This document includes mechanical drawings and specifications for a cardiac cath lab renovation project at a Department of Veterans Affairs medical center. The project involves removing existing cath lab equipment and replacing it with a new GE system, Stryker boom, and Cleansuite ceiling system. Chilled water, hot water, steam, and condensate piping will be installed, along with humidifiers, air handling units, and associated ductwork. Demolition and new construction will be phased to maintain lab operations.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12.511.510.59.57.46.1
AA
BB
CC
A
A.8
B.8
C
B
CHWS/R FOR NEW AHU.
CONNECT TO EXISTING
CHWS/R IN MECH ROOM
NEW
AHU-16
2 1/2"CHWS
2 1/2"CHWR
1/
2" C
H W
S
1/ 2"
C H
W R
CARDIAC CATH LAB NO. 2
AA223
ELECTRICAL
AA229
ELECTRICAL
AA230
CARDIAC CATH LAB NO. 2
OBSERVE ROOM
AA223A
SCRUB AREA
AA221
CARDIAC CATH LAB NO. 1
CONTROL ROOM
AA219
CARDIAC CATH LAB NO. 2
MECHANICAL ROOM
AA223B
CARDIAC CATH LAB NO. 1
AA205
COMPUTER ROOM
AA219A
SOILED UTILITY
AA205A SCRUB AREA
AA215
WARD SUPPLIES
AA204
MECH
AA237A
NEW COMPUTER
ROOM AHU-15
1 1/2"CHWR
1 1/2"CHWS
(E) AHU-19
(E) AHU-18
(E) AHU-17
1 1/2" CHWS/R DOWN TO
NEW AHU-16
1 1/2" CHWS/R DOWN TO
NEW AHU-15
1" HWS/R DOWN TO
NEW AHU-15
HT
1 1/2"(E)HWS
1 1/2"(E)HWR
3/ 4"
(E )H
W R
3/ 4"
(E )H
W S
1"HWS
1"HWR
CAV 1
(E) VAV
BOX
(E) VAV
BOX
(E) VAV
BOX
(E) VAV
BOX
1/
4" H
W S
1/
4" H
W R
1 1/4" HWS/R DOWN TO
NEW AHU-16
3/4"3/4"
3/4"3/4"
2"2"
1"1"
1 1/4"1 1/4"
3"3"
3/4"3/4"
T
THIS PROJECT SHALL BE PHASED. ALL WORK
EXTERNAL TO THE CATH LAB TO BE
COMPLETED IN PHASES 1-3 . ALL WORK INSIDE
THE CATH LAB SHALL BE DONE IN PHASE 4.
CONTRACTOR TO COORDINATE WITH OWNER.
ROUTE CONDENSATE PIPING FROM AHU AND
HUMIDIFIER TO FLOOR DRAIN. SEE PLUMBING
DRAWINGS FOR LOCATION.
PHASE 4 LIMITS
PHASE 4
LIMITS
PHASE 1
PHASE 1 3/
4"
H W
R 3/
4" H
W S
H-12
A. THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION
PURPOSES. THE SCALE, WHEN INDICATED IS INTENDED FOR GENERAL
REFERENCE ONLY.
B. ALL SHUTDOWNS SHALL BE COORDINATED AND APPROVED THROUGH
THE OWNERS REPRESENTATIVE AND WILL REQUIRE ADVANCE NOTICE
OF ONE WEEK. THIS TIME LENGTH MAY BE LONGER OR SHORTER FOR
SOME SHUTDOWNS AND SHALL BE AT THE OWNERS DISCRETION.
C. PROVIDE ESCUTCHEON PLATES WHERE DUCTS PENETRATE CEILINGS
OR WALLS IN AREAS EXPOSED TO VIEW. ESCUTCHEONS FOR DUCTS
SHALL BE CONSTRUCTED OF SAME MATERIAL AS DUCT. PIPE
ESCUTCHEONS SHALL BE CHROME-PLATED BRASS.
D. LEAVE A MINIMUM CLEARANCE OF 2 INCHES ABOVE DUCTS INSTALLED
IN RATED PARTITIONS TO ALLOW SPACE FOR THE GENERAL
CONTRACTOR TO SEAL THE WALL ABOVE THE DUCTS. DO NOT INSTALL
FLEXIBLE DUCT THROUGH RATED WALLS, BARRIERS OR PARTITIONS.
E. PROVIDE REMOVABLE ACCESS DOORS AT ALL MOTOR OPERATED
DAMPERS, FIRE DAMPERS, SMOKE DAMPERS, DUCT COILS, SMOKE
DETECTORS, AND SIMILAR ITEMS REQUIRING MAINTENANCE OR
ADJUSTMENT.
F. MECHANICAL CONTRACTOR SHALL REMOVE INSULATION, REPAIR DUCT
LEAKS, AND RE-INSULATE ALL EXISTING DUCT MAINS.
G. MECHANICAL CONTRACTOR SHALL INSTALL MANUAL VOLUME DAMPERS
ON ALL BRANCH DUCTWORK CONNECTIONS.
H. ANY EXISTING PIPE OR DUCT INSULATION THAT IS DAMAGED DURING
CONSTRUCTION SHALL BE REMOVED AND REPLACED WITH NEW
INSULATION TO MATCH ADJACENT INSULATION AND COVERING.
I. CONSTRUCTION DEBRIS SHALL BE REMOVED DAILY.
J. MECHANICAL CONTRACTOR SHALL RELOCATE EXISTING EQUIPMENT TO
REMAIN AS REQUIRED TO COORDINATE INSTALLATION OF NEW WORK.
K. PROVIDE TEST AND BALANCE OF EXISTING AIR AND HYDRONIC
SYSTEMS SERVING THIS AREA PRIOR TO DEMOLITION. PROVIDE
REPORT TO ENGINEER. PROVIDE TEST AND BALANCE AFTER
CONSTRUCTION PER SPECIFICATION.
GENERAL NOTES
CAP AND INSULATE PIPE.
SIZE STEAM SUPPLY PER HUMIDIFIER MANUFACTURER BETWEEN
HUMIDIFIER AND THE MANIFOLD. SLOPE PIPING PER
MANUFACTURER'S INSTRUCTIONS.
PROVIDE STEAM HUMIDIFIER DISTRIBUTION MANIFOLD IN SUPPLY
AIR DUCT.
LOCATION SHOWN FOR AHU IS APPROXIMATE. COORDINATE WITH
COR AND GE EQUIPMENT INSTALLER TO ENSURE CORRECT
SPACING AND CLEARANCE FOR ALL EQUIPMENT TO BE INSTALLED
IN THIS LOCATION.
COORDINATE PIPING IN THIS AREA WITH DUCTWORK AND ANY
OTHER ELECTRICAL AND PLUMBING WORK ABOVE CEILING WITH
THE ELECTRICAL AND PLUMBING CONTRACTOR.
COORDINATE NEW CAV 1 WITH NEW PLUMBING SINK PIPING ABOVE
CEILING.
NEW WORK KEYED NOTES
EXISTING KEYED NOTES
EXISTING 6" CHWS/R UP/DN (CHILLED WATER LOOP).
EXISTING PIPE CONTINUES OUTSIDE SCOPE OF WORK.
PROJECT LOCATION:
CARDIAC CATH LAB (2ND FLOOR)
BEE STREET
MAIN HOSPITAL ENTRANCE
BEE STREET/BRAVO STREET
MENTAL HEALTH CLINIC ENTRANCE
N
KEY PLAN
EXISTING PIPING TO REMAIN
NEW PIPE
EXISTING PIPING TO BE REMOVED
PIPE UP
FLOW ARROW
HOT WATER SUPPLY
HOT WATER RETURN
ISOLATION VALVE
NEW EQUIPMENT
EXISTING EQUIPMENT TO REMAIN
THERMOSTAT
HWS
HWR
T
SYMBOLS LEGEND
SMOKE TIGHT WALL (EXISTING)
1-HR FIRE RATED WALL (EXISTING)
2-HR FIRE RATED WALL (EXISTING)
WALL RATING LEGEND
LEAD-LINED WALL (EXISTING - MAINTAIN & PATCH AS NEEDED IN RENOVATION)
5838 Monroe Road, Suite 100 Charlotte, NC 28212
704 531 3000 Firm License Number: F-0674
Project No. 4415
Charlotte Engineers, LLP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% - CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Megan C. Day, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
Charlotte Engineers 5838 Monroe Road Charlotte, NC 28212 704-531-3000 Michael Eaves
E:
\L oc al
R ev it\
\4
- C E
C en tra l M od el
.rv t
8/
/2
:5 4:
P
M
MP-201
SECOND FLOOR - NEW WORK - PIPING CATH LAB SITE PREP at
RALPH JOHNSON VAMC
109 BEE STREET CHARLESTON, SC
534-CSI-555
MAY 08, 2020 GAT ESM
1/8" = 1'-0"1 MECHANICAL - SECOND FLOOR - NEW WORK - PIPING
Revisions: Date:
ADDENDUM 2 08/12/2020
| Sheets |
| M-004 - MECHANICAL - SCHEDULES |
| M-005 - MECHANICAL - SCHEDULES |
| MD-100 - MECHANICAL - SECOND FLOOR - DEMOLITION - DUCTWORK |
| MD-101 - MECHANICAL - SECOND FLOOR - DEMOLITION - PIPING |
| MH-200 - SECOND FLOOR - NEW WORK - DUCTWORK |
| MP-201 - SECOND FLOOR - NEW WORK - PIPING |
File details come from the government source that posted it. Updated .