RFI QA Temporary Shoring Crawl Space BPVAMC-516-23-604-RFI 12072023.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Z2JZ--FY24: NRM (PROJ: 516-23-604) Install Temp Shoring in Crawl Space at Building 1 (Specialized Contract)
Solicitation number
36C24824Q0071
Issued by

About this file

This document contains questions and answers regarding Request for Information number 36C24824Q0071 for temporary shoring installation in the crawl space of Building 1 at the Bay Pines VA Medical Center. The solicitation requests a 10-page maximum narrative response for Factor 1 of the proposal, covering specialized experience. Key personnel may assume multiple roles provided their qualifications and experience meet the requirements, though the medical center will only acknowledge up to two roles per individual. Offerors may submit Contractor Performance Assessment Reporting System records in place of past performance questionnaires if the questionnaires were not returned, with contact information for the VA to follow up.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

516-23-604 Install Temp Shoring Crawl Space Bldg 1 - Bay Pines VAMC
RFIs - 36C24824Q0071 12/07/2023
QuestionAnswer
1. Formatting and Other Restrictions: The Submission is limited to 10, 8-1/2” x 11” pages in total.” Appears in the proposal instructions but buried within Factor 1. Is this referencing the specific narrative found in section “h.”? All of Factor 1? Or is this to be the total page limit for the entire document?20 page maximum for Factor I, items "a" to "i." Factor I "Specialized Experience" does not have a page limit.
2. Can key personnel assume multiple roles provided their years of experience and qualifications meet the specified requirements?
For Factor I.a (Key Role Qualifications): a, b, c, d, and e are means and methods for the Contractor in the approach for this project but has to comply with the "Safety Requirements" specification. Please note that the Medical Center will only acknowledge up to 2 roles per individual. Additionally, items f and g shall be professional for each role, and item f shall be an independent third party.

3. Can CPARS be used in place of returned PPQ’s and will these count against the aforementioned page limit? The contractor is to provide evidence that the PPQ was submitted to the POC and shall include the contact information for the VA to follow up if needed. The VA may accept the CPARS instead of a no-response PPQ. This section does not apply to the pt. limit.