509-23-101 Bid sheet .pdf

PDF 242 KB Posted

Attached to
Y1DA--509-23-101 Renovate Public Bathroom, Improve Patient Safety
Solicitation number
36C24725R0051
Issued by

About this file

This document is a bid sheet for Project Number 509-23-101, focused on renovating public restrooms for the Department of Veterans Affairs Veterans Health Administration. The bid sheet contains a comprehensive breakdown of construction costs across multiple divisions, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal/Moisture Protection, Doors and Windows, Finishes, Specialties, Furnishings, Plumbing, Electrical, and HVAC. However, all line items are currently populated with $0.00, suggesting this is a template or preliminary document awaiting specific cost details for the renovation project.

The document includes detailed sections for both demolition and new work across various construction divisions, with specific areas of focus such as removing existing wall sheetrock, tiles, and bathroom accessories, and installing new toilet partitions, vanity tops, plumbing fixtures, electrical components, and ceiling tiles. The project appears to be part of a patient safety improvement initiative, with the renovation aimed at upgrading public restrooms in a Veterans Affairs healthcare facility.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Title:

Renovate Public Restrooms

Project Number:

509-23-101

Division Total: $0.00 Overhead: % $0.00

Subtotal: $0.00 Profit: % $0.00

Subtotal: $0.00 Insurance & Taxes: % $0.00

Subtotal: $0.00 Bonding: % $0.00

Grand Total: $0.00

Division Totals

Division 01 - General Requirements $0.00 Division 02 - Existing Conditions $0.00 Division 03 - Concrete $0.00 Division 04 - Masonry $0.00 Division 05 - Metals $0.00 Division 06 - Wood and Plastic $0.00 Division 07 - Therm/Moisture Prot. $0.00 Division 08 - Doors and Windows $0.00 Division 09 - Finishes $0.00 Division 10 - Specialties $0.00 Division 11 - Equipment $0.00 Division 12 - Furnishings $0.00 Division 13 - Special Construction $0.00 Division 14 - Conveying Equipment $0.00 Division 21 - Fire Suppression $0.00 Division 22 - Plumbing $0.00 Division 23 - HVAC $0.00 Division 25 - Integrated Automation $0.00 Division 26 - Electrical $0.00 Division 27 - Communications $0.00 Division 28 - Low Voltage Safety and Security $0.00 Division 31 - Earthwork $0.00 Division 32 - Exterior Improvements $0.00 Division 33 - Utilities $0.00 Division 34 - Transportation $0.00 Division 48 - Electrical Power Generation $0.00

Division 01 - General Requirements Labor Material Qty Cost Qty Cost General Conditions (Days) $0.00 $0.00 Project Manager (Weeks) $0.00 $0.00 Superintendent (weeks) $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Labor Sum: $0.00 Material Sum: $0.00

Division 02 - Existing Conditions Labor Material

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Division 03 - Concrete Labor Material

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Division 04 - Masonry Labor Material

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Division 05 - Metals Labor Material

Removal of Lightweight Metal Wall Full Height Framing @ < 20 lbs. per LF 4

$0.00 $0.00 $0.00

Lighting Metal Wall Full Height Framing

$0.00 $0.00 $0.00

Division 06 - Wood and Plastic Labor Material

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Division 07 - Therm /Moisture Prot. Labor Material

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Division 08 - Doors and Windows Labor Material

$0.00

Division 09 - Finishes Labor Material Demolition

Removal of Wall Sheetrock

$0.00 $0.00

Removal of Wall Tile $0.00 $0.00 Removal of Floor Tile $0.00 $0.00 Removal of Acoustical Ceiling Tiles $0.00 $0.00 New Work

Gypsum Wall Board Drywall $0.00 $0.00 Interior finish painting $0.00 $0.00 Wall Backerboard for tile substrate $0.00 $0.00 Porcelain Tile Wall Thin Set Covering, Field tile (PT-2) $0.00 $0.00 Porcelain Tile Wall Thin Set Covering, Accent tile (PT-3) $0.00 $0.00 Porcelain Tile Thin Set Flooring (PT-1) $0.00 $0.00 Cleaning of ACT Grid -Wire Brush Med. $0.00 $0.00 New Acoustical Ceiling Tiles, 2X2 (ACT-1) $0.00 $0.00 Labor Sum: Material Sum: $0.00

Division 10 - Specialties Labor Material Demolition Qty Cost Qty Cost

Removal of Toilet Partitions $0.00 $0.00 Removal of Bathroom Accessories $0.00 $0.00 Remove Existing Lockers $0.00 $0.00 $0.00 $0.00 New Work $0.00 $0.00 New Toilet Stall Partitions Pilasters $0.00 $0.00 New Toilet Stall Partition Panels $0.00 $0.00 New Toilet Stall Partition Door $0.00 $0.00 New Bathroom Accessories $0.00 $0.00 New Z Lockers -12x18 size $0.00 $0.00

Division Total:

Division 11 - Equipment Labor Material

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Division 12 - Furnishings Labor Material

Removal of Vanity Tops $0.00 $0.00 Removal of Vanity Base Cabs $0.00 $0.00 $0.00 $0.00 New Work $0.00 $0.00 New Vanity Tops $0.00 $0.00 New Vanity Base Cabs (@ 36" widths each) $0.00 $0.00 $0.00 $0.00

Division 13 - Special Construction Labor Material

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Division 14 - Conveying Equipment Labor Material

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Division 21 - Fire Suppression Labor Material

Expansion of existing system fire sprinkler system per NFPA 13

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Division 22 - Plumbing Labor Material

Plumbing fixtures and piping $0.00 $0.00 $0.00 New Work $0.00 $0.00 $0.00 Water Closet $0.00 $0.00 $0.00 Urinal $0.00 $0.00 $0.00 Lavatory $0.00 $0.00 $0.00 Shower $0.00 $0.00 $0.00 Flush valve $0.00 $0.00 $0.00 Faucet $0.00 $0.00 $0.00 Toilet Seat $0.00 $0.00 $0.00 Water Closet Support $0.00 $0.00 $0.00 Urinal Support $0.00 $0.00 $0.00 Piping - Water $0.00 $0.00 $0.00 Piping - Sanitary/vent $0.00 $0.00 $0.00 Pipe Insulation $0.00 $0.00 $0.00 Piping Support - Sanitary/Vent $0.00 $0.00 $0.00 Piping Support - Water $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Division 23 - HVAC Labor Material

Demolition

Qty Cost Qty Cost

Ductwork and Diffusers $0.00 $0.00 New Work Air-Side Components Ductwork, Diffusers Exhauat Fan $0.00 $0.00 Controls Exhaust Fan $0.00 $0.00

TAB $0.00 $0.00

Diffusers and Exhaust Fan $0.00 $0.00

Division 25 - Integrated Automation Labor Material

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Division 26 - Electrical Labor Material Demolition Qty Cost Removal of existing electrical $0.00 $0.00 $0.00 $0.00 New Work Cables #12 THHN $0.00 $0.00 $0.00 $0.00 Conduit ¾# EMT $0.00 $0.00 $0.00 $0.00 Receptables NEMA 5-20R $0.00 $0.00 $0.00 $0.00 Lighting $0.00 $0.00 $0.00 $0.00 Recessed 2x4 Troffer $0.00 $0.00 $0.00 $0.00 Downlight $0.00 $0.00 $0.00 $0.00 Vanity Lighting $0.00 $0.00 $0.00 $0.00 Miscellaneous $0.00 $0.00 $0.00 $0.00 Flush Value Connections $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

File details come from the government source that posted it. Updated .