This document contains questions and answers regarding a request for information (RFI) for a federal contract to install temporary shoring in a crawl space at a Veterans Affairs medical center building. The contract will require the contractor to perform confined space entry work and follow all relevant safety requirements, including obtaining confined space entry permits and presenting confined space certification for workers. The contractor must coordinate daily with the medical center regarding site access and sign-in/out procedures. Personal protective equipment of hard hats, steel-toe boots, safety vests, and safety glasses is minimally required. The contractor must also submit daily construction logs.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

516-23-604 Install Temp Shoring Crawl Space Bldg 1 - Bay Pines VAMC
RFIs - 36C24824Q0071 November 17, 2023
QuestionAnswer
1.Prior to Surveys and design, We have no way to quantify the potential for the work listed below. If the above work is deemed to be necessary, will this work be considered Unforeseen Conditions? Pg. 5 SOW :

"As a result, and after the approval of the VA, this Contract may include but is not limited to the following:

• The relocation/redirecting to existing utilities to complete the shoring installation.

o Any relocation of utilities shall follow the VA standards, design manuals, and specifications.

• This project may involve removing or reducing obstacles, addressing environmental hazards, or implementing remedial measures for asbestos and lead." The VAMC expectation is that the existing utilities should NOT be impacted by the temporary shoring. In the event there is an unforeseeable site condition, the parties shall come to an agreement on any potential movement of utilties and associated upward adjust in contract price. The VA will decide if there is a need to move utilities if that matter arises.

2. There may be potential for overall cost savings if we shore to make repairs vs shore to stabilize the building. Would the VA consider a design that offered permanent fix if one is deemed possible post award during the Design Phase?
(Assumes the VA intent would be to perform repairs after 18 Months under a separate contract)The temporary shoring for Bldg.-1 is required prior to full building occupancy upon completion of the Major Project. Please verify the JS Held Report in Appendix A, page 29 ("Conclusions") of the report, item #1.

The VA has a solicitation, which is close to being awarded, for the design of repairs in the crawlspace and basement for buildings 1, 22 & 23. The solicitation process for the construction of the permanent fix will start after the construction documents are 100% completed.

3. Within the Combined Synopsis/Solicitation Notice, Pg. 5 states that quotes shall be submitted Friday, November 27, 2023 @ 4:00 P.M., The 27th of November is Monday Corrected - Submission of all quotes shall be submitted Monday, November 27, 2023 @ 4:00 P.M.

4. Within the Combined Synopsis/Solicitation Notice, Pg. 5 states that vendor questions shall be submitted to the COR, Alberto Torres-Soto. Correction: Submit all RFI's to laurie.whitmore@va.gov and ken.caryer@va.gov

5. Amendment 01 - Point of Contact phone number (813) 816-9093 is being removed. Correct phone number 407-951-0924

6. Is it required to complete the the confine space entry form? Yes. See item A and VAHC Memorandum 516-18-00-161 (item I.5) of the SOW, Safety Requirements section. The Contractor shall complete the Confined Space Entry Permit/Checklist and submit it to the Safety Office in Building 24, 2nd floor, every day if work will be performed in a confined space area (the permit form is in the memorandum). After the work day is completed, the Contractor shall cancel the permit and return a copy to the Safety Office. The Contractor shall present the Confine Space OSHA Certification for all the workers in this project.

7. When the safety documentation has to be completed and delivered to the VAMC. Safety document has to be reviewed and approved by the COR and the Safety Office before the site investigation starts.

8. Site access seems to be internal to an active project. What is the protocol for coordination of efforts? 1. To access the project site, the Contractor and its team shall sign in each day at the CFM office trailer at the Building 1 project site. At the end of each day, the Contractor and its team shall sign out at the CFM office trailer. (Material and equipment delivery shall be coordinated ahead of time with VAMC COR and the CFM Resident Engineer.)

2. The Contractor shall bring the confined space permit documentation to the Safety Office in Building 24, 2nd floor, each day before performing work in a confined space area and shall close out the permit daily. Please see the confined space requirements in the Safety Requirements Section.

3. The Contractor shall sign the Contractor sign-in sheet daily at the Engineering Office (Bldg.-24, 3rd-floor lobby) and sign out at the end of each day.

9. What will be the requirements for the PPE? Construction hard hat, construction steel toe boots, safety vest, and safety glasses at minimum. Contractor shall comply with all relevant OSHA standards.

10. Does this specialize service contract requires construction daily logs? Yes, it does.