This document is an amendment to Solicitation 36C24724R0067 for the Special Roofing Replacements project, Project No. 679-23-101. The amendment revises the price schedule in response to a Request for Information (RFI) from a previous amendment.
The solicitation is issued by the Department of Veterans Affairs (VA) Veterans Integrated Service Network 7 for the replacement of roofs on eight buildings at the Tuscaloosa VA Medical Center. The contractor shall provide all materials, supervision, and labor to complete the work, which includes carpentry, plumbing, electrical, general construction, fire piping, HVAC, and other trades. The period of performance is 365 calendar days from the date of award. The amendment provides three bid items: a base bid for all work, a deductive bid to remove work associated with the reroof of two buildings, and a second deductive bid to remove work associated with the reroof of an additional two buildings. Offerors are required to provide a detailed line-item cost breakdown by trade, including overhead, profit, bond costs, and a breakdown of general and administrative expenses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24724R0067 0003.docx | DOCX document | |
| Roof Investigation Report - all combined.pdf | ||
| 36C24724R0067 0001.docx | DOCX document | |
| Pre- Bid Site Visit 6-3-24.pdf | ||
| Drawings 679-23-101.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| Specifications - Emergency Roofing Replacement 679-23-101.pdf | ||
| Attachment 2 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING Jan 2023 Dev form.pdf | ||
| UPDATED DBA WAGES AL20240098.pdf | ||
| Attachment 1 - Experience Modification Rate Form 2022 Revised 2 2 2023.pdf | ||
| 36C24724R0067_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 679-23-101 Department of Veterans Affairs VISN 7 Network Contracting Office 3 FL Directors Office 3700 Crestwood Parkway Duluth GA 30096 Department of Veterans Affairs VISN 7 Network Contracting Office 3 FL Directors Office 3700 Crestwood Parkway Duluth GA 30096 To all Offerors/Bidders
36C24724R0067 06-18-2024
X X X
THE
PURPOSE OF THIS AMENDMENT IS TO INCLUDE THE REVISED PRICE SCHEDULE IN RESPONSE TO RFI #13 OF AMENDMENT 0001
JOYCE POWERS
CONTRACTING OFFICER
Price Offer Schedule
| Description |
| U/I |
| QTY |
| UNIT PRICE |
| TOTAL PRICE |
A. ITEM 1, BASE BID: All work shown or specified within the drawings and specifications. Work includes all trades necessary to provide a finished work environment including, but is not limited to, general construction, carpentry, plumbing, electrical, fire piping, HVAC, and other tasks.
Completion Time: 365 days from Notice to Proceed (NTP)
B. ITEM 2, DEDUCTIVE BID 1: Item 1 Base bid, except delete all work associated with the Reroof of Building 18 and Building 4.
C. ITEM 3, DEDUCTIVE BID 2: Item 2 Deduct, plus delete all work associated with the Reroof of Building 12 and Building 17.
JB
The Period of Performance includes submittal phase the completion of all punch list items.
ATTACH YOUR ITEMIZED COST BREAKDOWN
*** Offerors are to include a cost breakdown to include a detailed line-item cost breakdown (materials, labor, and equipment) by trade, include overhead, profit, bond costs and breakdown of G&A expenses inclusive of all Project Staff and General Requirements of the Prime Contractor.
679-23-101, SPECIAL ROOFING REPLACEMENT, AMENDMENT A0002
File details come from the government source that posted it. Updated .