This document is an Amendment (Amendment 001) to a solicitation for renovating public bathrooms at the Charlie Norwood VA HealthCare System in Augusta, GA, associated with Solicitation Number 36C24725R0051. The amendment details specific modifications to the project's specifications and drawings, including changes to door hardware sets, bathroom layout adjustments, and equipment scheduling across multiple building levels (1B, 2B, 2C, 4C, 5C, and 7C).
Key technical modifications include revising hardware configurations, adding and repositioning wing walls in bathroom areas, adjusting water closet stall door swings, modifying counter lengths and sink placements, and updating reflected ceiling plan notations. The amendment also changes equipment schedule column headings from "PROVIDED BY" to "FURNISHED" and specifies that certain equipment (JSN#A103) will be furnished and installed by the government. These changes appear designed to improve patient safety and bathroom functionality within the VA healthcare facility.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Renovate Public Bathrooms and Improve Patient Safety | Project #528A7-20-705 |
| Charlie Norwood VA HealthCare System | Bid Documents |
Downtown Division, Building 801 Augusta, GA March 27, 2025
Amendment 001 March 27, 2025 The following changes, additions, or deletions are hereby made a part of the Contract Documents for the above noted project, fully and completely as if the same were fully contained therein.
Specifications:
1. Section 08 71 00 DOOR HARDWARE
a. Delete Hardware sets HW-2B and HW-2G.
b. Add hardware set HW-2 as follows:
| HW-2 | ||
| Each Door to Have: | RATED/NON-RATED |
| Hinges | QUANTITY AND TYPE AS REQUIRED | |||
| 1 Keyed Privacy Indicator Lock | F13 x OCCUPANCY INDICATOR | |||
| 1 Closer | C02011 | |||
| 1 Kick Plate | J102 | |||
| 1 Floor Stop | L02121 X 3 FASTENERS | |||
| 1 Set Self-Adhesive Seals | R0Y154 |
Drawings:
1. Sheet AD102, LEVEL 2 DEMO AND ENLARGED DEMO PLANS, 4/AD102:
a. Demolition Plan Key Note 4 applies to partial removal of wing walls adjacent to lavatories as shown graphically in Women’s Bath 2C 105 and Men’s Bath 2C 106.
2. Sheet AE101, LEVEL 1 ELARGED PLANS, 4/AE101:
a. Door Label 1B188 has been added to the door opening into Men’s Locker 1B 187 from Men’s Bath 1B 188.
3. Sheet AE107, LEVEL 7 ENLARGED PLANS, 2/AE107:
a. Men’s Bath 7C 106. Refer to attached drawing.
1) Add wing wall at left end of sink counter adjacent to urinal alcove. Wing wall to be constructed of 4” steel studs with 5/8” gypsum board on both sides of studs and on end face of wall.
2) Finished length of wing wall to be 26”, 2” beyond leading edge of 24” deep counter.
3) The countertop length has been reduced to 5’-6”.
4) Counter sinks are centered 15” finished clear from side walls.
b. Women’s Bath 7C 103. Refer to attached drawing.
1) The 3’-0” finished clear aisle adjacent to the water closet stalls has been increased to 3’-6” finished clear.
2) The narrow water closet stall door and panels are recessed 2” from the end of the gypsum board and steel stud side wall to provide clearance for toilet compartment panel anchorage.
3) The door swing for the narrow stall will change from left-hand to right-hand swing.
4) The countertop length remains at 6’-0”.
5) Counter sinks are centered 15” finished clear, one from side wall, the other from the end of the countertop.
4. Sheet AE601, DOOR, FRAME AND HARDWARE SCHEDULE:
a. The schedule has been amended. Refer to attached sheet.
b. All existing doors, door frames and hardware not identified on the schedule are to remain in place.
5. Sheets AE111 through AE117, REFLECTED CEILING PLANS:
a. Reflected Ceiling Plan (RCP) Key Not 1 has been revised to read
“PROVIDE AND INSTALL CEILING TILES”.
6. Sheets AE401, AE402 and AE451, MEN’S BATH/TOILETS
a. Delete JSN #A5090 from the following toilet rooms:
1) MEN’S BATH 1B 188
2) MEN’S BATH 1D 178
3) MEN’S BATH 2B 118
4) MEN’S BATH 2C 106
5) MEN’S BATH 2D 184
6) MEN’S BATH 4C 106
7) MEN’S BATH 5C 106
8) MEN’S BATH 7C 106
7. Sheets AE401 and AE402, EQUIPMENT SCHEDULE:
a. Change Equipment Schedule Column Heading “PROVIDED BY” to read “FURNISHED”.
b. Change Equipment Schedule Column Heading “INSTALLED BY” to read
“INSTALLED”.
c. Change Equipment Schedule for JSN#A103 to be furnished and installed by the Government.
- E N D