S02 - Specification 23 08 00 REV NRM 672-22-809 (5 Pages).docx

DOCX document 24 KB Posted

Attached to
Z2DA--FY22: NRM Tier 2 (PROJ: 672-22-809) DB - Install New HVAC Unit in SPS for Backup.
Solicitation number
36C24822R0155
Issued by

About this file

This federal contract opportunity notice seeks design-build services for the installation of a new HVAC unit at the San Juan VA Medical Center in Puerto Rico. The Department of Veterans Affairs intends to issue a solicitation for a design-build project to install a redundant air handling unit to serve as backup for an existing unit serving the Sterile Processing Services area. Interested small businesses must be certified as Service-Disabled Veteran-Owned and registered in SAM.gov by August 1, 2022 to respond. The contractor will be responsible for mechanical, electrical, structural, civil and architectural design and construction services to install the new unit connected to existing piping and controls. The contractor must follow all COVID-19 safety protocols and complete utility work outside normal hours to minimize disruptions. The period of performance is 365 calendar days with a magnitude between $100,000 and $250,000.

View the file

Other files

File Type Posted
S02 - 7-19-22 36C24822R0155 A00001.pdf PDF
S02 - Specification 23 05 12 REV NRM 672-22-809 (11 Pages).docx DOCX document
S02 - Infection Control Guidelines Construction-Renovation 11B-17-05 (11 Pages).pdf PDF
S02 - Location Plan 2nd Floor Referrence Drawing NRM 672-22-809 (1 Page).pdf PDF
S02 - Specification 23 34 00 REV NRM 672-22-809 (10 Pages).docx DOCX document
S02 - Specification 23 05 93 REV NRM 672-22-809 (12 Pages).docx DOCX document
S02 - RFP DB Ph1 Limitation on Subcontracting (LOS) Form.pdf PDF
S02 - Base Offer Price Breakdown_(Fill-In Mandatory)_(2 Pages).xlsx XLSX spreadsheet
S02 - Specification 23 31 00 REV NRM 672-22-809 (17 Pages).docx DOCX document
S02 - Specification 23 05 11 REV NRM 672-22-809 (36 Pages).docx DOCX document
S02 - Specification 01 00 00 REV NRM 672-22-809 (28 Pages).docx DOCX document
S02 - EMR_(Fill-In Mandatory)_(1 Page).pdf PDF
S02 - 7-15-2022 FINAL SOL 36C24822R0155.pdf PDF
S02 - Release of Claim (ROC) Form_(2 Pages).pdf PDF
S02 - Specification 23 05 41 REV NRM 672-22-809 (14 Pages).docx DOCX document
S02 - Specification 01 42 19 NRM 672-22-809 (9 Pages).docx DOCX document
S02 - Base Offer Price Breakdown_(Fill-In Mandatory)_(2 Pages).pdf PDF
S02 - Site Plan Referrence Drawing NRM 672-22-809 (1 Page).pdf PDF
S02 - Station_672_Local Protocols for COVID-19_(1 Page).pdf PDF
S02 - 7-15-2022 FINAL SOL 36C24822R0155.docx DOCX document
S02 - VA Supplemental Contract Req Combatting COVID-19_(2 Pages).pdf PDF
S02 - Specification 00 11 21 NRM 672-22-809 (10 Pages).docx DOCX document
S02 - Specification 01 33 23 NRM 672-22-809 (9 Pages).docx DOCX document
S02 - Past Performance Questionaire_(Fill-In Mandatory)_(4 Pages).pdf PDF
S02 - Specification 01 32 16 16 REV NRM 672-22-809 (23 Pages).docx DOCX document
S02 - Specification 23 07 11 REV NRM 672-22-809 (25 Pages).docx DOCX document
36C24822R0155_1.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

04-01-22

SECTION 23 08 00

COMMISSIONING OF HVAC SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

A.The requirements of this Section apply to all sections of Division 23.
B.This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.

1.2 RELATED WORK

A. Section 01 00 00 GENERAL REQUIREMENTS.

B. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

C. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.

D. Section 23 05 41 NOISE AND VIBRATION CONTROL for HVAC PIPING AND EQUIPMENT.

E. Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC.

F. Section 23 09 23 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.

1.3 SUMMARY

A.This Section includes requirements for commissioning the HVAC systems of the related subsystems and equipment. This Section supplements the general requirements specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.
B.Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.

1.4 DEFINITIONS

A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions.

1.5 COMMISSIONED SYSTEMS

A.Commissioning of a system or systems specified in Division 23 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance personnel in accordance with the requirements of Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS and of Division 23, is required in cooperation with the VA and the Commissioning Agent.
B.The Facility HVAC systems commissioning will include the systems listed in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.

1.6 SUBMITTALS

A.The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.
B.The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.

1.7 APPLICABLE PUBLICATIONS

A.The following publications form a part of this specification to the extent indicated by the reference thereto. In text the publications are referenced to by the acronym of the organization.
B.Department of Veterans Affairs (VA):
PG 18-10 2007Mission Critical Facilities - DRAFT
PG 18-10 2007Life-Safety Protected Facilities - DRAFT
C.American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc. (ASHRAE):
HANDBOOK 2019HVAC Applications ASHRAE Handbook, Chapter 39, Testing, Adjusting, and Balancing, Chapter 44, HVAC Commissioning and Chapter 49, Sound and Vibration Control
HANDBOOK 2017HVAC Fundamentals ASHRAE Handbook, Chapter 8, Sound and Vibration
D.Associated Air Balance Council (AABC):
7th Edition 2016AABC National Standards for Total System Balance
E.National Environmental Balancing Bureau (NEBB):
9th Edition 2019Procedural Standards for Testing, Adjusting, Balancing of Environmental Systems
3rd Edition 2015Procedural Standards for the Measurement of Sound and Vibration

2nd Edition 2019 ... Standard for Whole Building Technical Commissioning of New Construction

F.Sheet Metal and Air Conditioning Contractors National Association (SMACNA):
0062006...HVAC Duct Construction Standard – Metal and Flexible Duct

3rd Edition 2005 ... HVAC Systems Testing, Adjusting and Balancing PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 Construction inspections

A. Commissioning of HVAC systems will require inspection of individual elements of the HVAC systems construction throughout the construction period. The Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS and the Commissioning plan to schedule HVAC systems inspections as required to support the Commissioning Process.

3.2 PRE-FUNCTIONAL CHECKLISTS

A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The Commissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. Refer to Sections 23 05 41 NOISE AND VIBRATION CONTROL for HVAC PIPING AND EQUIPMENT, Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC and Section 23 09 23 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC requirements. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents.

3.3 CONTRACTORS TESTS

A. Contractor tests as required by other sections of Division 23 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days’ notice of testing. The Commissioning Agent will witness selected Contractor tests at the sole discretion of the Commissioning Agent. Contractor tests shall be completed prior to scheduling Systems Functional Performance Testing.

3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING:

A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the Resident Engineer. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing. The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS, for additional requirements.

3.5 TRAINING OF VA PERSONNEL

A. Training of the VA operation and maintenance personnel is required in cooperation with the Resident Engineer and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The instruction shall be scheduled in coordination with the VA Resident Engineer after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS and Division 23 Sections for additional Contractor training requirements.

----- END -----