36C24819Q0115_1.docx
DOCX document 130 KB Posted
- Attached to
- Supply: Drawings, Designs, Plans, patient lifts, booms, modular headwalls equipment and installation
- Solicitation number
- 36C24819Q0115
About this file
36C24819Q0115 36C24819Q0115_1.docx
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24819Q0115
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
36C248-19-Q-0115 36C24819Q0115 12-18-2018 Tony Rutledge
813-972-2000 EXT 5297
01-18-2019
3:00 EST
Y Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Suite 525 Tampa
FL
33637 X X Y 339113 750 Employees N/A X Department of Veterans Affairs James A. Haley Veterans Hospital (90C) 13000 Bruce B. Downs Blvd Tampa
FL
33612 00248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Tampa
FL
33637
Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin
TX
78714-9971 See CONTINUATION Page James A Haley is seeking quotes for designs, drawing, plans based upon government building floor plans and equipment identified in the Statement of Need and Price and Cost Schedule.
Estimated Quantities: The Government is seeking to issue a Requirements Contract for the periods stated in the RFQ.
The quantities of supplies or services are ESTIMATES ONLY and are not purchased by the awarded agreement. Quantaties will be purchased via a seperatley issued order. If the VA requirement do not result in orders in the quantaties described the fact shall not constitute the basis for an equitable price adjustment.
Contractor shall read in its entirety the INSTRUCTIONS TO OFFEROR IN SECTION E. for site visit, questions, answers special instructions and submission of quote citeria.
TIERED EVALUATION INCLUDING SMALL BUSINESS (See Evaluation) See CONTINUATION Page X X Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 4 |
| B.1 CONTRACT ADMINISTRATION DATA | 4 |
| B.2 PRICE/COST SCHEDULE | 14 |
| ITEM INFORMATION | 14 |
| B.3 DELIVERY SCHEDULE | 19 |
| SECTION C - CONTRACT CLAUSES | 25 |
| C.1 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (OCT 2018) | 25 |
| C.2 52.216-18 ORDERING (OCT 1995) | 32 |
| C.3 52.216-19 ORDER LIMITATIONS (OCT 1995) | 32 |
| C.4 52.216-21 REQUIREMENTS (OCT 1995) | 33 |
| C.5 52.217-6 OPTION FOR INCREASED QUANTITY (MAR 1989) | 33 |
| C.6 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 34 |
| C.7 MANDATORY WRITTEN DISCLOSURES | 34 |
| C.8 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 34 |
| C.9 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION) | 34 |
| C.10 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 35 |
| C.11 VAAR 852.247-72 MARKING DELIVERABLES (OCT 2018) | 36 |
| C.12 VAAR 852.247-73 PACKING FOR DOMESTIC SHIPMENT (OCT 2018) | 36 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 37 |
| D.3 Gray Market Prevention Language | 37 |
| D.1 IT CONTRACT SECURITY | 37 |
| SECTION E - SOLICITATION PROVISIONS | 48 |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (OCT 2018) | 48 |
| E.8 ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS | 52 |
| E.5 52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014) ADDENDUM | 54 |
| E.2 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (OCT 2018) | 55 |
| E.3 52.217-5 EVALUATION OF OPTIONS (JUL 1990) | 71 |
| E.4 52.237-1 SITE VISIT (APR 1984) | 71 |
| E.5 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008) | 71 |
| E.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 72 |
| E.7 52.233-3 PROTEST AFTER AWARD (AUG 1996) | 72 |
| E.8 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (SEP 2018) | 73 |
| E.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (SEP 2018) | 74 |
| E.10 VAAR 852.273-70 LATE OFFERS (JAN 2003) | 74 |
| E.11 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (OCT 2018) ALTERNATE I (OCT 2014) | 74 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
8875 Hidden River Pkwy Suite 525 Tampa FL 33637
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [] |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs Financial Services Center
P.O. Box 149971 Austin TX 78714-9971 ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
Page 1 of Page 1 of
B.2 STATEMENT OF NEED
I. INTRODUCTION
The James A Haley Veterans’ Hospital (JAHVH) has a requirement for a Contractor to furnish all services and supplies for Ceiling Mounted Patient Lifts, ICU Equipment Booms, and Modular Headwalls plans design, equipment and installation (as applicable)for a newly constructed Veterans Administration hospital patient bed tower.
II. BACKGROUND
James A Haley Veterans’ Hospital (JAHVH) is currently amid constructing a patient bed tower building in support of our veterans. The bed tower building will require design drawings, booms, headwalls, patient lift equipment and installation (as applicable). JAHVH is seeking design drawing and equipment capable of providing the highest quality of care, integration and standardization of equipment equal with currently installed brands of equipment in the medical center.
III. PERIOD OF PERFORMANCE
The period of performance shall be for a twelve (12) month base period and two 12 months optional periods.
IV. PLACE OF PERFORMANCE James A Haley Veterans’ Hospital 13000 Bruce B. Downs Blvd., Tampa, FL 33612
V. GENERAL REQUIREMENT/SCOPE OF WORK FOR DESIGN, DRAWINGS AND PLANS OF BOOMS, CEILING MOUNTED PATIENT LIFT AND HEADWALLS.
5-1 Contractor shall provide all labor, materials, equipment, tools, supervision, and other incidentals necessary to perform the work, deliverable of equipment, designs, drawings as defined in this Statement of Need. (SON). Contractor shall provide a sample of the drawings in the required format with its CAD/Revit or capable response in the Contractor quote.
5-2 Contractor shall provide ceiling mounted, and specifications for Booms, Equipment, Tandem Arm, Headwall, Modular Panel System and Patient Lifts. The drawings shall include room-specific layout plans indicating coordination with the building construction design floor plan layouts, elevations or details necessary to describe the installation, coordination with adjacent construction including any necessary electrical or low voltage utility or pathway provisions. Contractor shall provide detailed specification and installation details for structural steel support requirements and utility rough-in requirements.
5-3 Contractor shall reference Joint Schedule Numbers (JSN) on drawing per list below:
| Equipment Number |
| Item Description |
| JSN A1205 |
| Lift System, Overhead, Patient Room w/Bath for Med/Surg Patient Rooms bi-directional “traverse” systems w/single rail to bathroom. |
| JSN A1203 |
| Lift System, Overhead, Bariatric, Patient Room w/Bath for Med/Surg Patient Rooms bi-directional “traverse” systems w/single rail to bathroom. |
| JSN A1125 |
| Boom, Equipment, Tandem Arm, ICU |
| JSN A1110 |
| Headwall, Modular Panel System |
5-3a Contractor shall use Revit 2016 and AutoCAD 2016 or compatible software to create and provide drawings, Building Information Model (BIM) 3D models, and specifications for coordination and site prep for design, plans and drawings of booms, headwalls and patient lifts. The file format shall allow the government to view, edit, print, share, and plot drawings and plans in government software program.
5-3b Contractor shall provide drawings and specification in accordance with the below deliverables. The drawings shall be delivered upon issuance of a government order as detailed below. Contractor shall provide capability to meet the below deliverable timeframe.
| Description |
| Contractor First Deliverable |
| Government Deliverable |
(1st Review)
| Contractor 2nd Deliverable |
| Government Deliverable |
(Final Review) Contractor Final Deliverable
Within 15 days ARO (After Receipt of Order) 3 days after government receipt of Contractor 1st deliverable
| 5 days after receipt of government 1st review |
| 2 days after government receipt of Contractor |
2nd deliverable 3 days after receipt of government final review
| Patient Lift drawings and design |
| Contractor shall provide a 95% design of BIM models, drawings, and specifications for patient lifts. The drawings shall include room-specific layout plans indicating coordination with the building construction design floor plan layouts, elevations or details describing the installation. Contractor shall provide coordination with adjacent construction including any necessary utilities or pathway provisions. |
| Government shall provide a first review of drawings and design to the Contractor for corrections, modifications and updates. Government shall coordinate with Contractor during 3-day review for clarifications. |
| Contractor shall provide a 100% design of BIM models, drawings, and specifications for patient lifts. The drawings shall include room-specific layout plans indicating coordination with the building construction design floor plan layouts, elevations or details describing the installation. Contractor shall provide coordination with adjacent construction including any necessary utilities pathway provisions |
| Government shall provide a final review of drawings and design to the Contractor for corrections, modifications and updates. Government shall coordinate with Contractor during 2-day review for clarifications. |
| Contractor shall provide a 100% final design of BIM models, drawings, and specifications for patient lifts. The drawings shall include room-specific layout plans indicating coordination with the building construction design floor plan layouts, elevations or details describing the installation. Contractor shall provide coordination with adjacent construction including any necessary utilities or pathway provisions |
| Boom equipment drawings and design |
| Contractor shall provide a 95% design of BIM models, drawings, and specifications for Booms, Equipment, Tandem Arm, for ICUs. The drawings shall include room-specific layout plans indicating coordination with the building construction design floor plan layouts, elevations or details describing the installation. Contractor shall provide coordination with adjacent construction including any necessary utilities or pathway provisions. |
| Government shall provide a first review of drawings and design to the Contractor for corrections, modifications and updates. Government shall coordinate with Contractor during 3-day review for clarifications. |
| Contractor shall provide a 100% design of BIM models, drawings, and specifications for Booms, Equipment, Tandem Arm, for ICUs. The drawings shall include room-specific layout plans indicating coordination with the building construction design floor plan layouts, elevations or details describing the installation. Contractor shall provide coordination with adjacent construction including any necessary utilities or pathway provisions |
| Government shall provide a final review of drawings and design to the Contractor for corrections, modifications and updates. Government shall coordinate with contractor during 2-day review for clarifications. |
| Contractor shall provide a 100% final design of BIM models, drawings, and specifications for Booms, Equipment, Tandem Arm, for ICUs the drawings shall include room-specific layout plans indicating coordination with the building construction design floor plan layouts, elevations or details describing the installation. Contractor shall provide coordination with adjacent construction including any necessary utilities or pathway provisions. |
| Headwall Modular panel system drawings and design |
| Contractor shall provide a 95% design of BIM models, drawings, and specifications for Headwall, Modular Panel System The drawings shall include room-specific layout plans indicating coordination with the building construction design floor plan layouts, elevations or details describing the installation. Contractor shall provide coordination with adjacent construction including any necessary utilities or pathway provisions. |
| Government shall provide a first review of drawings and design to the Contractor for corrections, modifications and updates. Government shall coordinate with Contractor during 3-day review for clarifications. |
| Contractor shall provide a 100% design of BIM models, drawings, and specifications for Headwall, Modular Panel System. The drawings shall include room-specific layout plans indicating coordination with the building construction design floor plan layouts, elevations or details describing the installation. Contractor shall provide coordination with adjacent construction including any necessary utilities or pathway provisions. |
| Government shall provide a final review of drawings and design to the Contractor for corrections, modifications and updates. Government shall coordinate with Contractor during 2-days review for clarifications. |
| Contractor shall provide a 100% final design of BIM models, drawings, and specifications for Headwall, Modular Panel System. The drawings shall include room-specific layout plans indicating coordination with the building construction design floor plan layouts, elevations or details describing the installation. Contractor shall provide coordination with adjacent construction including any necessary utilities or pathway provisions. |
VI. GENERAL REQUIREMENT/ EQUIPMENT INSTALLATION FOR KITS AND ACCESSORIES FOR HEAD WALL MODULAR SYSTEM, BOOMS AND PATIENT LIFTS.
6-1 Contractor shall provide all labor, materials, equipment, tools, supervision, and other incidentals necessary to perform the work, deliverable of equipment and installation of as defined in this Statement of Need. (SON) for HEAD WALL MODULAR SYSTEM.
a. Contractor shall provide required installation kits including mounting plates with bolts and special fasteners, medical gas manifolds, special electrical or low voltage connection provisions, and any other items necessary to be installed prior to the final construction contractor installation of the headwall system.
b. All mounting hardware including an engineered structural support system and any floor, wall, or ceiling components shall be provided to and coordinated with the construction General Contractor (GC).
c. Contractor shall make all coordination through the Contracting Officer Representative (COR) for changes or coordination with the building construction General Contractor (GC) prior to and during delivery.
d. Finished color sample of headwalls shall be coordinated and determined with the COR during acceptance of order of equipment and prior to delivery.
6-2 Contractor shall provide all labor, materials, equipment, tools, supervision, and other incidentals necessary to perform the work, deliverable of equipment and installation of as defined in this Statement of Need. (SON) for BOOMS SYSTEM.
a. Contractor shall provide required installation kits including mounting plates with bolts, medical gas manifolds, special electrical or low voltage connection provisions, and any other provisions necessary to be installed prior to the final installation of the booms.
b. Contractor shall provide the installation of all Booms. During the duration of assembly and installation, the Contractor will have a representative on-site to manage the assembly and installation, and to serve as the interface between the Contractor, JAHVH COR, and General Contractor (GC). The COR may provide specific instructions, however, only the CO may change the terms or conditions of the contract.
c. Contractor shall make all coordination through the Contracting Officer Representative (COR) for changes or coordination with the building construction General Contractor (GC) prior to and during delivery and installation activities.
6-3 Contractor shall provide all labor, materials, equipment, tools, supervision, and other incidentals necessary to perform the work, deliverable of equipment as defined in this Statement of Need. (SON) for PATIENT LIFTS.
a. Contractor shall provide all required installation kits with any special connectors, fasteners, or accessories for the patient lift rail support system, rails, rail switches, and patient lift motors.
b. Contractor shall provide all rails, associated track switches or turnstiles, chargers, continuous rail charging provisions, and any special electrical or low voltage connections.
c. Contractor shall make all coordination through the Contracting Officer Representative (COR) for changes or coordination with the building construction General Contractor (GC) prior to and during delivery.
VII. GENERAL REQUIREMENT/ EQUIPMENT FEATURES/SPECIFICATIONS FOR HEAD WALL MODULAR SYSTEM, BOOMS, PATIENT LIFTS AND ACCESSORIES TO INCLUDE INSTALLATION (as applicable).
7-1. Headwall modular equipment.. Contractor shall provide all labor, materials, equipment, tools, supervision, and other incidentals necessary to perform the work, deliverable of equipment and as defined in this Statement of Need. (SON).
7-1a. Contractor shall have provided equipment that meets the below features/specifications and level of quality that will satisfy the government and allow for the integration and standardization with current equipment in the JAHVH. Contractor shall provide prefabricated, configurable, modular headwall system that consists of a patient service module for general care, and contains lighting, medical gas outlets, electrical outlets, nurse call and low voltage provisions, and bed bumper
a. Each modular headwall system shall extend the entire width of the bed headwall.
b. Equipment rail compatibility including attachment places for configurable and interchangeable equipment attachments is necessary.
c. Per Joint Commission guidelines (Environment of Care), life support equipment shall be readily accessible and functional.
d. Gas outlets shall be coordinated with building construction design interior elevations prior to production and placed at appropriate intervals to allow for appropriate use of supplies/equipment (e.g. suction canisters) to be used concurrently without interference.
e. Each headwall shall contain the following Diameter Index Safety System (DISS) outlets: two (2) Oxygen, two (2) Medical Vacuum, and three (3) Medical Air, location and number to be confirmed with final construction design elevations prior to production.
f. Vacuum pressure/flow shall be equivalent to wall source.
g. Each headwall shall have (10) total emergency and normal power electrical duplex receptacles, location and number to be confirmed with final design elevations prior to production.
h. Each headwall shall include ten (10) low voltage/video/data ports with specific number, location, and port arrangement to be confirmed with final construction design elevations prior to production.
i. Each headwall shall have nurse call and code blue device provisions, location and number to be confirmed with final construction design elevations prior to production.
j. Each headwall will consist of a single or double bed bumper to be coordinated with final construction design.
k. Each headwall will have a light over the bed with a toggle switch on the headwall for provider use and an integrated switch for patient control on the pillow speaker
l. Each headwall will include a procedure light
m. Each headwall shall include one mounted shelf
n. Each headwall shall support bracket for mounting for nurse side computer.
7.2. Ceiling Mounted Equipment Boom, exam lights and IV pole arms. Contractor shall provide all labor, materials, equipment, tools, supervision, and other incidentals necessary to perform the work, deliverable of equipment and installation of as defined in this Statement of Need. (SON).
7.2a. Ceiling Mounted Equipment Boom: Contractor shall have provided equipment that meets the below features/specifications and level of quality that will satisfy the government and allow for the integration and standardization with current equipment in the JAHVH.
a. Ceiling Mounted Equipment Boom with two (2) extendable dual arm supported supply modules, minimum overall reach of 59” fully extended for each arm
b. Maximum allowable dimension from face of patient headwall to the center of the boom support mount shall be 39”
c. Boom arm shall have rotational range of 180 to 330 degrees
d. Boom supply module shall have a rotation of at least 330 degrees with two (2) control handles each
e. Supply modules shall be vertically and horizontally adjustable with boom arm articulation
f. Boom arms shall articulate to allow maximum patient bed flexibility and staff access to the patient, to include both arms positioned together on one side of the bed, or on opposite sides of the patient
g. All mounting hardware including an engineered structural support system and any ceiling components shall be provided to and coordinated with the construction General Contractor (GC)
h. Independent electric boom braking system for each arm (pneumatic will not be accepted, air source does not exist)
i. Boom braking and movement mechanisms shall be powered via a single 120V, 20A electrical circuit
j. Boom shall have an emergency stop safety switch on the boom to disconnect power to the motor housing if needed
k. Boom shall have multifunctional rails so any shelves can be easily adjusted and accessories can attach directly to rails
l. Boom controls shall be available at front and rear of boom with specific location determined prior to installation
m. Boom shall can expand in length and width and reducing in length and width via layered modules that can be added or subtracted without changing any of the boom arms or down tubes
n. Boom shall have a load bearing capacity (articulating) of at least 330 pounds
o. Boom gas outlets shall be placed at appropriate intervals to allow for appropriate use of supplies/equipment (e.g. suction canisters) to be used concurrently without interference
p. Each boom service head shall contain the following DISS outlets, location and number to be confirmed with final construction design elevations prior to production: two (2) Oxygen, three (3) Medical Vacuum, and two (2) Medical Air
q. Vacuum pressure/flow shall be equivalent to wall source
r. Each boom service head shall have a minimum of seven (7) duplex 120V, 20A emergency electrical outlets, location and number to be confirmed with final construction design elevations prior to production.
s. Each boom service head shall include ten (10) low voltage/video/data plates with cable pathways for future capacity for up to twelve (12) with specific number, location, and port arrangement to be confirmed with final construction design elevations prior to production.
t. Non-Clinical side boom shall have mounting provisions for a physiological monitor, Phillip Healthcare Intellivue MP 70 capability or equal.
7-2b. Exam light and IV pole . Contractor shall have provided equipment that meets the below features/specifications and level of quality that will satisfy the government and allow for the integration and standardization with current equipment in the JAHVH.
a. Retractable LED exam light minimum 50,000 lux, minimum 4,400k rendering, shall be mounted to the boom to provide focused illumination for emergency surgical procedures on the clinical/nurse side of the ICU room
b. Arm System, IV Pole, Double
7-3. Patient Lift (Traverse H-type w/single Rail). Contractor shall provide all labor, materials, equipment, tools, supervision, software, parts necessary and deliverable of equipment as defined in this Statement of Need. (SON).
7-3a. Patient Lift (Traverse H-type w/single Rail). Contractor shall provide equipment that meets the below features/specifications and level of quality that will satisfy the government.
a. Lift system must move patient from wheelchair or stretcher, to bed, to chair, to toilet, to sink, and to shower
b. Underwriter Laboratory (UL) listed for electrical safety with overload circuit protection
c. Metal gear construction with electrical braking system
d. Disinfectable/cleanable using standard hospital cleaning procedures Minimal exposed hardware or rough surfaces that are difficult to clean and disinfect
e. All lifts shall include integral patient scale with minimum capacity to match lift capacity
f. Minimized infection control or cross-contamination hazard
g. Minimum 550lb weight capacity for JSN A1205 (Med/Surg patient rooms and ICU patient rooms) and safe working load.
h. Minimum 800lb weight capacity for JSN A1203 (Med/Surg bariatric patient rooms) and safe working load.
i. Continuous charging rail system (no docking station)
j. Batteries must be Lithium-Ion (or alternative rechargeable, long-lasting, lead and acid free)
k. Must have emergency-lowering safety feature
l. Emergency Stop function
m. Visual Battery Life Indicator
n. Lifting speed (vertical) minimum 2.0 in/sec (no load); adjustable horizontal speed
o. Recessed or ceiling mounted primary and secondary rail system with structural pendent type support above ceiling including all provisions to pass through bathroom door opening
p. Traverse H-type frame rail system over bed with single rail connection to the bathroom and allowing movement to toilet, sink, and bath.
q. All rail switch and turntable controls shall be electrically controlled from the lift hand control (no independent wall switch control).
VIII. EQUIPMENT DELIVERY
8-1. Contractor shall deliver and /or install( as applicable) equipment or designs within the order time frame indicated in each individual order of the purchase order processing and order placement. Contractor delivery of items identified in this document shall take place during normal business hours which are defined as: 0800 to 1630 (i.e.: 8:00am to 4:30pm Eastern Standard Time), Monday through Friday, and excluding Federal Holidays. Delivery trucks will not be permitted to remain at the loading dock. Trucks shall be unloaded, moved from the dock, and then brought back to the dock if required to haul out any waste, tools, or excess materials. Contractor shall be responsible for removal and disposal of packing material and trash after installation of equipment. Government will not be responsible for providing dumpsters. The removal of waste and/or excess material shall be conducted through the loading dock area of the patient bed tower building
IX. TRAINING
9-1. Contractor shall coordinate through the COR to provide training sessions to government staff on equipment. Training shall be completed within 45 days after installation of equipment. The Contractor will record the training and provide a copy of the training material to the COR.
Contractor shall provide training classes for ICU, Med/Surg. clinical staff and other government employees. All trainers shall be manufacturer’s approved. Training shall be providing instruction on proper operation and maintenance for equipment.
X. PRODUCT MARKING AND LABELING
10-1. Labeling of delivered items shall include the delivery order number and purchase order number for identification and reference upon receipt of product.
XI. WARRANTY
11-1. Contractor shall provide warranty in accordance with manufacturer’s normal warranty terms.
XII. PERFORMANCE STANDARDS
12-1. Contractor is 100% responsible for compliance with all Veterans Administration (VA), local, state, and federal environmental/occupational safety laws, rules and regulations. The contractor must follow life safety codes and take necessary actions to avoid conditions that may be hazardous to health and safety of hospital personnel and patients. The contractor is responsible for meeting all applicable OSHA and VA guidelines for safe working processes to include all upgrades/updates of equipment.
XIII. CONTRACTOR TRAINING
13-1. All contractor employees under this contract or order are required to complete VA's Information Security and Privacy Combined Awareness Training Course. Contractors must provide signed certifications of completion to the COR prior to installation date. This requirement is in addition to any other training that may be required of the contractor.
XIV. CONTRACTOR EMPLOYEE IDENTIFICATION
14-1 Contractor employees must be clearly identified as contractors (not VA employees) when performing services under this contract. This includes visual (appearance), verbal (phone), and electronic (email).
a. The contractor must provide all employees with a contractor identification (ID) badge at the contractor’s expense prior to performing work under this contract.
b. Contractor employees are required to display this badge always when performing services under this contract. All badges must contain an expiration date and photograph of the employee.
c. All contractor employees must also be required to wear VA issued badges and must display these badges always while in the performance of this contract and/or as instructed by the COR.
d. The contractor supervisor must ensure that all contractor employees display their VA issued badges.
e. The contractor supervisor must be responsible for managing all VA issued badges provided to contractor employees and immediately collect these badges from employees no longer working on the contract.
XV. CONTRACTOR EMPLOYEE CONDUCT
15-1. The contractor is completely responsible for all actions and conduct of their employees.
a. Contractor employees must be well-groomed and neat in appearance.
b. Contract employees must be professional in attire and must not wear any offensive clothing.
c. Contractor employees must conduct themselves in a socially acceptable manner appropriate for an office work environment.
d. Loudness, vulgarity, rudeness, or other similar offensive conduct by a contractor employee may be grounds for denying the employee further access to VA premises.
e. Contractor employees must not consume alcohol or illegal drugs during working hours or at any other time the employees are performing work under this contract.
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 136.00 |
| EA |
| __________________ |
| __________________ |
Patient Lift drawings and designs (bi-directional "traverse" systems w/single rail to bathroom) In accordance with (IAW) Statement of Need (SON) Section V
Contract Period: Base POP Begin: 01-22-2019 POP End: 01-21-2020
| 40.00 |
| EA |
| __________________ |
| __________________ |
Boom equipment drawings and design.
Contract Period: Base
| 96.00 |
| EA |
| __________________ |
| __________________ |
Headwall Modular panel system drawings and design.
Contract Period: Base
| 96.00 |
| EA |
| __________________ |
| __________________ |
Installation kits Headwall, Modular Panel System & hardware for attaching other equipment.
In Accordance With (IAW) Statement of Need (SON) Section VI 6-1 Contract Period: Option 1 POP Begin: 01-22-2021 POP End: 01-21-2022
| 40.00 |
| EA |
| __________________ |
| __________________ |
Installation kits for mounting boom system. including mounting plates In Accordance With (IAW) Statement of Need (SON) Section VI 6-2 Contract Period: Option 1 POP Begin: 01-22-2020 POP End: 01-21-2021
| 136.00 |
| EA |
| __________________ |
| __________________ |
Installation kits for Patient lifts equipment (Mounting Support)Traverse H-type System w/single Rail In Accordance With (IAW) Statement of Need (SON) Section VI 6-3 Contract Period: Option 1
| 20.00 |
| EA |
| __________________ |
| __________________ |
Headwall units for Medical/Surgical patient rooms In Accordance With (IAW) Statement of Need (SON) Section VII 7-1 Contract Period: Option 1
| 20.00 |
| EA |
| __________________ |
| __________________ |
Boom Exam Light with installation In Accordance With (IAW) Statement of Need (SON) Section VII 7-1c Contract Period: Option 1
| 20.00 |
| EA |
| __________________ |
| __________________ |
Boom IV Pole Arm System with installation In Accordance With (IAW) Statement of Need (SON) Section VII 7-1b Contract Period: Option 1
| 20.00 |
| EA |
| __________________ |
| __________________ |
Boom, Equipment, and Tandem arm, ICU with installation.
In Accordance With (IAW) Statement of Need (SON) Section VII 7.2
Contract Period: Option 1
| 1.00 |
| EA |
| __________________ |
| __________________ |
Booms Clinical and technical training sessions In Accordance With (IAW) Statement of Need (SON) Section IX
Contract Period: Option 1
| 20.00 |
| EA |
| __________________ |
| __________________ |
Lift System, Overhead, Patient Room w/Bath for ICU Patient rooms Traverse H-type System w/single Rail In Accordance With (IAW) Statement of Need (SON) Section VII 7-3
| 20.00 |
| EA |
| __________________ |
| __________________ |
Lift System, Overhead, Patient Room w/Bath for Med/Surg Patient Rooms Traverse H-type System w/single Rail.
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lift System, Overhead, Bariatric, Patient Room w/Bath for Med/Surg Patient Rooms Traverse --type System w/single Rail.
| 1.00 |
| EA |
| __________________ |
| __________________ |
Patient lift Clinical and technical training sessions with installation.
Contract Period: Option 1
| 1.00 |
| EA |
| __________________ |
| __________________ |
Installation kits Headwall, Modular Panel System & hardware for attaching other equipment.
In Accordance With (IAW) Statement of Need (SON) Section VI 6-1 Contract Period: Option 2
| 1.00 |
| EA |
| __________________ |
| __________________ |
Installation kits for mounting boom system. including mounting plates In Accordance With (IAW) Statement of Need (SON) Section VI 6-2 Contract Period: Option 2
| 1.00 |
| EA |
| __________________ |
| __________________ |
Installation kits for Patient lifts equipment (Mounting Support)Traverse H-type System w/single Rail In Accordance With (IAW) Statement of Need (SON) Section VI 6-3 Contract Period: Option 2
| 96.00 |
| EA |
| __________________ |
| __________________ |
Headwall units for Medical/Surgical patient rooms In Accordance With (IAW) Statement of Need (SON) Section VII 7-1 Contract Period: Option 2
| 40.00 |
| EA |
| __________________ |
| __________________ |
Boom Exam Light with installation In Accordance With (IAW) Statement of Need (SON) Section VII 7-1c Contract Period: Option 2
| 40.00 |
| EA |
| __________________ |
| __________________ |
Boom IV Pole Arm System with installation In Accordance With (IAW) Statement of Need (SON) Section VII 7-1b Contract Period: Option 2
| 40.00 |
| EA |
| __________________ |
| __________________ |
Boom, Equipment, and Tandem arm, ICU with installation.
In Accordance With (IAW) Statement of Need (SON) Section VII 7.2
Contract Period: Option 2
| 2.00 |
| EA |
| __________________ |
| __________________ |
Booms Clinical and technical training sessions
Contract Period: Option 2
| 40.00 |
| EA |
| __________________ |
| __________________ |
Lift System, Overhead, Patient Room w/Bath for ICU Patient rooms Traverse H-type System w/single Rail
| 86.00 |
| EA |
| __________________ |
| __________________ |
Lift System, Overhead, Patient Room w/Bath for Med/Surg Patient Rooms Traverse H-type System w/single Rail.
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lift System, Overhead, Bariatric, Patient Room w/Bath for Med/Surg Patient Rooms Traverse --type System w/single Rail.
| 2.00 |
| EA |
| __________________ |
| __________________ |
Patient lift Clinical and technical training sessions with installation.
Contract Period: Option 2
| GRAND TOTAL |
| __________________ |
B.3 DELIVERY SCHEDULE
| ITEM NUMBER |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
TAMPA, FL 33612 4745
USA
| 136.00 |
| January 10, 2020 |
| MARK FOR: |
| Mark Puhulla |
813.972.2000 x2472 Mark.Puhalla@va.gov
| 0002 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 40.00 |
| January 10, 2020 |
| MARK FOR: |
| Mark Puhulla |
813.972.2000 ext 2472
96.00
| 1001 |
| SHIP TO: |
| James A Haley Veterans Hospital |
13000 Bruce B Downs Tampa, FL 33612 4745
USA
| 96.00 |
| January 10, 2021 |
| MARK FOR: |
| Mark Puhulla |
| 1002 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 40.00 |
| 01-09-2021 |
| MARK FOR: |
| Mark Puhulla |
136.00
| 1004 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 20.00 |
| 01-10-2010 |
| MARK FOR: |
| Mark Puhulla |
| 1005 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 20.00 |
| 1-09-2021 |
| MARK FOR: |
| Mark Puhulla |
| 1006 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 20.00 |
| 1-09-2021 |
| MARK FOR: |
| Mark Puhulla |
| 1007 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 20.00 |
| 1-09-2021 |
| MARK FOR: |
| Mark Puhulla |
| 1008 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 1.00 |
| 1-09-2021 |
| MARK FOR: |
| Mark Puhulla |
| 1009 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 20.00 |
| 1-09-2022 |
| MARK FOR: |
| Mark Puhulla |
| 1010 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 20.00 |
| 01-09-2022 |
| MARK FOR: |
| Mark Puhulla |
| 1011 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 10.00 |
| 01-09-2022 |
| MARK FOR: |
| Mark Puhulla |
| 1012 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 1.00 |
| 1-09-2022 |
| MARK FOR: |
| Mark Puhulla |
| 2001 |
| SHIP TO: |
| James A Haley Veterans Hospital |
13000 Bruce B Downs Tampa, FL 33612 4745
USA
| 1.00 |
| January 10, 2021 |
| MARK FOR: |
| Mark Puhulla |
| 2002 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 1.00 |
| 01-09-2021 |
| MARK FOR: |
| Mark Puhulla |
1.00
| 2004 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 96.00 |
| 01-10-2010 |
| MARK FOR: |
| Mark Puhulla |
| 2005 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 40.00 |
| 1-09-2021 |
| MARK FOR: |
| Mark Puhulla |
| 2006 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 40.00 |
| 1-09-2021 |
| MARK FOR: |
| Mark Puhulla |
| 2007 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 40.00 |
| 1-09-2021 |
| MARK FOR: |
| Mark Puhulla |
| 2008 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 2.00 |
| 1-09-2021 |
| MARK FOR: |
| Mark Puhulla |
| 2009 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 40.00 |
| 1-09-2022 |
| MARK FOR: |
| Mark Puhulla |
| 2010 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 86.00 |
| 01-09-2022 |
| MARK FOR: |
| Mark Puhulla |
| 2011 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 10.00 |
| 01-09-2022 |
| MARK FOR: |
| Mark Puhulla |
| 2012 |
| SHIP TO: |
| JAMES A HALEY HOSPITAL |
13000 BRUCE B DOWNS
Tampa, FL 33612 4745
USA
| 2.00 |
| 1-09-2022 |
| MARK FOR: |
| Mark Puhulla |
SECTION C - CONTRACT CLAUSES
| FAR Number |
| Title |
| Date |
| 52.252-2 |
| CLAUSES INCORPORATED BY REFERENCE |
| FEB 1998 |
| 52.212-4 |
| CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS |
| OCT 2018 |
| 52.203-17 |
| CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS |
| APR 2014 |
| 52.204-4 |
| PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER |
| MAY 2011 |
| 52.204-18 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE |
| JUL 2016 |
| 52.228-5 |
| INSURANCE—WORK ON A GOVERNMENT INSTALLATION |
| JAN 1997 |
C.1 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (OCT 2018)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115–91).
(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(4) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(5) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[X] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
[] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509).
[] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
[X] (4) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109–282) (31 U.S.C. 6101 note).
[] (5) [Reserved] [] (6) 52.204–14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).
[] (7) 52.204–15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).
[X] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) (31 U.S.C. 6101 note).
[X] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
[] (10) [Reserved] [] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
[] (ii) Alternate I (NOV 2011) of 52.219-3.
[] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
[] (ii) Alternate I (JAN 2011) of 52.219-4.
[] (13) [Reserved] [] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
[] (ii) Alternate I (NOV 2011).
[] (iii) Alternate II (NOV 2011).
[] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
[] (ii) Alternate I (Oct 1995) of 52.219-7.
[] (iii) Alternate II (Mar 2004) of 52.219-7.
[X] (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).
[] (17)(i) 52.219-9, Small Business Subcontracting Plan (AUG 2018) (15 U.S.C. 637(d)(4)).
[] (ii) Alternate I (NOV 2016) of 52.219-9.
[] (iii) Alternate II (NOV 2016) of 52.219-9.
[] (iv) Alternate III (JAN 2017) of 52.219-9.
[] (v) Alternate IV (AUG 2018) of 52.219-9.
[] (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
[] (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).
[] (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
[] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).
[X] (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C 632(a)(2)).
[] (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (DEC 2015) (15 U.S.C. 637(m)).
[] (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (DEC 2015) (15 U.S.C. 637(m)).
[X] (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
[X] (26) 52.222–19, Child Labor—Cooperation with Authorities and Remedies (JAN 2018) (E.O. 13126).
[X] (27) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
[X] (28)(i) 52.222–26, Equal Opportunity (SEP 2016) (E.O. 11246).
[] (ii) Alternate I (FEB 1999) of 52.222-26.
[X] (29)(i) 52.222-35, Equal Opportunity for Veterans (OCT 2015) (38 U.S.C. 4212).
[] (ii) Alternate I (JULY 2014) of 52.222-35.
[X] (30)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).
[] (ii) Alternate I (JULY 2014) of 52.222-36.
[X] (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
[X] (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).
[X] (33)(i) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C. chapter 78 and E.O. 13627).
[] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
[] (34) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
[] (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C.6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[] (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
[] (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).
[] (38)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
[] (ii) Alternate I (OCT 2015) of 52.223-13.
[] (39)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
[] (ii) Alternate I (JUN 2014) of 52.223-14.
[] (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007)(42 U.S.C. 8259b).
[] (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
[] (ii) Alternate I (JUN 2014) of 52.223-16.
[X] (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) [] (43) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
[] (44) 52.223-21, Foams (JUN 2016) (E.O. 13693).
[] (45) (i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
[] (ii) Alternate I (JAN 2017) of 52.224-3.
[X] (46) 52.225-1, Buy American—Supplies (MAY 2014) (41 U.S.C. chapter 83).
[] (47)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
[] (ii) Alternate I (MAY 2014) of 52.225-3.
[] (iii) Alternate II (MAY 2014) of 52.225-3.
[] (iv) Alternate III (MAY 2014) of 52.225-3.
[] (48) 52.225–5, Trade Agreements (AUG 2018) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
[X] (49) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
[] (50) 52.225–26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
[] (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
[] (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
[] (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
[] (54) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
[X] (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Oct 2018) (31 U.S.C. 3332).
[] (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).
[] (57) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
[] (58) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
[] (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(12)).
[] (60)(i)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.