Electrical Drawings - Addendum 1.pdf
PDF 558 KB Posted
- Attached to
- Y1DA--FY26: NRM (PROJ:673-23-107) BB Install Continuous Water Quality for Legionella Directive Compliance
- Solicitation number
- 36C24825R0164_1
About this file
This document is a schematic diagram for a Campus Monitoring project for the U.S. Department of Veterans Affairs (VA) in Tampa, FL, detailing the installation of a continuous water quality monitoring system. The project involves deploying multiple Concube V3 water monitoring devices with Nano Station monitor units across various campus buildings (Buildings 1, 30, 32, 39, 52, 54, and 100), interconnected via a campus intranet system. The monitoring points will be centralized through a gateway protocol, with a dedicated domestic water monitoring display to be mounted in the plumbing department for constant viewing on desktop PCs and cell phones. The installation includes connecting monitoring devices to existing power panels, using 208/120V, 3-phase, 4-wire normal panelboards, and will involve precise electrical work, including conduit installation, wiring, and coordination with mechanical contractors. The project is scheduled for completion by 4-30-2025, with bid documents issued on 10/23/2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
DATE:
Drawing Title:
Approved Project Director
Project Title:
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date Checked
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
FK EO
673-23-107
REVISIONS:
INSTALL CONTINUOUS WATER
QUALITY MONITORING
TAMPA, FL
CAMPUS
CAMPUS MONITORING -
SCHEMATIC DIAGRAM
E400
SHEET NOTES:
KEYNOTES:
1. NEW CONCUBE V3 WATER MONITORING DEVICE SHALL BE
CIRCUITED TO THE CLOSEST 208/120V, 3 PHASE, 4-WIRE
NORMAL PANELBOARD. PROVIDE 20A CIRCUIT BREAKER AND 3
#12 + 1#12 G IN 3/4"C. PROVIDE ALL CONDUITS, WIRING AND
APPURTENANCES NEEDED FOR COMPLETE INSTALLATION.
CONTRACTOR TO VERIFY EXISTING PANELBOARD CAPACITY
PRIOR TO INSTALLING NEW CIRCUIT BREAKER AND CIRCUITING
NEW DEVICES. COORDINATE ALL REQUIREMENTS NEEDED FOR
COMPLETE INSTALLATION OF POWER TO CONCUBE V3 SYSTEM
WITH MECHANICAL CONTRACTOR AND MANUFACTURER PRIOR
TO PROCUREMENT AND INSTALLATION.
2. THE ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL
THE ELECTRICAL CONNECTIONS AND PATHWAYS FOR THE
BACNET -MODBUS GATEWAY DEVICE FOR BOTH POWER AND
COMMUNICATIONS PER MANUFACTURER’S
RECOMMENDATIONS.
A. REFER TO E-001 & E-002 FOR ELECTRICAL GENERAL NOTES,
ABBREVIATIONS & LEGEND.
B. THESE DRAWINGS SHOW THE INTENT OF THE NEW
CIRCUITING DESIGN. IT IS THE ELECTRICAL CONTRACTOR'S
RESPONSIBILITY TO FOLLOW THIS INTENT WHILE ADAPTING
TO THE EXISTING CONDITIONS FOUND IN THE FIELD.
C. ELECTRICAL CONTRACTOR SHALL PROVIDE UPDATED PANEL
DIRECTORIES FOR ALL PANELS AFFECTED DURING
CONSTRUCTION. VERIFY PANEL CAPACITY PRIOR TO
INSTALLATION.
D. ELECTRICAL CONTRACTOR SHALL CIRCUIT ELECTRICAL
DEVICES TO SPARE CIRCUIT BREAKERS & CIRCUITS THAT
BECOME AVAILABLE DURING DEMOLITION.
E. COORDINATE ELECTRICAL REQUIREMENTS OF ALL
EQUIPMENT WITH MANUFACTURER PRIOR TO ROUGH-IN AND
INSTALLATION. ADJUST DEVICE TYPES, SIZES, LOCATIONS
AND BRANCH CIRCUITRY (AS REQUIRED).
F. HOUSEKEEPING PAD SHALL BE PROVIDED FOR ALL FLOOR
MOUNTED ELECTRICAL EQUIPMENT. HOUSEKEEPING PAD
SHALL BE A MINIMUM OF 4" THICK AND 6" BEYOND THE
EQUIPMENT FOOTPRINT.
G. COORDINATE WITH CONTRACT DOCUMENTS FOR ALL
OTHER DISCIPLINES AND TRADES FOR EXACT LOCATION
OF ASSOCIATED EQUIPMENT.
H. THE CONTINUITY OF EXISTING CIRCUITS SERVING EXISTING
DEVICES AND EQUIPMENT TO REMAIN SHALL BE
MAINTAINED.
I. ALL NEW OUTLETS AND DEVICES MUST BE FLUSH
MOUNTED WITH CONCEALED CONDUITS. ANY SURFACE
MOUNTED OUTLETS, DEVICES AND CONDUITS IN THE
SCOPE OF WORK AREA MUST BE APPROVED BY THE
COR PRIOR TO INSTALLATION.
J. FIELD VERIFY EXACT LOCATION OF ALL DEVICES AND
EQUIPMENT PRIOR TO ROUGH IN.
K. ALL WIRING SHALL BE DONE WITH COPPER WIRE UNLESS
OTHERWISE NOTED.
L. PROVIDE FIRESTOPPING MATERIALS TO MAINTAIN INTEGRITY
OF THE FIRE RATED CONSTRUCTION WHERE CONDUITS PASS
THROUGH WALLS AND FLOORS. SEAL ALL CONDUITS
ABANDONED IN WALLS OR SLABS. ALL PENETRATIONS SHALL
BE SEALED
M. IF OUTAGES ARE REQUIRED IN AREAS NOT BEING
RENOVATED, THE CONTRACTOR SHALL COORDINATE WITH
THE CONTRACTING OFFICER'S REPRESENTATIVE AND
PROVIDE AT LEAST 72 HOUR NOTICE BEFORE THE OUTAGE
TAKES PLACE. SHOULD AN UNPLANNED OUTAGE OCCUR,
RESTORING POWER SHALL BE THE PRIORITY.
AVAILABLE POWER PANELS FOR USE. VERIFY LOCATION IN FIELD.
10/23/2025
ADDENDUM #1 10/23/2025
BID DOCUMENTS
BACKFLOW
PREVENTER
131st Ave.
BACKFLOW
PREVENTER
Bruce B. Downs Blvd.
BACKFLOW
PREVENTER
VA Property
ELEVATED TANK
OUTLET
WIRELESS BROADCAST
COMMUNICATING VIA CAMPUS
INTRANET SYSTEM
BUILDING
BUILDING
WIRELESS BROADCAST
COMMUNICATING VIA CAMPUS
INTRANET SYSTEM
BUILDING
BUILDING
BUILDING
NEW ELEVATED TANK (UNDER
CONSTRUCTION) INSTALLED IN NEW
OUTLET WATER PIPE FROM TANK
CONCUBE V3
WITH PIPE SCAN
MONITOR UNIT
Service Room BA-023b
Mechanical Room 30-099
Mezzanine #1 39-A209
Mechanical Room
Basement Corridor @ Col. J/10
Mechanical Room 111-52
BUILDING
CONCUBE V3 WITH
NANO STATION
MONITOR UNIT
ALL MONITORING
POINTS GOES TO
GATEWAY
PROTOCAL
DOMESTIC
WATER
MONITORING
DISPLAY
MOUNTED ON WALL
IN THE PLUMBING DEPARTMENT
VA TO PROVIDE AND INSTALL A
DISPLAY MONITOR PANEL FOR
CONSTANT VIEWING
DESKTOP
PC'S
CELL
PHONES
Fire Pump Room
GA006-100
BUILDING
CONCUBE V3 WITH
NANO STATION
MONITOR UNIT
CONCUBE V3 WITH
NANO STATION
MONITOR UNIT
CONCUBE V3 WITH
NANO STATION
MONITOR UNIT
CONCUBE V3 WITH
NANO STATION
MONITOR UNIT
CONCUBE V3 WITH
NANO STATION
MONITOR UNIT
CONCUBE V3 WITH
NANO STATION
MONITOR UNIT
CONCUBE V3
WITH PIPE SCAN
MONITOR UNIT
CONCUBE V3
WITH PIPE SCAN
MONITOR UNIT
CONCUBE V3
WITH PIPE SCAN
MONITOR UNIT
4-30-2025
| Sheets |
| E001 - ELECTRICAL GENERAL NOTES AND ABBREVIATIONS |
| E002 - ELECTRICAL LEGEND |
| E400 - CAMPUS MONITORING - SCHEMATIC DIAGRAM |
| ES100 - ELECTRICAL SITE PLAN |
File details come from the government source that posted it. Updated .