S02 - Base Offer Price Breakdown_(Fill-In Mandatory)_(2 Pages).xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z2DA--FY22: NRM Tier 2 (PROJ: 672-22-809) DB - Install New HVAC Unit in SPS for Backup.
Solicitation number
36C24822R0155
Issued by

About this file

This document provides details for a federal design-build construction project solicitation for the installation of a new HVAC unit at a VA medical facility in Puerto Rico as a backup system. The solicitation will be issued on or about July 8, 2022 for a project with a construction magnitude between $100,000 and $250,000. Interested firms must be registered in SAM.gov and verified as a service-disabled veteran-owned small business in VIP before the August 1, 2022 response deadline. The selected contractor will be responsible for design and construction services including mechanical, electrical, structural, civil and architectural disciplines to install a new air handling unit and connect it to existing piping and control systems over a 365-day period of performance after notice to proceed. The project aims to provide redundancy for an existing HVAC unit serving a critical facility area.

View the file

Other files

File Type Posted
S02 - 7-19-22 36C24822R0155 A00001.pdf PDF
S02 - Specification 23 05 12 REV NRM 672-22-809 (11 Pages).docx DOCX document
S02 - Specification 23 08 00 REV NRM 672-22-809 (5 Pages).docx DOCX document
S02 - Infection Control Guidelines Construction-Renovation 11B-17-05 (11 Pages).pdf PDF
S02 - Location Plan 2nd Floor Referrence Drawing NRM 672-22-809 (1 Page).pdf PDF
S02 - Specification 23 34 00 REV NRM 672-22-809 (10 Pages).docx DOCX document
S02 - Specification 23 05 93 REV NRM 672-22-809 (12 Pages).docx DOCX document
S02 - RFP DB Ph1 Limitation on Subcontracting (LOS) Form.pdf PDF
S02 - Specification 23 31 00 REV NRM 672-22-809 (17 Pages).docx DOCX document
S02 - Specification 23 05 11 REV NRM 672-22-809 (36 Pages).docx DOCX document
S02 - Specification 01 00 00 REV NRM 672-22-809 (28 Pages).docx DOCX document
S02 - EMR_(Fill-In Mandatory)_(1 Page).pdf PDF
S02 - 7-15-2022 FINAL SOL 36C24822R0155.pdf PDF
S02 - Release of Claim (ROC) Form_(2 Pages).pdf PDF
S02 - Specification 23 05 41 REV NRM 672-22-809 (14 Pages).docx DOCX document
S02 - Specification 01 42 19 NRM 672-22-809 (9 Pages).docx DOCX document
S02 - Base Offer Price Breakdown_(Fill-In Mandatory)_(2 Pages).pdf PDF
S02 - Site Plan Referrence Drawing NRM 672-22-809 (1 Page).pdf PDF
S02 - Station_672_Local Protocols for COVID-19_(1 Page).pdf PDF
S02 - 7-15-2022 FINAL SOL 36C24822R0155.docx DOCX document
S02 - VA Supplemental Contract Req Combatting COVID-19_(2 Pages).pdf PDF
S02 - Specification 00 11 21 NRM 672-22-809 (10 Pages).docx DOCX document
S02 - Specification 01 33 23 NRM 672-22-809 (9 Pages).docx DOCX document
S02 - Past Performance Questionaire_(Fill-In Mandatory)_(4 Pages).pdf PDF
S02 - Specification 01 32 16 16 REV NRM 672-22-809 (23 Pages).docx DOCX document
S02 - Specification 23 07 11 REV NRM 672-22-809 (25 Pages).docx DOCX document
36C24822R0155_1.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0