About this file

36C24819Q0115 0002 36C24819Q0115 0002.docx

View the file

Other files

File Type Posted
36C24819Q0115-0008000.docx DOCX document
36C24819Q0115-0007000.docx DOCX document
36C24819Q0115-0006000.docx DOCX document
36C24819Q0115_0005.docx DOCX document
Attachment_8_Basis_of_Design_Drawings.pdf PDF
Attachment_6__Lift_Patient_Traverse_Bariatric_-Basis_of_Design_Only.pdf PDF
Attachment_7_Traverse_Rail_Lift_System_Overhead_Patient_Rm_w_Shower_Basis_of_Design_Only.pdf PDF
Attachment_8_Intentionally_Left_Blank.pdf PDF
Attachment_9__Headwall_Basis_of_Design_Ref._Only.pdf PDF
Attachment_11_117265B100A-Sheet_-_100-A-103_-_OVERALL_FLOOR_PLAN_-_LEVEL_03.dwg DWG drawing
Attachment_5_Elevation_Drawings.pdf PDF
Attachment_2_Statement_of_Need_Revison_1_dated_010919.docx DOCX document
36C24819Q0115_0004.docx DOCX document
Attachment_12_117265B100A-Sheet_-_100-A-104_-_OVERALL_FLOOR_PLAN_LEVEL_04.dwg DWG drawing
Attachment_10_117265B100A-Sheet_-_100-A-102_-_OVERALL_FLOOR_PLAN_-_LEVEL_02.dwg DWG drawing
Attachment_4_Structural_Drawings.pdf PDF
Attachment_1__Questions_and_Answers_Response.docx DOCX document
Attachment_3_PRICE_SCHEDULE_and_DELIVERY_SCHEDULE_Revision_2.docx DOCX document
Attachment_2_Statement_of_Need_Revison_1_dated_010919.docx DOCX document
Attachment_12_117265B100A-Sheet_-_100-A-104_-_OVERALL_FLOOR_PLAN_LEVEL_04.dwg DWG drawing
Attachment_8__Boom_Basis_of_Design_Only.pdf PDF
Attachment_7_Traverse_Rail_Lift_System_Overhead_Patient_Rm_w_Shower_Basis_of_Design_Only.pdf PDF
Attachment_10_117265B100A-Sheet_-_100-A-102_-_OVERALL_FLOOR_PLAN_-_LEVEL_02.dwg DWG drawing
Attachment_6__Lift_Patient_Traverse_Bariatric_-Basis_of_Design_Only.pdf PDF
Attachment_4_Structural_Drawings.pdf PDF
Attachment_9__Headwall_Basis_of_Design_Ref._Only.pdf PDF
36C24819Q0115_0003.docx DOCX document
Attachment_11_117265B100A-Sheet_-_100-A-103_-_OVERALL_FLOOR_PLAN_-_LEVEL_03.dwg DWG drawing
Attachment_3_PRICE_SCHEDULE_and_DELIVERY_SCHEDULE_Revision_2.docx DOCX document
Attachment_5_Elevation_Drawings.pdf PDF
Attachment_1__Questions_and_Answers_Response.docx DOCX document
36C24819Q0115_0001.docx DOCX document
PRICE_SCHEDULE_and_DELIVERY_SCHEDULE_Revised.docx DOCX document
CAD_Drawings_Overall_Floor_Plan_Level_02.pdf PDF
CAD_Drawings_Overall_Floor_Plan_Level_04.pdf PDF
PDF_DRAWINGS_2nd_3rf_and_4th_Floors.pdf PDF
36C24819Q0115_1.docx DOCX document
CAD_Drawings_Overall_Floor_Plan_Level_03.pdf PDF
PDF_DRAWINGS_room_enlargements.pdf PDF
36C24819Q0115-000.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 01-03-2019 Y Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Suite 525 Tampa FL 33637 00248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Tampa FL 33637 To all Offerors/Bidders

TONY RUTLEDGE

813-972-2000 EXT 5297

36C24819Q0115 12-18-2018

X X X

X The Purpose of this Amendment is as Follows:

a. Extend the due date for government re sponse to industry questions & extend the RFQ closing due date & time

b. The government response due date is hearby changed from January 3, 2019 4:00 PM to January 9, 2019 4:00 PM EST

c. The quotation closing due date is hereby changed from January 18, 2019 3:00 PM to January 23, 2019 3:00 PM EST.

d. This change is to allow the government additional time to accurately answer industry questions End of Amendment

File details come from the government source that posted it.