S02 - Attachment 13 VHA Supplemental Contract Req Combatting COVID-19 REV_12-14-21 (2 Pages).docx

DOCX document 34 KB Posted

Attached to
Z2DA--Hurricane Recovery Project Phase 2
Solicitation number
36C24822R0038
Issued by

About this file

This document provides details for a federal contract opportunity to conduct Hurricane Recovery Project Phase 2 work. The Department of Veterans Affairs Network Contracting Office 8 intends to issue a design-build solicitation numbered 36C24822R0038 with a closing date of January 28, 2022 at 4:30 PM Atlantic Standard Time. The requirement is set aside for Service-Disabled Veteran-Owned Small Businesses. The purpose is to design and construct repairs from damages caused by Hurricanes Irma and Maria in September 2017 at the VA Caribbean Healthcare System in San Juan, Puerto Rico. The scope of work follows recommendations from the VA Central Office Damage Assessment Team. The magnitude of construction is estimated between $5 million to $10 million. All interested contractors must be registered in the System for Award Management.

View the file

Other files

File Type Posted
S02 - Solicitation 36C24822R0038_Final Version 1-19-2022.pdf PDF
S02 - Attachment_2 Mechanical Final Referenced Drawings_DB_672-21-000_(2 Pages).pdf PDF
S02 - Attachment_12_Proposed Staging Area - Site Plan - Hurricane Recovery Ph2 (1 Page).pdf PDF
S02 - Attachment_6_Experience Information Sheet_(MANDATORY) DB_672-21-000_(4 Pages).docx DOCX document
S02 - Attachment_11_ VACHS Operational Requirements for Hurricane Recovery Efforts Ph2 (2 Pages).pdf PDF
S02 - Attachment_8_ Base Offer Cost Breakdown_(MANDATORY)_DB_672-21-000_(2 Pages).pdf PDF
S02 - Attachment_14_Station_672_Local Protocols for COVID-19 (1 Page).docx DOCX document
S02 - Attachment_9_ Release of Claim (ROC) Form DB_672-21-000_(2 Pages).doc DOC document
S02 - SPECIFICATION - 01 00 00_DB_672-21-000_(24 Pages).docx DOCX document
S02 - SPECIFICATION - 01 42 19_DB_672-21-000_(9 Pages).docx DOCX document
S02 - Attachment_10_ Infection Control Guidelines on Construction and Renovation 11B-17-05 (11 Pages).docx DOCX document
S02 - Attachment_1 Architectural Final Referenced Drawings_DB_672-21-000_(16 Pages).pdf PDF
S02 - SPECIFICATION - 01 32 16 17_DB_672-21-000_(34 Pages).docx DOCX document
S02 - SPECIFICATION - 01 35 26_DB_672-21-000_(27 Pages).docx DOCX document
S02 - Attachment_7_EMR_(MANDATORY)_DB_672-21-000_(1 Page).docx DOCX document
S02 - SPECIFICATION - 01 32 16 16_DB_672-21-000_(23 Pages).docx DOCX document
S02 - SPECIFICATION - 01 33 23_DB_672-21-000_(8 Pages).docx DOCX document
S02 - Attachment_3 Electrical Final Referenced Drawings_DB_672-21-000_(7 Pages).pdf PDF
S02 - Attachment_5_Past Performance_(MANDATORY)_DB_672-21-000_(4 Pages).pdf PDF
S03 - 36C24822R0038_2_MODIFIED PRE-SOLICITATION NOTICE 1-19-2022.docx DOCX document
S02 - SPECIFICATION - 00 11 21_DB_672-21-000_(11 Pages).docx DOCX document
S02 - Attachment_4 - LOS CERTIFICATION (FILL-IN_MANDATORY) Vs-12-17-20_DB_672-21-000_(1 Page).doc DOC document
36C24822R0038_1.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT: 13

VHA Supplemental Contract Requirements for Combatting COVID-19

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements:

1) If fully vaccinated, contractors shall show proof of vaccination.

i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

2) If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.

3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.

a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.

1. For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.

Last Updated on Monday, December 20, 2021

File details come from the government source that posted it. Updated .