S02 - Attachment_8_ Base Offer Cost Breakdown_(MANDATORY)_DB_672-21-000_(2 Pages).pdf

PDF 30 KB Posted

Attached to
Z2DA--Hurricane Recovery Project Phase 2
Solicitation number
36C24822R0038
Issued by

About this file

This file contains information for a federal design-build contract opportunity for hurricane recovery work. The Department of Veterans Affairs Network Contracting Office in Puerto Rico intends to issue a solicitation by December 29, 2021 for design and construction services to repair damages from Hurricanes Irma and Maria in 2017 at the VA Caribbean Healthcare System in San Juan. The work scope follows recommendations from a VA damage assessment team. The magnitude of construction is estimated between $5 million and $10 million. The opportunity is set aside solely for service-disabled veteran-owned small businesses. The response deadline for the solicitation is January 28, 2022. All interested firms must register in the System for Award Management to receive solicitation documents which will be posted on beta.SAM.gov.

View the file

Other files

File Type Posted
S02 - Solicitation 36C24822R0038_Final Version 1-19-2022.pdf PDF
S02 - Attachment_2 Mechanical Final Referenced Drawings_DB_672-21-000_(2 Pages).pdf PDF
S02 - Attachment_12_Proposed Staging Area - Site Plan - Hurricane Recovery Ph2 (1 Page).pdf PDF
S02 - Attachment 13 VHA Supplemental Contract Req Combatting COVID-19 REV_12-14-21 (2 Pages).docx DOCX document
S02 - Attachment_6_Experience Information Sheet_(MANDATORY) DB_672-21-000_(4 Pages).docx DOCX document
S02 - Attachment_11_ VACHS Operational Requirements for Hurricane Recovery Efforts Ph2 (2 Pages).pdf PDF
S02 - Attachment_14_Station_672_Local Protocols for COVID-19 (1 Page).docx DOCX document
S02 - Attachment_9_ Release of Claim (ROC) Form DB_672-21-000_(2 Pages).doc DOC document
S02 - SPECIFICATION - 01 00 00_DB_672-21-000_(24 Pages).docx DOCX document
S02 - SPECIFICATION - 01 42 19_DB_672-21-000_(9 Pages).docx DOCX document
S02 - Attachment_10_ Infection Control Guidelines on Construction and Renovation 11B-17-05 (11 Pages).docx DOCX document
S02 - Attachment_1 Architectural Final Referenced Drawings_DB_672-21-000_(16 Pages).pdf PDF
S02 - SPECIFICATION - 01 32 16 17_DB_672-21-000_(34 Pages).docx DOCX document
S02 - SPECIFICATION - 01 35 26_DB_672-21-000_(27 Pages).docx DOCX document
S02 - Attachment_7_EMR_(MANDATORY)_DB_672-21-000_(1 Page).docx DOCX document
S02 - SPECIFICATION - 01 32 16 16_DB_672-21-000_(23 Pages).docx DOCX document
S02 - SPECIFICATION - 01 33 23_DB_672-21-000_(8 Pages).docx DOCX document
S02 - Attachment_3 Electrical Final Referenced Drawings_DB_672-21-000_(7 Pages).pdf PDF
S02 - Attachment_5_Past Performance_(MANDATORY)_DB_672-21-000_(4 Pages).pdf PDF
S03 - 36C24822R0038_2_MODIFIED PRE-SOLICITATION NOTICE 1-19-2022.docx DOCX document
S02 - SPECIFICATION - 00 11 21_DB_672-21-000_(11 Pages).docx DOCX document
S02 - Attachment_4 - LOS CERTIFICATION (FILL-IN_MANDATORY) Vs-12-17-20_DB_672-21-000_(1 Page).doc DOC document
36C24822R0038_1.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Cost Breakdown

Project Number:

Date:

Project Title

Project Location

Offeror Name

Offeror Street

Offeror City State Zip

Item Description Labor Cost Material Cost Total Cost

Division 1 General Requirements $ - $ - $ -

Division 2 Existing Conditions - - -

Division 3 Concrete - - -

Division 4 Masonry - - -

Division 5 Metals - - -

Division 6 Wood and Plastic - - -

Division 7 Thermal & Moisture Protect - - -

Division 8 Doors and Windows - - -

Division 9 Finishes - - -

Division 10 Specialties - - -

Division 11 Equipment - - -

Division 12 Furnishings - - -

Division 13 Special Construction - - -

Division 14 Conveying Equipment - - -

Division 21 Fire Suppression - - -

Division 22 Plumbing - - -

Division 23 HVAC - - -

Division 26 Electrical - - -

Division 27 Communications - - -

Division 28 Electronic Safety & Security - - -

Division 31 Earthwork - - -

Division 32 Exterior Improvements - - -

Division 33 Utilities - - -

Division 34 Transportation Subtotal - - -

ATTACHMENT: 8

Division Subtotals : $ - $ - $ -

Overhead % 0.00% -

Profit % 0.00% -

Bond % 0.00% -

Overhead/Profit Subtotals : $ -

Total Base Offer Cost $ - $ - $ -

ATTACHMENT: 8

File details come from the government source that posted it. Updated .