Questions and Answers amended.pdf
PDF 119 KB Posted
- Attached to
- X1DB--Lease Consolidation Port Charlotte CBOC
- Solicitation number
- 36C24822R0048
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
1. Can VA please clarify the requirements of Section 1.05, Paragraph D? The delineated area is served by the Sarasota Transit Authority and there is not a location within this area that can meet this requirement. Please confirm that this language was boilerplate language and therefore not tailored to this requirement and not required for this procurement.
a. It is boiler plate language and if it is not available that is acceptable.
2. This area is located within a low seismic area, as such can VA confirm that Section 2.03 and Section 2.04 of the RLP shall be deleted?
a. Yes, seismic requirement has been deleted.
3. Section 3.05 has two conflicting paragraphs – one that states the RLP is subject to an approved prospectus and another that states the project must stay under the prospectus threshold.
a. Stay under prospectus
4. Section 3.10 references both LEED and Green Globes. It is not possible to receive both of these certifications – please confirm is the requirement is for LEED or for Green Globes.
a. Green Globes
5. Please send over the past performance evaluation form for us to send out to our VA contacts.
a. added to attachments under Attachment P
6. Please send over the Program of Requirements (i.e. space plan or room list with square footages).
a. Added under Attachment Q
File details come from the government source that posted it. Updated .