | ||
| Drawings Part3.pdf | ||
| Drawings Part10.pdf | ||
| Plumbing Solicitation_36C24921R0062.pdf | ||
| S02-Price Schedule.xlsx | XLSX spreadsheet | |
| Drawings Part7.pdf | ||
| Drawings Part5.pdf | ||
| 36C24921R0062.docx | DOCX document |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET (FINAL)
G001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEMPHIS TENNESSEE
614-18-106
Project Director
NOVEMBER 20, 2020 JLH EO/JLHRevisions: Date:
440 Martin Luther King Jr. Blvd
Macon, GA 31201
478.743.8415 Fax: 478.743.8239
www.clarknexsen.com
VA Memphis Correct Plumbing Piping and Replace FixturesBID DOCUMENTS
OC CREMM
E
AGRICULTURE
CORRECT PLUMBING PIPING AND REPLACE
FIXTURES, VA MEDICAL CENTER
DRAWING TITLE
DWG
NO.
INDEX OF DRAWINGS
DRAWING TITLE
DWG
NO.
MEMPHIS VA MEDICAL CENTER
DRAWING TITLE
DWG
NO.
DRAWING TITLE
DWG
NO.
BID DOCUMENTS
MEMPHIS, TENNESSEE
NOVEMBER 20, 2020
BLDG 1AC
BLDG 1
JEFFERSON AVE.
INTERSTATE 40
BLDG 1
BLDG 1AC
BLDG 1A
POPLAR AVE.
DRAWING TITLE
DWG
NO.
BLDG 1A
BID DOCUMENTS
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text O.
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AREA MAP
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AREA VIEW
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
PLUMBING
AutoCAD SHX Text
ARCHITECTURAL
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text
1-PD101
AutoCAD SHX Text
BASEMENT FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text P001
AutoCAD SHX Text
LEGENDS AND NOTES
AutoCAD SHX Text P002
AutoCAD SHX Text
CONTROLS AND INSTRUMENTATION
AutoCAD SHX Text
1-PD102
AutoCAD SHX Text
BASEMENT FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD103
AutoCAD SHX Text
BASEMENT FLOOR ZONE C-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD104
AutoCAD SHX Text
BASEMENT FLOOR ZONE D-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PP101
AutoCAD SHX Text
BASEMENT FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP102
AutoCAD SHX Text
1-PP103
AutoCAD SHX Text
1-PP104
AutoCAD SHX Text
1-PD201
AutoCAD SHX Text
MECHANICAL ROOM DEMOLITION PLUMBING-PHASES 1
AutoCAD SHX Text
1-MED201
AutoCAD SHX Text
MECHANICAL ROOM DEMOLITION STEAM-PHASES 1
AutoCAD SHX Text
1-PP201
AutoCAD SHX Text
MECHANICAL ROOM-NEW WORK-PLUMBING PHASES 1 & 2
AutoCAD SHX Text
1-PP301
AutoCAD SHX Text
WATER HEATER PLUMB PIPE NW WK RISER DIAG-PHASES 1
AutoCAD SHX Text
1-MEP201
AutoCAD SHX Text
MECHANICAL ROOM-NEW WORK STM & ELEC-PHASES 1
AutoCAD SHX Text
AutoCAD SHX Text
JEFFERSON AVE.
AutoCAD SHX Text
AutoCAD SHX Text
POPLAR AVE.
AutoCAD SHX Text
1-PD107
AutoCAD SHX Text
GROUND FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD108
AutoCAD SHX Text
GROUND FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD109
AutoCAD SHX Text
GROUND FLOOR ZONE C-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD110
AutoCAD SHX Text
GROUND FLOOR ZONE D-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD105
AutoCAD SHX Text
BASEMENT FLOOR ZONE E-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD106
AutoCAD SHX Text
BASEMENT FLOOR ZONE F-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD111
AutoCAD SHX Text
GROUND FLOOR ZONE E-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD112
AutoCAD SHX Text
GROUND FLOOR ZONE F-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD113
AutoCAD SHX Text
FIRST FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD114
AutoCAD SHX Text
FIRST FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD115
AutoCAD SHX Text
FIRST FLOOR ZONE C-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD116
AutoCAD SHX Text
FIRST FLOOR ZONE D-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD117
AutoCAD SHX Text
FIRST FLOOR ZONE E-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD118
AutoCAD SHX Text
FIRST FLOOR ZONE F-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD119
AutoCAD SHX Text
SECOND FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD120
AutoCAD SHX Text
SECOND FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD121
AutoCAD SHX Text
SECOND FLOOR ZONE C-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD122
AutoCAD SHX Text
SECOND FLOOR ZONE D-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD123
AutoCAD SHX Text
SECOND FLOOR ZONE E-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD124
AutoCAD SHX Text
SECOND FLOOR ZONE F-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD125
AutoCAD SHX Text
THIRD FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD126
AutoCAD SHX Text
THIRD FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD127
AutoCAD SHX Text
THIRD FLOOR ZONE C-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD128
AutoCAD SHX Text
FOURTH FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PD202
AutoCAD SHX Text
MECHANICAL ROOM DEMOLITION PLUMBING-PHASES 2
AutoCAD SHX Text
1-MED202
AutoCAD SHX Text
MECHANICAL ROOM DEMO STEAM & ELECTRICAL-PHASES 2
AutoCAD SHX Text
1-PP107
AutoCAD SHX Text
GROUND FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP108
AutoCAD SHX Text
GROUND FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP109
AutoCAD SHX Text
GROUND FLOOR ZONE C-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP110
AutoCAD SHX Text
GROUND FLOOR ZONE D-NEW WORK PIPING PLAN
AutoCAD SHX Text
BASEMENT FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
BASEMENT FLOOR ZONE C-NEW WORK PIPING PLAN
AutoCAD SHX Text
BASEMENT FLOOR ZONE D-NEW WORK PIPING PLAN
AutoCAD SHX Text
BASEMENT FLOOR ZONE E-NEW WORK PIPING PLAN
AutoCAD SHX Text
BASEMENT FLOOR ZONE F-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP105
AutoCAD SHX Text
1-PP106
AutoCAD SHX Text
1-PP111
AutoCAD SHX Text
GROUND FLOOR ZONE E-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP112
AutoCAD SHX Text
GROUND FLOOR ZONE F-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP113
AutoCAD SHX Text
FIRST FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP114
AutoCAD SHX Text
FIRST FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP115
AutoCAD SHX Text
FIRST FLOOR ZONE C-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP116
AutoCAD SHX Text
FIRST FLOOR ZONE D-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP117
AutoCAD SHX Text
FIRST FLOOR ZONE E-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP118
AutoCAD SHX Text
FIRST FLOOR ZONE F-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP119
AutoCAD SHX Text
SECOND FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP120
AutoCAD SHX Text
SECOND FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP121
AutoCAD SHX Text
SECOND FLOOR ZONE C-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP122
AutoCAD SHX Text
SECOND FLOOR ZONE D-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP123
AutoCAD SHX Text
SECOND FLOOR ZONE E-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP124
AutoCAD SHX Text
SECOND FLOOR ZONE F-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP125
AutoCAD SHX Text
THIRD FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP126
AutoCAD SHX Text
THIRD FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP127
AutoCAD SHX Text
THIRD FLOOR ZONE C-NEW WORK PIPING PLAN
AutoCAD SHX Text
1-PP128
AutoCAD SHX Text
FOURTH FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PD101
AutoCAD SHX Text
GROUND FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD102
AutoCAD SHX Text
GROUND FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD103
AutoCAD SHX Text
GROUND FLOOR ZONE C-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD104
AutoCAD SHX Text
GROUND FLOOR ZONE D-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD105
AutoCAD SHX Text
FIRST FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD106
AutoCAD SHX Text
FIRST FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD107
AutoCAD SHX Text
FIRST FLOOR ZONE C-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD108
AutoCAD SHX Text
FIRST FLOOR ZONE D-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD109
AutoCAD SHX Text
SECOND FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD110
AutoCAD SHX Text
SECOND FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD111
AutoCAD SHX Text
SECOND FLOOR ZONE C-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD112
AutoCAD SHX Text
SECOND FLOOR ZONE D-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD113
AutoCAD SHX Text
THIRD FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD114
AutoCAD SHX Text
THIRD FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD115
AutoCAD SHX Text
THIRD FLOOR ZONE C-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD116
AutoCAD SHX Text
THIRD FLOOR ZONE D-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD117
AutoCAD SHX Text
FOURTH FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD118
AutoCAD SHX Text
FOURTH FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD119
AutoCAD SHX Text
FOURTH FLOOR ZONE C-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD120
AutoCAD SHX Text
FOURTH FLOOR ZONE D-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD121
AutoCAD SHX Text
FIFTH FLOOR ZONE A-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD122
AutoCAD SHX Text
FIFTH FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD123
AutoCAD SHX Text
FIFTH FLOOR ZONE C-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PD124
AutoCAD SHX Text
FIFTH FLOOR ZONE D-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1AC-PD101
AutoCAD SHX Text
GROUND FLOOR - DEMOLITION PIPING PLAN
AutoCAD SHX Text
1AC-PD102
AutoCAD SHX Text
FIRST FLOOR - DEMOLITION PIPING PLAN
AutoCAD SHX Text
1AC-PD103
AutoCAD SHX Text
SECOND FLOOR - DEMOLITION PIPING PLAN
AutoCAD SHX Text
1A-PP101
AutoCAD SHX Text
GROUND FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP102
AutoCAD SHX Text
GROUND FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP103
AutoCAD SHX Text
GROUND FLOOR ZONE C-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP104
AutoCAD SHX Text
GROUND FLOOR ZONE D-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP105
AutoCAD SHX Text
FIRST FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP106
AutoCAD SHX Text
FIRST FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP107
AutoCAD SHX Text
FIRST FLOOR ZONE C-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP108
AutoCAD SHX Text
FIRST FLOOR ZONE D-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP109
AutoCAD SHX Text
SECOND FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text A501
AutoCAD SHX Text
WALL DETAILS
AutoCAD SHX Text A601
AutoCAD SHX Text
PARTITION TYPES AND FINISH SCHEDULE
AutoCAD SHX Text
1A-PP110
AutoCAD SHX Text
SECOND FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP111
AutoCAD SHX Text
SECOND FLOOR ZONE C-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP112
AutoCAD SHX Text
SECOND FLOOR ZONE D-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP113
AutoCAD SHX Text
THIRD FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP114
AutoCAD SHX Text
THIRD FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP115
AutoCAD SHX Text
THIRD FLOOR ZONE C-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP116
AutoCAD SHX Text
THIRD FLOOR ZONE D-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP117
AutoCAD SHX Text
FOURTH FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP118
AutoCAD SHX Text
FOURTH FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP119
AutoCAD SHX Text
FOURTH FLOOR ZONE C-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP120
AutoCAD SHX Text
FOURTH FLOOR ZONE D-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP121
AutoCAD SHX Text
FIFTH FLOOR ZONE A-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PD201
AutoCAD SHX Text
MECHANICAL ROOM-DEMOLITION-PLUMBING PHASES 1 & 2
AutoCAD SHX Text
1AC-PP101
AutoCAD SHX Text
GROUND FLOOR - NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP122
AutoCAD SHX Text
FIFTH FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP123
AutoCAD SHX Text
FIFTH FLOOR ZONE C-NEW WORK PIPING PLAN
AutoCAD SHX Text
1A-PP124
AutoCAD SHX Text
FIFTH FLOOR ZONE D-NEW WORK PIPING PLAN
AutoCAD SHX Text
1AC-PP102
AutoCAD SHX Text
FIRST FLOOR - NEW WORK PIPING PLAN
AutoCAD SHX Text
1AC-PP103
AutoCAD SHX Text
SECOND FLOOR - NEW WORK PIPING PLAN
AutoCAD SHX Text
PP401
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
PP402
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
PP501
AutoCAD SHX Text
SCHEDULES
AutoCAD SHX Text
1A-PD301
AutoCAD SHX Text
WATER HEATER PLUMB PIPE DEMO RISER DIAG-PHASES 1
AutoCAD SHX Text
1A-MED201
AutoCAD SHX Text
MECHANICAL ROOM DEMOLITION STM&ELEC-PHASES 1&2
AutoCAD SHX Text
1A-PD302
AutoCAD SHX Text
WATER HEATER PLUMB PIPE DEMO RISER DIAG-PHASES 2
AutoCAD SHX Text
1A-PP201
AutoCAD SHX Text
MECHANICAL ROOM-NEW WORK-PLUMBING PHASES 1 & 2
AutoCAD SHX Text
1A-PP301
AutoCAD SHX Text
WATER HEATER PLUMB PIPE NW WK RISER DIAG-PHASES 1
AutoCAD SHX Text
1A-MEP201
AutoCAD SHX Text
MECHANICAL ROOM-NEW WORK STM & ELEC-PHASES 1&2
AutoCAD SHX Text
1A-PP302
AutoCAD SHX Text
WATER HEATER PLUMB PIPE NW WK RISER DIAG-PHASES 2
AutoCAD SHX Text
1AC-PD201
AutoCAD SHX Text
MECHANICAL ROOM DEMOLITION PLUMBING-PHASES 1 & 2
AutoCAD SHX Text
1AC-PD301
AutoCAD SHX Text
WATER HEATER PLUMB PIPE DEMO RISER DIAG-PHASES 1
AutoCAD SHX Text
1AC-MED201
AutoCAD SHX Text
MECHANICAL ROOM DEMO STM&ELEC-PHASES 1&2
AutoCAD SHX Text
1AC-PD302
AutoCAD SHX Text
WATER HEATER PLUMB PIPE DEMO RISER DIAG-PHASES 2
AutoCAD SHX Text
1AC-PP201
AutoCAD SHX Text
MECHANICAL ROOM NEW WORK PLUMBING-PHASES 1 & 2
AutoCAD SHX Text
1AC-PP301
AutoCAD SHX Text
WATER HEATER PLUMB PIPE NW WK RISER DIAG-PHASES 1
AutoCAD SHX Text
1AC-MEP201
AutoCAD SHX Text
MECHANICAL ROOM-NEW WORK STM & ELEC-PHASES 1&2
AutoCAD SHX Text
1AC-PP302
AutoCAD SHX Text
WATER HEATER PLUMB PIPE NW WK RISER DIAG-PHASES 2
AutoCAD SHX Text
BUILDING 1AC
AutoCAD SHX Text 1-A101
AutoCAD SHX Text
BUILDING 1 - GROUND FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1 - FIRST FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1 - SECOND FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1 - THIRD FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1 - THIRD FLOOR - ZONE D PLAN
AutoCAD SHX Text 1-A108
AutoCAD SHX Text 1-A115
AutoCAD SHX Text 1-A122
AutoCAD SHX Text 1-A102
AutoCAD SHX Text
BUILDING 1 - GROUND FLOOR - ZONE A PLAN
AutoCAD SHX Text 1-A103
AutoCAD SHX Text
BUILDING 1 - GROUND FLOOR - ZONE B PLAN
AutoCAD SHX Text 1-A104
AutoCAD SHX Text
BUILDING 1 - GROUND FLOOR - ZONE C PLAN
AutoCAD SHX Text 1-A105
AutoCAD SHX Text
BUILDING 1 - GROUND FLOOR - ZONE D PLAN
AutoCAD SHX Text 1-A106
AutoCAD SHX Text
BUILDING 1 - GROUND FLOOR - ZONE E PLAN
AutoCAD SHX Text 1-A107
AutoCAD SHX Text
BUILDING 1 - GROUND FLOOR - ZONE F PLAN
AutoCAD SHX Text
BUILDING 1 - FIRST FLOOR - ZONE A PLAN
AutoCAD SHX Text 1-A109
AutoCAD SHX Text
BUILDING 1 - FIRST FLOOR - ZONE B PLAN
AutoCAD SHX Text 1-A110
AutoCAD SHX Text
BUILDING 1 - FIRST FLOOR - ZONE C PLAN
AutoCAD SHX Text 1-A111
AutoCAD SHX Text
BUILDING 1 - FIRST FLOOR - ZONE D PLAN
AutoCAD SHX Text 1-A112
AutoCAD SHX Text
BUILDING 1 - FIRST FLOOR - ZONE E PLAN
AutoCAD SHX Text 1-A113
AutoCAD SHX Text
BUILDING 1 - FIRST FLOOR - ZONE F PLAN
AutoCAD SHX Text 1-A114
AutoCAD SHX Text
BUILDING 1 - SECOND FLOOR - ZONE A PLAN
AutoCAD SHX Text 1-A116
AutoCAD SHX Text
BUILDING 1 - SECOND FLOOR - ZONE B PLAN
AutoCAD SHX Text 1-A117
AutoCAD SHX Text
BUILDING 1 - SECOND FLOOR - ZONE C PLAN
AutoCAD SHX Text 1-A118
AutoCAD SHX Text
BUILDING 1 - SECOND FLOOR - ZONE D PLAN
AutoCAD SHX Text 1-A119
AutoCAD SHX Text
BUILDING 1 - SECOND FLOOR - ZONE E PLAN
AutoCAD SHX Text 1-A120
AutoCAD SHX Text
BUILDING 1 - SECOND FLOOR - ZONE F PLAN
AutoCAD SHX Text 1-A121
AutoCAD SHX Text
BUILDING 1 - THIRD FLOOR - ZONE A PLAN
AutoCAD SHX Text 1-A123
AutoCAD SHX Text
BUILDING 1 - THIRD FLOOR - ZONE B PLAN
AutoCAD SHX Text 1-A124
AutoCAD SHX Text
BUILDING 1 - THIRD FLOOR - ZONE C PLAN
AutoCAD SHX Text 1-A125
AutoCAD SHX Text 1-A126
AutoCAD SHX Text
BUILDING 1 - BASEMENT FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1 - BASEMENT FLOOR - ZONE A PLAN
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text
BUILDING 1 - BASEMENT FLOOR - ZONE C PLAN
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text 1-A127
AutoCAD SHX Text 1-A128
AutoCAD SHX Text 1-A129
AutoCAD SHX Text 1-A130
AutoCAD SHX Text 1-A131
AutoCAD SHX Text 1-A132
AutoCAD SHX Text 1-A133
AutoCAD SHX Text
BUILDING 1A
AutoCAD SHX Text 1A-A101
AutoCAD SHX Text
BUILDING 1A - GROUND FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1A - FIRST FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1A - SECOND FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1A - THIRD FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1A - FOURTH FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1A - FIFTH FLOOR - OVERALL PLAN
AutoCAD SHX Text 1A-A102
AutoCAD SHX Text 1A-A103
AutoCAD SHX Text 1A-A104
AutoCAD SHX Text 1A-A105
AutoCAD SHX Text 1A-A106
AutoCAD SHX Text
BUILDING 1A - GROUND FLOOR - ZONE A
AutoCAD SHX Text
BUILDING 1A - GROUND FLOOR - ZONE B
AutoCAD SHX Text
BUILDING 1A - GROUND FLOOR - ZONE C
AutoCAD SHX Text
BUILDING 1A - GROUND FLOOR - ZONE D
AutoCAD SHX Text
BUILDING 1A - FIRST FLOOR - ZONE A
AutoCAD SHX Text 1A-A107
AutoCAD SHX Text
BUILDING 1A - FIRST FLOOR - ZONE B
AutoCAD SHX Text 1A-A108
AutoCAD SHX Text
BUILDING 1A - FIRST FLOOR - ZONE C
AutoCAD SHX Text 1A-A109
AutoCAD SHX Text
BUILDING 1A - FIRST FLOOR - ZONE D
AutoCAD SHX Text 1A-A110
AutoCAD SHX Text 1A-A111
AutoCAD SHX Text
BUILDING 1A - SECOND FLOOR - ZONE A
AutoCAD SHX Text 1A-A112
AutoCAD SHX Text
BUILDING 1A - SECOND FLOOR - ZONE B
AutoCAD SHX Text 1A-A113
AutoCAD SHX Text
BUILDING 1A - SECOND FLOOR - ZONE C
AutoCAD SHX Text 1A-A114
AutoCAD SHX Text
BUILDING 1A - SECOND FLOOR - ZONE D
AutoCAD SHX Text 1A-A115
AutoCAD SHX Text 1A-A116
AutoCAD SHX Text
BUILDING 1A - THIRD FLOOR - ZONE A
AutoCAD SHX Text 1A-A117
AutoCAD SHX Text 1A-A118
AutoCAD SHX Text 1A-A119
AutoCAD SHX Text 1A-A120
AutoCAD SHX Text 1A-A121
AutoCAD SHX Text
BUILDING 1A - THIRD FLOOR - ZONE B
AutoCAD SHX Text
BUILDING 1A - THIRD FLOOR - ZONE C
AutoCAD SHX Text
BUILDING 1A - THIRD FLOOR - ZONE D
AutoCAD SHX Text
BUILDING 1A - FOURTH FLOOR - ZONE A
AutoCAD SHX Text 1A-A122
AutoCAD SHX Text
BUILDING 1A - FOURTH FLOOR - ZONE B
AutoCAD SHX Text 1A-A123
AutoCAD SHX Text
BUILDING 1A - FOURTH FLOOR - ZONE C
AutoCAD SHX Text 1A-A124
AutoCAD SHX Text
BUILDING 1A - FOURTH FLOOR - ZONE D
AutoCAD SHX Text 1A-A125
AutoCAD SHX Text 1A-A126
AutoCAD SHX Text
BUILDING 1A - FIFTH FLOOR - ZONE A
AutoCAD SHX Text 1A-A127
AutoCAD SHX Text
BUILDING 1A - FIFTH FLOOR - ZONE B
AutoCAD SHX Text 1A-A128
AutoCAD SHX Text
BUILDING 1A - FIFTH FLOOR - ZONE C
AutoCAD SHX Text 1A-A129
AutoCAD SHX Text
BUILDING 1A - FIFTH FLOOR - ZONE D
AutoCAD SHX Text 1A-A130
AutoCAD SHX Text
BUILDING 1A (CONT.)
AutoCAD SHX Text
BUILDING 1AC
AutoCAD SHX Text
BUILDING 1AC - GROUND FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1AC - FIRST FLOOR - OVERALL PLAN
AutoCAD SHX Text
BUILDING 1AC - SECOND FLOOR - OVERALL PLAN
AutoCAD SHX Text
1AC-A101
AutoCAD SHX Text
1AC-A102
AutoCAD SHX Text
1AC-A103
AutoCAD SHX Text
BUILDING 1 (CONT.)
AutoCAD SHX Text
BUILDING 1A
AutoCAD SHX Text
1-PD129
AutoCAD SHX Text
FOURTH FLOOR ZONE B-DEMOLITION PIPING PLAN
AutoCAD SHX Text
1-PP129
AutoCAD SHX Text
FOURTH FLOOR ZONE B-NEW WORK PIPING PLAN
AutoCAD SHX Text
HAZARDOUS ABATEMENT
AutoCAD SHX Text H001
AutoCAD SHX Text
HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES
AutoCAD SHX Text
BUILDING 1 - FOURTH FLOOR - OVERALL PLAN
AutoCAD SHX Text 1-A134
AutoCAD SHX Text COVER SHEET LEGENDS, ABBREVIATIONS, AND NOTES KEY NOTES PHASING PLAN AND NOTES - FIRST FLOOR PHASING PLAN AND NOTES - THIRD FLOOR
AutoCAD SHX Text G001 G002 G003 G004 G005
ARCHITECTURAL ABBREVIATIONS
ARCHITECTURAL LEGEND
MATERIAL LEGEND ARCHITECTURAL GENERAL NOTESGENERAL PROJECT NOTES ARCHITECTURAL RENOVATION GENERAL NOTES
ARCHITECTURAL CEILING RENOVATION NOTES
LEGEND, ABBREVIATIONS AND
NOTES
G002
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEMPHIS TENNESSEE
614-18-106
Project Director
NOVEMBER 20, 2020 JLH EO/JLHRevisions: Date:
VA Memphis Correct Plumbing Piping and Replace Fixtures
OC CREMM
E
AGRICULTURE
AutoCAD SHX Text AC AIR CONDITIONING AIR CONDITIONING AT ACOUSTICAL CEILING TILE ACOUSTICAL CEILING TILE AFF ABOVE FINISH FLOOR ABOVE FINISH FLOOR ALUM ALUMINUM ALUMINUM BATT BATT INSULATION BATT INSULATION BO BOTTOM OF BOTTOM OF CBB CEMENTITIOUS BACKER BOARD CEMENTITIOUS BACKER BOARD CCW CEMENTITIOUS CRYSTALLINE WATERPROOFING CEMENTITIOUS CRYSTALLINE WATERPROOFING CFMF COLD-FORMED METAL FRAMING COLD-FORMED METAL FRAMING CG CORNER GUARD CORNER GUARD C CENTERLINE CENTERLINE CMT CERAMIC MOSAIC TILE CERAMIC MOSAIC TILE CMU CONCRETE MASONRY UNIT CONCRETE MASONRY UNIT CO CASED OPENING CASED OPENING COMM COMMUNICATION COMMUNICATION CONC CONCRETE CONCRETE CONC-S CONCRETE WITH SEALER CONCRETE WITH SEALER CONT CONTINUOUS CONTINUOUS COR CONTRACTING OFFICER'S REPRESENTATIVE CONTRACTING OFFICER'S REPRESENTATIVE CT CERAMIC TILE CERAMIC TILE CTB CERAMIC TILE BASE CERAMIC TILE BASE CP CARPET CARPET DIA DIAMETER DIAMETER EDF ELECTRIC DRINKING FOUNTAIN ELECTRIC DRINKING FOUNTAIN ELEC ELECTRICAL ELECTRICAL EQ EQUAL EQUAL ES EXPOSED STRUCTURE EXPOSED STRUCTURE ETC ET CETERA ET CETERA EXIST EXISTING EXISTING EXP EXPOSED EXPOSED FAC FIN FACTORY FINISH FACTORY FINISH FD FLOOR DRAIN FLOOR DRAIN FEC FIRE EXTINGUISHER CABINET FIRE EXTINGUISHER CABINET FHC FIRE HOSE CABINET FIRE HOSE CABINET FF FINISHED FLOOR FINISHED FLOOR FIN FINISH FINISH FLR FLOOR FLOOR FO FACE OF FACE OF FV FIELD VERIFY (PRIOR TO ORDERING OR CUTTING) FIELD VERIFY (PRIOR TO ORDERING OR CUTTING) FWC FABRIC WALLCOVERING FABRIC WALLCOVERING GA GAGE GAGE GRA GRANITE GRANITE GYP BD/GWB GYPSUM (WALL) BOARD GYPSUM (WALL) BOARD HC HANDICAPPED HANDICAPPED HM HOLLOW METAL HOLLOW METAL HPDL HIGH-PRESSURE DECORATIVE LAMINATE HIGH-PRESSURE DECORATIVE LAMINATE HVAC HEATING VENTILATION AND AIR-CONDITIONING HEATING VENTILATION AND AIR-CONDITIONING MATL MATERIAL MATERIAL MAX MAXIMUM MAXIMUM MECH MECHANICAL MECHANICAL MFR MANUFACTURER MANUFACTURER MIN MINIMUM MINIMUM MO MASONRY OPENING MASONRY OPENING MTL METAL METAL NIC NOT IN CONTRACT NOT IN CONTRACT NTS NOT TO SCALE NOT TO SCALE OC ON CENTER ON CENTER OH OPPOSITE HAND OPPOSITE HAND PB PORCELAIN BASE PORCELAIN BASE PLS PLASTER PLASTER PL/PLAM PLASTIC LAMINATE PLASTIC LAMINATE PT PORCELAIN TILE PORCELAIN TILE PR PAIR PAIR P PAINT PAINT QT QUARRY TILE QUARRY TILE RB RESILIENT BASE RESILIENT BASE REF REFRIGERATOR REFRIGERATOR REQ'D REQUIRED REQUIRED RES RESINOUS FLOORING RESINOUS FLOORING RES-C RESINOUS EPOXY - CEILING RESINOUS EPOXY - CEILING RES-W RESINOUS EPOXY - WALL RESINOUS EPOXY - WALL RO ROUGH OPENING ROUGH OPENING RF RUBBER FLOORING RUBBER FLOORING RPH RECESSED PAPER HOLDER RECESSED PAPER HOLDER SC SPECIAL COATING (HIGH BUILD GLAZED COATING) SPECIAL COATING (HIGH BUILD GLAZED COATING) (HIGH BUILD GLAZED COATING) SD SOAP DISPENSER SOAP DISPENSER SCW SOLID CORE WOOD SOLID CORE WOOD SIM SIMILAR SIMILAR SND SANITARY NAPKIN DISPENSER SANITARY NAPKIN DISPENSER SP SPECIAL FACED SPECIAL FACED SS STAINLESS STEEL/SOLID SURFACE STAINLESS STEEL/SOLID SURFACE ST STEEL STEEL SUBS SUBSTRATE SUBSTRATE SV SHEET VINYL SHEET VINYL SVT SOLID VINYL TILE SOLID VINYL TILE TB TACK BOARD TACK BOARD TELE TELEPHONE TELEPHONE TO TOP OF TOP OF TP TOILET PAPER TOILET PAPER TYP TYPICAL TYPICAL UNO UNLESS NOTED OTHERWISE UNLESS NOTED OTHERWISE VCT VINYL COMPOSITION TILE VINYL COMPOSITION TILE VWC VINYL WALL COVERING VINYL WALL COVERING WC WALL COVERING WALL COVERING WR WATER RESISTANT WATER RESISTANT WD WOOD WOOD WSF WELDED SEAM [SHEET] FLOORING WELDED SEAM [SHEET] FLOORING (HEAT WELDED WITH ROD)
AutoCAD SHX Text A
AutoCAD SHX Text + 0'-6"
AutoCAD SHX Text F.E.C.
AutoCAD SHX Text
FIRE EXTINGUISHER CABINET
AutoCAD SHX Text
ROOM NAME AND NUMBER
AutoCAD SHX Text
DOOR NUMBER
AutoCAD SHX Text
KEY NOTE
AutoCAD SHX Text
WINDOW TYPE
AutoCAD SHX Text
PARTITION TYPE
AutoCAD SHX Text
DETAIL CALLOUT
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
SHEET WHERE DETAIL IS DRAWN
AutoCAD SHX Text
SECTION CALLOUT
AutoCAD SHX Text
VERTICAL ELEVATION
AutoCAD SHX Text
COLUMN CENTERLINE DESIGNATION
AutoCAD SHX Text
DEMOLITION NOTE
AutoCAD SHX Text
SECTION NUMBER
AutoCAD SHX Text
SHEET WHERE SECTION IS DRAWN
AutoCAD SHX Text
EXTERIOR ELEVATION CALLOUT
AutoCAD SHX Text
ELEVATION NUMBER
AutoCAD SHX Text
SHEET WHERE ELEVATION IS DRAWN
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
AutoCAD SHX Text A401
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A201
AutoCAD SHX Text
AutoCAD SHX Text
GA4
AutoCAD SHX Text
SECTION PLAN
AutoCAD SHX Text
INTERIOR ELEVATION CALLOUT
AutoCAD SHX Text
ELEVATION NUMBER
AutoCAD SHX Text
SHEET WHERE ELEVATION IS DRAWN
AutoCAD SHX Text A401
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: FACE OF EXISTING WALL SURFACE FACE OF NEW MASONRY FACE OF NEW WALL STUDS ALIGN NEW WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED. B. COORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE COORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTION DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE DUCT, CONDUIT, AND PIPE OPENINGS IN SLABS, ROOF, AND WALLS. COORDINATE DUCT, CONDUIT, AND PIPE ROUTING ABOVE CEILINGS. WHERE NEW HOLES IN EXISTING WALLS AND SLABS ARE CREATED FOR CONDUIT, DUCT, OR PIPE PENETRATIONS COORDINATE SIZE AND LOCATION OF SUCH WORK WITH INSTALLERS OF SUCH CONDUIT, PIPE, DUCT, AND EQUIPMENT. PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLES, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY. C. COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKING FOR WALL HOOKS, BRACKETS, GRAB BARS, COMPUTER MONITORS, TELEVISION WALL BRACKETS, HANDRAILS, GUARDRAILS, WOOD MOLDINGS, DISPLAYS, ACCESSORIES ETC., BETWEEN STUDS. COORDINATE LOCATIONS WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT. D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED. E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES. F. COORDINATE CONTRACTOR DUMPSTER LOCATION WITH COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT. DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING. G. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING. H. PRIME CONTRACTOR TO HIRE AN ABATEMENT PRIME CONTRACTOR TO HIRE AN ABATEMENT SUB-CONTRACTOR TO PERFORM ASBESTOS ABATEMENT WORK. ABATEMENT WORK MUST BE COORDINATED WITH THE COR PRIOR TO START OF ABATEMENT. GIVE THE COR A MINIMUM OF 14 DAYS NOTICE BEFORE START OF PLANNED ABATEMENT ACTIVITIES. SEE ABATEMENT SPECIFICATIONS. I. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES. J. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR IF APPLICABLE. K. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. WHERE EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.) EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES SHALL BE PREPARED AS RECOMMENDED BY MANUFACTURER PRIOR TO INSTALLATION OF NEW MATERIALS. L. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN (PAINT, WALLCOVERING, BASE, CEILINGS, CHAIR RAILS, ETC.). REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST TO THE OWNER. WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED OR LEFT WITH HOLES BY CONSTRUCTION ACTIVITIES, REPAIR, REPLACE, OR INFILL SUCH MATERIALS AND FINISHES TO MATCH EXISTING IN MATERIAL, SIZE, ALIGNMENT, FINISH, COLOR, TEXTURE, AND QUALITY. EXTEND NEW FINISHES TO LOGICAL EDGES (CHANGE OF MATERIAL OR CORNERS). ALL SHALL BE REPLACED OR REPAIRED TO MATCH OR EXCEED THE QUALITY THAT EXISTED BEFORE DAMAGE. M. DRAWINGS ARE BASED ON CURRENT CONDITIONS AT THE TIME DRAWINGS ARE BASED ON CURRENT CONDITIONS AT THE TIME OF THE FIELD SURVEY. DUE TO ONGOING WORK AT THE FACILITY THERE WILL BE MINOR CHANGES IN CEILING CONDITIONS. CONTRACTOR SHALL NOTE LOCATION OF ANY ADDITIONAL ITEMS IN CEILING NOT SHOWN ON DRAWINGS AND STORE FOR INSTALLATION. REINSTALL ITEMS IN PREVIOUS LOCATIONS ONCE PLUMBING WORK IS COMPLETED.
AutoCAD SHX Text A. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED. B. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR. C. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM. ALL SUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH COR. ALL FIRE ALARM DEVICES SHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENT IN WORK AREA. D. THE CONTRACTOR MUST PROVIDE A WRITTEN FIRE SAFETY THE CONTRACTOR MUST PROVIDE A WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND FOUND TO BE SECURE, SAFE, AND FREE OF ANY FLAMMABLE LIQUIDS. E. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER. F. SEE SPECIFICATION SECTION 01 00 00 FOR INTERIM LIFE SEE SPECIFICATION SECTION 01 00 00 FOR INTERIM LIFE SAFETY MEASURES. G. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. EXISTING CONDITIONS ARE BASED ON GOVERNMENT FURNISHED EXISTING DRAWINGS AND LIMITED FIELD INVESTIGATION. NOTIFY COR OF ANY DISCREPANCIES. H. ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT OTHERWISE INDICATED. I. PROVIDE MINIMUM (1)16"x16" ACCESS PANELS IN HARD PROVIDE MINIMUM (1)16"x16" ACCESS PANELS IN HARD CEILINGS WHERE DUCTS AND DAMPERS OR OTHER PIPES REQUIRE ACCESS PER PLUMBING DRAWINGS. PROVIDE MINIMUM (1)24"x24" ACCESS PANELS IN CHASES AT EACH FLOOR TO ACCESS DUCTS AND DAM PERSPER PLUMBING DRAWINGS. COORDINATE EXACT LOCATIONS W/COR. SEE 2&3/A601 FOR ACCESS PANEL DETAILS. J. OPEN EXISTING DRYWALL AS NECESSARY TO INSTALL NEW OPEN EXISTING DRYWALL AS NECESSARY TO INSTALL NEW PLUMBING AND ELECTRICAL DEVICES. RECONSTRUCT WALL AND FINISH TO MATCH EXISTING. ADD ACCESS PANELS WHERE INDICATED PER PLUMBING DRAWINGS. COORDINATE EXACT LOCATIONS W/COR. SEE 2&3/A601 FOR ACCESS PANEL DETAILS. WHERE POSSIBLE PLACE PANELS ABOVE CEILINGS.
AutoCAD SHX Text A. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES. B. SEE "H" DRAWINGS FOR ASBESTOS, LEAD BASED PAINT, AND/OR PCB ABATEMENT. CONTRACTOR SEE "H" DRAWINGS FOR ASBESTOS, LEAD BASED PAINT, AND/OR PCB ABATEMENT. CONTRACTOR SHALL COORDINATE DEMOLITION WORK SHOWN WITH ASBESTOS, LEAD BASE PAINT, AND PCB REMOVAL. C. NORMAL WORKING HOURS: SEE PLUMBING DRAWINGS. FOR PHASING OF WORK, SEE SHEET NORMAL WORKING HOURS: SEE PLUMBING DRAWINGS. FOR PHASING OF WORK, SEE SHEET G004 & G005 FOR GENERAL PHASING NOTES, PHASING DESCRIPTION AND PHASING KEY NOTES. D. EXISTING FACILITY TO REMAIN IN-PLACE AND OPERATIONAL THROUGHOUT CONSTRUCTION. EXISTING FACILITY TO REMAIN IN-PLACE AND OPERATIONAL THROUGHOUT CONSTRUCTION. COORDINATE CONSTRUCTION ACTIVITIES AND PHASING WITH COR TO MINIMIZE DISRUPTIONS TO OWNER'S OPERATIONS AND ACCESS, AND TO INSURE SAFETY OF PEOPLE. PROVIDE MEASURES TO PREVENT HAZARDS TO PEOPLE, AND DAMAGE TO ITEMS TO REMAIN, INCLUDING BUT NOT LIMITED TO DAMAGE FROM DUST AND HEAT. MEASURES SHALL INCLUDE BUT ARE NOT LIMITED TO: 1. COORDINATION OF POWER SHUTDOWNS WITH COR. COORDINATION OF POWER SHUTDOWNS WITH COR. 2. PROTECTIVE COVERINGS FOR EQUIPMENT. PROTECTIVE COVERINGS FOR EQUIPMENT. 3. BARRIER WALLS AND BARRICADES. BARRIER WALLS AND BARRICADES. 4. TEMPORARY AIR CONDITIONING FOR OCCUPIED ENCLOSED SPACES TO MAINTAIN TEMPERATURE. TEMPORARY AIR CONDITIONING FOR OCCUPIED ENCLOSED SPACES TO MAINTAIN TEMPERATURE. 5. COORDINATION OF THE MOVING OF EXISTING HVAC EQUIPMENT TO INSURE THAT REQUIRED COORDINATION OF THE MOVING OF EXISTING HVAC EQUIPMENT TO INSURE THAT REQUIRED TEMPERATURES ARE MAINTAINED TO ALLOW PROPER OPERATION OF THE FACULTY. 6. HEPA CARTS AS DESCRIBED IN PLUMBING DRAWINGS. HEPA CARTS AS DESCRIBED IN PLUMBING DRAWINGS. 7. OTHER MEANS COORDINATED WITH COR. OTHER MEANS COORDINATED WITH COR. E. THE CONTRACTOR SHALL PROVIDE DUST AND DEBRIS CONTROL AT EVERY SPECIFIC WORK SITE THE CONTRACTOR SHALL PROVIDE DUST AND DEBRIS CONTROL AT EVERY SPECIFIC WORK SITE AND SHALL PREVENT CONTAMINATION OF AREAS NOT UNDER CONSTRUCTION. USE WHEELED CONTAINERS WITH TIGHTLY FITTING LIDS TO TRANSPORT CONSTRUCTION DEBRIS, UNOPENED, THROUGH NON-WORK AREAS, TO THE EXTERIOR OF THE BUILDING. PREVENT DUST AND DEBRIS FROM ENTERING HVAC INTAKES. F. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN (PAINT WALL COVERING, BASE, PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN (PAINT WALL COVERING, BASE, CEILINGS, CHAIR RAILS, ETC.). REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST TO OWNER. WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED OR LEFT WITH HOLES BY CONSTRUCTION ACTIVITIES, REPAIR, REPLACE, OR INFILL SUCH MATERIALS AND FINISHES TO MATCH EXISTING IN MATERIAL, SIZE, ALIGNMENT, FINISH, COLOR, TEXTURE, AND QUALITY. EXTEND NEW FINISHES TO LOGICAL EDGES (CHANGE OF MATERIAL OR CORNERS). PATCH REPAIRS WILL NOT BE ACCEPTED UNLESS SPECIFICALLY NOTED. SUBMIT SAMPLES OF MATERIALS PROPOSED FOR REPAIRS TO COR FOR WRITTEN APPROVAL PRIOR TO INSTALLATION OF NEW MATERIALS. G. REMOVE COMPLETELY MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW REMOVE COMPLETELY MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. WHERE EXISTING MATERIALS ARE TO BE REPLACED (WALLS, ROOFING, INSULATION, FLOORING, ETC.) EXISTING MATERIALS, ADHESIVES, ETC.. SHALL BE REMOVED AND EXPOSED SURFACES SHALL BE REPAIRED AS RECOMMENDED BY MANUFACTURER PRIOR TO INSTALLATION OF NEW MATERIALS. H. WHERE NEW HOLES IN EXISTING WALLS AND SLABS ARE CREATED FOR CONDUIT, DUCT, OR PIPE WHERE NEW HOLES IN EXISTING WALLS AND SLABS ARE CREATED FOR CONDUIT, DUCT, OR PIPE PENETRATIONS, COORDINATE SIZE AND LOCATION OF SUCH WORK WITH INSTALLERS OF SUCH CONDUIT, PIPE, DUCT, AND EQUIPMENT. I. OPENINGS CREATED IN SLABS, SMOKE PARTITIONS, OR FIRE RATED PARTITIONS BY THIS WORK OPENINGS CREATED IN SLABS, SMOKE PARTITIONS, OR FIRE RATED PARTITIONS BY THIS WORK SHALL BE REPAIRED USING TECHNIQUES AND MATERIALS TO MAINTAIN THE RATING OF THE WALL, INCLUDING BUT NOT LIMITED TO, SMOKE DAMPERS, FIRE DAMPERS, FIRESTOPPING, AND FIRE SAFING. PENETRATIONS OF MASONRY AND CONCRETE WALLS AND CONCRETE FLOORS SHALL BE FIRE STOPPED TO MINIMUM 2 HOUR RATING PER U.L. DETAILS ON SHEET A501. J. PATCH HOLES IN FLOORS OR WALLS CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, PATCH HOLES IN FLOORS OR WALLS CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLS, ETC. WITH MATERIALS MATCHING SLAB OR WALL IN STRUCTURE, MATERIAL, THICKNESS, ALIGNMENT, GRADES, FIRE RATINGS AND QUALITY PER UL DETAILS ON SHEET A501. K. FIELD VERIFY EXISTING DIMENSIONS PRIOR TO ORDERING OR CUTTING MATERIALS. FIELD VERIFY EXISTING DIMENSIONS PRIOR TO ORDERING OR CUTTING MATERIALS. L. METAL STUDS USED FOR REPAIRS OF EXISTING METAL STUD CONSTRUCTION SHALL BE MINIMUM METAL STUDS USED FOR REPAIRS OF EXISTING METAL STUD CONSTRUCTION SHALL BE MINIMUM 20 GA. GALVANIZED.
AutoCAD SHX Text A. TEMPORARILY SUSPEND EXISTING CEILING MOUNTED ELECTRICAL DEVICES SCHEDULED TO REMAIN TEMPORARILY SUSPEND EXISTING CEILING MOUNTED ELECTRICAL DEVICES SCHEDULED TO REMAIN (LIGHTS, SPEAKERS, SMOKE DETECTORS, ETC.) WHERE EXISTING CEILINGS ARE INDICATED TO BE REMOVED. SEE PLUMBING DRAWINGS FOR ADDITIONAL ELECTRICAL WORK. B. REMOVE AND SAVE FOR REINSTALLATION, EXISTING AIR DIFFUSERS, RETURN AIR GRILLS AND REMOVE AND SAVE FOR REINSTALLATION, EXISTING AIR DIFFUSERS, RETURN AIR GRILLS AND OTHER MISCELLANEOUS CEILING MOUNTED ACCESSORIES SCHEDULED FOR REUSE. C. WHERE OTHER WORK ALLOWS REMOVE ONLY CEILING TILES AND LEAVE GRID IN PLACE. REPLACE WHERE OTHER WORK ALLOWS REMOVE ONLY CEILING TILES AND LEAVE GRID IN PLACE. REPLACE TILES DAMAGED DURING WORK. D. WHERE DAMAGE OCCURS TO EXISTING CEILING GRID OR PANELS INDICATED TO BE REINSTALLED WHERE DAMAGE OCCURS TO EXISTING CEILING GRID OR PANELS INDICATED TO BE REINSTALLED NEW COMPONENTS SHALL BE PROVIDED. ENSURE THAT ALL CEILING PANELS IN A SPACE IS EITHER ALL NEW OR ALL EXISTING. ENSURE THAT ALL GRID IN A SPACE IS EITHER ALL NEW OR ALL EXISTING. CONTRACTOR MAY ACCOMPLISH THE GOAL BY REMOVING AN EXISTING SMALL CEILING SURFACE, SALVAGING ITS PARTS, REINSTALLING ITS PARTS IN DAMAGED AREAS AND PROVIDING ALL NEW CEILING AND/OR GRID IN THE AREA FROM WHICH THE COMPONENTS WERE SALVAGED. LOCATION FOR SUCH SALVAGE AREA SHALL BE COORDINATED WITH AND APPROVED BY CSH PHYSICAL PLANT. E. EXISTING BUILDING IS SPRINKLERED. SPRINKLER SYSTEM SHALL REMAIN ACTIVE AT ALL TIMES. EXISTING BUILDING IS SPRINKLERED. SPRINKLER SYSTEM SHALL REMAIN ACTIVE AT ALL TIMES. DAMAGED SPRINKLER HEADS SHALL BE REPLACED WITH LIKE KIND AT NO ADDITIONAL COST TO GOVERNMENT. ALL SPRINKLER WORK SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 13 AND ALL APPLICABLE LOCAL AND STATE CODES BY A SPRINKLER CONTRACTOR LICENSED IN THE STATE OF TENNESSEE. CONTRACTOR SHALL COORDINATE WITH GOVERNMENT TO DETERMINE LIMITS OF DOWN-TIME FOR SPRINKLER SYSTEM.
AutoCAD SHX Text EARTH GRAVEL CONCRETE MORTAR, STUCCO CEMENT PLASTER CONCRETE MASONRY UNIT STEEL INSULATION - RIGID INSULATION - BATT BRICK WOOD (ROUGH) WOOD FINISH
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text O.
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
T
KEY NOTE 1A TYPICAL RESTROOM SINK KEY NOTE 1B TYPICAL RESTROOM SHOWER KEY NOTE 2 KITCHENETTE KEY NOTE 3 CORRIDOR KEY NOTE 4 OFFICE/EXAM/PATIENT ROOM
KEY NOTE 5 OFFICE KEY NOTE 6 HAC CLOSET KEY NOTE 7 UTILITY ROOM KEY NOTE 9 LAB ROOM
KEY NOTE 1C TYPICAL RESTROOM TUB
KEY NOTE 8 MECHANICAL ROOM KEY NOTE 10 PLUMBING CHASE
GENERAL KEY NOTES
G003
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEMPHIS TENNESSEE
614-18-106
Project Director
NOVEMBER 20, 2020 JLH EO/JLHRevisions: Date:
VA Memphis Correct Plumbing Piping and Replace Fixtures
OC CREMM
E
AGRICULTURE
AutoCAD SHX Text TYPICAL RESTROOM - SINK DEMOLITION: FLOOR: FLOORING SHOULD BE PROTECTED AS NECESSARY. WALL: PROTECT WALL AND ALL FINISHES FROM PLUMBING WORK. CONTRACTOR TO REPAIR OR REPLACE ANY DAMAGED WALL TILE OR FINISHES TO MATCH EXISTING. MILLWORK/CABINETRY: PROTECT COUNTERTOP AND ALL FINISHES FROM PLUMBING WORK. CONTRACTOR TO REPAIR OR REPLACE EXISTING MILLWORK TO MATCH EXISTING. CEILING: REMOVE THE ACT/GYPSUM CEILING BOARD AS NECESSARY TO ACCESS THE REQUIRED PLUMBING FIXTURE COMPONENTS. ACT TILE SHOULD BE REMOVED TO EXTENT NECESSARY TO DO WORK. PROTECT GRID MEMBERS. SEE CEILING NOTE C3. THE GYPSUM CEILING BOARD SHOULD BE REMOVED TO THE NEAREST METAL FURRING/FRAMING MEMBER OR THE LEAST EXTENT REQUIRED TO REMOVE THE NECESSARY COMPONENTS. SEE CEILING NOTE C2. NEW WORK: FLOOR: NONE. WALL: IF PLUMBING CALLS FOR REMOVAL OF FOOT PEDALS, OPEN WALL SUFFICIENT TO ACCESS PIPES TO DISCONNECT PEDAL MECHANISM AS DETAILED IN PLUMBING DRAWINGS. PATCH AND REPAIR GWB TO MATCH EXISTING FINISHES. SEE DETAIL 1/A501 MILLWORK: IF PLUMBING CALLS FOR REMOVAL OF FOOT PEDALS, OPEN BOTTOM OF CABINETRY TO ACCESS PIPES TO DISCONNECT PEDAL MECHANISM AS DETAILED IN PLUMBING DRAWINGS. PATCH AND REPAIR MILLWORK AND KICKPLATE TO MATCH EXISTING FINISHES. SEE DETAIL 2/A501 CEILING: PATCH AND REPAIR GYPSUM CEILING BOARD TO MATCH TYPE AND THICKNESS. PAINT PATCHED CEILING FROM CORNER, OR SURFACE TRANSITION TO CORNER, OR SURFACE TRANSITION. PAINT COLOR TO MATCH EXISTING. SEE PLUMBING FOR LOCATION OF ACCESS PANELS. SEE DETAIL 2/A601. *NOTE: IF FINISHES CANNOT BE MATCHED, CONTRACTOR RESPONSIBLE FOR REPLACING FINISHES TO THE NEAREST CORNER OF FACE OF TRANSITION. **NOTE: ALL FINISHES AND MATERIALS ARE ASSUMED TO BE REPLACED IN KIND. ***NOTE: SEE CONCRETE FLOOR REPAIR DETAIL FOR ALL CONCRETE FLOOR REPAIRS. SEE DETAIL 5/A501
AutoCAD SHX Text TYPICAL RESTROOM - SHOWER DEMOLITION: FLOOR: FLOORING SHOULD BE PROTECTED AS NECESSARY. WALL: REMOVE THE CERAMIC WALL TILE, FIBERGLASS OR PLASTIC PANELING AS NECESSARY TO ACCESS THE REQUIRED PLUMBING FIXTURE COMPONENTS. THE CERAMIC TILE MAY HAVE EITHER GYPSUM OR CEMENT BACKER BOARD OR OTHER. THE BACKER BOARD SHOULD BE REMOVED TO THE NEAREST METAL STUD FRAMING MEMBER OR THE LEAST EXTENT REQUIRED TO REMOVE THE NECESSARY COMPONENTS. THE CERAMIC TILE SHOULD BE REMOVED BACK TO THE NEAREST GROUT JOINT. CEILING: REMOVE THE ACT/GYPSUM CEILING BOARD AS NECESSARY TO ACCESS THE REQUIRED PLUMBING FIXTURE COMPONENTS. ACT TILE SHOULD BE REMOVED TO EXTENT NECESSARY TO DO WORK. PROTECT GRID MEMBERS. SEE CEILING NOTE C3. THE GYPSUM CEILING BOARD SHOULD BE REMOVED TO THE NEAREST METAL FURRING/FRAMING MEMBER OR THE LEAST EXTENT REQUIRED TO REMOVE THE NECESSARY COMPONENTS. SEE CEILING NOTE C2. NEW WORK: FLOOR: NONE. WALL: PATCH AND REPAIR WALL BACKING TO MATCH EXISTING. REPLACE CERAMIC TILE AND GROUT TO MATCH EXISTING. IF EXISTING TILE CANNOT BE MATCHED OR TYPE HAS BEEN DISCONTINUED, PROVIDE COR WITH SEVERAL ALTERNATIVE SELECTIONS FOR CONSIDERATION. SEAL SS PLATE WITH 3" OVERLAP ALL SIDES TO FIBERGLAS/PLASTIC ENCLOSURE. SEE DETAIL 3/A501 CEILING: PATCH AND REPAIR GYPSUM CEILING BOARD TO MATCH TYPE AND THICKNESS. PAINT PATCHED CEILING FROM CORNER, OR SURFACE TRANSITION TO CORNER, OR SURFACE TRANSITION. PAINT COLOR TO MATCH EXISTING. *NOTE: IF FINISHES CANNOT BE MATCHED, CONTRACTOR RESPONSIBLE FOR REPLACING IF FINISHES CANNOT BE MATCHED, CONTRACTOR RESPONSIBLE FOR REPLACING FINISHES TO THE NEAREST CORNER OR SURFACE TRANSITION. **NOTE: ALL FINISHES AND MATERIALS ARE ASSUMED TO BE REPLACED IN KIND. ***NOTE: SEE CONCRETE FLOOR REPAIR DETAIL FOR ALL CONCRETE FLOOR REPAIRS. SEE DETAIL 5/A501.
AutoCAD SHX Text TYPICAL - KITCHENETTE DEMOLITION FLOOR: FLOORING SHOULD BE PROTECTED AS NECESSARY. WALL: PROTECT WALL AND ALL FINISHES FROM PLUMBING WORK. CONTRACTOR TO REPAIR PROTECT WALL AND ALL FINISHES FROM PLUMBING WORK. CONTRACTOR TO REPAIR OR REPLACE ANY EXISTING WALL TILE OR FINISHES TO MATCH EXISTING. MILLWORK/CABINETRY: PROTECT COUNTERTOP AND ALL FINISHES FROM PLUMBING WORK. CONTRACTOR TO REPAIR OR REPLACE EXISTING MILLWORK TO MATCH EXISTING. SEE DETAIL 2/A501. CEILING: REMOVE THE ACT/GYPSUM CEILING BOARD AS NECESSARY TO ACCESS THE REQUIRED PLUMBING FIXTURE COMPONENTS. ACT TILE SHOULD BE REMOVED TO EXTENT NECESSARY TO DO WORK. PROTECT GRID MEMBERS. SEE CEILING NOTE C3. THE GYPSUM CEILING BOARD SHOULD BE REMOVED TO THE NEAREST METAL FURRING/FRAMING MEMBER OR THE LEAST EXTENT REQUIRED TO REMOVE THE NECESSARY COMPONENTS. NEW WORK FLOOR: NONE. WALL: PATCH AND REPAIR GWB TO MATCH EXISTING TYPE AND THICKNESS. PRIME PATCHED WALLS FROM CORNER SURFACE TRANSITION, TO CORNER OR SURFACE TRANSITION. REPAIR BASE CABINET AS REQUIRED. NEW MILLWORK TO MATCH EXISTING. IF BASE CABINETS REPLACED, CONTRACTOR IS RESPONSIBLE FOR MATCHING COUNTERTOP, FLOOR AND ADJACENT CABINETS/FINISHES. ALL MATERIALS AND/OR SURFACES SHOULD BE PROTECTED. REPLACE OR REPAIR AS NECESSARY TO MATCH EXISTING. SEE KEYNOTE 1A FOR DIRECTION ON FOOT PEDAL WORK. SEE DETAIL 2/A501. MILLWORK: IF PLUMBING CALLS FOR REMOVAL OF FOOT PEDALS, OPEN BOTTOM OF CABINETRY TO ACCESS PIPES TO DISCONNECT PEDAL MECHANISM AS DETAILED IN PLUMBING DRAWINGS. PATCH AND REPAIR MILLWORK AND KICKPLATE TO MATCH EXISTING FINISHES. CEILING: REINSTALL CEILING TILE AND METAL GRID. REPLACE DAMAGED CEILING TILES AND METAL GRID AS NECESSARY TO MATCH EXISTING. SEE CEILING NOTE C3. *NOTE: IF FINISHES CANNOT BE MATCHED, CONTRACTOR RESPONSIBLE FOR REPLACING FINISHES TO THE NEAREST CORNER OR SURFACE TRANSITION. **NOTE: ALL FINISHES AND MATERIALS ARE ASSUMED TO BE REPLACED IN KIND. ***NOTE: SEE CONCRETE FLOOR REPAIR DETAIL FOR ALL CONCRETE FLOOR REPAIRS. SEE DETAIL 5/A501
AutoCAD SHX Text TYPICAL - CORRIDOR DEMOLITION FLOOR: FLOORING SHOULD BE PROTECTED AS NECESSARY. WALL: REMOVE THE NECESSARY GWB AND BASE TO ACCESS THE REQUIRED PLUMBING FIXTURE COMPONENTS. THE GWB SHOULD BE REMOVED TO THE NEAREST METAL STUD/FRAMING MEMBER OR THE LEAST REQUIRED TO REMOVE THE NECESSARY COMPONENTS. CEILING: REMOVE THE ACT/GYPSUM CEILING BOARD AS NECESSARY TO ACCESS THE REQUIRED PLUMBING FIXTURE COMPONENTS. ACT TILE SHOULD BE REMOVED TO EXTENT NECESSARY TO DO WORK. PROTECT GRID MEMBERS. THE GYPSUM CEILING BOARD SHOULD BE REMOVED TO THE NEAREST METAL FURING/FRAMING MEMBER OR THE LEAST EXTENT REQUIRED TO REMOVE THE NECESSARY COMPONENTS. NEW WORK FLOOR: NONE. WALL: PATCH AND REPAIR GWB TO MATCH EXISTING TYPE AND THICKNESS. PRIME PATCHED WALLS FROM CORNER OR SURFACE TRANSITION, TO CORNER OR SURFACE TRANSITION. PAINT COLOR TO MATCH EXISTING. REINSTALL OR REPLACE HANDRAILS, CRASH RAILS AND BASE TO MATCH EXISTING SIZE, PROFILE AND COLOR. ALL PENETRATIONS THROUGH RATED CONSTRUCTION SHALL BE SEALED TO MAINTAIN RATING. SEE SHEET A501 FOR U.L. DETAILS. CEILING: REINSTALL CEILING TILE AND METAL GRID. REPLACE DAMAGED CEILING TILES AND METAL GRID AS NECESSARY TO MATCH EXISTING. SEE CEILING NOTE C3. *NOTE: IF FINISHES CANNOT BE MATCHED, CONTRACTOR RESPONSIBLE FOR REPLACING FINISHES TO THE NEAREST CORNER OR SURFACE TRANSITION. **NOTE: ALL FINISHES AND MATERIALS ARE ASSUMED TO BE REPLACED IN KIND. ***NOTE: SEE CONCRETE FLOOR REPAIR DETAILS FOR ALL CONCRETE FLOOR REPAIRS. SEE DETAIL 5/A501.
AutoCAD SHX Text TYPICAL - OFFICE/EXAM/PATIENT ROOM DEMOLITION FLOOR: FLOORING SHOULD BE PROTECTED AS NECESSARY. WALL: PROTECT WALL AND ALL FINISHES FROM PLUMBING WORK. CONTRACTOR TO PROTECT WALL AND ALL FINISHES FROM PLUMBING WORK. CONTRACTOR TO REPAIR OR REPLACE ANY EXISTING TILE AND FINISHES TO MATCH EXISTING. CEILING: CAREFULLY REMOVE THE NECESSARY ACOUSTICAL CEILING TILE AND METAL GRID. CEILING TILES AND METAL GRID SHOULD BE STORED IN A SAFE LOCATION FOR REUSE. NEW WORK FLOOR: NONE. WALL: PATCH AND REPAIR GWB TO MATCH EXISTING TYPE AND THICKNESS. PRIME PATCHED WALLS FROM CORNER OR SURFACE TRANSITION, TO CORNER OR SURFACE TRANSITION. PAINT COLOR TO MATCH EXISTING. REINSTALL BASE OR REPLACE TO MATCH EXISTING SIZE AND COLOR. IF PLUMBING CALLS FOR REMOVAL OF FOOT PEDALS, OPEN WALL SUFFICIENT TO ACCESS PIPES TO DISCONNECT PEDAL MECHANISM AS DETAILED IN PLUMBING DRAWINGS. PATCH AND REPAIR GWB TO MATCH EXISTING FINISHES. SEE DETAIL 2/A501 MILLWORK: IF PLUMBING CALLS FOR REMOVAL OF FOOT PEDALS, OPEN BOTTOM OF CABINETRY TO ACCESS PIPES TO DISCONNECT PEDAL MECHANISM AS DETAILED IN PLUMBING DRAWINGS. PATCH AND REPAIR MILLWORK AND KICKPLATE TO MATCH EXISTING FINISHES. SEE DETAIL 2/A501. CEILING: REINSTALL CEILING TILE AND METAL GRID. REPLACE DAMAGED CEILING TILES AND METAL GRID AS NECESSARY TO MATCH EXISTING. SEE CEILING NOTE C3. *NOTE: IF FINISHES CANNOT BE MATCHED, CONTRACTOR RESPONSIBLE FOR REPLACING FINISHES TO THE NEAREST CORNER OR SURFACE TRANSITION. **NOTE: ALL FINISHES AND MATERIALS ARE ASSUMED TO BE REPLACED IN KIND. ***NOTE: SEE CONCRETE FLOOR REPAIR DETAIL FOR ALL CONCRETE FLOOR REPAIRS. SEE DETAIL 5/A501.
AutoCAD SHX Text TYPICAL - OFFICE DEMOLITION FLOOR: FLOORING SHOULD BE PROTECTED AS NECESSARY. WALL: PROTECT WALL AND ALL FINISHES FROM PLUMBING WORK. CONTRACTOR TO REPAIR OR REPLACE ANY DAMAGED GWB OR FINISHES TO MATCH EXISTING.. CEILING: CAREFULLY REMOVE THE NECESSARY ACOUSTICAL CEILING TILE AND METAL GRID. CEILING TILES AND METAL GRID SHOULD BE STORED IN A SAFE LOCATION FOR REUSE. NEW WORK FLOOR: NONE. WALL: NONE. CEILING: REINSTALL CEILING TILE AND METAL GRID. REPLACE DAMAGED CEILING TILES AND METAL GRID AS NECESSARY TO MATCH EXISTING. *NOTE: IF FINISHES CANNOT BE MATCHED, CONTRACTOR RESPONSIBLE FOR REPLACING FINISHES TO THE NEAREST CORNER OR SURFACE TRANSITION. **NOTE: ALL FINISHES AND MATERIALS ARE ASSUMED TO BE REPLACED IN KIND. ***NOTE: SEE CONCRETE FLOOR REPAIR DETAIL FOR ALL CONCRETE FLOOR REPAIRS. SEE DETAIL 5/A501.
AutoCAD SHX Text TYPICAL - H.A.C. DEMOLITION FLOOR: FLOORING SHOULD BE PROTECTED AS NECESSARY. WALL: REMOVE THE NECESSARY GLAZED MASONRY UNIT/CERAMIC TILE TO ACCESS THE REQUIRED PLUMBING FIXTURE COMPONENTS. THE FULL UNIT OF MASONRY AND ADJACENT MORTAR SHOULD BE REMOVED.