This is a Joint Commission fire and life safety inspection report for the VA Medical Center located at 1826 Veterans Boulevard, Dublin, Georgia 31021, dated November 14, 2025. The inspection was conducted by Johnson Controls North America, with inspector Aldes Anderson Jr. holding NICET Level 2 certification (#142757). The inspection covered fire alarm systems and life safety devices across multiple buildings at the facility, spanning from October 20 to November 14, 2025, under Work Order #59868766.

The inspection evaluated 2,139 total devices across multiple categories including pull stations (264), smoke detectors (777), duct detectors (74), heat detectors (53 total: 8 standard and 45 fixed-temperature), supervisory duct detectors (70), notification devices (door holders, horns/strobes, speakers, and strobes totaling 796), and HVAC shutdown devices (25). Results indicate 2,135 devices passed inspection with 4 devices unable to be inspected: three elevator-related devices (alternate recall, shunt trip, and primary recall notifiers in Building 19) were out of service due to elevator outages, and one heat detector in Building 5's generator room was disabled on the fire alarm control panel. No device deficiencies were identified. A low-priority recommendation was issued recommending that the facility program fire alarm control panel bypasses for elevator recall, shunt trip, AHU shutdown, door holders, and silent walk test functions to minimize business interruption during contractor work and system testing. The inspection summary indicates 99% of devices were successfully inspected.

View the file

Other files

File Type Posted
Price Cost Schedule.docx DOCX document
36C24726Q0652 0003_1 Fire Alarm Maintenance and Testing.docx DOCX document
Basis for Award-1.docx DOCX document
36C24726Q0652_Questions and Answers.docx DOCX document
36C24726Q0652 0002-Dublin VAMC.docx DOCX document
SiteDrawing_27FEB2024_FireAlarmPanels.pdf PDF
SOW_FireAlarm_AnnualContract_V1_31AUG26.docx DOCX document
36C24726Q0652 0001_2.docx DOCX document
36C24726Q0652_1.docx DOCX document
S02-36C24726Q0652-Fire Alarm Testing.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Johnson Controls is committed to serving our customers with the best-in-class services and technologies. Xaap is an advanced inspection reporting application that has been used by Johnson Controls on your inspections.

Xaap is a software-as-a-service (SaaS) solution that provides a streamlined and digitized approach for performing fire and life safety inspections and managing compliance reports in a single, centralized platform.

The application allows inspectors to capture data for fire and life safety systems and devices while generating the required compliance reports directly from their phones. It also provides facility managers, building managers and key stakeholders with a centralized view of all building systems and deficiency data. Users can easily access, download and share historical inspection reports through Xaap.

See how your organization can leverage this smart technology for your internal inspections Visit info.jci.com/xaap-tjc To Learn More

This report is powered by Xaap, the Building Compliance Reporting Platform used by Johnson Controls.

This page is informational only and not part of The Joint Commission Report

This report is powered by https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc

[This Page Intentionally Left Blank]

Inspection Summary

Customer Information

Name VA Medical Center

Building Information

Name VA Medical Center

Address 1826 Veterans Blvd, Dublin, GA 31021

Contact Information

Name Daniel DiMartino

Role Monitoring Organization

E-Mail Daniel.dimartino2@va.gov

Phone 4783044664

Account Information

Service Provider

Johnson Controls North America

Office Address

1350 Northmeadow Parkway, Suite 100 Rosewell, GA 30076

Office Phone 678) 896-4090

Office License

Inspector Name

Aldes Anderson

Inspector License

NICET 2. #142757

Inspection Information

Start Date 10/20/2025

Date 11/14/2025

Inspection Type

Joint Commission

Work Order# 59868766

Timezone GMT-04:00

Inspection Summary

The following Tests and Inspections have been covered in this inspection

EP 3 - Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations

EP 4 - Notification Devices Audible, Visual, Speakers and Door Releasing Devices

EP 19 - Smoke Detection Shut Down Devices for HVAC

NFPA 72 - 2010

DEVICE DEFICIENCIES

No device deficiencies in this inspection.

www.xaapbuildings.com

CANNOT INSPECT REPORT

LOCATION DESCRIPTION ADDRESS DEVICE MAKE MODEL BARCODE DATE OF TEST TYPE IMAGES

(Building 19) Alternate Recall L01M014 Alternate Elevator

Recall Notifier Notifier — 11/05/2025 Cannot Inspect

CANNOT INSPECT

IMAGES

APPENDIX 1.1

Reason cannot inspect: Elevator is Out of Order

(Building 19) Shunt Trip

Elevator Machine Room

L01M012 Elevator Shunt

Trip Notifier Notifier — 11/05/2025 Cannot Inspect

CANNOT INSPECT

IMAGES

APPENDIX 1.2

Reason cannot inspect: Elevator is out of order

(Building 19) Primary Recall L01M013 Primary Elevator

Recall Notifier Otifier — 11/05/2025 Cannot Inspect

CANNOT INSPECT

IMAGES

APPENDIX 1.3

Reason cannot inspect: Elevator is out of order

(Building 5) Generator room

C-153 L01D002

Heat Detector Fixed Temp

Notifier Notifier — 11/06/2025 Cannot Inspect

CANNOT INSPECT

IMAGES

APPENDIX 1.4

Reason cannot inspect: Upon Arrival of Inspection Team Device was in Disabled mode on FACP.

RECOMMENDATIONS

Priority Created At Created By Updated At Updated By

LOW 11/14/2025 Aldes Anderson Jr. 11/14/2025 Aldes Anderson Jr.

Description: Recommendation:

It is my Recommendation that All Fire Alarm Control Panel be programmed with bypasses within the walk test Function or on its own.

The Following recommended bypasses are.

1.Elevator Recall, Shunt Trip 2.AHU Shutdown

3. Door Holders.

3. Silent Walk Test.

This will Ensure Normal business would not be interrupted by Contractors working on or testing the system in that particular area.

INSPECTION RESULTS SUMMARY

CURRENT INSPECTION RESULTS PREVIOUS INSPECTION RESULTS

TEST PERFORMED DEVICE TYPE TOTAL PASSED FAILED CANNOT INSPECT % INSPECTED TOTAL

EP3 Duct Detector 74 74 0 0 100 74

EP3 Heat Detector 8 8 0 0 100 8

EP3 Heat Detector Fixed Temp 45 44 0 1 97 45

EP3 Pull Station 264 264 0 0 100 264

EP3 Smoke Detector 777 777 0 0 100 777

EP3 Supervisory - Duct Detector 70 70 0 0 100 70

EP4 Door Holder 31 31 0 0 100 31

EP4 Horn/Strobe 75 75 0 0 100 75

EP4 Speaker 140 140 0 0 100 140

EP4 Speaker/Strobe 527 527 0 0 100 527

EP4 Strobe 23 23 0 0 100 23

EP19 AHU Fan Shutdown 24 24 0 0 100 24

EP19 Exhaust Fan 1 1 0 0 100 1

NFPA 72 Alternate Elevator Recall 11 10 0 1 90 11

NFPA 72 Amplifier 9 9 0 0 100 9

NFPA 72 Annunciator 10 10 0 0 100 10

NFPA 72 Elevator Shunt Trip 11 10 0 1 90 11

NFPA 72 Primary Elevator Recall 11 10 0 1 90 11

NFPA 72 Remote Power Supply 8 8 0 0 100 8

NFPA 72 Reporting System Server PC 1 1 0 0 100 1

NFPA 72

EP3

Panel 19 19 0 0 100 19

TOTAL 2139 2135 0 4 99 2139

DUCT, HEAT, FLAME, OPTICAL, SMOKE DETECTORS, PULL STATIONS

CUSTOMER NAME: VA Medical Center

BUILDING NAME: VA Medical Center

BUILDING ADDRESS: 1826 Veterans Blvd, Dublin, GA 31021

CONTACT NAME: Daniel DiMartino

CONTACT E-MAIL: Daniel.dimartino2@va.gov

CONTACT ROLE: Monitoring Organization

CONTACT PHONE: 4783044664

SERVICE PROVIDER: Johnson Controls North America

OFFICE ADDRESS: 1350 Northmeadow Parkway, Suite 100 Rosewell, GA 30076

OFFICE PHONE: 678) 896-4090

INSPECTOR: Aldes Anderson

INSPECTOR LICENSE: NICET 2. #142757

INSPECTION START DATE: 10/20/2025

INSPECTION END DATE: 11/14/2025

WORK ORDER: 59868766

TIMEZONE: GMT-04:00

INSPECTION RESULTS SUMMARY

CURRENT INSPECTION RESULTS PREVIOUS INSPECTION RESULTS

DEVICE TYPE INVENTORY COUNT PASSED FAILED CANNOT INSPECT % INSPECTED INVENTORY COUNT

Pull Station 264 264 0 0 100 264

Duct Detector 74 74 0 0 100 74

Heat Detector 8 8 0 0 100 8

Smoke Detector 777 777 0 0 100 777

Heat Detector Fixed Temp 45 44 0 1 97 45

Supervisory - Duct Detector 70 70 0 0 100 70

DEVICE DEFICIENCIES

No device deficiencies in this inspection.

RETIRED DEVICES

No retired devices in this inspection.

Element of Performance - EP 3 Joint Commission Standard EC.02.03.05 Element of Performance 3 EP

-3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

Customer: VA Medical Center | Building: VA Medical Center

Elements of Performance #3

Every 12 months the facility will test all Pull Stations. The completion date of the tests is documented.

Manual Pull Stations

For additional guidance on performing the tests, see NFPA 72-2010: Table 14.4.5; 17.14

Device Test Method

Manual Pull Stations

Performance Verification. Inspection, testing, and maintenance progress shall satisfy the requirements of this Code, shall conform to the equipment manufacturer's recommendations, and shall verify correct operation of the fire alarm system.

Confirm that each fire alarm box is unobstructed, readily accessible, located in the normal path of egress and that the installed height of each is between 3 ½ feet and 4 ½ feet above the floor. Confirm that there is a manual box within five feet of every exit door. Activate each manual box by physically operating the device.

Operate per manufacturer's instruction. For key-operated pre-signal fire alarm boxes, test both pre-signal and general alarm circuits.

Element of Performance - EP 3 NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

PULL STATION

# LOCATION DESCRIPTION ADDRESS MAKE DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT

1 (Building 9) 1sr Floor Stairwell

Exit L0M1022 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

2 (Building 19) 1st By Corridor L01M024 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

3 (Building 41) 1st Exit to Corridor

L01M028 Notifier Pull Station — Aldes Anderson Jr. 11/04/2025 Passed

4 (Building 13) 1st Exit To Corridor

N17.L2.M2 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

5 (Building 1) 1st Floor at Fire

Door L02M006 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

6 (Building 10) 1st Floor By

Corridor L01M0100 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

7 (Building 1) 1st Floor by Fire

Door L02M013 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

8 (Building 17) 1st Floor By Fire

Door L02M007 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

9 (Building 9) 1st Floor by

Vending L0M1020 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

10 (Building 12) 1st Floor Corridor L01M035 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

11 (Building 9) 1st Floor Exit L0M1019 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

12 (Building 13) 1st Floor Exit Hall N17.L2.M11 — Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

13 (Building 14) 1st Floor Fire

Door L01M015 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

14 (Building 11) 1st Floor Fire

Door Exit L02M002 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

15 (Building 1) 1st Floor Front

Exit L02M010 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

16 (Building 1) 1st Floor Front

Exit L02M011 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

17 (Building 13) 1st Floor Hall Exit N17.L2.M3 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

18 (Building 13) 1st floor Hallway N17.L2.M6 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

19 (Building 6) 1st Floor Mid Exit L01M017 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

20 (Building 19) 1st Floor Rear Exit L01M029 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

21 (Building 12) 1st Floor Side Exit L01M038 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

22 (Building 41) 1st Floor Side Exit L01M029 Notifier Pull Station — Aldes Anderson Jr. 11/04/2025 Passed

23 (Building 3) 1st Floor Stair 11

Exit L01M024 Notifier Pull Station — Aldes Anderson Jr. 11/04/2025 Passed

24 (Building 3) 1st Floor Stair 12

Exit L01M026 Notifier Pull Station — Aldes Anderson Jr. 11/04/2025 Passed

25 (Building 12) 1st Floor Stair Exit L01M037 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

26 (Building 12) 1st Floor Stair Exit L01M039 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

27 (Building 14) 1st Floor Stair Exit L01M021 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

28 (Building 1) 1st Floor Stair Exit L02M008 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

29 (Building 1) 1st Floor Stair Exit L02M014 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

30 (Building 10 West) 1st Floor Stairwell exit L01M011 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

31 (Building 12) 1st Nurse Station L01M036 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

32 (Building 17) 1st Stair Exit L02M010 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

Element of Performance - EP 3 NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

33 (Building 5) 2nd by Stair

ST-22-5

L01M061 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

34 (Building 5) 2nd Exit By C-232 L01M032 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

35 (Building 6) 2nd Floor

Building 6 Exit L01M030 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

36 (Building 9) 2nd Floor by Cart

Wash L0M1030 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

37 (Building 19) 2nd Floor by

Corridor L01M032 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

38 (Building 14) 2nd Floor by Fire

Door L01M029 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

39 (Building 17) 2nd Floor By Fire

Door L02M014 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

40 (Building 2) 2nd Floor By

ST25-2

L01M067 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

41 (Building 6) 2nd floor by Stair

ST22-6

L01M020 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

42 (Building 10) 2nd floor Corridor L01M028 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

43 (Building 12) 2nd Floor Corridor

L01M033 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

44 (Building 9) 2nd Floor

Corridor Exit L0M1028 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

45 (Building 5) 2nd Floor Exit by

A226 L01M062 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

46 (Building 1) 2nd Floor Fire

Door L02M016 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

47 (Building 14) 2nd Floor Fire

Door Exit L01M028 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

48 (Building 11) 2nd Floor Fire

Door Exit L02M030 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

49 (Building 11) 2nd Floor Fire

Door Exit L02M032 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

50 (Building 11) 2nd Floor Fire

Door Exit L02M040 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

51 (Building 5) 2nd Floor Hall by

C-204 L01M031 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

52 (Building 13) 2nd Floor Hallway N17.L2.M19 — Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

53 (Building 15) 2nd Floor Hallway

15 By Exit N17.L1.M28 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

54 (Building 3) 2nd Floor Stair

21-3 Exit L01M037 Notifier Pull Station — Aldes Anderson Jr. 11/04/2025 Passed

55 (Building 3) 2nd floor Stair 22

Exit L01M039 Notifier Pull Station — Aldes Anderson Jr. 11/04/2025 Passed

56 (Building 15) 2nd floor Stair

Exit N17.L1.M29 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

57 (Building 12) 2nd floor Stair

Exit L01M034 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

58 (Building 10) 2nd Floor Stair

Exit L01M030 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

59 (Building 19) 2nd Floor Stair

Exit L01M038 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

60 (Building 17) 2nd Floor Stair

Exit L02M016 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

61 (Building 1) 2nd Floor Stair

Exit L02M015 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

Element of Performance - EP 3 NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

62 (Building 8) 2nd Floor Stair

Exit L02M004 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

63 (Building 11) 2nd Floor Stairwell

L02M045 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

64 (Building 9) 2nd Floor

Stairwell Exit L0M1031 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

65 (Building 9) 2nd floor to corridor L0M1026 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

66 (Building 6) 2nd ST22-6 L01M022 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

67 (Building 12) 12A Entry L01M080 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

68 (Building 15) 15 Hall N17.L1.M20 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

69 (Building 15) 15 Hall Exit N17.L1.M22 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

70 (Building 41) 103-41 To Corridor

L01M034 Notifier Pull Station — Aldes Anderson Jr. 11/04/2025 Passed

71 (Building 41) 104-41 To Corridor

L01M035 Notifier Pull Station — Aldes Anderson Jr. 11/04/2025 Passed

72 (Building 41) 104-41 To Corridor

L01M036 Notifier Pull Station — Aldes Anderson Jr. 11/04/2025 Passed

73 (Building 29) 115-29 Exit L01M025 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

74 (Building 8) Across from

Room N2-142 L02M040 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

75 (Building 16) Base 16 Corr N7.L2.M4 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

76 (Building 19) Basement L01M016 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

77 (Building 16) Basement 16

Door N7.L2.M18 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

78 (Building 6) Basement

Building 6 Entry L01M001 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

79 (Building 6) Basement CR-18

Exit L01M019 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

80 (Building 26) Basement Exit N23.L1.M12 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

81 (Building 12) Basement Exit L01M060 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

82 (Building 14) Basement Fire

Exit N7.L1.M9 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

83 (Building 11) Basement Stair

Exit L02M009 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

84 (Building 3) Basement Stair

Exit L01M014 Notifier Pull Station — Aldes Anderson Jr. 11/04/2025 Passed

85 (Building 3) Basement Stairs

12 Exit L01M023 Notifier Pull Station — Aldes Anderson Jr. 11/04/2025 Passed

86 (Building 12) Basement Stairs

Exit L01M041 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

87 (Building 10 West) Basement

Stairwell Exit L01M003 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

88 (Building 11) Basement

Stairwell Exit L02M029 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

89 (Building 12) Basement

Storage L01M058 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

90 (Building 12) Basement

Storage L01M059 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

91 (Building 10) Base Stair Exit L01M013 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

92 (Building 10) Base Storage Exit N25.L1.M9 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

Element of Performance - EP 3 NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

93 (Building 10) Base Storage Exit L01M012 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

94 (Building 8) BM 101-6 L02M011 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

95 (Building 28) BM 101 Exit L01M020 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

96 (Building 8) BM 102 L02M021 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

97 (Building 8) BM 103-8 L02M031 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

98 (Building 28) BM 103 Exit L01M019 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

99 (Building 2) BM 104 L01M015 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

100 (Building 8) BM 104A Exit L02M046 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

101 (Building 5) BM 110-5 L01M078 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

102 (Building 27) Boiler Room 103 N19.L1.M4 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

103 (Building 27) Boiler Room Exit

N19.L1.M5 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

104 (Building 27) Boiler Room Exit

N19.L1.M6 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

105 (Building 27) Break Area Room

N19.L1.M2 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

106 (Building 40) Building 40 Exit

Room 106-40 L01M041 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

107 (Building 40) Building 40 Exit the Hall L01M040 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

108 (Building 40) Building 40 Rear N31.L1.M22 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

109 (Building 40) Building 40 Room

106-40 L01M026 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

110 (Building 40) Building 40

Room106-40 L01M042 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

111 (Building 73) Building Exit L02M001 Notifier Pull Station — Aldes Anderson Jr. 11/14/2025 Passed

112 (Building 8) Business

Management Center

L02M026 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

113 (Building 8) By Bathing Suite L02M019 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

114 (Building 8) By Elevator L02M006 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

115 (Building 2) By Elevator D3 L01M064 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

116 (Building 8) By Med N1-17 L02M015 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

117 (Building 2) By ST23-2 L01M080 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

118 (Building 8) By Stair K1 L02M029 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

119 (Building 2) By Stairs STB 4-2 L01M018 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

120 (Building 2) By Stair ST11-2 L01M044 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

121 (Building 2) By Stair ST21-2 L01M078 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

122 (Building 2) By Stair St22-2 L01M086 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

123 (Building 2) By Stair ST24-2 L01M076 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

124 (Building 2) By Stair STB1-2 L01M036 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

125 (Building 2) By Stair STB2-2 L01M028 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

126 (Building 2) By Stair STB3-2 L01M027 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

Element of Performance - EP 3 NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

127 (Building 2) By Stair STB 5-2 L01M003 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

128 (Building 2) By Stair STD-2 L01M056 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

129 (Building 2) Canteen Exit L01M121 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

130 (Building 2) Canteen Exit L01M122 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

131 (Building 2) Canteen Kitchen L01M123 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

132 (Building 5) Checking A-167 L01M042 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

133 (Building 16) Corridor by 14-16 L02M001 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

134 (Building 16) Corridor By 14-16 N7.L2.M34 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

135 (Building 4) Corridor By Stairs

2nd Floor N31.L1.M30 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

136 (Building 13) Corridor Exit 2Nd N17.L2.M14 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

137 (Building 29) Corridor Exit by

L01M003 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

138 (Building 29) Corridor Exit by

L01M004 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

139 (Building 86) Corridor To B14 N27.L1.M11 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

140 (Building 16) Cr22-16 Exit N7.L2.M39 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

141 (Building 89) Electrical 1230 L01M003 Pull Station Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

142 (Building 27) Electrical Room

N19.L1.M3 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

143 (Building 5) Electrical Room

C-152 L01M011 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

144 (Building 4) Elevator Lobby 1st

Floor N31.L1.M24 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

145 (Building 4) Elevator Lobby

Basement N31.L1.M3 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

146 (Building 6) Elev Machine

Room N15.L1.M8 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

147 (Building 27) Equipment Room

N19.L1.M8 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

148 (Building 27) Equipment Room

Exit N19.L1.M13 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

149 (Building 25) Exit 101A L01M003 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

150 (Building 2) Exit 103-2 L01M049 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

151 (Building 25) Exit 107-25 L01M0014 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

152 (Building 2) Exit 139-2 L01M057 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

153 (Building 2) Exit 145-2 L01M052 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

154 (Building 8) Exit By 045 8A L02M014 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

155 (Building 8) Exit by 082 8A L02M024 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

156 (Building 5) Exit by A-112 L01M049 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

(Building 10

WEST)

Exit By Bm116 N35.L1.M9 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

158 (Building 10 West) Exit by BM 128 L01M004 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

159 (Building 5) Exit by C-138 L01M002 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

Element of Performance - EP 3 NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

160 (Building 87) Exit By C506 N29.L1.M16 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

161 (Building 87) Exit By C510 N29.L1.M15 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

162 (Building 87) Exit By Coun 2

A110 N29.L1.M4 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

163 (Building 87) Exit By Coun 3

A106 N29.L1.M6 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

164 (Building 87) Exit By Coun 9

A414 N29.L1.M8 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

165 (Building 87) Exit By Coun C114 N29.L1.M12 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

166 (Building 87) Exit By Coun C306 N29.L1.M13 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

167 (Building 5) Exit by CR-138A L01M035 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

168 (Building 89) Exit by Exam 1111 L01M011 Pull Station Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

169 (Building 89) Exit by Exam 1279 L01M007 Pull Station Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

170 (Building 87) Exit By Men C501 N29.L1.M18 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

171 (Building 87) Exit By Nurse

A205 N29.L1.M1 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

172 (Building 89) Exit by office 1133 L01M010 Pull Station Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

173 (Building 5) Exit by police

Electrical Closet D-171

L01M020 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

174 (Building 85) Exit By Room 152 N21.L1.M2 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

175 (Building 89) Exit By Staff Toilet

L01M006 Pull Station Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

176 (Building 87) Exit By Women

A114 N29.L1.M2 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

177 (Building 2) Exit Dock L01M060 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

178 (Building 25) Exit end of East L01M015 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

179 (Building 87) Exit Front Lobby N29.L1.M9 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

180 (Building 2) Exit in Hall CR14-2 L01M047 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

181 (Building 87) Exit Rear Lobby N29.L1.M10 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

182 (Building 87) Exit Rear Lobby N29.L1.M11 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

183 (Building 2) Exit Room 125-2 L01M065 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

184 (Building 10 West) Exit to B10 L01M016 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

185 (Building 14) Exit to BG 86 L01M011 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

186 (Building 14&16) Exit To Bg 86 N7.L1.M11 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

187 (Building 85) Exit To Building

N21.L1.M7 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

188 (Building 10) Fire Door Base N25.L1.M7 Notifier Pull Station — Aldes Anderson Jr. 10/22/2025 Passed

189 (Building 5) Generator c-153 L01M008 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

190 (Building 16) Gym Exit N7.L2.M23 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

191 (Building 85) Gym Exit N21.L1.M11 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

192 (Building 13) Hall 2Nd Flr Blg

N17.L2.M17 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

193 (Building 16) Hall by 101-16 L02M028 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

Element of Performance - EP 3 NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

194 (Building 16) Hall By 201-16 N7.L2.M35 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

195 (Building 2) Hall CR22-2 L01M068 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

196 (Building 86) Hbhc Lobby N27.L1.M14 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

197 (Building 86) Hbhc Team

Station N27.L1.M29 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

198 (Building 85) Kitchen 117 Exit N21.L1.M4 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

199 (Building 10 West) Lobby 121 Exit L01M001 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

200 (Building 10 West) Lobby 121 Exit L01M002 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

201 (Building 25) Main Front Exit L01M004 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

202 (Building 89) Mechanical 2000 L01M009 Pull Station Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

203 (Building 5) Mechanical C-151 L01M005 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

204 (Building 89) Mechanical Room

L01M002 Pull Station Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

205 (Building 87) Mech C503 Exit N29.L1.M24 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

206 (Building 86) Mech Room Exit N27.L1.M8 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

207 (Building 8) Module L02M001 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

208 (Building 25) North Exit 2nd

Floor L0M1016 Otifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

209 (Building 89) Outpatient Foyer L01M015 Pull Station Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

210 (Building 8) Patio Exit L02M025 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

211 (Building 86) Pat Server Exit N27.L1.M26 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

212 (Building 5) Penthouse A L01M046 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

213 (Building 5) Penthouse B-201 L01M017 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

214 (Building 5) Penthouse C L01M014 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

215 (Building 5) Penthouse D L01M058 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

216 (Building 5) Pharmacy C-107 L01M001 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

217 (Building 5) Primary Care

Corridor CR-101 L01M048 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

218 (Building 5) Primary Care

Waiting CR-139A L01M057 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

219 (Building 87) Rear Ext By Men

A101 N29.L1.M7 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

220 (Building 8) Res Hall Exit 8A L02M037 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

221 (Building 8) Resident Hall Exit

8A L02M049 Notifier Pull Station — Aldes Anderson Jr. 11/06/2025 Passed

222 (Building 26) Restroom Vestibule

N23.L1.M3 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

223 (Building 29) Room 100 Exit L01M002 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

224 (Building 28) Room 101 Exit L01M011 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

225 (Building 28) Room 103 Exit L01M012 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

226 (Building 28) Room 105 Exit L01M013 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

227 (Building 28) Room 106 Exit L01M014 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

Element of Performance - EP 3 NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

228 (Building 28) Room 109 Exit L01M016 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

229 (Building 29) Room 110 Exit L01M006 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

230 (Building 29) Room 115 Exit L01M007 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

231 (Building 29) Room 117 Exit L01M008 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

232 (Building 29) Room 122 Exit L01M005 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

233 (Building 2) Room 144-2 L01M051 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

234 (Building 2) Room 216-2 L01M079 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

235 (Building 2) Room 223-2 L01M077 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

236 (Building 2) Room 229-2 L01M070 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

237 (Building 2) Room 229-2 L01M071 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

238 (Building 63) Screened wreck area L02M009 Notifier Pull Station — Aldes Anderson Jr. 11/14/2025 Passed

(Building 10

WEST)

Shell Space N35.L1.M5 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

240 (Building 87) Side Front Exit N29.L1.M26 Notifier Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

241 (Building 25) South Exit 2nd

Floor L0M1017 Otifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

242 (Building 25) South Exit 2ST

Floor L01M002 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

243 (Building 5) Space Chase

C-104C L01M044 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

244 (Building 16) ST 11-16 Exit L02M030 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

245 (Building 5) ST-12-5 L01M009 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

246 (Building 4) St21-4 Exit 2nd

Floor N31.L1.M34 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

247 (Building 16) ST 21-16 Exit L02M038 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

248 (Building 15) Stair Exit 1St 15 N17.L1.M18 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

249 (Building 14) Stair Exit 2Nd Flr N7.L1.M40 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

250 (Building 13) Stair Exit 2Nd Flr N17.L2.M22 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

251 (Building 14) Stair Exit Base L01M012 Notifier Pull Station — Aldes Anderson Jr. 10/23/2025 Passed

252 (Building 2) Stair NO.6 Attic L01M090 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

253 (Building 15) Stairs By 200 N17.L1.M24 Notifier Pull Station — Aldes Anderson Jr. 10/24/2025 Passed

254 (Building 4) Stairwell 11-4

Lobby 1st Floor N31.L1.M27 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

255 (Building 4) Stairwell Lobby

STB-1

N31.L1.M13 Notifier Pull Station — Aldes Anderson Jr. 11/05/2025 Passed

256 (Building 11) Surgical Hall L02M041 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

257 (Building 11) Surgical Hall L02M043 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

258 (Building 5) Urgent Care Exit by B-122 L01M038 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

259 (Building 5) Urgent Care

Nurse station B-161

L01M079 Notifier Pull Station — Aldes Anderson Jr. 11/03/2025 Passed

260 (Building 89) Waiting 1203 Exit L01M008 Pull Station Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

Element of Performance - EP 3 NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

261 (Building 26) Warehouse 108

Exit N23.L1.M4 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

262 (Building 26) Warehouse 108

Exit N23.L1.M5 Notifier Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

263 (Building 89) Woman’s Foyer L01M016 Pull Station Pull Station — Aldes Anderson Jr. 10/20/2025 Passed

264 (Building 26) Work Area 109

Exit N23.L1.M1 — Pull Station — Aldes Anderson Jr. 10/21/2025 Passed

Element of Performance - EP 3 NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

Elements of Performance #3

Every 12 months the facility will test all Smoke Detectors. The completion date of the tests is documented.

Smoke Detectors

For additional guidance on performing the tests, see NFPA 72-2010: Table 14.4.5; 17.14

Device Test Method

Smoke Detectors Performance Verification. Inspection, testing, and maintenance progress shall satisfy the requirements of this Code, shall conform to the equipment manufacturer's recommendations, and shall verify correct operation of the fire alarm system.

The detectors will be tested in place to ensure the smoke entry into the sensing chamber and an alarm response. Testing with smoke or listed aerosol acceptable to the manufacturer, or other means acceptable test method.

Sensitivity Testing: Every 2 Years - Ensure that each smoke detector is within its listed and marked sensitivity range by testing using either:

1. A calibrated test method; or

2. The manufacturer's calibrated sensitivity test instrument; or

3. Listed control equipment arranged for the purpose; or

4. A smoke detector/control unit arrangement whereby the detector causes a signal at the control unit when its sensitivity is outside its acceptable sensitivity range; or

5. Other calibrated sensitivity test method acceptable to the authority having jurisdiction.

**NOTE: The detector sensitivity cannot be tested or measured using any spray device that administers an unmeasured concentration of aerosol into the detector.

Element of Performance - EP 3 Smoke Detectors NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

SMOKE DETECTOR

1 (Building 2) 1st CR-14-2 Fire

Doors L01D025 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

2 (Building 10 West) 1st Elevator

Lobby L0D1039 Notifier Smoke Detector — Aldes Anderson Jr. 10/21/2025 Passed

3 (Building 10 West) 1st Elevator Looby L0D1036 Notifier Smoke Detector — Aldes Anderson Jr. 10/21/2025 Passed

4 (Building 10 West) 1st Elevator Shaft L0D1041 Notifier Smoke Detector — Aldes Anderson Jr. 10/21/2025 Passed

5 (Building 13) 1st Fire Door L01D004 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

6 (Building 8) 1st Fire Doors by

L02D121 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

7 (Building 11) 1st Floor 126-11 L02D005 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

8 (Building 8) 1st Floor Building

8 Entry L02D041 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

9 (Building 8) 1st Floor Building

8 Entry L02D042 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

10 (Building 2) 1st Floor Canteen

Elevator Lobby L01D123 Notifier Smoke Detector — Aldes Anderson Jr. 11/05/2025 Passed

11 (Building 2) 1st Floor CR-22

Fire Doors L01D026 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

12 (Building 14) 1st Floor Day Room 125-14

L01D056 Notifier Smoke Detector — Aldes Anderson Jr. 10/23/2025 Passed

13 (Building 10) 1st Floor Elevator

Lobby L01D022 Notifier Smoke Detector — Aldes Anderson Jr. 10/22/2025 Passed

14 (Building 14) 1st Floor Elevator

Lobby L01D016 Notifier Smoke Detector — Aldes Anderson Jr. 10/23/2025 Passed

15 (Building 17) 1st Floor Elevator

Lobby L02D002 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

16 (Building 13) 1st Floor Elevator

Lobby L02D001 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

17 (Building 9) 1st Floor Elevator

Lobby L01D017 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

18 (Building 3) 1st Floor Elevator

Lobby L01D013 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

19 (Building 8) 1st Floor Elevator

Lobby L02D043 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

20 (Building 12) 1st Floor Fire

Door L01D0111 Notifier Smoke Detector — Aldes Anderson Jr. 10/22/2025 Passed

21 (Building 12) 1st Floor Fire

Door L01D0113 Notifier Smoke Detector — Aldes Anderson Jr. 10/22/2025 Passed

22 (Building 14) 1st Floor Fire

Door L01D015 Notifier Smoke Detector — Aldes Anderson Jr. 10/23/2025 Passed

23 (Building 14) 1st Floor Fire

Door L01D021 Notifier Smoke Detector — Aldes Anderson Jr. 10/23/2025 Passed

24 (Building 19) 1st Floor Fire

Door L01D005 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

25 (Building 13) 1st Floor Fire

Door L01D005 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

26 (Building 9) 1st Floor Fire

Door L01D002 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

27 (Building 9) 1st Floor Fire

Door L01D009 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

28 (Building 11) 1st Floor Fire

Door L02D001 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

29 (Building 11) 1st Floor Fire

Door L02D002 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

Element of Performance - EP 3 Smoke Detectors NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

30 (Building 3) 1st Floor Fire

Door L01D012 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

31 (Building 3) 1st Floor Fire

Door L01D014 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

32 (Building 1) 1st Floor Fire

Door L02D001 Notifier Smoke Detector — Aldes Anderson Jr. 11/05/2025 Passed

33 (Building 1) 1st Floor Fire

Door L02D002 Notifier Smoke Detector — Aldes Anderson Jr. 11/05/2025 Passed

34 (Building 8) 1st Floor Fire

Door 153 L02D120 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

35 (Building 12) 1st Floor Fire

Doors L01D0110 Notifier Smoke Detector — Aldes Anderson Jr. 10/22/2025 Passed

36 (Building 19) 1st Floor Fire

Doors L01D004 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

37 (Building 14) 1st Floor Hall L01D029 Notifier Smoke Detector — Aldes Anderson Jr. 10/23/2025 Passed

38 (Building 14) 1st Floor Hall L01D030 Notifier Smoke Detector — Aldes Anderson Jr. 10/23/2025 Passed

39 (Building 14) 1st Floor Hall L01D035 Notifier Smoke Detector — Aldes Anderson Jr. 10/23/2025 Passed

40 (Building 14) 1st Floor Hall L01D040 Notifier Smoke Detector — Aldes Anderson Jr. 10/23/2025 Passed

41 (Building 14) 1st Floor Hall L01D052 Notifier Smoke Detector — Aldes Anderson Jr. 10/23/2025 Passed

42 (Building 14) 1st Floor Hall L01D055 Notifier Smoke Detector — Aldes Anderson Jr. 10/23/2025 Passed

43 (Building 13) 1st Floor Hallway N17.L2.D18 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

44 (Building 13) 1st Floor Hallway N17.L2.D19 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

45 (Building 13) 1st Floor Hallway N17.L2.D20 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

46 (Building 13) 1st Floor Hallway N17.L2.D38 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

47 (Building 19) 1st Floor Hallway L01D006 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

48 (Building 19) 1st Floor Hallway L01D007 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

49 (Building 19) 1st Floor Hallway L01D008 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

50 (Building 19) 1st Floor Hallway L01D009 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

51 (Building 19) 1st Floor Hallway L01D010 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

52 (Building 19) 1st Floor Hallway L01D011 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

53 (Building 19) 1st Floor Hallway L01D012 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

54 (Building 19) 1st Floor Hallway L01D013 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

55 (Building 19) 1st Floor Hallway L01D014 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

56 (Building 19) 1st Floor Hallway L01D015 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

57 (Building 13) 1st Floor Hallway L02D017 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

58 (Building 9) 1st Floor Hallway L01D010 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

59 (Building 11) 1st Floor Info

Mang. storage L02D003 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

60 (Building 2) 1st floor in front of Elevator L01D019 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

61 (Building 2) 1st Floor Room

101-2 L01D022 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

62 (Building 2) 1st Floor Room

101-2 L01D024 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

Element of Performance - EP 3 Smoke Detectors NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

63 (Building 14) 1st Hall L01D025 Notifier Smoke Detector — Aldes Anderson Jr. 10/23/2025 Passed

64 (Building 2) 1st Room 101-2 L01D021 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

65 (Building 2) 1st Room 101-2 L01D023 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

66 (Building 2) 2nd 229C-2 L01D041 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

67 (Building 2) 2nd 229E-2 L01D043 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

68 (Building 2) 2nd By Elevator

D1 L01D033 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

69 (Building 8) 2nd Corridor 23 L02D027 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

70 (Building 2) 2nd CR 22-2 Fire

Doors L01D036 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

71 (Building 19) 2nd Door Fire

Doors L01D017 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

72 (Building 17) 2nd Elevator

Lobby L02D013 Notifier Smoke Detector — Aldes Anderson Jr. 10/24/2025 Passed

73 (Building 12) 2nd Fire Door L01D097 Notifier Smoke Detector — Aldes Anderson Jr. 10/22/2025 Passed

74 (Building 5) 2nd Fire Doors By

C-218 L01D027 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

75 (Building 5) 2nd Fire Doors By

C-218 L01D028 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

76 (Building 2) 2nd Floor 221-2 L01D052 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

77 (Building 2) 2nd floor 229.2 L01D045 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

78 (Building 2) 2nd Floor 229.2 L01D046 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

79 (Building 2) 2nd Floor 229.2 L01D046 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

80 (Building 2) 2nd Floor 229.2 L01D047 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

81 (Building 2) 2nd Floor 229.2 L01D048 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

82 (Building 2) 2nd Floor 229A-2 L01D039 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

83 (Building 2) 2nd Floor 229B-2 L01D040 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

84 (Building 2) 2nd Floor 229D-2 L01D042 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

85 (Building 2) 2nd Floor 229F-2 L01D044 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

86 (Building 2) 2nd Floor by Room 229A-2

L01D038 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

87 (Building 2) 2nd Floor

Connector Hall L01D020 Notifier Smoke Detector — Aldes Anderson Jr. 11/04/2025 Passed

88 (Building 8) 2nd Floor

Corridor 22 L02D032 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

89 (Building 8) 2nd Floor

Corridor 22 L02D034 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

90 (Building 5) 2nd Floor

Corridor by C-223A

L01D029 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

91 (Building 5) 2nd Floor

Corridor by C-233 L01D032 Notifier Smoke Detector — Aldes Anderson Jr. 11/03/2025 Passed

92 (Building 8) 2nd Floor CR-21 L02D005 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

93 (Building 8) 2nd Floor CR-21 L02D009 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

94 (Building 8) 2nd Floor CR-21 L02D011 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

95 (Building 6) 2nd floor CR22-6 L01D014 Notifier Smoke Detector — Aldes Anderson Jr. 11/06/2025 Passed

Element of Performance - EP 3 Smoke Detectors NFPA 72-2010: Table 14.4.5; 17.14

Joint Commission Standard EC.02.03.05 Element of Performance 3 EP -3

1b45801b-e16b-4782-bec1-9ce4d215866e | Duct, Heat, Flame, Optical, Smoke Detectors, Pull Stations | 11/14/2025

96 (Building 6) 2nd Floor CR22-6 L01D013 Notifier Smoke Detector — Aldes…