RLP 36C248-26-R-0042 Vero Beach FL Clarification Questions from Offerors.pdf

PDF 68 KB Posted

Attached to
X1DB--FY27 New: Primary care Clinic Vero Beach New Lease Amendment 0001
Solicitation number
36C24826R0042
Issued by

About this file

This document contains clarification questions and answers from offerors regarding RLP 36C248-26-R-0042, a General Services Administration (GSA) real property lease solicitation for space in Vero Beach, Florida. The clarifications address nine key topics pertaining to the solicitation requirements.

The agency confirmed that seismic safety requirements have been deleted from the RLP as they are not applicable to Vero Beach's non-seismic location. Green building certification requirements have been modified to allow compliance through either LEED or Green Globes certification at a single level, applicable to either Tenant Interiors (existing buildings) or New Building (new construction), with offerors using whichever standard applies to their specific proposal. The lease term has been revised to 7 years with 2 years firm; while the ideal scenario is full compliance with this term, the agency will consider alternative options if at least one compliant option is submitted. The Agency Special Requirements Exhibit has been updated to reflect 86% circulation factors per VA design guidelines, and the TR (toilet room) is specified at 87 NUSF (net usable square feet). A portable electric generator quick connection and associated transfer switch are required, but not the generator itself. The lease exhibits, including the Documents Incorporated in the Lease section, are informational templates to be completed by the Lease Contracting Officer following selection of the offeror. The space plan includes three workstations for Health Administration staff totaling 868 NUSF, with a reception/check-in area addressed separately in ASR Section C rather than in the detailed space plan.

View the file

Other files

File Type Posted
3 - Exhibit B - Agency Special Requirements ASR Revised January 16 2026.pdf PDF
36C248-26-R-0042_4.docx DOCX document
36C248-26-R-0042 0001.pdf PDF
RLP 36C248-26-R-0042 Updated Sections.pdf PDF
11 - Exhibit J - Sample Request for Past Performance and Questionaire.pdf PDF
13 - Exhibit L - Security Unit Price List FSL II Oct 2024.xlsx XLSX spreadsheet
1 - 36C248-26-R-0042 - Global Request for Lease Proposal RLP Template R100 June 2025.pdf PDF
7 - Exhibit F - 3516 Solicitation Provisions Feb 2025.pdf PDF
5 - Exhibit D - Form 1364 Proposal to Lease Space Jan 2023.pdf PDF
6 - Exhibit E - GSA Form 1217 Lessor Annual Cost.pdf PDF
2 - Exhibit A - 36C248-26-L-0007 - Global Lease Template L100 Sep 2025.pdf PDF
8 - Exhibit G - 3517B General Clauses Feb 2025.pdf PDF
12 - Exhibit K - Tenant Improvements Cost Summary TICS Table Oct 2024.xlsx XLSX spreadsheet
10 - Exhibit I - GSA Form 12000 Prelease FPLS Evaluation Part A Part B May 2015.pdf PDF
15 - Exhibit N - Deliverables IAW RLP 36C248-26-R-0042.xlsx XLSX spreadsheet
14 - Exhibit M - Labor Standards Provisions and DOL Wage Determination.pdf PDF
36C248-26-R-0042_3.docx DOCX document
3 - Exhibit B - Agency Special Requirements Vero Beach PC.pdf PDF
9 - Exhibit H - 2025 04 VA GSAR Representation 552 270 33 Nov 2024.pdf PDF
4 - Exhibit C - Security Requirements FSL Level II Oct 2024.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RLP 36C248-26-R-0042 Vero Beach FL Clarification Questions from Offerors

1. CLARIFICATION ONE:

RLP Section 2.03 and 2.04 of the RLP show Seismic Safety requirements. RLP Section 3.06 – item I states, “Evidence of seismic safety compliance as required in Section 2 of this RLP.

Lease Section 3.46 and 4.14 show seismic requirements. Vero Beach, FL is not in a seismic zone, can the agency clarify if this requirement this RLP should contain seismic requirements?

This.Amendment.deletes.these.sections.from.the.RLP¡.The.lease.exhibit.is.a.standard.

template.and.will.be.filled.out.and.edited.after.selection.of.offer¡

2. CLARIFICATION TWO:

RLP Section 3.06 S and T, as well as Lease Section 3.48 and 3.49 contain LEED and Green Globe requirements. RLP Section 3.10 also states LEED requirements. Recently, we have seen the Green Building requirements being removed from Government Lease procurements. Can the agency confirm if these requirements should be deleted in their entirety?

This.Amendment.includes.verbiage.allowing.compliance.using.LEED.or.Gren.Globes

3. CLARIFICATION THREE:

If Green Building requirements are required, can the agency replace LEED requirements with Green Globes? Would the agency also expand on the requirements, clarifying that what is required is one (1) certifying requirement being LEED or Green Globes at the single level, with this requirement being for either Tenant Interiors (for existing buildings) or New Building (for a new build), but not both.

This.Amendment.includes.verbiage.allowing.compliance.using.LEED.or.Gren.Globes¡.

The.offerors.are.to.use.whatever.applies.to.their.offer.(New.or.Existing)

4. CLARIFICATION FOUR:

RLP Section 1.02 – item F state, “The lease term shall be 15 Years, 5 Years Firm…” Would the agency accept a proposal for 10- or 15-years firm?

The.term.as.of.now.is.7❶.years?.❶.years.firm¡.The.ideal―preferred.scenario.would.be.

awarding.a.lease.accordingly¡.However?.depending.on.the.number.of.offers.received.

this.may.be.negotiable¡.It.is.ok.to.submit.different.options.with.your.offer.as.long.as.at.

least.one.of.them.is.fully.compliant.with.the.RLP¡

5. CLARIFICATION FIVE

Attached is an excel spreadsheet version of the Space Plan set out in Section A. of the agency Special Requirements. The total Net Area (Programmable) square footage listed in this document is 10,824 sf, only 2,076 sf less than the desired ABOA. In order to meet VA design guidelines (including wall thickness), circulation needs to be added.

Lease Section 2.01 B.2 states, “ANSI/BOMA Occupant Area” or “ABOA” means the measurement standard (Z65.1-2017) provided by ANSI/BOMA for Occupant Area, which is “the total aggregated area used by an Occupant before Load Factors are applied, consisting of Tenant Area and Tenant Ancillary Area.” The Method A – Multiple Load Factor Method shall apply.”

Page 31 of ANSI/BOMA Z65.1-2017, when defining “Tenant Area” states, “Any portion within the demised boundaries of a Tenant Area that a tenant has Exclusive Use of (including, but not limited to Unenclosed Occupant Features, Non-Permanent Dedicated Restrooms, Elevator Lobbies, Circulation Area, and Occupant Voids) shall be considered part of the Tenant Area.

The overall concern is that you will not be able to achieve your listed room schedule for your desired programming at the current requested ABOA square footage.

Can the agency re-evaluate their desired square footages set out in ASR – A. Space Plan IAW

ANSI/BOMA Z65.1-2017?

This.amendment. includes.an.updated.version.of. the.Agency.Special.Requirements.

Exhibit¡.Note.that.VA.uses.86↘ .circulation

6. CLARIFICATION SIX

Exhibit B – ASR – A. Space Plan lists TR, at a quantity of 1 room, with an area of 216 SF. The net area listed is different, and shows 180 square feet, as well as a 1 TR room at 216, but a net area of 180 sf.

Can the agency clarify what the correct square footage for the TR room is intended to be?

TR.is.87❷.NUSF

7. CLARIFICATION SEVEN:

Exhibit B – ASR shows requirements for a backup generator. Can the agency confirm that a backup generator is required for this project?

Not.the.generator.itself¡.Per.section.Q.in.the.ASR?.» lessor.shall.provide.inclusion.of.a.

portable.electric.generator.quick.connection.and.associated.transfer.switch¡‹

8. CLARIFICATION EIGHT:

Lease Section 1.07 Documents Incorporated in the Lease has a table to list documents but does not list any documents. Can the agency clarify what documents are to be incorporated into the lease?

That.exhibit.is.informational.template.only¡.The.lease.document.will.be.completed.by.

the.LCO.in.accordance.with.the.terms.agreed.between.VA.and.the.selected.offeror¡

9. CLARIFICATION NINE:

Exhibit B – ASR – A. Space Plan does not show space programmed for a reception area/medical support assistant. Can the agency clarify if a reception or medical support assistant area should be added to Exhibit B – ASR – Space Plan – A?

The.space.requirements.list.includes.three.workstations.for.Health.Administration.staff.

for.a.total.of.868.NUSF¡.A.reception―check‗in.area.is.included.in.the.ASR.in.section.C¡