This document provides details for a federal construction contract opportunity to correct plumbing, piping and replace fixtures at the Memphis Veterans Affairs Medical Center. The Department of Veterans Affairs is seeking a Service-Disabled Veteran-Owned Small Business contractor to provide all labor, materials and equipment to complete plumbing corrections and fixture replacements in three campus facilities in accordance with project specifications, statements of work and drawings. The project magnitude is between $5 million to $10 million and work will include site utilities, infrastructure coordination of trades such as plumbing, mechanical, electrical and related construction disciplines. Asbestos abatement is anticipated and surveys will be provided. Interested parties must have experience coordinating multiple trades in a hospital environment during normal business hours while maintaining continuous facility operations. Construction phasing may be required to minimize disruptions. The solicitation is anticipated to be awarded using the Lowest Price Technically Acceptable process to one contractor. No responses are required for this pre-solicitation notice, which serves to alert interested parties that a formal solicitation will be issued on or around March 23, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02-Price Schedule_5-6-2021.xlsx | XLSX spreadsheet | |
| 36C24921R0062 0006.pdf | ||
| Plumbing RFIs.docx | DOCX document | |
| Plumbing RFIs.docx | DOCX document | |
| 01 33 23 - Shop Dwgs - PD - Samples.pdf | ||
| 36C24921R0062 0004.pdf | ||
| RFIs Round 2.pdf | ||
| Plumbing Solicitation_36C24921R0062.pdf | ||
| 36C24921R0062_Amendment_0003.pdf | ||
| 36C24921R0062_Amendment_0002.pdf | ||
| S02-Price Schedule.xlsx | XLSX spreadsheet | |
| Q-A RFIs 1.pdf | ||
| 36C24921R0062 Amendment 0001.pdf | ||
| Specifications.pdf | ||
| Drawings Part8.pdf | ||
| Drawings Part4.pdf | ||
| Drawings Part9.pdf | ||
| S15-PPQ-Template.docx | DOCX document | |
| Drawings Part1.pdf | ||
| Wage Rates_Shelby County.pdf | ||
| Drawings Part6.pdf | ||
| Drawings Part2.pdf | ||
| Drawings Part3.pdf | ||
| Drawings Part10.pdf | ||
| Plumbing Solicitation_36C24921R0062.pdf | ||
| S02-Price Schedule.xlsx | XLSX spreadsheet | |
| Drawings Part7.pdf | ||
| Drawings Part5.pdf | ||
| 36C24921R0062.docx | DOCX document |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0005 04-27-2021 614-18-106
Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129
90C
Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129
To all Offerors/Bidders
36C24921R0062
03-26-2021
X
X X
May 13, 2021 at 1:00 PM CT
This amendment is to answer RFIs and incorporate attachments, information, and addendums on SF30 continuation page 2.
Roxie Keese Contracting Officer
SF30 CONTINUATION PAGE 2
Solicitation 36C24921R0062 Amendment 0005 incorporates the following documents, addendums, changes, and verbiage:
1. Add Specification Section 013323 Shop Drawings, Product Data, and Samples. This was identified in the table of contents but was inadvertently not included with the rest of the specifications. This is listed as attachment “01 33 23 Shop Dwgs, PD, Samples”.
2. Addendum to SOW and Specifications: Delete the requirements for the Water Monitoring and Instrumentation. Existing Water Monitoring and Instrumentation to remain in use.
Where sensors are currently installed and must be removed and stored due to demolition of domestic water piping, install necessary fittings in new piping for reinstallation. Restore system to full operation as found prior to start of work.
3. Addendum to SOW and Specifications: Delete the requirements for the Instantaneous Hot Water Heaters, Controls, and Pumps. Existing Hot Water Heaters to remain in use.
Replacement of Hot Water Supply and Return piping remains in the project. Where sensors are currently installed and must be removed and stored due to demolition of domestic water piping, install necessary fittings in new piping for reinstallation. Restore system to full operation as found prior to start of work.
4. Incorporate answers to all RFIs in one attachment. All RFIs have been consolidated and answered on one document. This is listed as attachment “Plumbing RFIs”. Questions 13 and 19 are still being researched for answers. Those two answers will be posted in an upcoming amendment as soon as the answers are obtained.
5. Clarify that at least one past performance questionnaire must have been received (by the indicated due date for questionnaires) for the contractor to be considered “Acceptable” under Evaluation Factor 3. If the contractor has no past performance and is considered “Acceptable” due to being evaluated neither favorably nor unfavorably, a questionnaire still must have been received as indicated in the evaluation instructions.
See attached document: 01 33 23 - Shop Dwgs, PD, Samples.
See attached document: Plumbing RFIs.