This is Amendment 0003 to solicitation 36C24726R0078 for Building 1 Exterior Repair and Coating Phase 1 at the Atlanta VA Healthcare System under the Department of Veterans Affairs Veterans Health Administration VISN 7. The amendment, issued by Contracting Officer Ryan Crispin on April 27, 2026, addresses two Request for Information (RFI) responses and adds a federal contracting requirement. The contracting office is located at 1670 Clairmont Road, Decatur, Georgia 30033.

The amendment clarifies personnel staffing flexibility by confirming that a single individual may serve simultaneously in the roles of General Contractor (GC) superintendent, Site Safety and Health Officer (SSHO), and Quality Control (QC) officer, provided that person has prior experience on similar projects and current QC certifications. When serving as SSHO, the individual must hold proper and current training certificates including OSHA 30 and CPR certification. The QC officer degree requirement in Architecture, Engineering, or Construction Management is waived if the person possesses required experience and current QC certifications. A written contingency plan must be in place for replacement of personnel filling all three roles. Additionally, Amendment 0003 adds FAR Clause 52.222-90 addressing Discrimination by Federal Contractors (April 2026). The proposal submission deadline remains unchanged at April 30, 2026, at 1:00 p.m. EST. All other terms and conditions of the original solicitation remain in full force and effect.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-27-2026 508-26-102 36C247 Department of Veterans Affairs VISN 7 Network Contracting Office Atlanta VA Healthcare System (AVAHCS) 1670 Clairmont Road Decatur

GA

30033 36C247 Same as 6

To all Offerors/Bidders

36C24726R0078

X X X X Purpose of Amendment: To answer RFIs and to add FAR clause 52.222-90.

Continued on page 2.

Ryan Crispin Contracting Officer

VA-VHA-RPOE-2026-2019

CONTINUATION PAGE

36C24726R0078 0003 A. To Answer 2 RFIs submitted:

1. Please confirm how many personnel can be used to fulfill the roles of GC superintendent, SSHO and QC officer. Can these roles be held by one person?

Response: One person may serve all 3 roles of GC superintendent, SSHO, and QC officer. In serving role of QC officer, he/she does not need to have degrees as listed, but must have both prior experience in projects similar to this project, and current QC certifications. If one person is additionally serving as SSHO, he/she must also have proper and up-to-date training certificates as listed in the solicitation and specifications (OSHA 30, CPR, etc.).

There needs to be a written contingency plan in place for replacement of an individual(s) filling all three roles in the event this single individual leaves or cannot fulfil his duties. The contingency needs to meet all contractual requirements outside of the exceptions listed as part of this RFI response

2. The QC specs require the QC officer to be onsite daily and to have a degree in Architecture, engineering, or construction management. Can this degree requirement be waived if the person has the required experience and QC certifications?

Response:

In serving role of QC officer, he/she does not need to have degrees as listed, but must have both prior experience in projects similar to this project, and current QC certifications B. Add- FAR Clause -- FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026)

C. Proposal Due date remains unchanged. Apr 30, 2026 at 1:00 p.m. EST.

D. All other terms and conditions remain unchanged.